CN201406689Y - 沉井的封底排水结构 - Google Patents

沉井的封底排水结构 Download PDF

Info

Publication number
CN201406689Y
CN201406689Y CN200920080533XU CN200920080533U CN201406689Y CN 201406689 Y CN201406689 Y CN 201406689Y CN 200920080533X U CN200920080533X U CN 200920080533XU CN 200920080533 U CN200920080533 U CN 200920080533U CN 201406689 Y CN201406689 Y CN 201406689Y
Authority
CN
China
Prior art keywords
back cover
open caisson
discharge structure
sealing
collecting well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920080533XU
Other languages
English (en)
Inventor
黄成友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CN200920080533XU priority Critical patent/CN201406689Y/zh
Application granted granted Critical
Publication of CN201406689Y publication Critical patent/CN201406689Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开了一种简单且止水效果好的沉井的封底排水结构。结构包括铺设在井底上方的沉井封底层,在井底挖有盲沟,盲沟中挖有集水井,沉井封底层中埋设有插入集水井中的抽水管道。该结构通过盲沟将水汇聚在集水井内,再利用抽水管道将水抽出,从而将大面积止水封堵转化为局部止水封堵,不仅结构简单,而且止水效果好,具有明显的经济效益。

Description

沉井的封底排水结构
技术领域
本实用新型涉及地下构筑物沉井底板止水封堵的一种施工结构,具体涉及沉井的封底排水结构。
背景技术
沉井下沉有排水法和不排水法两种。若采用排水法施工,当沉井下沉到设计标高后,就涉及到沉井封底层的止水封堵问题。针对该问题目前所采用的是大面积止水封堵技术,这种止水封堵技术难度大、花费高,处理不当易导致底板渗漏,严重时会影响构筑物的使用功能。
实用新型内容
本实用新型所解决的技术问题是:提供一种简单且止水效果好的沉井封底排水结构。
解决上述技术问题的技术方案是:沉井的封底排水结构,包括铺设在井底上方的沉井封底层,在井底挖有盲沟,盲沟中挖有集水井,沉井封底层中埋设有插入集水井中的抽水管道。
本实用新型的有益效果是:该结构通过盲沟将水汇聚在集水井内,再利用抽水管道将水抽出,从而将大面积止水封堵转化为局部止水封堵,不仅结构简单,而且止水效果好,具有明显的经济效益。
附图说明
图1为本申请沉井的封底排水结构的示意图。
图中标记为:1-集水井;2-带孔砼滤管;3-卵石盲沟;4-砂夹石滤水层;5-抽水法兰;6-钢筋砼底板;7-速凝高强砼;8-沉井壁;9-封底砼垫层。
具体实施方式
下面结合附图对本实用新型做进一步说明。
如图1所示,在井底上方铺设沉井封底层,沉井封底层从下往上由砂夹石滤水层4、封底砼垫层9以及钢筋砼底板6构成,在井底挖有盲沟3,盲沟3中挖有集水井1,沉井封底层中埋设有插入集水井1中的带孔砼滤管2,带孔砼滤管2的出口安装有抽水法兰5,抽水法兰5的出口掩埋并封堵在钢筋砼底板6中。该结构的施工过程为:当沉井壁8下降到设计标高后,在井底挖盲沟3,并用卵石进行铺设;在盲沟3铺设完成后,在盲沟3中挖集水井1,并埋设带孔砼滤管2;然后在井底铺填砂夹石滤水层4,砂夹石滤水层4起引导滤水的作用,避免泥、砂被水带出,导致局部土体垮塌;在砂夹石滤水层4铺设完成后,在带孔砼滤管2的出口安装抽水法兰5;大面积浇筑封底砼垫层9,满足沉井底抗浮的要求,方便底板测量放线;大面积浇筑浇筑钢筋砼底板6,待钢筋砼底板6的强度及抗渗等级达到设计的70%左右时,关闭抽水法兰5停止抽水,并采用速凝高强砼7将抽水法兰5的出口强行封堵,防止水渗出。该结构通过盲沟3将水汇聚在集水井1内,再利用抽水管道将水抽出,从而将大面积止水封堵转化为局部止水封堵,不仅结构简单,而且止水效果好。

Claims (7)

1、沉井的封底排水结构,包括铺设在井底上方的沉井封底层,其特征是:在井底挖有盲沟(3),盲沟(3)中挖有集水井(1),沉井封底层中埋设有插入集水井(1)中的抽水管道。
2、如权利要求1所述的沉井的封底排水结构,其特征是:所述抽水管道的出口掩埋并封堵在沉井封底层中。
3、如权利要求1或2所述的沉井的封底排水结构,其特征是:所述沉井封底层从下往上由砂夹石滤水层(4)、封底砼垫层(9)以及钢筋砼底板(6)构成。
4、如权利要求3所述的沉井的封底排水结构,其特征是:所述抽水管道的出口掩埋并封堵在钢筋砼底板(6)中。
5、如权利要求4所述的沉井的封底排水结构,其特征是:所述抽水管道的出口通过速凝高强砼(7)封堵。
6、如权利要求1、2、3、4或5所述的沉井的封底排水结构,其特征是:所述抽水管道由插入集水井(1)中的带孔砼滤管(2)以及安装在出口的抽水法兰(5)构成。
7、如权利要求1、2、3、4或5所述的沉井的封底排水结构,其特征是:所述盲沟(3)由卵石铺设而成。
CN200920080533XU 2009-04-30 2009-04-30 沉井的封底排水结构 Expired - Lifetime CN201406689Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920080533XU CN201406689Y (zh) 2009-04-30 2009-04-30 沉井的封底排水结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920080533XU CN201406689Y (zh) 2009-04-30 2009-04-30 沉井的封底排水结构

Publications (1)

Publication Number Publication Date
CN201406689Y true CN201406689Y (zh) 2010-02-17

Family

ID=41677620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920080533XU Expired - Lifetime CN201406689Y (zh) 2009-04-30 2009-04-30 沉井的封底排水结构

Country Status (1)

Country Link
CN (1) CN201406689Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088838A (zh) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 沉井封底排水装置及施工方法
CN103693176A (zh) * 2013-11-29 2014-04-02 中交第四航务工程局有限公司 一种沉箱坞门
CN115162360A (zh) * 2022-08-16 2022-10-11 山西四建集团有限公司 一种独立杯基沉井支护的施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088838A (zh) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 沉井封底排水装置及施工方法
CN103693176A (zh) * 2013-11-29 2014-04-02 中交第四航务工程局有限公司 一种沉箱坞门
CN115162360A (zh) * 2022-08-16 2022-10-11 山西四建集团有限公司 一种独立杯基沉井支护的施工方法

Similar Documents

Publication Publication Date Title
CN100516380C (zh) 基坑潜水与承压含水层一井分层联合降水的方法
CN102454167B (zh) 大型超深沉井的施工方法
CN104196034B (zh) 一种利用钢板桩作为支护围堰的基坑施工方法
CN103046565B (zh) 超深岩基深基坑降排水方法
CN105625445B (zh) 一种沿海砂土地区的基坑降水方法
CN102535441A (zh) 一种地下连续墙的施工方法
CN110004935A (zh) 一种局部深坑导流排水沟系统及施工方法
CN206448286U (zh) 一种用于降低灰场坝体浸润线的辐射井系统
CN206204972U (zh) 一种兼作井点降水的预制管桩
CN201406689Y (zh) 沉井的封底排水结构
CN103967015B (zh) 一种深基坑止水开挖方法及其结构
CN105256818A (zh) 一泵多井深基坑管井同步抽排降水装置
CN102995647B (zh) 一种桩孔注浆隔渗的地下水控制方法
CN204551510U (zh) 一种填方路基集水降压井降排水结构
CN204298837U (zh) 明、暗排水系统
CN207727514U (zh) 一种库盆防渗抗抬动结构
CN207017281U (zh) 一种大型建筑深基坑局部的降水结构
CN108755724A (zh) 综合管廊体外疏排水防水方法
CN206204981U (zh) 巨型进水口岩石地基
CN202090321U (zh) 排涝泵站前池底板置换式排水孔
CN204532379U (zh) 地铁区间隧道废水泵房预埋排水管构造
CN105568958B (zh) 变截面地下连续墙及施工方法
CN203284787U (zh) 复合式管井降水系统
CN104018488B (zh) 基于流塑状态黏性土地基打设塑料排水板的辅助装置
CN204418195U (zh) 具有止水与减沉功能的沉井

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA 19TH METALLURGICAL CORPORATION

Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD.

Effective date: 20110328

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 617000 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110328

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: CHINA 19TH METALLURGICAL GROUP Co.,Ltd.

Address before: 617000 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC SHIJIU CONSTRUCTION Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100217