CN101845820B - 沉井下沉的助沉施工方法 - Google Patents

沉井下沉的助沉施工方法 Download PDF

Info

Publication number
CN101845820B
CN101845820B CN2009100242103A CN200910024210A CN101845820B CN 101845820 B CN101845820 B CN 101845820B CN 2009100242103 A CN2009100242103 A CN 2009100242103A CN 200910024210 A CN200910024210 A CN 200910024210A CN 101845820 B CN101845820 B CN 101845820B
Authority
CN
China
Prior art keywords
sinking
immersed tube
well
open caisson
around
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100242103A
Other languages
English (en)
Other versions
CN101845820A (zh
Inventor
沈良成
先正权
杜洪池
肖开军
梁进达
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Construction Headquarters of Changjiang Highway and Bridge
Hohai University HHU
CCCC SHEC Second Engineering Co Ltd
Original Assignee
CCCC SHEC Second Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Second Engineering Co Ltd filed Critical CCCC SHEC Second Engineering Co Ltd
Priority to CN2009100242103A priority Critical patent/CN101845820B/zh
Publication of CN101845820A publication Critical patent/CN101845820A/zh
Application granted granted Critical
Publication of CN101845820B publication Critical patent/CN101845820B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及公路桥梁施工领域,特别是一种沉井下沉的助沉施工方法,其方法步骤是:1)在距离沉井(1)的井壁外侧0.8-1.2m处绕沉井井壁外周围,均匀下设空芯助沉管;2)在每一个助沉管的上端通过空压机由管路压入高压气体使沉井四周土体松散;3)在每一个助沉管的上端重新通过高压水泵向助沉管内射入高压水破坏沉井外围土体,减小沉井下沉阻力;4)检查沉井下沉是否到位,如果没有,持续25-35分钟,如此重新返回步骤2),沉井下沉到位结束。此方法通过反复向助沉管内加入高压气体和高压水,可使沉井四周土体松散,使沉井能通过自身的重量克服土体的阻力沿预设下沉路下下沉到位。

Description

沉井下沉的助沉施工方法
技术领域
[0001] 本发明涉及公路桥梁施工领域,特别是一种沉井下沉的助沉施工方法。 技术背景
[0002] 沉井基础具有整体性强、稳定性好,有较大的承载面积,能承受较大的垂直荷载和水平荷载,且成本低、抗震性能好等诸多优点,在公路桥梁、农田水利、污水泵房、地铁竖井、 水利水电、高层建筑等领域获得了广泛的应用。由于其独特的优势,特别是在特大跨径桥梁基础中应用日益增加。
[0003] 在沉井下沉过程中,随着下沉深度的不断加大,沉井四周的侧摩阻力不断增大,沉井下沉系数逐渐减小,导致沉井后期下沉困难,甚至致使沉井无法下沉到设计位置。
发明内容
[0004] 本发明目的是提供一种能减小沉井四周的侧摩阻力,增大沉井的下沉系数,使沉井顺利下沉,达到经济、安全、高效地将沉井下沉到位的沉井下沉的助沉施工方法。
[0005] 本发明解决问题所采用的技术方案是:沉井下沉的助沉施工方法,其方法步骤是:
[0006] 1)在距离沉井的井壁外侧0. 8-1. ail处绕沉井井壁外周围,均勻下设空芯助沉管;
[0007] 2)在每一个助沉管的上端通过空压机由管路压入高压气体使沉井四周土体松散;
[0008] 3)在每一个助沉管的上端重新通过高压水泵向助沉管内射入高压水破坏沉井外围土体,减小沉井下沉阻力;
[0009] 4)检查沉井下沉是否到位,如果没有,持续25-35分钟,如此重新返回2、沉井下沉到位结束。
[0010] 所述的助沉管上端为钢管,下端为花管;花管上开设有溢出小孔。
[0011] 所述的助沉管直径为45mm-l 18mm之间。
[0012] 所述的下设空芯助沉管到刃脚底标高下0. 9m-l. Im的位置。
[0013] 所述的助沉管绕沉井井壁外周围是以间距4. 6m-5. 6m之间的任何距离下设。
[0014] 本发明的优点是:由于是在距离沉井的井壁外侧0. 8-1. an处绕沉井井壁外周围, 下设空芯助沉管到刃脚底标高下0. 9m-l. Im的位置。通过反复向助沉管内加入高压气体和高压水,可使沉井四周土体松散,使沉井能通过自身的重量克服土体的阻力沿预设下沉路下下沉到位。
附图说明
[0015] 下面结合实施例附图对本发明的实施方法做进一步说明。
[0016] 图1是本发明实施例结构示意立面图;
[0017] 图2是图1的平面图。[0018] 图中:1、沉井;2、空压机;3、高压水泵;4、管路;5、钢管;6、刃脚;7、花管;8、小孔;
9、助沉管。
具体实施方式
[0019] 实施例1
[0020] 如图1或图2所示,在距离沉井1的井壁外侧0. 8m处绕沉井1井壁外周围每隔 4. 6m,均勻下设空芯助沉管9 ;在每一个助沉管9的上端分别通过空压机2由管路4压入高压气体,高压空气通过底部花管7壁上小孔8溢出,松散四周的土体,使沉井1四周土体松散;隔大约25-35分钟,在每一个助沉管9的上端重新分别通过高压水泵3向助沉管9内射入高压水,高压水流通过底部花管7壁上小孔8射出,射出的水流从下往上流动,再次破坏四周的土体,持续25-35分钟,如此反复交叉进行,彻底破坏四周的土体,减小四周的土体的侧摩阻力,使沉管1顺利下沉。所述的助沉管9直径为100mm,下设空芯助沉管9到刃脚 6底标高下0. 9m到1. Im任意的位置。
[0021] 实施例2
[0022] 在距离沉井1的井壁外侧Im处绕沉井1井壁外周围每隔5m,均勻下设空芯助沉管 9 ;在每一个助沉管9的上端分别通过空压机2由管路4压入高压气体,高压空气通过底部花管7壁上小孔8溢出,松散四周的土体,使沉井1四周土体松散;隔大约25-35分钟,在每一个助沉管9的上端重新分别通过高压水泵3向助沉管9内射入高压水,高压水流通过底部花管7壁上小孔8射出,射出的水流从下往上流动,再次破坏四周的土体,持续25-35分钟,如此反复交叉进行,彻底破坏四周的土体,减小四周的土体的侧摩阻力,使沉管1顺利下沉。所述的助沉管直径为108mm,下设空芯助沉管9到刃脚6底标高下0. 9m到1. Im任意的位置。
[0023] 实施例3
[0024] 在距离沉井1的井壁外侧1. !处绕沉井1井壁外周围每隔5m,均勻下设空芯助沉管;在每一个助沉管9的上端分别通过空压机2由管路4压入高压气体,高压空气通过底部花管7壁上小孔8溢出,松散四周的土体,使沉井1四周土体松散;隔大约25-35分钟,在每一个助沉管9的上端重新分别通过高压水泵向助沉管内射入高压水,高压水流通过底部花管7壁上小孔8射出,射出的水流从下往上流动,再次破坏四周的土体,持续25-35分钟,如此反复交叉进行,彻底破坏四周的土体,减小四周的土体的侧摩阻力,使沉管1顺利下沉。 所述的助沉管9直径为108mm,下设空芯助沉管9到刃脚6底标高下0. 9m到1. Im任意的位置。
[0025] 实际上本发明中,助沉管9直径为45mm-118mm之间。下设空芯助沉管到刃脚6底标高下0. 9m-l. Im的位置。助沉管绕沉井1井壁外周围是以间距4. 6m_5. 6m之间的任何距离下设。这些参数的选择是根据具体情况灵活选取.
[0026] 本发明适合在深度较大的沉井中组合使用,在规模较小的沉井施工中,也可仅采用高压压气或高压射水单一方法使用,根据现场实际情况取舍。钢管的直径也可以根据情况选取,宜为45〜110mm。

Claims (3)

1.沉井下沉的助沉施工方法,其方法步骤是:1)在距离沉井(1)的井壁外侧0.8-1. ail处绕沉井(1)井壁外周围,均勻下设空芯助沉管⑶;2)在每一个助沉管(9)的上端通过空压机O)由管路(4)压入高压气体使沉井(1)四周土体松散;3)在每一个助沉管(9)的上端重新通过高压水泵(¾向助沉管(9)内射入高压水破坏沉井(1)外围土体,减小沉井下沉阻力;4)检查沉井(1)下沉是否到位,如果没有,持续25-35分钟,如此重新返回步骤2),沉井(1)下沉到位结束;所述的助沉管(9)上端为钢管(5),下端为花管(7);花管(7)上开设有溢出小孔(8);所述的下设空芯助沉管(9)到刃脚(6)底标高下0. 9m-l. Im的位置。
2.根据权利要求1所述的沉井下沉的助沉施工方法,其特征是:所述的助沉管(9)直径为45mm-l 18mm之间。
3.根据权利要求1所述的沉井下沉的助沉施工方法,其特征是:所述的助沉管绕沉井井壁外周围是以间距4. 6m-5. 6m之间的任何距离下设。
CN2009100242103A 2009-10-10 2009-10-10 沉井下沉的助沉施工方法 Active CN101845820B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100242103A CN101845820B (zh) 2009-10-10 2009-10-10 沉井下沉的助沉施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100242103A CN101845820B (zh) 2009-10-10 2009-10-10 沉井下沉的助沉施工方法

Publications (2)

Publication Number Publication Date
CN101845820A CN101845820A (zh) 2010-09-29
CN101845820B true CN101845820B (zh) 2012-01-25

Family

ID=42770620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100242103A Active CN101845820B (zh) 2009-10-10 2009-10-10 沉井下沉的助沉施工方法

Country Status (1)

Country Link
CN (1) CN101845820B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060623A (zh) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 带有降阻机构的沉井结构及干挖沉井方法
CN104975612B (zh) * 2015-06-23 2017-06-27 连卫东 水上沉井施工新工艺
CN105113530A (zh) * 2015-08-12 2015-12-02 上海市基础工程集团有限公司 高压喷射沉井助沉工艺
CN105386451A (zh) * 2015-10-16 2016-03-09 上海市基础工程集团有限公司 预防沉井二次下沉的注浆设备
CN105386452A (zh) * 2015-10-16 2016-03-09 上海市基础工程集团有限公司 沉井高压水助沉的施工方法
CN105297755A (zh) * 2015-10-16 2016-02-03 上海市基础工程集团有限公司 沉井高压水助沉的施工设备
CN108824445A (zh) * 2018-07-09 2018-11-16 上海渡舟建设工程管理咨询有限公司 一种具有围挡式泥浆平衡功能围护结构的基坑施工工法
CN109469082B (zh) * 2018-11-22 2021-07-23 国家电网有限公司 一种沉井施工设备及施工方法
CN109881697A (zh) * 2019-01-28 2019-06-14 中交第二航务工程局有限公司 一种沉井松土检侧压下沉方法
CN110144921A (zh) * 2019-06-06 2019-08-20 广东水利电力职业技术学院(广东省水利电力技工学校) 一种简易高效沉井纠偏方法

Also Published As

Publication number Publication date
CN101845820A (zh) 2010-09-29

Similar Documents

Publication Publication Date Title
CN101845820B (zh) 沉井下沉的助沉施工方法
CN204370469U (zh) 一种钻孔桩长腿导管架海上风机基础
CN105386452A (zh) 沉井高压水助沉的施工方法
CN104389318B (zh) 用于海上风电的钢砼‑钢构混合重力式基础及其施工方法
CN102409674B (zh) 布袋护壁微型桩及其施工方法
CN104120699B (zh) 钢板桩桶基人工岛护壁结构
CN205677030U (zh) 一种排水检查井回填结构
CN201261950Y (zh) 一种钢筋混凝土水池池壁上的开孔结构
CN202108045U (zh) 一种锚杆穿越地下连续墙的套管
CN201943064U (zh) 一种排水管桩
CN204185856U (zh) 新型抗浮锚索装置
CN105780806A (zh) 一种钻孔桩长腿导管架海上风机基础及其施工方法
CN206233232U (zh) 一种上、下部扩大型水泥土复合管桩
CN204608815U (zh) 筏板重力式海上风机基础
CN105297755A (zh) 沉井高压水助沉的施工设备
CN102235003B (zh) 预制混凝土管桩用扩张型钢桩尖及沉桩施工方法
RU142703U1 (ru) Винтовая свая
CN204125941U (zh) 抗拔桩结构
CN205077463U (zh) 用于发电厂的山体引水隧道结构
CN205259175U (zh) 一种下部扩大直径段复合基桩
CN104074183A (zh) 一种钻孔及根部注入砼的组合桩植桩结构及施工方法
CN201713813U (zh) 预制混凝土管桩用扩张型钢桩尖
CN205077490U (zh) 在深厚饱水砂层中防倒吸防沉淀的注浆装置
CN103485337A (zh) 抗浮锚桩施工方法
CN105908773A (zh) 海上风电场浅覆盖层地基两级嵌岩桩风机基础及施工方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CB03 Change of inventor or designer information

Inventor after: Shen Liangcheng

Inventor after: Liang Jinda

Inventor after: Wang Jinguo

Inventor after: Li Wei

Inventor after: Feng Zhaoyang

Inventor after: Zhou Zhifang

Inventor after: Xian Zhengquan

Inventor after: Du Hongchi

Inventor after: Ding Zhiqun

Inventor after: Yang Ning

Inventor after: Xiao Kaijun

Inventor after: Zhao Yanrong

Inventor before: Shen Liangcheng

Inventor before: Xian Zhengquan

Inventor before: Du Hongchi

Inventor before: Xiao Kaijun

Inventor before: Liang Jinda

Inventor before: Li Wei

TR01 Transfer of patent right

Effective date of registration: 20130609

Address after: 710119 Xi'an high tech Zone, West Avenue, No. 1 Park, No. 29

Patentee after: CCCC-SHB Second Engineering Co.,Ltd.

Patentee after: Hohai University

Patentee after: Jiangsu Construction Headquarters of Changjiang Highway and Bridge

Address before: 710119 Xi'an high tech Zone, West Avenue, No. 1 Park, No. 29

Patentee before: CCCC-SHB Second Engineering Co.,Ltd.

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SHEN LIANGCHENG XIAN ZHENGQUAN DU HONGCHI XIAO KAIJUN LIANG JINDA LI WEI TO: SHEN LIANGCHENG FENG ZHAOYANG ZHOU ZHIFANG XIAN ZHENGQUAN DU HONGCHI DING ZHIQUN YANG NING XIAO KAIJUN ZHAO YANRONG LIANG JINDA WANG JINGUO LI WEI

ASS Succession or assignment of patent right

Owner name: HEHAI UNIV. JIANGSU YANGTZE RIVER HIGHWAY + BRIDGE

Effective date: 20130609