CN105371887A - Multi-station circulation testing device - Google Patents

Multi-station circulation testing device Download PDF

Info

Publication number
CN105371887A
CN105371887A CN201410402822.2A CN201410402822A CN105371887A CN 105371887 A CN105371887 A CN 105371887A CN 201410402822 A CN201410402822 A CN 201410402822A CN 105371887 A CN105371887 A CN 105371887A
Authority
CN
China
Prior art keywords
circulating device
slave
circulation
information
main control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410402822.2A
Other languages
Chinese (zh)
Other versions
CN105371887B (en
Inventor
严自陵
徐毓堃
贺云朋
陈良波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Giga Solution Tech Co Ltd
Original Assignee
Giga Solution Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Giga Solution Tech Co Ltd filed Critical Giga Solution Tech Co Ltd
Priority to CN201410402822.2A priority Critical patent/CN105371887B/en
Publication of CN105371887A publication Critical patent/CN105371887A/en
Application granted granted Critical
Publication of CN105371887B publication Critical patent/CN105371887B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Small-Scale Networks (AREA)

Abstract

The invention discloses a multi-station circulation testing device which comprises the components of a master control device, a circulation triggering device arranged in the master control device, a circulation transmitting device, a circulation detecting device, a circulation confirming device, a circulation resetting device, and a plurality of auxiliary devices which are in information connection with the master control device. When an auxiliary device transmits state information, the circulation triggering device receives the state information and checks whether other auxiliary device transmits the state information. The circulation transmitting device transmits testing starting information and detects whether each auxiliary device receives the testing starting information. The circulation detecting device receives data information which is transmitted back from each auxiliary device and simultaneously detects whether each auxiliary device performs backward transmission. The circulation confirming device receives the data information and checks the operation for determining and transmitting finishing information. The circulation resetting device resets each circulation device and transmits detecting information for viewing by a user. Therefore the multi-station circulation testing device has advantages of quickly improving capacity configuration and deposition, enlarging an effective test amount and improving testing speed and efficiency.

Description

Multi-station cyclic proving installation
Technical field
The present invention relates to a kind of proving installation, refer to a kind of multi-station cyclic proving installation especially.
Background technology
Existing multistation checkout equipment includes single main frame and multiple pick-up unit be connected with main frame, and by main frame computing and the detection data showing pick-up unit, increase detectable amount by this and accelerate detection speed, but when detection data are passed to main frame by multiple pick-up unit simultaneously, the computing power of main frame can have influence on the speed that computing detects data, even there is computing power can't bear load and postpone, pause or the situation when machine, and existing multistation checkout equipment when action be control each pick-up unit one by one action synchronously detect one by one, so then stop when arbitrary pick-up unit occurs abnormal totally, therefore it is quite inefficent, simultaneously when the quantity of the pick-up unit for changing main frame connection, software (main frame) setting and hardware (main frame and pick-up unit and connection therebetween) configure and all need to reinstall setting, so quite bother.
Therefore, how to solve above-mentioned existing problem and disappearance, be present invention applicant be engaged in the industry relevant manufactures desire most ardently the place, direction studied and improve.
Summary of the invention
The object of the present invention is to provide one can increase production capacity framework and subordinate fast, and increase Validity Test amount, and improve the multi-station cyclic proving installation of test speed and efficiency.
In order to reach above-mentioned purpose, solution of the present invention is:
A kind of multi-station cyclic proving installation, it comprises: a main control equipment; Multiple slave, each slave and main control equipment Info Link; One is located at the trigger cycle device in main control equipment, and this trigger cycle device for receiving the status message that sends of each slave, and detects each slave and whether sends status message; Whether one is located at the transmission circulating device in main control equipment, and this transmission circulating device for the status message receiving trigger cycle device, and has sent measurement information to each slave, and detect each slave and receive; One is located at and looks into survey circulating device in main control equipment, this look into survey circulating device receive send circulating device play measurement information, and receive each slave and comply with the data message that measurement information returns, and detect each slave and whether return; One is located at the confirmation circulating device in main control equipment, this confirmation circulating device receives the data message looked into and survey circulating device, and check trigger cycle device, send circulating device and look into survey circulating device duty to carry out judging whether that terminating it detects, and sent information; One is located at the replacement circulating device in main control equipment, and this replacement circulating device finishes receiving information, and the duty resetting trigger cycle device, send circulating device, look into survey circulating device and confirmation circulating device, and send information of observing and predicting for user's viewing.
Described each slave respectively message sense is connected at least one surveying instrument.
Described surveying instrument detects according to aforementioned measurement information, and gives each slave according to testing result passback aforementioned data information.
Described main control equipment and each slave are via Ethernet Info Link.
Described main control equipment and each slave are computing machine.
After adopting said structure, when any slave of the present invention sends status message, trigger cycle device meeting accepting state message, and rechecking sends status message with or without other slaves, and status message is passed to transmission circulating device, send circulating device then sent measurement information to each slave and be confirmed whether reception, till all slave all receives, and sent measurement information to looking into survey circulating device, look into and survey circulating device and then receive each slave and complied with measurement information and obtain and the data message returned from each surveying instrument, and check whether each slave returns, till each slave all returns, and look into survey circulating device meeting transfer data information to confirming circulating device, confirm that circulating device can check trigger cycle device, send circulating device and look into the duty surveying circulating device, to judge whether end trigger circulating device, send circulating device and look into and survey the action that circulating device detects each slave, and give replacement circulating device by data information transfer, reset circulating device and then reset trigger cycle device, send circulating device, look into the duty surveyed circulating device and confirm circulating device, and send information of observing and predicting for user's viewing according to data message.Only need directly to be connected with main control equipment when wish changes the quantity of slave, via trigger cycle device, transmission circulating device, look into and survey circulating device, confirmation circulating device and reset cycle control, above technology, can for the easy situation postponing, pause or work as machine existing for existing multistation checkout equipment, and detect inefficent, and become the troublesome problem points of number of connection and broken through, reach and can increase production capacity framework and subordinate fast, and increase Validity Test amount, improve test speed and efficiency.
Accompanying drawing explanation
Fig. 1 is the enforcement schematic diagram of present pre-ferred embodiments;
Fig. 2 is the structure block schematic diagram of present pre-ferred embodiments;
Fig. 3 is the triggering block schematic diagram of present pre-ferred embodiments;
Fig. 4 is the transmission block schematic diagram of present pre-ferred embodiments;
Fig. 5 is the detection block schematic diagram of present pre-ferred embodiments;
Fig. 6 is the confirmation block schematic diagram of present pre-ferred embodiments;
Fig. 7 is the replacement block schematic diagram of present pre-ferred embodiments.
Wherein:
Main control equipment 1 trigger cycle device 11 sends circulating device 12
Look into survey circulating device 13 and confirm that circulating device 14 resets circulating device 15
Ethernet 2 slave 3 surveying instrument 4.
Embodiment
In order to explain technical scheme of the present invention further, below by specific embodiment, the present invention will be described in detail.
Refer to Fig. 1, shown in Fig. 2, the enforcement schematic diagram of present pre-ferred embodiments and structure block schematic diagram, find out the present invention includes a main control equipment 1 by knowing in figure, multiple via Ethernet 2(Ethernet) with the slave 3(figure of main control equipment 1 Info Link in for 2) and multiple respectively with the surveying instrument 4 of each slave 3 Info Link, wherein main control equipment 1 and each slave 3 are computing machine, and in main control equipment 1, be provided with a trigger cycle device 11 of mutual information link, one sends circulating device 12, one looks into survey circulating device 13, one confirms that circulating device 14 and resets circulating device 15, above are only one of them embodiment of the present invention, its aspect is not limited in this.
Please coordinate consults shown in Fig. 1 to Fig. 7 simultaneously, trigger cycle device 11 can continue to detect each slave 3 and send any status message with or without via interoperations such as handling procedure or detectors (not indicating in figure), and this status message can be passed to transmission circulating device 12 by trigger cycle device 11, and continue to detect other slaves 3 with or without sending status message, until the status message receiving whole slaves 3 just can stop detecting (circulation start).
Then sends measurement information extremely each slave 3 and look into survey circulating device 13 according to this status message when sending circulating device 12 and receiving status message, and continue detection and whether receive more multimode message and has detected measurement information and whether be sent to each slave 3, until send circulating device 12 receive whole slaves 3 status message and sent measurement information extremely whole slaves 3 just can stop detection (circulation start).
And the surveying instrument 4 that each slave 3 starts link separately when having received measurement information measures, and each surveying instrument 4 gives each slave 3 according to measurement return data information, and carries out computing in each slave 3.
Look into survey after circulating device 13 has received measurement information and then receive the data message of each slave 3 through computing, and give confirmation circulating device 14 by data information transfer, look into and survey the lasting detection of circulating device 13 until the data message receiving whole slaves 3 just can stop detecting (circulation start).
Confirm to start after circulating device 14 receives data message to confirm trigger cycle device 11, send circulating device 12 and look into the duty surveying circulating device 13, send circulating device 12 if be found to or look into survey circulating device 13 and not yet stop detecting (circulation start), still carry out information transmission with each slave 3, then continue to confirm and etc. circulating device to be sent 12 survey circulating device 13 and stop detecting (circulation start) with looking into;
Not yet stop detecting (circulation start) if be found to trigger cycle device 11, then the current stateless message of slave 3 judging not send status message can send, and can ignore this slave 3;
When trigger cycle device 11, send circulating device 12 and look into survey the duty of circulating device 13 be all in stop detecting (circulation start) time, be each slave 3 all to complete with each surveying instrument 4 and measures and return (do not contain and can ignore), confirm that circulating device 14 terminates trigger cycle device 11, sends circulating device 12 and look into the detection of surveying circulating device 13, and sent information to replacement circulating device 15 according to whole data messages.
Reset after circulating device 15 has received information and then reset this trigger cycle device 11, send circulating device 12, look into the duty surveyed circulating device 13 and confirm circulating device 14, and observe and predict information for user's viewing according to completing delivering.
Therefore, the present invention connects multiple slave 3 to promote except Validity Test amount except a reliable main control equipment 1, by trigger cycle device 11, send circulating device 12, look into and survey circulating device 13, confirm circulating device 14 and reset circulating device 15 to coordinate start, detect with parallel recycle design, so the mistiming sending status message between each slave 3 can be ignored, to promote test speed and efficiency, and only need to set up slave 3 and surveying instrument 4 in addition during for increasing amount detection, and be directly connected with main control equipment 1, by trigger cycle device 11, send circulating device 12, look into and survey circulating device 13, confirm circulating device 14 and reset circulating device 15 to control, therefore production capacity framework and subordinate can be increased fast.
Therefore, multi-station cyclic proving installation of the present invention is that the key can improving prior art is:
1, by trigger cycle device 11, send circulating device 12, look into survey circulating device 13, confirm circulating device 14 and reset circulating device 15 and match, the present invention reached can increase fast production capacity framework and subordinate and increase the progressive of Validity Test amount.
2, by trigger cycle device 11, send circulating device 12, look into survey circulating device 13, confirm circulating device 14 and reset circulating device 15 and match, make the present invention reach the progressive improving test speed and efficiency.
Above-described embodiment and graphic and non-limiting product form of the present invention and style, any person of an ordinary skill in the technical field, to its suitable change done or modification, all should be considered as not departing from patent category of the present invention.

Claims (5)

1. a multi-station cyclic proving installation, it comprises:
One main control equipment;
Multiple slave, each slave and main control equipment Info Link;
One is located at the trigger cycle device in main control equipment, and this trigger cycle device for receiving the status message that sends of each slave, and detects each slave and whether sends status message;
Whether one is located at the transmission circulating device in main control equipment, and this transmission circulating device for the status message receiving trigger cycle device, and has sent measurement information to each slave, and detect each slave and receive;
One is located at and looks into survey circulating device in main control equipment, this look into survey circulating device receive send circulating device play measurement information, and receive each slave and comply with the data message that measurement information returns, and detect each slave and whether return;
One is located at the confirmation circulating device in main control equipment, this confirmation circulating device receives the data message looked into and survey circulating device, and check trigger cycle device, send circulating device and look into survey circulating device duty to carry out judging whether that terminating it detects, and sent information;
One is located at the replacement circulating device in main control equipment, and this replacement circulating device finishes receiving information, and the duty resetting trigger cycle device, send circulating device, look into survey circulating device and confirmation circulating device, and send information of observing and predicting for user's viewing.
2. multi-station cyclic proving installation as claimed in claim 1, is characterized in that: described each slave respectively message sense is connected at least one surveying instrument.
3. multi-station cyclic proving installation as claimed in claim 2, is characterized in that: described each surveying instrument detects according to aforementioned measurement information, and gives each slave according to testing result passback aforementioned data information.
4. multi-station cyclic proving installation as claimed in claim 1, is characterized in that: described main control equipment and each slave are via Ethernet Info Link.
5. multi-station cyclic proving installation as claimed in claim 1, is characterized in that: described main control equipment and each slave are computing machine.
CN201410402822.2A 2014-08-14 2014-08-14 Multi-station cyclic test device Active CN105371887B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410402822.2A CN105371887B (en) 2014-08-14 2014-08-14 Multi-station cyclic test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410402822.2A CN105371887B (en) 2014-08-14 2014-08-14 Multi-station cyclic test device

Publications (2)

Publication Number Publication Date
CN105371887A true CN105371887A (en) 2016-03-02
CN105371887B CN105371887B (en) 2017-08-29

Family

ID=55374291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410402822.2A Active CN105371887B (en) 2014-08-14 2014-08-14 Multi-station cyclic test device

Country Status (1)

Country Link
CN (1) CN105371887B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05344565A (en) * 1992-06-05 1993-12-24 Toshiba Corp Plant monitoring system
JP2004328472A (en) * 2003-04-25 2004-11-18 Toshiba Corp Master station and slave station in communication system
CN101482748A (en) * 2008-11-19 2009-07-15 上海大学 Novel remote monitoring system
CN102333003A (en) * 2010-07-12 2012-01-25 熊猫电子集团有限公司 Simulation test system of data casting distribution network
CN202693749U (en) * 2012-05-18 2013-01-23 全智科技股份有限公司 Structure of RFIC (Radio Frequency Integrated Circuit) staggered classification test
CN102915265A (en) * 2011-08-01 2013-02-06 鸿富锦精密工业(深圳)有限公司 BMC (baseboard management controller) loop test method and system
CN203491224U (en) * 2013-08-23 2014-03-19 全智科技股份有限公司 High-efficiency multi-level test device
CN203490294U (en) * 2013-08-23 2014-03-19 全智科技股份有限公司 High power multi-port measurement apparatus
CN103873301A (en) * 2014-03-20 2014-06-18 浙江宇视科技有限公司 System and method for automatically finding and adding devices

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05344565A (en) * 1992-06-05 1993-12-24 Toshiba Corp Plant monitoring system
JP2004328472A (en) * 2003-04-25 2004-11-18 Toshiba Corp Master station and slave station in communication system
CN101482748A (en) * 2008-11-19 2009-07-15 上海大学 Novel remote monitoring system
CN102333003A (en) * 2010-07-12 2012-01-25 熊猫电子集团有限公司 Simulation test system of data casting distribution network
CN102915265A (en) * 2011-08-01 2013-02-06 鸿富锦精密工业(深圳)有限公司 BMC (baseboard management controller) loop test method and system
CN202693749U (en) * 2012-05-18 2013-01-23 全智科技股份有限公司 Structure of RFIC (Radio Frequency Integrated Circuit) staggered classification test
CN203491224U (en) * 2013-08-23 2014-03-19 全智科技股份有限公司 High-efficiency multi-level test device
CN203490294U (en) * 2013-08-23 2014-03-19 全智科技股份有限公司 High power multi-port measurement apparatus
CN103873301A (en) * 2014-03-20 2014-06-18 浙江宇视科技有限公司 System and method for automatically finding and adding devices

Also Published As

Publication number Publication date
CN105371887B (en) 2017-08-29

Similar Documents

Publication Publication Date Title
US11386363B2 (en) Production management system, production management apparatus and production management method for manufacturing line
MX2018006208A (en) System for verifying distance measurements.
CN102004474B (en) Detection and controller for aircraft integration test general interface
CN102571480A (en) Network state monitoring system
FI3799512T3 (en) Trigger frame indication for energy sensing of an 802.11 communication channel before transmitting
JP2013101685A5 (en)
JP2012134614A5 (en)
RU2016114405A (en) SYSTEM WITH CONTACTLESS SENSORS
CN103380595A (en) Communication device and communication method
CN102435246A (en) Excavator self-detection system and method
CN109560993A (en) The method of communication link abnormality detection, device, electronic equipment and network
CN110050419A (en) System and method for the operation of across communication network synchronous processing device
CN103196482B (en) Method and corresponding transmitter for monitoring transmitter
KR20140047984A (en) Method for detecting can bus off using message
CN102508754B (en) Method for detecting 1553B communication interface
CN102780590A (en) Method and apparatus to determine the amount of delay in the transfer of data associated with a TCP zero window event or set of TCP zero window events
CN105371887A (en) Multi-station circulation testing device
EP2903324B1 (en) Wireless network adapter and self-configuration method of same
WO2014039394A3 (en) Maintaining inventory and components of gaming equipment
JP2016092709A (en) Antenna system abnormality detection method, system of distributed antenna, and repeating device using the same
CN106528431A (en) Test data display control method for store management system test device
CN105303758A (en) Alarming device and method against drop of blasting charge
CN102149116B (en) Backup method and device for coordinator of wireless private area network
JP2015171010A (en) communication path management device and program
JPWO2019102567A1 (en) Article management system for assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant