CN105370504A - 一种双剪拼接连接的分片风力发电塔筒 - Google Patents
一种双剪拼接连接的分片风力发电塔筒 Download PDFInfo
- Publication number
- CN105370504A CN105370504A CN201510865468.1A CN201510865468A CN105370504A CN 105370504 A CN105370504 A CN 105370504A CN 201510865468 A CN201510865468 A CN 201510865468A CN 105370504 A CN105370504 A CN 105370504A
- Authority
- CN
- China
- Prior art keywords
- double shear
- double
- shear
- tower drum
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
一种双剪拼接连接的分片风力发电塔筒。本发明涉及一种风力发电双剪拼接连接的分片塔筒,对于直径较大的塔筒分为若干片塔筒弧片,各塔筒弧片连接为整圆台时,在塔筒弧片的内外侧均布置竖向双剪拼接板,采用双剪螺栓依次穿过塔筒弧片和竖向双剪拼接板,紧固双剪螺栓使塔筒弧片形成环向刚度完好、整圆的焊接筒段。本发明分片塔筒由若干个焊接筒段上下连接而成。上下焊接筒段的塔筒弧片内外侧均布置环向双剪拼接板,采用双剪螺栓依次穿过塔筒弧片和环向双剪拼接板,紧固双剪螺栓使上下拼接筒段形成抗弯刚度连续塔筒。环向双剪拼接板环向分为若干片,使环向双剪拼接板与上下拼接筒段的塔筒弧片良好贴合。门洞处的塔筒弧片内外布置门框双剪加强板,紧固双剪螺栓使门框双剪加强板与塔筒弧片从而起到加强的作用。
Description
技术领域
本发明属于风力发电塔筒结构技术领域,具体涉及一种双剪拼接连接的分片风力发电塔筒。
背景技术
传统风力发电塔常见为塔筒结构,其底部与基础2连接,顶部安装风力发电机3和风轮4,塔筒1内部布置供上下交通的爬梯及传输电能的电缆等,塔筒1底部需开孔设置门洞5。塔筒1一般由多个焊接筒段6连接组成,各焊接筒段6之间采用锻造横向法兰7和法兰螺栓8连接,各焊接筒段6的筒节9与锻造横向法兰7采用对接焊缝10连接。由于焊接筒段6长度较大,各焊接筒段6由多个筒节9组成,每个筒节9由钢板11卷圆之后用纵向对接焊接10连接而成。
传统风力发电塔筒分段数量较少,每段塔筒较重,运输和吊装难度较大;当风机功率较大、载荷较大,要求塔筒直径较大时,较大直径的整圆塔筒受公路运输高度和宽度限制较大;为满足运输、吊装等要求,大功率风机塔筒采用小直径整圆塔筒时,结构效率较低,经济性较差。
发明内容
本发明的目的在于提供一种双剪拼接连接的分片风力发电塔筒。
本发明提出的双剪拼接连接的分片风力发电塔筒,所述塔筒由若干个焊接筒段6自上而上焊接而成,每个焊接筒段6由若干个筒节9自上而下焊接而成,每个筒节9由若干片塔筒弧片12首尾相连构成圆台结构,每个筒节9上设有竖向双剪拼接板13、横向双剪拼接板14和双剪螺栓15,每个筒节9上相邻的塔筒弧片12之间的内外侧均布置有竖向双剪拼接板13,采用双剪螺栓15依次穿过塔筒弧片12和竖向双剪拼接板13,紧固双剪螺栓15使若干塔筒弧片12形成环向刚度完好、整圆台的焊接筒段6。
本发明中,上下相邻的焊接筒段6上的塔筒弧片12之间的内外侧均布置环向双剪拼接板14,采用双剪螺栓15依次穿过塔筒弧片12和环向双剪拼接板14,紧固双剪螺栓15使上下焊接筒段6形成一定的抗弯刚度。
本发明中,所述环向双剪拼接板14环向分为若干片,使环向双剪拼接板14与上、下焊接筒段6上的塔筒弧片12紧密贴合。
本发明中,所述塔筒上设有门洞5,所述门洞5处的塔筒弧片12内外布置门框双剪加强板16,采用双剪螺栓15依次穿过塔筒弧片12和门框双剪加强板16,紧固双剪螺栓15使门框双剪加强板16与塔筒弧片12起到加强的作用。
本发明优点在于:
1.提供了一种风力发电双剪拼接连接的分片塔筒,塔筒竖向分段和纵向分片均采用双剪连接,门框采用双剪加强。对塔筒分片,塔筒运输不受限制,可采用大直径、更高效的截面形式。
2.塔筒分段、纵向分片采用双剪连接,门框采用双剪加强可大大减小塔筒焊接量,提高结构的抗疲劳性能,减小焊接变形,确保塔筒连接和安装的精度。
附图说明
图1为传统风力发电塔侧视图;
图2为传统塔筒焊接筒段详图;
图3为传统塔筒钢板卷圆焊接详图;
图4为传统塔筒锻造横向法兰详图;
图5为分片塔筒侧视图;
图6为分片塔筒底部正视图;
图7为分片塔筒上下筒段双剪拼接详图;
图8为分片塔筒各弧片双剪拼接详图;
图9为分片塔筒双剪加强门框详图。
图中标号:1为塔筒,2为基础,3为发电机,4为风轮,5为门洞,6为焊接筒段,7为锻造横向法兰,8为法兰螺栓,9为筒节,10为对接焊缝,11为钢板,12为塔筒弧片,13为竖向双剪拼接板,14为横向双剪拼接板,15为双剪螺栓,16为门框双剪加强板。
具体实施方式
下面通过实施例结合附图进一步说明本发明。
实施例1,图5-图8所示,本发明由塔筒弧片12、竖向双剪拼接板13、横向双剪拼接板14、双剪螺栓15、门框双剪加强板16组成。
本发明提出的风力发电双剪拼接连接的分片塔筒,对于直径较大的塔筒可以分为若干片塔筒弧片12,各塔筒弧片12连接为整圆台时,在塔筒弧片12的内外侧均布置竖向双剪拼接板13,采用双剪螺栓15依次穿过塔筒弧片12和竖向双剪拼接板13,紧固双剪螺栓15使塔筒弧片12形成环向刚度完好、整圆台的拼接筒段17。
本发明提出的风力发电双剪拼接连接的分片塔筒由若干个拼接筒段17上下连接而成。连接上下拼接筒段16的塔筒弧片12内外侧均布置环向双剪拼接板14,采用双剪螺栓15依次穿过塔筒弧片12和环向双剪拼接板14,紧固双剪螺栓15使上下拼接筒段17形成抗弯刚度连续塔筒1。
所述环向双剪拼接板14环向分为若干片,使环向双剪拼接板14与上下拼接筒段17的塔筒弧片12良好贴合。
本发明提出的风力发电双剪拼接连接的分片塔筒门洞5也采用双剪拼接加强,门洞5处的塔筒弧片12内外布置门框双剪加强板16,采用双剪螺栓15依次穿过塔筒弧片12和门框双剪加强板16,紧固双剪螺栓15使门框双剪加强板16与塔筒弧片12从而起到加强的作用。
Claims (4)
1.一种双剪拼接连接的分片风力发电塔筒,所述塔筒由若干个焊接筒段(6)自上而上焊接而成,每个焊接筒段(6)由若干个筒节(9)自上而下焊接而成,其特征在于每个筒节(9)由若干片塔筒弧片(12)首尾相连构成圆台结构,每个筒节(9)上设有竖向双剪拼接板(13)、横向双剪拼接板(14)和双剪螺栓(15),每个筒节(9)上相邻的塔筒弧片(12)之间的内外侧均布置有竖向双剪拼接板(13),采用双剪螺栓(15)依次穿过塔筒弧片(12)和竖向双剪拼接板(13),紧固双剪螺栓(15)使若干塔筒弧片(12)形成环向刚度完好、整圆台的焊接筒段(6)。
2.根据权利要求1所述的双剪拼接连接的分片风力发电塔筒,其特征在于上下相邻的焊接筒段(6)上的塔筒弧片(12)之间的内外侧均布置环向双剪拼接板(14),采用双剪螺栓(15)依次穿过塔筒弧片(12)和环向双剪拼接板(14),紧固双剪螺栓(15)使上下焊接筒段(6)形成一定的抗弯刚度。
3.根据权利要求1所述的双剪拼接连接的分片风力发电塔筒,其特征在于所述环向双剪拼接板(14)环向分为若干片,使环向双剪拼接板(14)与上、下焊接筒段(6)上的塔筒弧片(12)紧密贴合。
4.根据权利要求1所述的双剪拼接连接的分片风力发电塔筒,其特征在于所述塔筒上设有门洞(5),所述门洞(5)处的塔筒弧片(12)内外布置门框双剪加强板(16),采用双剪螺栓(15)依次穿过塔筒弧片(12)和门框双剪加强板(16),紧固双剪螺栓(15)使门框双剪加强板(16)与塔筒弧片(12)起到加强的作用。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510865468.1A CN105370504A (zh) | 2015-12-02 | 2015-12-02 | 一种双剪拼接连接的分片风力发电塔筒 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510865468.1A CN105370504A (zh) | 2015-12-02 | 2015-12-02 | 一种双剪拼接连接的分片风力发电塔筒 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105370504A true CN105370504A (zh) | 2016-03-02 |
Family
ID=55373024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510865468.1A Pending CN105370504A (zh) | 2015-12-02 | 2015-12-02 | 一种双剪拼接连接的分片风力发电塔筒 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105370504A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708831A (zh) * | 2018-05-16 | 2018-10-26 | 南京风电科技有限公司 | 风力发电机组塔筒及塔筒构建方法 |
CN113007031A (zh) * | 2019-12-19 | 2021-06-22 | 北京天杉高科风电科技有限责任公司 | 塔架及风力发电机组 |
CN114248030A (zh) * | 2021-11-25 | 2022-03-29 | 中建五洲工程装备有限公司 | 一种塔筒法兰焊前平面度控制施工方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2851632Y (zh) * | 2005-09-30 | 2006-12-27 | 珠海互翔软件技术有限公司 | 组合式风力发电塔筒 |
CN201129274Y (zh) * | 2007-12-26 | 2008-10-08 | 江苏保龙塔筒制造有限公司 | 风力发电机塔筒筒体拼接装置 |
CN201443475U (zh) * | 2009-07-17 | 2010-04-28 | 辽宁大金钢结构工程(集团)有限公司 | 大功率分片式风力发电塔架 |
CN201486774U (zh) * | 2009-06-19 | 2010-05-26 | 孙柏青 | 减震式风电塔筒 |
CN202001212U (zh) * | 2011-03-02 | 2011-10-05 | 国电联合动力技术有限公司 | 一种风电机组塔架 |
CN202187872U (zh) * | 2011-08-30 | 2012-04-11 | 南车株洲电力机车研究所有限公司 | 一种风力发电机组塔架门 |
CN202628408U (zh) * | 2012-06-28 | 2012-12-26 | 湖南科技大学 | 一种风电机组分片式套筒连接混凝土-钢组合式塔架 |
CN204175533U (zh) * | 2014-10-09 | 2015-02-25 | 东方电气集团东方汽轮机有限公司 | 一种风力发电机组塔筒门洞及风力发电机组塔筒 |
CN205277704U (zh) * | 2015-12-02 | 2016-06-01 | 同济大学 | 一种双剪拼接连接的分片风力发电塔筒 |
-
2015
- 2015-12-02 CN CN201510865468.1A patent/CN105370504A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2851632Y (zh) * | 2005-09-30 | 2006-12-27 | 珠海互翔软件技术有限公司 | 组合式风力发电塔筒 |
CN201129274Y (zh) * | 2007-12-26 | 2008-10-08 | 江苏保龙塔筒制造有限公司 | 风力发电机塔筒筒体拼接装置 |
CN201486774U (zh) * | 2009-06-19 | 2010-05-26 | 孙柏青 | 减震式风电塔筒 |
CN201443475U (zh) * | 2009-07-17 | 2010-04-28 | 辽宁大金钢结构工程(集团)有限公司 | 大功率分片式风力发电塔架 |
CN202001212U (zh) * | 2011-03-02 | 2011-10-05 | 国电联合动力技术有限公司 | 一种风电机组塔架 |
CN202187872U (zh) * | 2011-08-30 | 2012-04-11 | 南车株洲电力机车研究所有限公司 | 一种风力发电机组塔架门 |
CN202628408U (zh) * | 2012-06-28 | 2012-12-26 | 湖南科技大学 | 一种风电机组分片式套筒连接混凝土-钢组合式塔架 |
CN204175533U (zh) * | 2014-10-09 | 2015-02-25 | 东方电气集团东方汽轮机有限公司 | 一种风力发电机组塔筒门洞及风力发电机组塔筒 |
CN205277704U (zh) * | 2015-12-02 | 2016-06-01 | 同济大学 | 一种双剪拼接连接的分片风力发电塔筒 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708831A (zh) * | 2018-05-16 | 2018-10-26 | 南京风电科技有限公司 | 风力发电机组塔筒及塔筒构建方法 |
CN113007031A (zh) * | 2019-12-19 | 2021-06-22 | 北京天杉高科风电科技有限责任公司 | 塔架及风力发电机组 |
CN114248030A (zh) * | 2021-11-25 | 2022-03-29 | 中建五洲工程装备有限公司 | 一种塔筒法兰焊前平面度控制施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10001111B2 (en) | Transition body between tower sections of a wind turbine and wind turbine tower comprising same | |
CN206158925U (zh) | 一种分片式风力发电塔筒 | |
EP2253781B1 (en) | Composite connection for a wind turbine tower structure | |
KR101696019B1 (ko) | 모듈러 풍력타워 | |
KR20150038243A (ko) | 풍력 발전소의 모듈식 타워 | |
US20130299277A1 (en) | Optimized Wind Turbine Tower with Mountings for Tower Internals | |
US20150369209A1 (en) | Rotor blade transportation system | |
CN105545609B (zh) | 风力发电机组的塔筒以及塔筒的构建方法 | |
CN105370504A (zh) | 一种双剪拼接连接的分片风力发电塔筒 | |
CN205423080U (zh) | 风力发电机组的塔筒及风力发电机组 | |
CN204324052U (zh) | 运输工装 | |
CN102192112A (zh) | 一种分片式混凝土风电塔架 | |
CN202001212U (zh) | 一种风电机组塔架 | |
CN202065134U (zh) | 一种分片式混凝土风电塔架 | |
CN202913752U (zh) | 复合材料杆塔用法兰连接结构 | |
CN105888986B (zh) | 一种风机塔筒组件、塔筒以及塔筒安装方法 | |
CN205445908U (zh) | 风力发电机组的塔筒及风力发电机组 | |
CN205277704U (zh) | 一种双剪拼接连接的分片风力发电塔筒 | |
CN106762441B (zh) | 过渡连接件及风电塔架 | |
CN202001210U (zh) | 一种锥型圆筒塔架 | |
CN208236577U (zh) | 风力发电机组机舱运输底架 | |
CN203827799U (zh) | 抗风强度高的大棚架 | |
CN207685654U (zh) | 一种带有抗风风嘴的钢板梁结构 | |
CN202001213U (zh) | 一种筒型塔架 | |
CN209278059U (zh) | 一种风力发电机组分片式塔筒 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160302 |