CN103020756B CN201210489695.5A CN201210489695A CN103020756B CN 103020756 B CN103020756 B CN 103020756B CN 201210489695 A CN201210489695 A CN 201210489695A CN 103020756 B CN103020756 B CN 103020756B
Authority
CN
China
Prior art keywords
instrument
urge
equipment
computing machine
money
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210489695.5A
Other languages
Chinese (zh)
Other versions
CN103020756A (en
Inventor
宋进良
宋崇辉
李为兵
张艳
王舟宁
孙长河
周洁
智元庆
刘化
邢凯
边春元
宋国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cpi Northeast New Energy Development Co ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Original Assignee
CPINORTHEAST NEW ENERGY DEVELOPMENT Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CPINORTHEAST NEW ENERGY DEVELOPMENT Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd, Shenyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd filed Critical CPINORTHEAST NEW ENERGY DEVELOPMENT Co Ltd
Priority to CN201210489695.5A priority Critical patent/CN103020756B/en
Publication of CN103020756A publication Critical patent/CN103020756A/en
Application granted granted Critical
Publication of CN103020756B publication Critical patent/CN103020756B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to full automatic smart instrumentation management system, particularly relate to a kind of instrument management informatization platform system and control method.Hardware components of the present invention comprises master server, backup server, gigabit switch, gigabit Ethernet, calibration calculation machine, receives and dispatches computing machine, urges money computing machine a, urges and get computing machine b, outbound computing machine, communication interface, digital standards equipment, barcode scanner, network facsimile machine, the network printer, protocol converter, electric instrument; Wherein master server and backup server form redundant system; Gigabit Ethernet as communication network, by the network switch respectively by server end run instrument management informatization platform system terminal calibration calculation machine, receive and dispatch computing machine, urge money computing machine a, urge get computing machine b, outbound computing machine couples together.The present invention can ensure the accuracy of calibrating department management system, has efficient, that safe, operation is simple remarkable characteristic.

Description

Instrument management informatization platform system and control method
Technical field
The present invention relates to full automatic smart instrumentation management system, particularly relate to a kind of instrument management informatization platform system and control method.
Background technology
Instrument is for the equipment of network system, circuits etc. are accurate, efficiently, safe operation serves supervisory role, in order to can be comprehensive, careful, supervise network system accurately, each generating plant, transformer station has all introduced correlate meter equipment to calibrate supervision, and the availability of these instrumentations and accuracy need authoritative department to admit just can obtain practical application to carry out detection, and detect complete instrument and there is the term of validity, before the deadline, each company needs that overdue instrument is delivered to authoritative department again and detects, therefore, the numerous censorship instrument of calibrating department in the face of institute's pipe area are often had more visitors or business than one can attend to.Meanwhile, the mode of instrument check department original adoption hand-kept, brings great inconvenience to the supervision of instrument, management.
Summary of the invention
The present invention is directed to above-mentioned problems of the prior art, provide a kind of instrument management informatization platform system and control method.Object is accurate, efficient, the safety in order to ensure calibrating department management system, adopts the method that B/S framework combines with C/S framework, and a kind of gauge management system based on finite states machine control provided.
The technical solution adopted for the present invention to solve the technical problems is:
Instrument management informatization platform system, is characterized in that: hardware comprises master server, backup server, gigabit switch, gigabit Ethernet, calibration calculation machine, receives and dispatches computing machine, urges money computing machine a, urges and get computing machine b, outbound computing machine, communication interface, digital standards equipment, barcode scanner, network facsimile machine, the network printer, protocol converter, electric instrument composition;
Wherein, master server and backup server form redundant system; Gigabit Ethernet as communication network, by the network switch respectively by server end run instrument management informatization platform system terminal calibration calculation machine, receive and dispatch computing machine, urge money computing machine a, urge get computing machine b, outbound computing machine couples together;
Calibration calculation machine carries out robotization by communication interface and digital standards equipment and is connected, and digital standards equipment recycling protocol converter is from being dynamically connected and detecting electric instrument;
Transmitting-receiving computing machine by communication interface with automatically control barcode scanner and be connected;
Urge money computing machine a, urge and get computing machine b and be connected with network facsimile machine with the network printer respectively with outbound computing machine;
Software comprises: instrument transceiver module, instrument calibration module, instrument urge money module, instrument urges delivery block, instrument goes out library module.
Described instrument transceiver module uses VB6.0 to write formation local software, and with SQLSERVER2005 DataBase combining, forming data can share with Web platform.
Described instrument transceiver module is, the inspection every annual meeting in list position receives the instrument to be checked sent to by detection zone, place power plant, after equipment is sent to, will be carried out the Data Enter of censorship instrument, and instrument is distributed to concrete verification worker by calibrating unit instrument mail clerk.If the instrument that new unit sends here, need by the essential information typing web platform of the instrument of the unit essential information of new unit, unit censorship, system generates bar code automatically, be pasted on after being printed by bar code printer on equipment, this equipment will use this bar code from now on like this, if bar code is lost, then can be found the bar code of loss by the web platform inquiry model of relevant device, factory number, and print.Mail clerk by unit and facility information typing complete, open the instrument receive-transmit system of VB6.0 exploitation, barcode machine is connected with PC, use hand-held bar code machine typing bar code, be uploaded to receive-transmit system, be added into storage bill, now, new equipment enters storage bill, then, mail clerk prints the contract of authorization and device label, and finally, equipment will be distributed by mail clerk.Transmitting-receiving flow process as shown in Figure 4.
Described instrument calibration module is: after instrument is distributed to different verification workers according to instrument by mail clerk, verification worker enters respective test page according to different authorities, can see one's ownly having examined and not examining instrument.Verification worker, after laboratory verification instrument, logs in the verification worker page, can fill in the notice of surveys book of this equipment, and print certificate.
Described instrument urges money module to be: urge money person to log in web platform, urge money interface if there is urge money state be 0 equipment, paying in unit information table and payee's information table by filling in respectively, generating paying-in slip, and urge money file printout by relevant and post.Urge money flow process as shown in Figure 6.
Described instrument urges delivery block: if equipment needs to pay in complete, then examine and determine unit and can make equipment and urge and get selection, after mail clerk notifies that table is got by censorship unit, will " urge and get selection " field to elect as " urged and having got ".
Described instrument goes out library module: when table is got by censorship unit, does outbound process by mail clerk to warehouse-in instrument.
The control method of instrument management informatization platform system is: mail clerk uses barcode machine to be put in storage by equipment bar code scan, device-dependent message is inserted storage bill by VB program, after equipment Print Label and the contract of authorization, equipment is carried out discharge device according to verification classification by mail clerk, puts complete can qualification in storage; Verification worker enters verification worker interface according to authority, will the complete device data copying platform of calibrating, examines and determine completely can urge money; Urge money person that complete for inspection equipment is carried out urging money, print paying-in slip, invoice, urge complete can the urging of money to get; Urge getting and completed by mail clerk, urge after taking and corresponding state of getting of urging is retained; Treat that censorship unit pays the bill and takes equipment away, this equipment and outbound confirm.
The present invention compared with prior art, can ensure the accuracy of calibrating department management system, and also have distinguishing feature efficient, safe, simple to operate, easy simultaneously.The present invention is that the method adopting B/S framework to combine with C/S framework realizes,
Below in conjunction with specific embodiments of the invention and accompanying drawing, the present invention is described in detail.
Accompanying drawing explanation
Fig. 1 is structured flowchart of the present invention;
Fig. 2 is working interface of the present invention;
Fig. 3 is working state figure of the present invention;
Fig. 4 is the transmitting-receiving process flow diagram of transceiver module in the present invention;
Fig. 5 is the verifying process flow figure of instrument assay module in the present invention;
Fig. 6 be in the present invention instrument urge money module urge money process flow diagram;
Fig. 7 is instrument outbound block flow diagram in the present invention.
In figure: draw together master server 1, backup server 2, gigabit switch 3, gigabit Ethernet 4, calibration calculation machine 5, transmitting-receiving computing machine 6, urge money computing machine a7, urge and get computing machine b8, outbound computing machine 9, communication interface 10, digital standards equipment 11, barcode scanner 12, network facsimile machine 13 network printer 14, protocol converter 15, electric instrument 16.
Embodiment
The present invention is a kind of instrument management informatization platform system and control method.Instrument management platform of the present invention adopts MicrosoftServer2003 operating system, SQLSERVER2005 database, combine with C/S framework based on B/S framework, be provided with instrument transceiver module, instrument detection module, instrument urges money module, instrument urges delivery block, instrument goes out library module.When instrument to be checked is delivered to Electric Power Research Institute by power plant, instrument to be checked will be logged management platform, receive and dispatch, detect, urge the states such as money (create meter status machine and carry out state observation) or specifying information whole process are carried out typing by authority staff at different levels and are checked, simple and convenient management, intelligence.
Wherein, instrument transceiver module uses VB6.0 to write formation local software, and with SQLSERVER2005 DataBase combining, forming data can share with Web platform.
The instrument management informatization platform system that instrument management platform of the present invention is run by server apparatus, the network equipment, server end is formed.This system is core with server apparatus, take LAN as transmitting carrier, and the instrument management informatization platform system terminal run by server end by the network equipment is coupled together.
Wherein, server apparatus comprises the server program of computer system as server and upper operation thereof; The network equipment is the procotol of networking equipment and upper operation thereof; The instrument management informatization platform system that server end runs is instrument transceiver module, instrument calibration module, instrument urge money module, instrument urges delivery block, instrument goes out library module.
1, instrument management plateform system structured flowchart of the present invention, as shown in Figure 1.Its hardware components comprises: master server 1, backup server 2, gigabit switch 3, gigabit Ethernet 4, calibration calculation machine 5, transmitting-receiving computing machine 6, urge money computing machine a7, urge get computing machine b8, outbound computing machine 9, communication interface 10, digital standards equipment 11, barcode scanner 12, network facsimile machine 13, the network printer 14, protocol converter 15, electric instrument 16 form;
Wherein, this system take server apparatus as core, and master server 1 and backup server 2 form redundant system, carry out Hot Spare, improve system stability to system data, ensures that data are not lost.Gigabit Ethernet 4 as communication network, by the network switch 3 respectively by server end run instrument management informatization platform system terminal calibration calculation machine 5, transmitting-receiving computing machine 6, urge money computing machine a7, urge get computing machine b8, outbound computing machine 9 couples together.
Calibration calculation machine 5 carries out robotization by communication interface 10 with digital standards equipment 11 and is connected, and digital standards equipment 11 recycles protocol converter 15 from being dynamically connected and detecting electric instrument 16;
Transmitting-receiving computing machine 6 by communication interface 10 with automatically control barcode scanner 12 and be connected;
Urge money computing machine a7, urge and get computing machine b8 and be connected with network facsimile machine 13 with the network printer 14 respectively with outbound computing machine 9, and take the network printer (14) print data according to system current state respectively, application network facsimile recorder (13) sends information.
Software section of the present invention comprises: instrument transceiver module, instrument calibration module, instrument urge money module, instrument urges delivery block, instrument goes out library module.
2, the working interface of this Novel meter management platform system as shown in Figure 2.
3, data transmission.
After client user logs in LAN (Local Area Network), the information of display server on the client, user can check, typing, deletion data, and can the reception server information of sending and pass to server info.Server reads the information in SQLSERVER database, data can be passed to client, receive the information that client passes over while more new database.The server info hung on network can be shared by gigabit Ethernet by server, and by Ethernet by data message display on the user computer, can make real-time the checking, revise status information of user.
4, instrument management informatization platform system.
Mail clerk uses barcode machine to be put in storage by equipment bar code scan, and device-dependent message is inserted storage bill by VB program, and after equipment Print Label and the contract of authorization, equipment is carried out discharge device according to verification classification by mail clerk, puts complete can qualification in storage; Verification worker enters verification worker interface according to authority, will the complete device data copying platform of calibrating, examines and determine completely can urge money; Urge money person that complete for inspection equipment is carried out urging money, print paying-in slip, invoice, urge complete can the urging of money to get; Urge getting and completed by mail clerk, urge after taking and corresponding state of getting of urging is retained; Treat that censorship unit pays the bill and takes equipment away, this equipment and outbound confirm.System prevailing operating state machine as shown in Figure 3.
5, instrument transceiver module.
The inspection every annual meeting in list position receives the instrument to be checked sent to by detection zone, place power plant, after equipment is sent to, will be carried out the Data Enter of censorship instrument, and instrument is distributed to concrete verification worker by calibrating unit instrument mail clerk.If the instrument that new unit sends here, need by the essential information typing web platform of the instrument of the unit essential information of new unit, unit censorship, system generates bar code automatically, be pasted on after being printed by bar code printer on equipment, this equipment will use this bar code from now on like this, if bar code is lost, then can be found the bar code of loss by the web platform inquiry model of relevant device, factory number, and print.Mail clerk by unit and facility information typing complete, open the instrument receive-transmit system of VB6.0 exploitation, barcode machine is connected with PC, use hand-held bar code machine typing bar code, be uploaded to receive-transmit system, be added into storage bill, now, new equipment enters storage bill, then, mail clerk prints the contract of authorization and device label, and finally, equipment will be distributed by mail clerk.Transmitting-receiving flow process as shown in Figure 4.
6, instrument calibration module.
After instrument is distributed to different verification workers according to instrument by mail clerk, verification worker enters respective test page according to different authorities, can see one's ownly having examined and not examining instrument.Verification worker, after laboratory verification instrument, logs in the verification worker page, can fill in the notice of surveys book of this equipment, and print certificate.Verifying process flow as shown in Figure 5.
7, instrument urges money module.
Urge money person to log in web platform, urge money interface if there is urge money state be 0 equipment, paying in unit information table and payee's information table by filling in respectively, generating paying-in slip, and urge money file printout by relevant and post.Urge money flow process as shown in Figure 6.
8, instrument urges delivery block.
If equipment needs to pay in complete, then examine and determine unit and can make equipment and urge and get selection, after mail clerk notifies that table is got by censorship unit, will " urge and get selection " field to elect as " urged and having got ".
9, instrument goes out library module.
When table is got by censorship unit, by mail clerk, outbound process is done to warehouse-in instrument.
10, instrument goes out library module.
When table is got by censorship unit, by mail clerk, outbound process is done to warehouse-in instrument, in detail as shown in Figure 7.
The control method of instrument management informatization platform system of the present invention is: mail clerk uses barcode machine to be put in storage by equipment bar code scan, device-dependent message is inserted storage bill by VB program, after equipment Print Label and the contract of authorization, equipment is carried out discharge device according to verification classification by mail clerk, puts complete can qualification in storage; Verification worker enters verification worker interface according to authority, will the complete device data copying platform of calibrating, examines and determine completely can urge money; Urge money person that complete for inspection equipment is carried out urging money, print paying-in slip, invoice, urge complete can the urging of money to get; Urge getting and completed by mail clerk, urge after taking and corresponding state of getting of urging is retained; Treat that censorship unit pays the bill and takes equipment away, this equipment and outbound confirm.

Claims (2)

1. instrument management informatization platform system, it is characterized in that: hardware components comprises master server (1), backup server (2), gigabit switch (3), gigabit Ethernet (4), calibration calculation machine (5), transmitting-receiving computing machine (6), urge money computing machine a (7), urge and get computing machine b (8), outbound computing machine (9), communication interface (10), digital standards equipment (11), barcode scanner (12), network facsimile machine (13), the network printer (14), protocol converter (15), electric instrument (16) forms,
Wherein, master server (1) and backup server (2) form redundant system; Gigabit Ethernet (4) as communication network, by the network switch (3) respectively by server end run instrument management informatization platform system terminal calibration calculation machine (5), transmitting-receiving computing machine (6), urge money computing machine a (7), urge get computing machine b (8), outbound computing machine (9) couples together;
Calibration calculation machine (5) carries out robotization by communication interface (10) with digital standards equipment (11) and is connected, and digital standards equipment (11) recycling protocol converter (15) is certainly dynamically connected and detects electric instrument (16);
Transmitting-receiving computing machine (6) by communication interface (10) with automatically control barcode scanner (12) and be connected;
Urge money computing machine a (7), urge and get computing machine b (8) and be connected with network facsimile machine (13) with the network printer (14) respectively with outbound computing machine (9);
Software section comprises: instrument transceiver module, instrument calibration module, instrument urge money module, instrument urges delivery block, instrument goes out library module;
Described instrument transceiver module uses VB6.0 to write formation local software, and with SQLSERVER2005 DataBase combining, forming data can share with Web platform;
Described instrument transceiver module is, the inspection every annual meeting in list position receives the instrument to be checked sent to by detection zone, place power plant, after equipment is sent to, will be carried out the Data Enter of censorship instrument, and instrument is distributed to concrete verification worker by calibrating unit instrument mail clerk; If the instrument that new unit sends here, need by the essential information typing web platform of the instrument of the unit essential information of new unit, unit censorship, system generates bar code automatically, be pasted on after being printed by bar code printer on equipment, this equipment will use this bar code from now on like this, if bar code is lost, then can be found the bar code of loss by the web platform inquiry model of relevant device, factory number, and print; Mail clerk by unit and facility information typing complete, open the instrument receive-transmit system of VB6.0 exploitation, barcode machine is connected with PC, use hand-held bar code machine typing bar code, be uploaded to receive-transmit system, be added into storage bill, now, new equipment enters storage bill, then, mail clerk prints the contract of authorization and device label, and finally, equipment will be distributed by mail clerk;
Described instrument calibration module is: after instrument is distributed to different verification workers according to instrument by mail clerk, verification worker enters respective test page according to different authorities, can see one's ownly having examined and not examining instrument; Verification worker, after laboratory verification instrument, logs in the verification worker page, can fill in the notice of surveys book of this equipment, and print certificate;
Described instrument urges delivery block: described instrument urges money module to be: urge money person to log in web platform, urge money interface if there is urge money state be 0 equipment, unit information table and payee's information table is paid in by filling in respectively, generate paying-in slip, and urge money file printout by relevant and post;
If equipment needs to pay in complete, then examine and determine unit and can make equipment and urge and get selection, after mail clerk notifies that table is got by censorship unit, will " urge and get selection " field to elect as " urged and having got ";
Described instrument goes out library module: when table is got by censorship unit, does outbound process by mail clerk to warehouse-in instrument.
2. the control method of instrument management informatization platform system according to claim 1, it is characterized in that: mail clerk uses barcode machine to be put in storage by equipment bar code scan, device-dependent message is inserted storage bill by VB program, after equipment Print Label and the contract of authorization, equipment is carried out discharge device according to verification classification by mail clerk, puts complete can qualification in storage; Verification worker enters verification worker interface according to authority, will the complete device data copying platform of calibrating, examines and determine completely can urge money; Urge money person that complete for inspection equipment is carried out urging money, print paying-in slip, invoice, urge complete can the urging of money to get; Urge getting and completed by mail clerk, urge after taking and corresponding state of getting of urging is retained; Treat that censorship unit pays the bill and takes equipment away, this equipment and outbound confirm.
CN201210489695.5A 2012-11-27 2012-11-27 Instrument management informatization platform system and control method Active CN103020756B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210489695.5A CN103020756B (en) 2012-11-27 2012-11-27 Instrument management informatization platform system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210489695.5A CN103020756B (en) 2012-11-27 2012-11-27 Instrument management informatization platform system and control method

Publications (2)

Publication Number Publication Date
CN103020756A CN103020756A (en) 2013-04-03
CN103020756B true CN103020756B (en) 2016-02-24

Family

ID=47969338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210489695.5A Active CN103020756B (en) 2012-11-27 2012-11-27 Instrument management informatization platform system and control method

Country Status (1)

Country Link
CN (1) CN103020756B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109886425A (en) * 2018-07-24 2019-06-14 广东电网有限责任公司 A kind of with no paper electrical measurement inspection bench sheet of instruments system
CN109447193A (en) * 2018-09-07 2019-03-08 徐州树袋熊电子科技有限公司 A kind of integrated management system for meter network exploitation
CN110907598A (en) * 2019-11-06 2020-03-24 太原科技大学 One-network communication detection system for coal mine safety instrument and meter detection center equipment
CN111221946A (en) * 2019-12-14 2020-06-02 国网辽宁省电力有限公司电力科学研究院 Instrument and meter management control system, device and method based on GPS module
CN111738631B (en) * 2020-08-25 2021-01-26 北京康斯特仪表科技股份有限公司 Instrument management system, management platform, industrial instrument and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144854A (en) * 2007-08-10 2008-03-19 陕西银兴电力电子科技有限公司 Electrical energy metering automatic verification integrative management platform system
CN101957947A (en) * 2010-09-03 2011-01-26 深圳市科陆电子科技股份有限公司 Web-based system and method for managing electric meter seal
CN102521682A (en) * 2011-11-28 2012-06-27 安徽省电力公司滁州供电公司 Comprehensive management system for vehicles
CN102760255A (en) * 2012-07-19 2012-10-31 福建省电力有限公司福州电业局 Underground power network data management and power network planning system and management method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101144854A (en) * 2007-08-10 2008-03-19 陕西银兴电力电子科技有限公司 Electrical energy metering automatic verification integrative management platform system
CN101957947A (en) * 2010-09-03 2011-01-26 深圳市科陆电子科技股份有限公司 Web-based system and method for managing electric meter seal
CN102521682A (en) * 2011-11-28 2012-06-27 安徽省电力公司滁州供电公司 Comprehensive management system for vehicles
CN102760255A (en) * 2012-07-19 2012-10-31 福建省电力有限公司福州电业局 Underground power network data management and power network planning system and management method

Also Published As

Publication number Publication date
CN103020756A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN103020756B (en) Instrument management informatization platform system and control method
CN103593634B (en) A kind of identity card identifier network is concentrated and is solved code system and coding/decoding method thereof
CN102005065B (en) Handheld inspection device of maintenance and operation system for equipment and method thereof
CN108665330B (en) Method and device for monitoring order in service link
CN108182479A (en) Equipment point-detecting method, device and server
CN106781057B (en) Intelligent electric energy meter supplements the method that fault detection system and detection processing supplement failure with money with money
CN104376081A (en) Data application processing system, handhold terminal and on-site checking data processing system
CN106485298A (en) A kind of equipment routing inspection maintaining method based on Quick Response Code
CN106991483B (en) A kind of implementation for examining detection applied to special equipment
CN204856196U (en) Intelligent production line process control system of bearing thing networking
CN104166827B (en) Transaction processing system based on Quick Response Code and the method for processing business based on Quick Response Code
CN101620698A (en) Integrated system of test detection, management and monitoring and method
CN105225071A (en) Based on the power communication identity management method of Quick Response Code
CN106502219A (en) A kind of bearing Internet of Things intelligence fabrication line process control system
CN108665198B (en) Method and device for performing assessment in service link
CN101840545A (en) Integrated system and method for test detection, management and monitoring
CN102043986A (en) Online processing system for abnormal electricity information transferring and application method of system
CN109242145B (en) Batch alternate field operation method, device and system for electric energy meters
CN102480383B (en) A kind of log information message processing method and device
CN108646990A (en) A kind of cloud print client management system
CN109447193A (en) A kind of integrated management system for meter network exploitation
CN107563671A (en) A kind of enterprise's test and appraisal planning service system based on internet
CN104008194B (en) A kind of electric energy meter rotation data handling system based on PDA
CN103617500A (en) Operation and maintenance method of substation device
CN110111002A (en) Tobacco monopolization site intelligent checking method, device and electronic equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190703

Address after: 110 000 Siping Street 39-7, Heping District, Shenyang City, Liaoning Province

Co-patentee after: CHINA POWER INPUT NORTHEAST NEW ENERGY CHAOYANG WIND POWER CO., LTD.

Patentee after: Liaoning Electric Power Co., Ltd.Electric Power Science Research Institute

Co-patentee after: Liaoning Shenyang Electric Power Supply Co., Ltd.

Co-patentee after: State Grid Corporation of China

Address before: 11 006 No. 39-7 Siping Street, Heping District, Shenyang City, Liaoning Province

Co-patentee before: CPINORTHEAST New Energy Development Co., Ltd.

Patentee before: Liaoning Electric Power Co., Ltd.Electric Power Science Research Institute

Co-patentee before: Liaoning Shenyang Electric Power Supply Co., Ltd.

Co-patentee before: State Grid Corporation of China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200701

Address after: 39-7 Siping Street, Heping District, 110000, Liaoning, Shenyang

Co-patentee after: CPI Northeast New Energy Development Co.,Ltd.

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF LIAONING ELECTRIC POWER Co.,Ltd.

Co-patentee after: LIAONING SHENYANG ELECTRIC POWER SUPPLY Co.,Ltd.

Co-patentee after: State Grid Corporation of China

Address before: 39-7 Siping Street, Heping District, 110000, Liaoning, Shenyang

Co-patentee before: CHINA POWER INPUT NORTHEAST NEW ENERGY CHAOYANG WIND POWER Co.,Ltd.

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF LIAONING ELECTRIC POWER Co.,Ltd.

Co-patentee before: LIAONING SHENYANG ELECTRIC POWER SUPPLY Co.,Ltd.

Co-patentee before: State Grid Corporation of China

TR01 Transfer of patent right