CN105386452A - 沉井高压水助沉的施工方法 - Google Patents

沉井高压水助沉的施工方法 Download PDF

Info

Publication number
CN105386452A
CN105386452A CN201510667372.4A CN201510667372A CN105386452A CN 105386452 A CN105386452 A CN 105386452A CN 201510667372 A CN201510667372 A CN 201510667372A CN 105386452 A CN105386452 A CN 105386452A
Authority
CN
China
Prior art keywords
steel pipe
sinking
open caisson
pressure
caisson
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510667372.4A
Other languages
English (en)
Inventor
李耀良
王理想
袁芬
郑亮亮
卢秀丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201510667372.4A priority Critical patent/CN105386452A/zh
Publication of CN105386452A publication Critical patent/CN105386452A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

本发明涉及一种沉井高压水助沉的施工方法,其步骤:①在沉井井壁制作时,预先在井壁内两侧分布安设钢管,钢管应沿着井壁均匀安设,并应自上而下伸至刃脚处;②若遇到下沉受阻时,在每根钢管的上端口通过高压水泵向钢管内压入高压水破坏沉井刃脚内外侧的土体,减少下沉阻力;③检查沉井是否下沉到位,若未到位,应返回步骤②,直至沉井下沉到位。本发明通过在刃脚两侧高压水助沉,提高了传统助水下沉的施工效率。

Description

沉井高压水助沉的施工方法
技术领域
本发明涉及一种沉井施工方法,特别是一种适用于较硬地层中的沉井施工方法。
背景技术
沉井具有刚度大,承载力高、抗渗能力强等诸多优点,使其成为城市大型地下构筑物和深基础最重要的施工方式之一。当然沉井施工中仍然有着一些难以解决的技术问题。例如,当下沉过程中,遇到砂土、砂砾石层或者砂卵石层时,经常会出现沉井难以继续下沉的问题,目前沉井辅助下沉的措施主要包括射水下沉法,触变泥浆护壁下沉法、压重下沉法等。目前使用的沉井射水下沉法,仍存在助沉效率较低的问题,这将会拖延施工工期。本发明对射水下沉的施工部署和方法进行改进,提高了助沉效率。
发明内容
本发明是要提供一种沉井高压水助沉的施工方法,该方法对沉井射水下沉方法进行了改进,通过在刃脚内外侧预先安设钢管,借助高压水在刃脚两侧冲刷土层,能够有效减少刃脚处的下沉阻力,增大沉井的下沉系数,并且安全可靠、经济高效。
本发明的技术方案是:一种沉井高压水助沉的施工方法,包括以下步骤:
①在沉井井壁制作时,预先在井壁内两侧分布安设钢管,钢管应沿着井壁均匀安设,并应自上而下伸至刃脚处;
②若遇到下沉受阻时,在每根钢管的上端口通过高压水泵向钢管内压入高压水破坏沉井刃脚内外侧的土体,减少下沉阻力;
③检查沉井是否下沉到位,若未到位,应返回步骤②,直至沉井下沉到位。
所用钢管的直径为40mm-120mm,钢管的出水口距离刃脚底端为100mm-300mm.。
在砂土中,高压水泵向钢管内压入的高压水压为0.4-0.6MPa;在砂砾石层中,高压水泵向钢管内压入的高压水压为0.6-12MPa;在砂卵石层中,高压水泵向钢管内压入的高压水压为8-20MPa。
本发明的有益效果:通过在刃脚两侧高压水助沉,提高了传统助水下沉的施工效率。
附图说明
图1为本发明的沉井高压水助沉的施工方工艺流程图;
图2为沉井高压水助沉施工部署主剖视图;
图3为沉井高压水助沉施工部署的左剖视图;
图4为刃脚处钢管示意图。
具体实施方式
下面结合具体实施例,进一步阐述本发明。
如图1所示,一种沉井高压水助沉的施工方法,包括以下步骤:
①在沉井井壁制作时,预先在井壁内两侧分布安设钢管,钢管应沿着井壁均匀安设,并应自上而下伸至刃脚处;
②若遇到下沉受阻时,在每根钢管的上端口通过高压水泵向钢管内压入高压水破坏沉井刃脚内外侧的土体,减少下沉阻力;
③检查沉井是否下沉到位,若未到位,应返回步骤②,直至沉井下沉到位。
所用钢管的直径为40mm-120mm,钢管的出水口距离刃脚底端为100mm-300mm.。
在砂土中,高压水泵向钢管内压入的高压水压为0.4-0.6MPa;在砂砾石层中,高压水泵向钢管内压入的高压水压为0.6-12MPa;在砂卵石层中,高压水泵向钢管内压入的高压水压为8-20MPa。
黄浦江上游某原水支线工程是黄浦江上游水源地连通管工程的支线工程。本工程采用顶管工艺进行隧道施工,顶管工作井及接收井采用沉井工艺施工。该工程采取了本发明中的高压水助沉施工方法。
高压助沉施工方法流程如下:
1、根据图2,3所示,在井壁1内外两侧均匀布置外侧钢管3及内侧钢管4,外侧钢管长4.5m,内侧钢管长4m,每一根钢管经流通管道5与高压水泵6相连,流通管道为PVC管道,强度满足压力要求。钢管采用公称直径120mm的不锈刚管连接而成,钢管连接采用螺纹连接,钢管安设前,进行了强度试验和严密性试验,以防漏压。
2、钢管出水口7距离刃脚2底部200mm(见图4)。
3、由于该工程沉井刃脚处的土质为砂砾石层,因此选用的高压水压为1MPa,选用的高压水泵最大泵压为1.6MPa,满足助沉要求。高压水从外侧钢管3及内侧钢管4流出,冲刷刃脚2处的硬质土,根据工程实际情况,冲刷时间为30min,破坏了刃脚2处的土体,减少了刃脚处的下沉阻力,使沉井可以继续下沉。
4、高压水助沉措施应保证沉井可下沉至设计位置,若达不到要求,应继续采用高压水助沉,必要时,可以适度增加高压水压。
5、实际上本发明中的钢管并不需要完全启用,应根据实际情况对称使用。
6、实际上本发明中的钢管直径,布置间距及距离刃脚底端的高度应根据实际情况进行验算得到。
7、在实际过程中,在利用高压水助沉时,仍可以采用压重下沉法辅助下沉。

Claims (3)

1.一种沉井高压水助沉的施工方法,其特征在于,包括以下步骤:
①在沉井井壁制作时,预先在井壁内两侧分布安设钢管,钢管应沿着井壁均匀安设,并应自上而下伸至刃脚处;
②若遇到下沉受阻时,在每根钢管的上端口通过高压水泵向钢管内压入高压水破坏沉井刃脚内外侧的土体,减少下沉阻力;
③检查沉井是否下沉到位,若未到位,应返回步骤②,直至沉井下沉到位。
2.根据权利要求1所述的沉井高压水助沉的施工方法,其特征在于:所述钢管的直径为40mm-120mm,钢管的出水口距离刃脚底端为100mm-300mm.。
3.根据权利要求1所述的沉井高压水助沉的施工方法,其特征在于:在砂土中,高压水泵向钢管内压入的高压水压为0.4-0.6MPa;在砂砾石层中,高压水泵向钢管内压入的高压水压为0.6-12MPa;在砂卵石层中,高压水泵向钢管内压入的高压水压为8-20MPa。
CN201510667372.4A 2015-10-16 2015-10-16 沉井高压水助沉的施工方法 Pending CN105386452A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510667372.4A CN105386452A (zh) 2015-10-16 2015-10-16 沉井高压水助沉的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510667372.4A CN105386452A (zh) 2015-10-16 2015-10-16 沉井高压水助沉的施工方法

Publications (1)

Publication Number Publication Date
CN105386452A true CN105386452A (zh) 2016-03-09

Family

ID=55419185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510667372.4A Pending CN105386452A (zh) 2015-10-16 2015-10-16 沉井高压水助沉的施工方法

Country Status (1)

Country Link
CN (1) CN105386452A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735337A (zh) * 2016-03-17 2016-07-06 王燏斌 桥梁深水沉井基础施工法
CN106351211A (zh) * 2016-10-31 2017-01-25 天津港航工程有限公司 混凝土大圆筒结构及其冲水下沉的施工方法
CN108487285A (zh) * 2018-04-09 2018-09-04 大连久鼎祥瑞特种工程技术研究院有限公司 非开挖或钻进沉管、沉井或沉箱施工方法
CN109083200A (zh) * 2018-08-16 2018-12-25 温州东联市政工程有限公司 一种沉管式检查井及其施工方法
CN109469082A (zh) * 2018-11-22 2019-03-15 国家电网有限公司 一种沉井施工设备及施工方法
CN109930498A (zh) * 2019-04-09 2019-06-25 南京林业大学 一种深入河床加固桥梁竖向构件的处置方法
CN110397057A (zh) * 2019-07-31 2019-11-01 武汉市市政建设集团有限公司 一种软土区域自沉式钢沉井支护系统及方法
CN112252349A (zh) * 2020-09-11 2021-01-22 北京市市政二建设工程有限责任公司 一种沉井不排水下沉施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150210A (zh) * 1995-11-15 1997-05-21 阎林森 封底沉井法
JPH09279598A (ja) * 1996-04-10 1997-10-28 Kokune Kensetsu Kk オープンケーソンの施工法
CN2611437Y (zh) * 2003-04-09 2004-04-14 王民寿 快速沉井的井架结构装置
JP2007291618A (ja) * 2006-04-21 2007-11-08 Yamaha Kako Kensetsu Kk 沈設構造物及び沈設方法
CN101845820A (zh) * 2009-10-10 2010-09-29 中交二公局第二工程有限公司 沉井下沉的助沉施工方法
CN102182186A (zh) * 2011-04-28 2011-09-14 中交第一航务工程局有限公司 水冲助沉系统及施工技术方法
CN203795446U (zh) * 2014-04-11 2014-08-27 中国化学工程第十三建设有限公司 一种钢板混凝土沉井

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1150210A (zh) * 1995-11-15 1997-05-21 阎林森 封底沉井法
JPH09279598A (ja) * 1996-04-10 1997-10-28 Kokune Kensetsu Kk オープンケーソンの施工法
CN2611437Y (zh) * 2003-04-09 2004-04-14 王民寿 快速沉井的井架结构装置
JP2007291618A (ja) * 2006-04-21 2007-11-08 Yamaha Kako Kensetsu Kk 沈設構造物及び沈設方法
CN101845820A (zh) * 2009-10-10 2010-09-29 中交二公局第二工程有限公司 沉井下沉的助沉施工方法
CN102182186A (zh) * 2011-04-28 2011-09-14 中交第一航务工程局有限公司 水冲助沉系统及施工技术方法
CN203795446U (zh) * 2014-04-11 2014-08-27 中国化学工程第十三建设有限公司 一种钢板混凝土沉井

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐鹏飞等: "压入式沉井施工对环境影响的现场监测研究", 《岩土力学》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735337A (zh) * 2016-03-17 2016-07-06 王燏斌 桥梁深水沉井基础施工法
CN106351211A (zh) * 2016-10-31 2017-01-25 天津港航工程有限公司 混凝土大圆筒结构及其冲水下沉的施工方法
CN108487285A (zh) * 2018-04-09 2018-09-04 大连久鼎祥瑞特种工程技术研究院有限公司 非开挖或钻进沉管、沉井或沉箱施工方法
CN109083200A (zh) * 2018-08-16 2018-12-25 温州东联市政工程有限公司 一种沉管式检查井及其施工方法
CN109469082A (zh) * 2018-11-22 2019-03-15 国家电网有限公司 一种沉井施工设备及施工方法
CN109930498A (zh) * 2019-04-09 2019-06-25 南京林业大学 一种深入河床加固桥梁竖向构件的处置方法
CN110397057A (zh) * 2019-07-31 2019-11-01 武汉市市政建设集团有限公司 一种软土区域自沉式钢沉井支护系统及方法
CN110397057B (zh) * 2019-07-31 2024-05-14 武汉市市政建设集团有限公司 一种软土区域自沉式钢沉井支护系统及方法
CN112252349A (zh) * 2020-09-11 2021-01-22 北京市市政二建设工程有限责任公司 一种沉井不排水下沉施工方法

Similar Documents

Publication Publication Date Title
CN105386452A (zh) 沉井高压水助沉的施工方法
CN105297755A (zh) 沉井高压水助沉的施工设备
CN106988719B (zh) 向煤层循环注入热水和液氮的增透系统和增透方法
CN101845820B (zh) 沉井下沉的助沉施工方法
CN201650362U (zh) 可维护式隧道排水系统
CN207073410U (zh) 向煤层循环注入热水和液氮的增透系统
KR101944023B1 (ko) 지하수 관정을 활용한 복합 지중 열교환장치
CN105780792B (zh) 一种基坑高水头减压降水井封井方法及封井结构
CN103031847B (zh) 变径搭接组合式孔口管灌浆法
CN105401606A (zh) 深掏管式纠倾法及掏深装置
CN108952776A (zh) 一种等距水平定向顺层钻孔注浆改造顶底板双重灰岩的方法
CN108625388B (zh) 一种适用于浅基岩地质条件的套筒组合式大直径单桩基础及其施工方法
CN204491645U (zh) 一种深基坑降水封井装置
CN106245621A (zh) 一种电渗回灌井施工方法
CN105605335A (zh) 一种用于顶进施工的大口径预应力钢筒混凝土管
CN204676504U (zh) 一种无自流引排条件的长尾水隧洞群的放空检修结构
CN203741851U (zh) 流沙隧道全环真空降水系统
CN203768881U (zh) 一种山体、坝体廊道渗水排水装置
CN215630060U (zh) 一种可重复使用的降水井井管
CN204456024U (zh) 用于水电站输水隧洞钢衬段的接地设备
CN201406689Y (zh) 沉井的封底排水结构
CN204551551U (zh) 一种地连墙接缝渗漏检测及注浆堵漏装置
CN203475453U (zh) 桥梁深埋式承台帷幕结构
CN105887778A (zh) 一种高压隧洞附近临空面的可控排水系统
CN106958255A (zh) 一种建筑工程基坑降水用自冲式降压井

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160309