CN105735337A - 桥梁深水沉井基础施工法 - Google Patents

桥梁深水沉井基础施工法 Download PDF

Info

Publication number
CN105735337A
CN105735337A CN201610151956.0A CN201610151956A CN105735337A CN 105735337 A CN105735337 A CN 105735337A CN 201610151956 A CN201610151956 A CN 201610151956A CN 105735337 A CN105735337 A CN 105735337A
Authority
CN
China
Prior art keywords
foundation
open caisson
construction
well foundation
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610151956.0A
Other languages
English (en)
Inventor
王燏斌
Original Assignee
王燏斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王燏斌 filed Critical 王燏斌
Priority to CN201610151956.0A priority Critical patent/CN105735337A/zh
Publication of CN105735337A publication Critical patent/CN105735337A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/18Foundations formed by making use of caissons

Abstract

本发明是桥梁深水沉井基础施工法,包括如下步骤:1)沉井基础1在工场制作完成后,运至施工水域,沉井基础1顶部有施工室,施工室有通向承台(桥墩)的通道和/或有与潜水器接口;2)沉井基础1内注水下沉,在重力作用下使沉井基础1底部压入土体;3)从沉井基础1与土体所形成的密闭腔体内向外排水(气),使沉井基础1在腔体内负压、顶部水压力和重力的作用下下降,直至沉井基础1下降到设定深度;4)沉井基础1封顶。本发明的优点:沉井基础1通过浮运到施工水域利用水力进行调整姿态,以水力为主要作用力将沉井基础1压入土体,沉井基础1顶面为主要承载面。结构简单,施工周期短,劳动强度低,适应更深水域的基础施工。

Description

桥梁深水沉井基础施工法
技术领域
[0001]本发明涉及的是一种桥梁深水沉井基础施工法,属于桥梁深水沉井基础施工技术领域。
背景技术
[0002]现有桥梁沉井基础施工,采用整体开挖沉井基础底面为主要承载面的结构形式,施工周期长、劳动强度大、工作环境安全度差。
发明内容
[0003]本发明提出的是一种桥梁深水沉井基础施工法,其目的旨在克服现有技术存在的缺陷,在工场制作沉井基础,通过浮运到施工水域利用水力进行调整姿态,以水力为主要作用力将沉井基础压入土体,沉井基础顶面为主要承载面。结构简单,能缩短施工周期,减轻劳动强度,且能适应更深水域的基础施工。
[0004]本发明的技术方案:桥梁深水沉井基础施工法,包括如下步骤:
1)沉井基础I在工场制作完成后,运至施工水域,沉井基础I顶部有施工室,施工室有通向承台(桥墩)的通道和/或有与潜水器接口 ;
2)沉井基础I内注水下沉,在重力作用下使沉井基础I底部压入土体;
3)从沉井基础I与土体所形成的密闭腔体内向外排水(气),使沉井基础I在腔体内负压、顶部水压力和重力的作用下下降,直至沉井基础I下降到设定深度;
4)沉井基础I封顶。
[0005]本发明的优点:沉井基础I在工场制作完成后,通过浮运到施工水域利用水力进行调整姿态,以水力为主要作用力将沉井基础I压入土体,沉井基础I顶面为主要承载面。
附图说明
[0006]图1是实施例1沉井基础I示意图。
[0007]图2是实施例1沉井基础I浮运示意图。
[0008]图3是实施例1沉井基础I示底部压入土体意图。
[0009]图4是实施例1沉井基础I下降示意图1。
[0010]图5是实施例1沉井基础I下降示意图2。
[0011 ]图6是实施例1沉井基础I调整姿态示意图1。
[0012]图7是实施例1沉井基础I调整姿态示意图2。
[0013]图8是实施例1沉井基础I调整姿态示意图3。
[0014]图9是实施例1沉井基础I调整姿态示意图4。
[0015]图10是实施例1沉井基础I下降到设定深度示意图。
[0016]图11是实施例1丨几井基础I封顶不意图。
[0017]图12是实施例2沉井基础I整体示意图。
[0018]图中的I是沉井基础;1-1是沉井体;1-2是铅直分隔板;1-3是排水(气)装置;3是桥墩。
具体实施方式
[0019]桥梁深水沉井基础施工法,包括如下步骤:
1)沉井基础I在工场制作完成后,运至施工水域,沉井基础I顶部有施工室,施工室有通向承台(桥墩)的通道和/或有与潜水器接口 ;
2)沉井基础I内注水下沉,在重力作用下使沉井基础I底部压入土体;
3)从沉井基础I与土体所形成的密闭腔体内向外排水(气),使沉井基础I在腔体内负压、顶部水压力和重力的作用下下降,直至沉井基础I下降到设定深度;
4)沉井基础I封顶。
[0020]所述的沉井基础I通过注水和排水实现沉浮。
[0021] 所述的沉井基础I浮运至施工水域。
[0022]所述的沉井基础I,包括沉井体1-1、铅直分隔板1-2、排水(气)装置1-3,其中铅直分隔板1-2安装在沉井体内,将沉井体1-1在铅直方向分隔为若干个区域,每个区域都有出水(气)口。
[0023]所述的沉井基础I的每个区域均安装有排水(气)装置1-3或合用一台排水(气)装置1-3。当沉井基础I发生倾斜时,通过调整沉井基础I内各区域内的排水(气)量来调整姿
ίέτ O
[0024]所述步骤4)中沉井基础I封顶:用灌混凝土等方法实现。
[0025]所述的沉井基础I包含桥墩3。
[0026]下面结合附图进一步描述本发明的技术方案:
实施例1:
1)如图2所示,桥梁沉井基础I在工场制作完成后加临时盖,浮运至施工水域;
2)如图3所示,沉井基础I内注水下沉,在重力作用下使沉井基础底部压入土体;
3)如图4、图5所示,从沉井基础I与土体所形成的密闭腔体内向外排水,使沉井基础I在腔体内负压、顶部水压力和重力的作用下下降;
4)如图6-图9所示,当沉井基础发生倾斜时,通过调整沉井基础内各区域内的排水量使下降多的区域负压小下降少的区域负压大,从而使下降多的区域向下总压力小下降少的区域向下总压力大来调整姿态;
5)如图10所示,重复上述步骤3)、4),直至沉井基础下降到设定深度;
6)如图11所示,沉井基础封顶:灌混凝土等方法实现。
[0027] 实施例2:
如图12所示,所述的沉井基础I包含桥墩3。

Claims (7)

1.桥梁深水沉井基础施工法,其特征是该方法包括如下步骤: I)沉井基础(I)在工场制作完成后,运至施工水域,沉井基础(I)顶部有施工室,施工室有通向承台(桥墩)的通道和/或有与潜水器接口 ; 2 )沉井基础(I)内注水下沉,在重力作用下使沉井基础(I)底部压入土体; 3)从沉井基础(I)与土体所形成的密闭腔体内向外排水(气),使沉井基础(I)在腔体内负压、顶部水压力和重力的作用下下降,直至沉井基础(I)下降到设定深度; 4)沉井基础(I)封顶。
2.根据权利要求1所述的桥梁深水沉井基础施工法,其特征在于所述的沉井基础(I)通过注水和排水实现沉浮。
3.根据权利要求2所述的桥梁深水沉井基础施工法,其特征在于所述的沉井基础(I)浮运至施工水域。
4.根据权利要求1所述的桥梁深水沉井基础施工法,其特征在于所述的沉井基础(I),包括沉井体(1-1)、铅直分隔板(1-2)、排水(气)装置(1-3),其中铅直分隔板(1-2)安装在沉井体内,将沉井体(1-1)在铅直方向分隔为若干个区域,每个区域都有出水(气)口。
5.根据权利要求4所述的桥梁深水沉井基础施工法,其特征在于所述的沉井基础(I)的每个区域均安装有排水(气)装置(1-3)或合用一台排水(气)装置(1-3), 当沉井基础(I)发生倾斜时,通过调整沉井基础(I)内各区域内的排水(气)量来调整姿ίέτ O
6.根据权利要求1所述的桥梁深水沉井基础施工法,其特征在于所述步骤4)中沉井基础(I)封顶:用灌混凝土等方法实现。
7.根据权利要求1所述的桥梁深水沉井基础施工法,其特征在于所述的沉井基础(I)包含桥墩(3)。
CN201610151956.0A 2016-03-17 2016-03-17 桥梁深水沉井基础施工法 Pending CN105735337A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610151956.0A CN105735337A (zh) 2016-03-17 2016-03-17 桥梁深水沉井基础施工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610151956.0A CN105735337A (zh) 2016-03-17 2016-03-17 桥梁深水沉井基础施工法

Publications (1)

Publication Number Publication Date
CN105735337A true CN105735337A (zh) 2016-07-06

Family

ID=56250647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610151956.0A Pending CN105735337A (zh) 2016-03-17 2016-03-17 桥梁深水沉井基础施工法

Country Status (1)

Country Link
CN (1) CN105735337A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087701A (zh) * 2016-08-10 2016-11-09 上海市城市建设设计研究总院 高架桥梁和地下综合管廊合建结构
CN109944267A (zh) * 2019-03-20 2019-06-28 中铁大桥勘测设计院集团有限公司 打入式桥梁深水沉井和桥梁基础及施工方法
CN110387898A (zh) * 2019-06-26 2019-10-29 中交第二航务工程局有限公司 低渗透性土层舱内水位调控沉井姿态方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002371568A (ja) * 2001-06-15 2002-12-26 Kajima Corp 立坑と立坑の構築工法及びその装置
CN1730842A (zh) * 2005-09-07 2006-02-08 天津大学 软基箱筒型基础结构海上气浮拖运和定位下沉安装方法
CN102900090A (zh) * 2011-07-29 2013-01-30 邹宗煊 一种防涌水防地面下沉不倾斜干作业沉井及其施工方法
CN103205978A (zh) * 2013-04-18 2013-07-17 成军 高渗透层水位下电梯基坑沉井胎模施工方法
CN105386452A (zh) * 2015-10-16 2016-03-09 上海市基础工程集团有限公司 沉井高压水助沉的施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002371568A (ja) * 2001-06-15 2002-12-26 Kajima Corp 立坑と立坑の構築工法及びその装置
CN1730842A (zh) * 2005-09-07 2006-02-08 天津大学 软基箱筒型基础结构海上气浮拖运和定位下沉安装方法
CN102900090A (zh) * 2011-07-29 2013-01-30 邹宗煊 一种防涌水防地面下沉不倾斜干作业沉井及其施工方法
CN103205978A (zh) * 2013-04-18 2013-07-17 成军 高渗透层水位下电梯基坑沉井胎模施工方法
CN105386452A (zh) * 2015-10-16 2016-03-09 上海市基础工程集团有限公司 沉井高压水助沉的施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087701A (zh) * 2016-08-10 2016-11-09 上海市城市建设设计研究总院 高架桥梁和地下综合管廊合建结构
CN106087701B (zh) * 2016-08-10 2017-09-12 上海市城市建设设计研究总院(集团)有限公司 高架桥梁和地下综合管廊合建结构
CN109944267A (zh) * 2019-03-20 2019-06-28 中铁大桥勘测设计院集团有限公司 打入式桥梁深水沉井和桥梁基础及施工方法
CN110387898A (zh) * 2019-06-26 2019-10-29 中交第二航务工程局有限公司 低渗透性土层舱内水位调控沉井姿态方法
CN110387898B (zh) * 2019-06-26 2021-01-26 中交第二航务工程局有限公司 低渗透性土层舱内水位调控沉井姿态方法

Similar Documents

Publication Publication Date Title
CN105735337A (zh) 桥梁深水沉井基础施工法
JP5342300B2 (ja) 採取装置及び水底資源の採取方法
WO2019071933A1 (zh) 粉砂质海洋天然气水合物砾石吞吐开采方法及开采装置
CN103883796B (zh) 泥砂淤泥区手掘式顶管施工装置及方法
CN104762981A (zh) 一种降水井的成孔方法
CN107023026A (zh) 一种封底式沉井井壁及施工方法
CN103643690A (zh) 一种深基坑勘探孔涌水处理方法
CN104196488B (zh) 水下勘探孔封孔工艺
CN104727325B (zh) 一种海涂围垦用海堤的建造方法
CN206128099U (zh) 一种新型降水井封井装置
CN106988317A (zh) 一种用于地下综合管廊地基处理方法
CN106638647A (zh) 一种沉井水下封底方法及沉井
CN203978442U (zh) 一种公铁合建水下隧道
CN210086275U (zh) 一种双壁中空沉井基础
CN204098050U (zh) 一种控制承压水降水系统
CN107724420B (zh) 一种用于粉土海床的吸力桶型基础结构及其安装方法
CN103669333B (zh) 便于真空降水的抗滑桩
CN105604083A (zh) 桥梁深水沉井基础施工法
CN206457835U (zh) 一种沉井
RU172738U1 (ru) Устройство для изготовления буронабивной сваи
CN107780420B (zh) 铸造机下液压活塞井的施工方法
CN103556647A (zh) 一种软土地质旋流池井字形加强沉井及施工方法
CN106245621B (zh) 一种电渗回灌井施工方法
CN104594369B (zh) 喀斯特地区高压群孔置换灌浆方法及其结构
KR101630522B1 (ko) 프리로딩을 위한 석션기초 및 그 시공방법

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160706

RJ01 Rejection of invention patent application after publication