CN105373895A - Green building power distribution management system - Google Patents
Green building power distribution management system Download PDFInfo
- Publication number
- CN105373895A CN105373895A CN201510820407.3A CN201510820407A CN105373895A CN 105373895 A CN105373895 A CN 105373895A CN 201510820407 A CN201510820407 A CN 201510820407A CN 105373895 A CN105373895 A CN 105373895A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- processing module
- data set
- management system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a green building power distribution management system. The green building power distribution management system includes a data acquisition module, a data storage module, a data processing module, a data set establishment module, a data set processing module, a loading module, a data warehouse and an algorithm processing module; the data storage module and the data acquisition module are in control connection; the data acquisition module is connected with the data processing module; the loading module is in control connection with the data warehouse and the algorithm processing module; and the loading module is connected with the data set establishment module through the data set processing module. According to the green building power distribution management system provided by the invention, a large quantity of initial data are cleared, and recorded data associated with analysis factors are extracted according to the characteristics of the safe operation of a power distribution system, and the recorded data are loaded to the data warehouse, and then, corresponding mining algorithm processing is performed on the recorded data, and required information can be obtained, and therefore, support can be provided for the application of the data of the power distribution system to green building operating management and environmental monitoring and the like.
Description
Technical field
The present invention relates to a kind of green building management devices, particularly relate to green building Distribution Management System.
Background technology
Energy-saving and emission-reduction are national strategy policies, develop low-carbon economy especially, keep the only way of national economy sustainable development.The power producer that electric power operates as national economy is major fields and the main force of energy-saving and emission-reduction.Along with China's sustained and rapid development of economy, the green offfice building that unit concentrates, the density of population is large become a lot of landscape in city, its power consumption characteristics establishes the large-scale current consuming apparatus such as central air conditioner, express elevator, watch-dog, office facility, modern communications facility in being, power consumption is very big.Thus, the distribution in research friendly building is energy-conservation and operation management technology is significant for the energy-saving and emission-reduction of building.
Summary of the invention
The technical matters that the present invention mainly solves how to pass through the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: provide green building Distribution Management System, comprise: data acquisition module, data memory module, data processing module, data set sets up module, for carrying out the data set processing module for the treatment of and analyses to data set, loading module, data warehouse and algorithm processing module, wherein, control linkage between described data memory module and data acquisition module, described data acquisition module is connected with between data processing module, described loading module and data warehouse, control linkage between algorithm processing module, described loading module is connected to data set by data set processing module and sets up module.
In a preferred embodiment, collecting unit, retrieval unit, integral unit and screening unit is included in described data processing module, described collecting unit, retrieval unit, control linkage successively between integral unit and screening unit, described screening unit is connected to data set and sets up module.
In a preferred embodiment, described architectural electric management system is also provided with intelligent analysis module, and described intelligent analysis module between described data set processing module, loading module, and described data set processing module, to communicate to connect between loading module.
The invention has the beneficial effects as follows: by the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of green building Distribution Management System one specific embodiment of the present invention.
Embodiment
Be clearly and completely described to the technical scheme in the embodiment of the present invention below, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
Refer to Fig. 1, green building Distribution Management System is provided in one particular embodiment of the present invention, described green building Distribution Management System comprises: data acquisition module, data memory module, data processing module, data set sets up module, for carrying out the data set processing module for the treatment of and analyses to data set, loading module, data warehouse and algorithm processing module, wherein, control linkage between described data memory module and data acquisition module, described data acquisition module is connected with between data processing module, described loading module and data warehouse, control linkage between algorithm processing module, described loading module is connected to data set by data set processing module and sets up module.
Include collecting unit, retrieval unit, integral unit and screening unit in described data processing module, described collecting unit, retrieval unit, control linkage successively between integral unit and screening unit, described screening unit is connected to data set and sets up module.Described architectural electric management system is also provided with intelligent analysis module, and described intelligent analysis module between described data set processing module, loading module, and described data set processing module, to communicate to connect between loading module.
In a specific embodiment, first data mining obtains and stores data, carries out data acquisition, retrieval and integration, and screen data according to demand in large data, comprise denoising, sampling, filtration, merging, standardization etc. and remove redundancy and redundant data, set up pending data set.Then data set processed and analyze, comprise the process such as linear, non-linear, factorial analysis, time series analysis, linear regression, variable curve, bavariate statistics and analyze, according to certain way, data are classified, and analyze the relation etc. between data and between classification.Then, by the various algorithm models in Data Mining, intellectual analysis is carried out to the electrical equipment fault data of electrical network, service data, by the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
Data acquisition module described in literary composition, data memory module, data processing module, data set set up all functional modules and the unit such as module, data set processing module, loading module, data warehouse and algorithm processing module, collecting unit, retrieval unit, integral unit and screening unit, be device of the prior art, as long as can realize corresponding function just can, structurally do not limited.
Therefore, the present invention has the following advantages: by the cleaning to a large amount of primary data, the related record data with analytical factor are extracted according to the feature that power distribution system secure runs, be loaded into data warehouse, then it is carried out to the process of corresponding mining algorithm, obtain the information needed, for the application of intelligent distribution system data in green building operation management and environmental monitoring etc. provides support.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.
Claims (3)
1. green building Distribution Management System, it is characterized in that, comprise: data acquisition module, data memory module, data processing module, data set sets up module, for carrying out the data set processing module for the treatment of and analyses to data set, loading module, data warehouse and algorithm processing module, wherein, control linkage between described data memory module and data acquisition module, described data acquisition module is connected with between data processing module, described loading module and data warehouse, control linkage between algorithm processing module, described loading module is connected to data set by data set processing module and sets up module.
2. green building Distribution Management System according to claim 1, it is characterized in that, collecting unit, retrieval unit, integral unit and screening unit is included in described data processing module, described collecting unit, retrieval unit, control linkage successively between integral unit and screening unit, described screening unit is connected to data set and sets up module.
3. green building Distribution Management System according to claim 1, it is characterized in that, described architectural electric management system is also provided with intelligent analysis module, described intelligent analysis module between described data set processing module, loading module, and described data set processing module, to communicate to connect between loading module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510820407.3A CN105373895A (en) | 2015-11-24 | 2015-11-24 | Green building power distribution management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510820407.3A CN105373895A (en) | 2015-11-24 | 2015-11-24 | Green building power distribution management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105373895A true CN105373895A (en) | 2016-03-02 |
Family
ID=55376074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510820407.3A Pending CN105373895A (en) | 2015-11-24 | 2015-11-24 | Green building power distribution management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105373895A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101075304A (en) * | 2006-05-18 | 2007-11-21 | 河北全通通信有限公司 | Method for constructing decision supporting system of telecommunication industry based on database |
CN104484734A (en) * | 2014-11-17 | 2015-04-01 | 国家电网公司 | Low-carbon city energy optimized configuration data center architecture |
CN105069690A (en) * | 2015-06-11 | 2015-11-18 | 国家电网公司 | Power grid operating data processing method |
CN205230111U (en) * | 2015-11-24 | 2016-05-11 | 苏州科技学院 | Green building distribution management system |
-
2015
- 2015-11-24 CN CN201510820407.3A patent/CN105373895A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101075304A (en) * | 2006-05-18 | 2007-11-21 | 河北全通通信有限公司 | Method for constructing decision supporting system of telecommunication industry based on database |
CN104484734A (en) * | 2014-11-17 | 2015-04-01 | 国家电网公司 | Low-carbon city energy optimized configuration data center architecture |
CN105069690A (en) * | 2015-06-11 | 2015-11-18 | 国家电网公司 | Power grid operating data processing method |
CN205230111U (en) * | 2015-11-24 | 2016-05-11 | 苏州科技学院 | Green building distribution management system |
Non-Patent Citations (1)
Title |
---|
李德仁 等: "智慧城市中的大数据", 《武 汉 大 学 学 报 信 息 科 学 版》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204022161U (en) | A kind of elevator management system for internet of things | |
CN107330056B (en) | Wind power plant SCADA system based on big data cloud computing platform and operation method thereof | |
CN110378809A (en) | A kind of intelligent check method of supervisory control of substation information table information data | |
CN104715340A (en) | Cloud computing energy management system and method based on green energy resources | |
CN103544652A (en) | Power grid industry classification load automatic statistical method and system | |
CN202837985U (en) | GPRS-communication based remote online monitoring system for sewage treatment equipment | |
CN105303316A (en) | National power grid distribution network fault processing system | |
CN100550564C (en) | Electric power system transient stability and thermally-stabilised coordination emergency control method | |
CN108183814B (en) | Troubleshooting method and device for communication channel of electricity utilization information acquisition system | |
CN105634122A (en) | Ammeter remote control system | |
CN205230111U (en) | Green building distribution management system | |
CN104156888A (en) | Power system operation risk monitoring method based on comprehensive risk evaluation model | |
CN105608637A (en) | Substation equipment model topology-based wiring diagram automatic generation method | |
CN104317868A (en) | Control integration method based on single-front and multi-SCADA (Supervisory Control and Data Acquisition) application | |
CN105373895A (en) | Green building power distribution management system | |
CN111556108A (en) | Cloud platform-based electric power big data acquisition system and method | |
CN105631552A (en) | Power distribution automation engineering economic benefit assessment method based on whole life cycle | |
CN102030022A (en) | Track traffic management device and method | |
CN204355078U (en) | A kind of track traffic signal control convenience | |
CN106600129A (en) | Power grid planning method and system | |
CN204179747U (en) | A kind of power grid accident automatic analysis process system | |
CN204557090U (en) | Energy forecast and intelligent maintenance system | |
CN109118385A (en) | Urban distribution network status data modeling method and system towards big data | |
CN205246804U (en) | Power distribution network failure locating device | |
CN204190490U (en) | A kind of guarantor's level platform power information synthetical collection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160302 |
|
RJ01 | Rejection of invention patent application after publication |