- CN105371887B CN105371887B CN201410402822.2A CN201410402822A CN105371887B CN 105371887 B CN105371887 B CN 105371887B CN 201410402822 A CN201410402822 A CN 201410402822A CN 105371887 B CN105371887 B CN 105371887B
- Authority
- CN
- China
- Prior art keywords
- egr
- slave
- main control
- control device
- survey
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Small-Scale Networks (AREA)
Abstract
The invention discloses a kind of multi-station cyclic test device, it includes main control device, the triggering EGR in main control device, sends EGR, looks into survey EGR, confirms EGR and reset EGR and multiple slaves being connected with main control device information;When there is slave to send status message, triggering EGR can receive and check for other and send, and transmission EGR has sent measurement information and has detected whether each slave receives, and look into and survey EGR and can receive the data message of each slave passback, detect whether each slave returns simultaneously, and confirm the reception data message of EGR, and check that aforementioned operation completes information to judge and send, reset foregoing each EGR by replacement EGR again and sent and observe and predict information for user's viewing, production capacity framework and subordinate can quickly be increased by thereby reaching the present invention, and increase Validity Test amount, and improve test speed and efficiency.
Description
Technical field
The present invention relates to a kind of test device, a kind of multi-station cyclic test device is particularly related to.
Background technology
Existing multistation detection device includes single main frame and multiple detection means being connected with main frame,
And by main frame computing and the detection data of display detection means, thereby increase detectable amount to accelerate detection speed,
But when detection data are transmitted to main frame by multiple detection means simultaneously, the computing capability of main frame is influenced whether
Computing detects the speed of data, or even occurs computing capability and can't bear load and postpone, pause or when the situation of machine, and existing multistation
Detection device is to control each detection means to act one by one synchronously to be detected one by one when action, so when any detection dress
Then stop totally when putting generation exception, thus it is quite inefficent, while working as the detection means that main frame to be changed is connected
During quantity, software(Main frame)Setting and hardware(Connection of the main frame with detection means and therebetween)Configuration all needs weight
It is new set-mounted, so fairly cumbersome.
Therefore, the problem of how solving above-mentioned existing and missing, as phase of the present invention applicant with being engaged in the industry
Shutout business is desired most ardently where the direction that research improves.
The content of the invention
It can quickly increase production capacity framework and subordinate, and increase Validity Test amount it is an object of the invention to provide one kind, and
Improve the multi-station cyclic test device of test speed and efficiency.
In order to reach above-mentioned purpose, solution of the invention is:
A kind of multi-station cyclic test device, it includes:One main control device;Multiple slaves, each slave and master control
Facility information is linked;The one triggering EGR in main control device, the triggering EGR is for receiving each slave hair
The status message gone out, and detect whether each slave sends status message;The one transmission circulation dress in main control device
Put, the transmission EGR has sent measurement information for receiving the status message of triggering EGR to each slave, and examines
Survey whether each slave receives;One looks into survey EGR in main control device, and this is looked into survey EGR reception transmission and followed
A measurement information for loop device, and each slave is received according to a data message for measurement information passback, and detect that each slave is
No passback;The one confirmation EGR in main control device, the confirmation EGR, which is received, looks into the data letter for surveying EGR
Breath, and check triggering EGR, send EGR and look into and survey the working condition of EGR judge whether terminating
It is detected, and is sent and completed information;The one replacement EGR in main control device, the replacement EGR is finished receiving
Information, and reset triggering EGR, send EGR, look into the working condition surveyed EGR and confirm EGR, and
Send and observe and predict information for user's viewing.
Message sense is connected to an at least measuring instrument to each slave respectively.
The measuring instrument detected according to foregoing measurement information, and according to testing result return aforementioned data information to it is each from
Belong to equipment.
The main control device is with each slave via Ethernet Info Link.
The main control device is computer with each slave.
After said structure, when any slave of the invention sends status message, triggering EGR can be received
Status message, and rechecking whether there is other slaves and send status message, and status message is passed into transmission circulation
Device, sends EGR and has then sent measurement information to each slave and be confirmed whether to receive, until whole slaves are all
Untill receiving, and measurement information has been sent to looking into survey EGR, and look into survey EGR and then receive each slave and survey letter according to rising
The data message for obtaining and returning from each measuring instrument is ceased, and checks whether each slave returns, until each slave is equal
Untill passback, and survey EGR meeting transfer data information is looked into EGR is confirmed, confirm that EGR can check that triggering is followed
Loop device, transmission EGR and the working condition for looking into survey EGR, to judge whether that end trigger EGR, transmission are followed
Loop device and the action for looking into each slave of survey EGR detection, and replacement EGR is given by data information transfer, and weigh
EGR is put then to reset triggering EGR, send EGR, look into the work shape surveyed EGR and confirm EGR
State, and send according to data message and to observe and predict information and watched for user.Only needed when the quantity of slave to be changed directly and master control
Equipment is connected, and via triggering EGR, is sent EGR, looks into survey EGR, confirmation EGR and is reset circulation control
System, by above-mentioned technology, easy generation that can be present in existing multistation detection device postpones, paused or when the feelings of machine
Shape, and detect it is inefficent, and become connection the troublesome problem points of quantity broken through, production capacity framework and portion can quickly be increased by reaching
Category, and increase Validity Test amount, improve test speed and efficiency.
Brief description of the drawings
Fig. 1 is the implementation schematic diagram of present pre-ferred embodiments;
Fig. 2 is the structure block schematic diagram of present pre-ferred embodiments;
Fig. 3 is the triggering block schematic diagram of present pre-ferred embodiments;
Fig. 4 is the transmission block schematic diagram of present pre-ferred embodiments;
Fig. 5 is the detection block schematic diagram of present pre-ferred embodiments;
Fig. 6 is the confirmation block schematic diagram of present pre-ferred embodiments;
Fig. 7 is the replacement block schematic diagram of present pre-ferred embodiments.
Wherein:
The triggering EGR 11 of main control device 1 sends EGR 12
Look into survey EGR 13 and confirm that EGR 14 resets EGR 15
The measuring instrument 4 of 2 slave of Ethernet 3.
Embodiment
In order to which technical scheme is explained further, the present invention is explained in detail below by specific embodiment
State.
Refer to shown in Fig. 1, Fig. 2, the implementation schematic diagram and structure block schematic diagram of present pre-ferred embodiments, in figure
It can be seen that the present invention includes a main control device 1, multiple via Ethernet 2(Ethernet)With the message sense of main control device 1
The slave 3 connect(In figure exemplified by 2)And multiple measuring instruments 4 respectively with each Info Link of slave 3, wherein main
Control equipment 1 and each slave 3 be linked in computer, and main control device 1 provided with mutual information a triggering EGR 11,
One transmission EGR 12, one looks into survey EGR 13, one and confirms that EGR 14 and one resets EGR 15, above are only
One of them embodiment of the present invention, its aspect is not limited in this.
Please coordinate simultaneously refering to shown in Fig. 1 to Fig. 7, triggering EGR 11 can continue to detect each slave 3 whether there is through
By processing routine or detector(Do not indicated in figure)Any status message is sent Deng interoperation, and triggering EGR 11 can be by
This status message is transferred to transmission EGR 12, and continues to detect other slaves 3 whether there is and send status message, until receiving
Status message to whole slaves 3 can just stop detection(Circulate start).
Measurement information then has been sent to each subordinate according to this status message when sending EGR 12 and receiving status message
Equipment 3 and survey EGR 13 is looked into, and persistently detected whether to receive more status messages and detected whether measurement information has
Each slave 3 is sent to, the status message of whole slaves 3 is received until sending EGR 12 and has sent survey
Information to whole slave 3 can just stop detection(Circulate start).
And each slave 3 starts the measuring instrument 4 each linked when having received measurement information and measured, and each measuring instrument
Device 4 gives each slave 3 according to measurement return data information, and carries out computing in each slave 3.
Survey EGR 13 is looked into have received and then receive each data message of the slave 3 through computing after measurement information, and by number
It is believed that breath passes to confirmation EGR 14, look into survey EGR 13 and be consistently detected for up to receive whole slaves 3
Data message can just stop detection(Circulate start).
Confirm that EGR 14 is received start to confirm triggering EGR 11 after data message, send EGR 12 and look into
The working condition of EGR 13 is surveyed, detection is not yet stopped if being found to transmission EGR 12 or looking into survey EGR 13(Follow
Ring start), information transmission still is carried out with each slave 3, then is persistently confirmed and is waited EGR 12 to be sent and look into survey circulation
Device 13 stops detection(Circulate start);
If being found to triggering EGR 11 not yet stops detection(Circulate start), then judge not send status message from
Belong to the current stateless message of equipment 3 can be transmitted, this slave 3 can be neglected;
When triggering EGR 11, the working condition for sending EGR 12 and looking into survey EGR 13 are in stopping inspection
Survey(Circulate start)When, as each slave 3 is completed to measure and returned with each measuring instrument 4(Without negligible), confirm
EGR 14 then terminates to triggering EGR 11, transmission EGR 12 and the detection for looking into survey EGR 13, and according to complete
The data message in portion sends completion information to replacement EGR 15.
Reset EGR 15 receive completion information after then reset the triggering EGR 11, send EGR 12,
The working condition surveyed EGR 13 and confirm EGR 14 is looked into, and information is observed and predicted for user's viewing according to delivering is completed.
Therefore, the present invention connects multiple slaves 3 come in addition to lifting Validity Test amount except a reliable main control device 1, by
By triggering EGR 11, EGR 12 is sent, survey EGR 13, confirmation EGR 14 is looked into and resets EGR 15
Coordinate start, detected with parallel endless form, so sending the time of status message between each slave 3 can be neglected
Difference, only needs to set up slave 3 and measuring instrument 4 in addition to lift test speed and efficiency, and during amount detection to be increased, and
Directly it is connected with main control device 1, by triggering EGR 11, transmission EGR 12, looks into survey EGR 13, confirmation circulation dress
Put 14 and reset EGR 15 and control, therefore can quickly increase production capacity framework and subordinate.
Therefore, multi-station cyclic test device of the present invention is that the key that can improve prior art is:
1st, by triggering EGR 11, send EGR 12, look into survey EGR 13, confirm EGR 14 and again
Put EGR 15 to be engaged, production capacity framework and the progress of subordinate and increase Validity Test amount can quickly be increased by reaching the present invention
Property.
2nd, by triggering EGR 11, send EGR 12, look into survey EGR 13, confirm EGR 14 and again
Put EGR 15 to be engaged, the present invention is reached the progressive for improving test speed and efficiency.
Above-described embodiment and schema and non-limiting product form of the invention and style, any art it is common
Appropriate change or modification that technical staff is done to it, all should be regarded as not departing from the patent category of the present invention.
Claims (5)
1. a kind of multi-station cyclic test device, it includes:
One main control device;
Multiple slaves, each slave and main control device Info Link;
The one triggering EGR in main control device, the triggering EGR disappears for receiving the state that each slave is sent
Breath, and detect whether each slave sends status message;
The one transmission EGR in main control device, the transmission EGR disappears for receiving the state of triggering EGR
Breath, and measurement information has been sent to each slave, and detect whether each slave receives;
One looks into survey EGR in main control device, and this, which is looked into, surveys the measurement information that EGR receives transmission EGR,
And each slave is received according to a data message for measurement information passback, and detect whether each slave returns;
The one confirmation EGR in main control device, the confirmation EGR receives the data message looked into and survey EGR,
And check triggering EGR, send EGR and look into and survey the working condition of EGR judge whether terminating its inspection
Survey, and send and complete information;
The one replacement EGR in main control device, the replacement EGR finishes receiving information, and resets triggering circulation
Device, send EGR, look into survey EGR and confirm EGR working condition, and send observe and predict information for user sight
See.
2. multi-station cyclic test device as claimed in claim 1, it is characterised in that:Each slave difference Info Link
There is an at least measuring instrument.
3. multi-station cyclic test device as claimed in claim 2, it is characterised in that:The measuring instrument is according to foregoing measurement information
Detected, and aforementioned data information is returned to each slave according to testing result.
4. multi-station cyclic test device as claimed in claim 1, it is characterised in that:The main control device is passed through with each slave
By Ethernet Info Link.
5. multi-station cyclic test device as claimed in claim 1, it is characterised in that:The main control device is with each slave
Computer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410402822.2A CN105371887B (en) | 2014-08-14 | 2014-08-14 | Multi-station cyclic test device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410402822.2A CN105371887B (en) | 2014-08-14 | 2014-08-14 | Multi-station cyclic test device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105371887A CN105371887A (en) | 2016-03-02 |
CN105371887B true CN105371887B (en) | 2017-08-29 |
Family
ID=55374291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410402822.2A Active CN105371887B (en) | 2014-08-14 | 2014-08-14 | Multi-station cyclic test device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105371887B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05344565A (en) * | 1992-06-05 | 1993-12-24 | Toshiba Corp | Plant monitoring system |
JP2004328472A (en) * | 2003-04-25 | 2004-11-18 | Toshiba Corp | Master station and slave station in communication system |
CN101482748A (en) * | 2008-11-19 | 2009-07-15 | 上海大学 | Novel remote monitoring system |
CN102333003A (en) * | 2010-07-12 | 2012-01-25 | 熊猫电子集团有限公司 | Simulation test system of data casting distribution network |
CN202693749U (en) * | 2012-05-18 | 2013-01-23 | 全智科技股份有限公司 | Structure of RFIC (Radio Frequency Integrated Circuit) staggered classification test |
CN102915265A (en) * | 2011-08-01 | 2013-02-06 | 鸿富锦精密工业(深圳)有限公司 | BMC (baseboard management controller) loop test method and system |
CN203490294U (en) * | 2013-08-23 | 2014-03-19 | 全智科技股份有限公司 | High power multi-port measurement apparatus |
CN203491224U (en) * | 2013-08-23 | 2014-03-19 | 全智科技股份有限公司 | High-efficiency multi-level test device |
CN103873301A (en) * | 2014-03-20 | 2014-06-18 | 浙江宇视科技有限公司 | System and method for automatically finding and adding devices |
-
2014
- 2014-08-14 CN CN201410402822.2A patent/CN105371887B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05344565A (en) * | 1992-06-05 | 1993-12-24 | Toshiba Corp | Plant monitoring system |
JP2004328472A (en) * | 2003-04-25 | 2004-11-18 | Toshiba Corp | Master station and slave station in communication system |
CN101482748A (en) * | 2008-11-19 | 2009-07-15 | 上海大学 | Novel remote monitoring system |
CN102333003A (en) * | 2010-07-12 | 2012-01-25 | 熊猫电子集团有限公司 | Simulation test system of data casting distribution network |
CN102915265A (en) * | 2011-08-01 | 2013-02-06 | 鸿富锦精密工业(深圳)有限公司 | BMC (baseboard management controller) loop test method and system |
CN202693749U (en) * | 2012-05-18 | 2013-01-23 | 全智科技股份有限公司 | Structure of RFIC (Radio Frequency Integrated Circuit) staggered classification test |
CN203490294U (en) * | 2013-08-23 | 2014-03-19 | 全智科技股份有限公司 | High power multi-port measurement apparatus |
CN203491224U (en) * | 2013-08-23 | 2014-03-19 | 全智科技股份有限公司 | High-efficiency multi-level test device |
CN103873301A (en) * | 2014-03-20 | 2014-06-18 | 浙江宇视科技有限公司 | System and method for automatically finding and adding devices |
Also Published As
Publication number | Publication date |
---|---|
CN105371887A (en) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104897260B (en) | A kind of intelligent vehicle dynamic weighing system | |
JP2013077279A5 (en) | Information processing system, information processing apparatus, information processing method, and program | |
EP4254909A3 (en) | Remote monitoring of analyte measurements | |
IN2014DN10164A (en) | ||
CN109670707A (en) | A kind of management method of automatic vending machine, apparatus and system | |
Zafar et al. | Defining best supportive care. | |
CN105371887B (en) | Multi-station cyclic test device | |
CN103969125B (en) | Based on distributed frame gas cylinder hydrostatic test outside measurement system and method | |
CN112036526B (en) | Electronic tag device and corresponding data processing method, device and system thereof | |
CN103020756B (en) | Instrument management informatization platform system and control method | |
JP2017510012A5 (en) | ||
JP2011018239A5 (en) | Network system, processing method, and computer program | |
NZ627527A (en) | Method and system for measurement of resource meters | |
CN107064757B (en) | Partial discharge of transformer intellectualized detection device and method based on multisensor | |
JP2017505929A5 (en) | ||
CN105890810A (en) | Setting method for temperature detecting equipment and grain condition detecting system | |
CN201928984U (en) | Tobacco leaf multi-station weighing and formulating system | |
CN109862511A (en) | Fence area monitoring method, device and computer readable storage medium | |
CN105204966B (en) | A kind of electronic equipment and information processing method | |
CN103313088A (en) | Comprehensive detection platform for digital video monitoring systems and detection method | |
CN209485514U (en) | A kind of glazing weighing-appliance | |
CN202748648U (en) | Steel coil real-time monitoring system in industrial production reservoir area | |
CN105589433A (en) | Remote monitoring system of belt conveyor | |
TW201823886A (en) | Monitoring system, monitoring method and server | |
CN204536446U (en) | A kind of comprehensive protector monitor station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |