CN105366598A - Hydraulic lifting method for gas holder top - Google Patents

Hydraulic lifting method for gas holder top Download PDF

Info

Publication number
CN105366598A
CN105366598A CN201510629751.4A CN201510629751A CN105366598A CN 105366598 A CN105366598 A CN 105366598A CN 201510629751 A CN201510629751 A CN 201510629751A CN 105366598 A CN105366598 A CN 105366598A
Authority
CN
China
Prior art keywords
jack
hydraulic
holder top
cabinet
dop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510629751.4A
Other languages
Chinese (zh)
Inventor
李永佳
杨建新
万缨
赵广才
喻辉
王顺龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201510629751.4A priority Critical patent/CN105366598A/en
Publication of CN105366598A publication Critical patent/CN105366598A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for

Abstract

The invention relates to a hydraulic lifting method for a gas holder top. The method comprises the following steps that 1, supporting columns are installed on tops of a plurality of gas holder stand columns, a hydraulic support is installed on each supporting column, and jacks are installed on upper platforms of the hydraulic supports; 2, steel strands upwards penetrate into the lower ends of lower clamping heads at the lower ends of the hydraulic supports, so that upper and lower clamping heads are in the locking and clamping state, and the lower ends of the steel strands are connected with the holder top; 3, a hydraulic pump station is suspended on an operation platform, the jacks and a main oil pipe are connected together, tensions of all the steel strands are adjusted to be the same, then the jacks are adjusted to be arranged at the bottommost end of a stroke, and lifting is prepared; and 4, the holder top is started to be lifted. The holder top is hydraulically lifted at a time, the mechanical degree is high, the installation speed is high, and the labor force is greatly lowered; the holder top is integrated to the hydraulic pump through the jacks in a uniform control manner, the synchronism is good, the reliability is high, and the precision is high; and the circulation utilization rate of tools adopted for lifting the holder top is high, no one-time investment is realized, and the cost is saved.

Description

Top of gas cabinet hydraulic pressure lift method
Technical field
The present invention relates to top of gas cabinet construction field, more particularly, relate to a kind of top of gas cabinet hydraulic pressure lift method.
Background technology
In metallurgical project construction, the construction of various types of gas chamber can be run into.Gas chamber top overall weight is large, weighs 180 tons, and balance is installed on cabinet top, safety is difficult to control.Gas chamber absolute altitude is ▽ 45.756m, and cabinet top setting height(from bottom) is 38.1m, belongs to aloft work, dangerous large, the bad control of setting accuracy.And the lifting of cabinet top is the Focal point and difficult point of whole construction technology in gas chamber installation work, traditional gas chamber top construction adopts the methods such as crane lifting, hoisting, cucurbit lifting, during construction, safety hazard many, poor reliability, labour power requires many, the difficult control of synchronism, and construction speed is slow.
Summary of the invention
The technical problem to be solved in the present invention is, provides a kind of top of gas cabinet hydraulic pressure lift method, improves the safety and reliability of construction, save labour power, shorten the duration.
The technical solution adopted for the present invention to solve the technical problems is: construct a kind of top of gas cabinet hydraulic pressure lift method, comprise the following steps:
S1, respectively pillar stiffener is installed at many gas chamber column capitals, on the support columns hydraulic support is installed, loose clip type jack is installed on the upper mounting plate of hydraulic support, and the lower dop of jack is installed to the lower platform of hydraulic support, makes the upper chuck of jack and lower dop be in loose card-like state;
S2, steel strand upwards penetrate from the lower dop lower end of hydraulic support lower end, and make upper chuck and lower dop be in pintle hook lock state, steel strand lower end is connected with cabinet top;
S3, hydraulic power unit is lifted on service platform, jack and oil main line are coupled together, all steel strand are all adjusted the same pulling force, then jack is adjusted to stroke bottom, prepare to promote;
S4, beginning lifting cabinet top, jack upper chuck is locked, and lower dop unclamps, hydraulic power unit fuel feeding, and promote to jack voltage supply, after reaching jack stroke, dop under locked jack, unclamps upper chuck, and recalls to previous status by upper chuck and push rod; Circularly enhancing successively, until it is high to be promoted to cabinet top mark.
In such scheme, the capital of described pillar stiffener is provided with radial inflow bracket.
In such scheme, be connected with cabinet top steel strand lower end by fastening means, described fastening means is provided with two connecting bores, and the lower end of steel strand is connected with ground tackle through connecting bore, described fastening means lower end is connected with cabinet top by chock, and the two ends of described chock are provided with steel wire buckle.
Implement top of gas cabinet hydraulic pressure lift method of the present invention, there is following beneficial effect:
1, adopt hydraulic integral lifting cabinet top, level of mechanization is high, and installation rate is fast, and greatly reduces labour power;
2, pillar stiffener adopts radial inflow bracket, makes cabinet apical ring beam and sidewall form gap, when avoiding cabinet top to promote and sidewall collide;
3, cabinet top is integrated into the unified control of Hydraulic Pump by jack, and synchronism is good, reliability is high, accuracy rate is high;
4, lifting cabinet top uses tool cycle availability high, and non-once drops into, cost-saving.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the structural representation of gas chamber cabinet;
Fig. 2 is the front view of equipment therefor in top of gas cabinet hydraulic pressure lift method;
Fig. 3 is the lateral plan of Fig. 2;
Fig. 4 is the schematic diagram of loose clip type jack;
Fig. 5 is the front view of fastening means;
Fig. 6 is the lateral plan of Fig. 5.
Detailed description of the invention
In order to there be understanding clearly to technical characteristic of the present invention, object and effect, now contrast accompanying drawing and describe the specific embodiment of the present invention in detail.
Top of gas cabinet hydraulic pressure lift method of the present invention comprises the following steps as shown in figs 1 to 6:
1, cabinet top lifting device assembling
1.1 install 24 pillar stiffeners 4 respectively at 24 gas chamber column tops.Capital is provided with radial inflow bracket 10.Pillar stiffener 4, with the blanking of final section structural column, cuts off after being used to complete.Every root pillar stiffener 4 installs a lifting hydraulic support 3 above.The sidewall 7 of cabinet is provided with wind truss.
24 hydraulic supports 3 are in place by 1.2, loose clip type jack 2 is installed on the upper mounting plate of hydraulic support 3, fixes with M20 bolt, lower dop 2.14 is installed on the lower platform of hydraulic support 3, fixes with M16 bolt.Jack 2 comprises upper chuck 2.1, oil cylinder 2.2, upper oil nozzle 2.3, lower oil nozzle 2.4, dop spring 2.5, end cap 2.6, fixture block 2.7, fixture block seat 2.8, coupling link 2.9, loose snap ring 2.10, loose card screw rod 2.11, loose card nut 2.12, limit base 2.13, lower dop 2.14, push rod 2.15.
Loose card nut 2.12 conter clockwise of upper and lower dop is upwards threaded to summit by 1.3, makes upper and lower dop be in loose card-like state.
Lower dop 2.14 lower end of the steel strand 6 of 52 meters long from hydraulic support 3 lower end upwards penetrates by 1.4, upwards always through upper chuck 2.1, is advisable to expose upper chuck 200mm.
1.5 are threaded to summit by under loose card nut 2.12 clockwise direction of upper and lower dop, make upper and lower dop be in pintle hook lock state.
All jacks 2 and steel strand 6 are in place by 1.6 successively.
Steel strand 6 lower end is penetrated the suspension centre of fastening means 9 by 1.7, and with ground tackle 11 anchoring jail, a suspension centre installs 2 ground tackles 11, is connected on cabinet top 8 with steel ingot chock 12 with fastening means 9, and the two ends of chock 12 have steel wire buckle 13 spacing.Successively by 48 steel strand 6 anchoring jails.
Because the hoisting speed of the steel strand of 2 on each suspension centre 6 can not be completely the same, if take to promote lower seat directly to weld with ring flat-plate, so when 2 steel strand 6 hoisting speeies of same suspension centre are not quite identical, this 2 steel strand 6 stressed also just different, even differ greatly, can potential safety hazard be brought thus.In order to address this problem, adopt chock 12 to be hinged to each suspension centre in cabinet top, even if 2 steel strand hoisting speeies of same like this suspension centre are inconsistent, the stressed of these 2 steel strand is also uniform, thus solves the stability under loading sex chromosome mosaicism promoting suspension centre.
Two hydraulic power units are lifted on 38.1 meters of platforms by 1.8, at 144 meters of circumferentially uniform 2 points, then are in place by hydraulic oil radiator.The oil pipe of diameter 16*6.5 rice is picked out from hydraulic power unit.Jack and oil main line are coupled together by the branch oil pipe of diameter 10*4 rice, under jack, oil circuit can only communicate with working connection one, and on jack, another of oil circuit and working connection communicates.Successively the oil circuit of two hydraulic power units is in place.
Hydraulic power unit is connected three casees quadded cables by 1.9, is coupled together by the electromagnetic valve cable on two hydraulic power units, controls for unified.Mix up the position of rotating and rise and fall.
1.10 by hydraulic power unit pressure testing one by one, gets rid of leakage of oil point.
1.11 start hydraulic power unit, the pressure of two hydraulic power units is adjusted to 1-2Mpa, button is adjusted to hoisting position, be adjusted to lowering position every several seconds, back and forth several times, all steel strand all adjusted the same pulling force, again jack is adjusted to stroke bottom, prepares to promote.
2, the examination of cabinet top promotes
Suspend when being promoted to one meter of height, check all fixing ground tackles 11, locker, jack 2 whether flexibility and reliability one by one, whether the oil pipe of hydraulic efficiency pressure system, valve, electric switch be safe and reliable.Measure cabinet top Integral synchronous situation, guarantee no problem after treat within second day, to continue to promote.
3, formal circularly enhancing is to design height
After top of gas cabinet examination lifting confirmation is safe and reliable, formally promote.
After steel strand 6 insert jack 2, make upper chuck 2.1, lower dop 2.14 in running order, when pump fuel feed, pressure oil enters in cylinder body from lower oil nozzle 2.4, due to upper chuck 2.1 auto lock steel strand 6, this at present dop 2.14 unclamp, under oil pressure effect, piston rises and is upwards lifted with load by steel strand 6, when piston rises a full stroke gear pump stop control lever, load stops rising, and completes lifting process.During oil return, pressure oil enters from upper oil nozzle 2.3, this at present dop 2.14 lock, steel strand 6 transfixion, under the effect of oil pressure, return piston stroke, hydraulic oil is discharged from lower oil nozzle 2.4.So far, a lifting process is completed.After completing jack 2 one strokes, locked lower dop 2.14, unclamps upper chuck 2.1, and recalls to previous status by upper chuck 2.1 and push rod 2.15; Circularly enhancing successively, until it is high to be promoted to cabinet top mark.In Fig. 4, label 8 indication is the position on cabinet top to be hoisted, and label 1 is the position on the cabinet top promoted.
Often promote 2m in lifting process to check and once fix ground tackle 11, locker, jack 2 whether flexibility and reliability, whether the oil pipe of hydraulic efficiency pressure system, valve, electric switch be safe and reliable, measure cabinet top Integral synchronous situation, please adjust in time when error is large, and pinpoint the problems and will report without delay.
During lifting cabinet top, disposable cabinet top is risen to below design and installation height 100mm.When promoting from cabinet top setting height(from bottom) 100mm, slowly must promote, namely adjust the design height installed on cabinet top, adjust cabinet top surrounding from side plate size.
4, cabinet top is fixed
When cabinet apex distance is from 100mm below design and installation absolute altitude, slowly promotes, make the laminating of cabinet top surrounding connecting panel and side plate connecting panel as far as possible, then reinforcement of weld gusset immediately, cabinet top is fixed.In welding process, bont must remain uniform force state, by locked for dop under jack 2.14.Dop 2.14 under jack can be opened after band weld seam passed examination.
By reference to the accompanying drawings embodiments of the invention are described above; but the present invention is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; instead of it is restrictive; those of ordinary skill in the art is under enlightenment of the present invention; do not departing under the ambit that present inventive concept and claim protect, also can make a lot of form, these all belong within protection of the present invention.

Claims (3)

1. a top of gas cabinet hydraulic pressure lift method, is characterized in that, comprises the following steps:
S1, respectively pillar stiffener is installed at many gas chamber column capitals, on the support columns hydraulic support is installed, loose clip type jack is installed on the upper mounting plate of hydraulic support, and the lower dop of jack is installed to the lower platform of hydraulic support, makes the upper chuck of jack and lower dop be in loose card-like state;
S2, steel strand upwards penetrate from the lower dop lower end of hydraulic support lower end, and make upper chuck and lower dop be in pintle hook lock state, steel strand lower end is connected with cabinet top;
S3, hydraulic power unit is lifted on service platform, jack and oil main line are coupled together, all steel strand are all adjusted the same pulling force, then jack is adjusted to stroke bottom, prepare to promote;
S4, beginning lifting cabinet top, jack upper chuck is locked, and lower dop unclamps, hydraulic power unit fuel feeding, and promote to jack voltage supply, after reaching jack stroke, dop under locked jack, unclamps upper chuck, and recalls to previous status by upper chuck and push rod; Circularly enhancing successively, until it is high to be promoted to cabinet top mark.
2. top of gas cabinet hydraulic pressure lift method according to claim 1, is characterized in that, the capital of described pillar stiffener is provided with radial inflow bracket.
3. top of gas cabinet hydraulic pressure lift method according to claim 1, it is characterized in that, by fastening means, steel strand lower end is connected with cabinet top, described fastening means is provided with two connecting bores, the lower end of steel strand is connected with ground tackle through connecting bore, described fastening means lower end is connected with cabinet top by chock, and the two ends of described chock are provided with steel wire buckle.
CN201510629751.4A 2015-09-28 2015-09-28 Hydraulic lifting method for gas holder top Pending CN105366598A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510629751.4A CN105366598A (en) 2015-09-28 2015-09-28 Hydraulic lifting method for gas holder top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510629751.4A CN105366598A (en) 2015-09-28 2015-09-28 Hydraulic lifting method for gas holder top

Publications (1)

Publication Number Publication Date
CN105366598A true CN105366598A (en) 2016-03-02

Family

ID=55369323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510629751.4A Pending CN105366598A (en) 2015-09-28 2015-09-28 Hydraulic lifting method for gas holder top

Country Status (1)

Country Link
CN (1) CN105366598A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112374344A (en) * 2020-10-29 2021-02-19 上海宝冶冶金工程有限公司 Method for mounting top of large-scale gas tank in steel mill
CN112520610A (en) * 2020-10-29 2021-03-19 上海宝冶冶金工程有限公司 Method for installing hydraulic lifting equipment on top of gas cabinet
CN114991571A (en) * 2022-07-01 2022-09-02 中国二十二冶集团有限公司 Lifting method for large water tank of emergency water tower

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4268191A (en) * 1977-07-01 1981-05-19 Entreprise D'equipments Mecaniques Et Hydraulics Stand-by service structure for casual off-shore attendance
CN1640805A (en) * 2004-01-13 2005-07-20 柳州海威姆建筑机械有限公司 Pretightening method of hoist steel strand for continuous hoist jack
CN1736848A (en) * 2005-06-27 2006-02-22 华南理工大学 Large-scale structure integral hositing device and method
CN101186273A (en) * 2007-11-22 2008-05-28 广西壮族自治区公路桥梁工程总公司 Method for lowering overweight structure by connecting two jacks in series
CN101660660A (en) * 2009-09-15 2010-03-03 中冶成工建设有限公司 Novel installing method of gas cabinet
CN101723286A (en) * 2010-01-27 2010-06-09 中冶实久建设有限公司 Large gas holder top lifting device and method
CN201580966U (en) * 2010-01-27 2010-09-15 中冶实久建设有限公司 Fixing support of cabinet top hydraulic lifting device for large-scale gas cabinet
CN201580960U (en) * 2010-01-27 2010-09-15 中冶实久建设有限公司 Cabinet top lifting device of large-scale gas cabinet
CN201694728U (en) * 2010-01-27 2011-01-05 中冶实久建设有限公司 Lifting appliance for lifting top of gas cabinet
CN201704035U (en) * 2010-06-30 2011-01-12 中冶实久建设有限公司 Lifting device of large-sized gas holder top

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4268191A (en) * 1977-07-01 1981-05-19 Entreprise D'equipments Mecaniques Et Hydraulics Stand-by service structure for casual off-shore attendance
CN1640805A (en) * 2004-01-13 2005-07-20 柳州海威姆建筑机械有限公司 Pretightening method of hoist steel strand for continuous hoist jack
CN1736848A (en) * 2005-06-27 2006-02-22 华南理工大学 Large-scale structure integral hositing device and method
CN101186273A (en) * 2007-11-22 2008-05-28 广西壮族自治区公路桥梁工程总公司 Method for lowering overweight structure by connecting two jacks in series
CN101660660A (en) * 2009-09-15 2010-03-03 中冶成工建设有限公司 Novel installing method of gas cabinet
CN101723286A (en) * 2010-01-27 2010-06-09 中冶实久建设有限公司 Large gas holder top lifting device and method
CN201580966U (en) * 2010-01-27 2010-09-15 中冶实久建设有限公司 Fixing support of cabinet top hydraulic lifting device for large-scale gas cabinet
CN201580960U (en) * 2010-01-27 2010-09-15 中冶实久建设有限公司 Cabinet top lifting device of large-scale gas cabinet
CN201694728U (en) * 2010-01-27 2011-01-05 中冶实久建设有限公司 Lifting appliance for lifting top of gas cabinet
CN201704035U (en) * 2010-06-30 2011-01-12 中冶实久建设有限公司 Lifting device of large-sized gas holder top

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112374344A (en) * 2020-10-29 2021-02-19 上海宝冶冶金工程有限公司 Method for mounting top of large-scale gas tank in steel mill
CN112520610A (en) * 2020-10-29 2021-03-19 上海宝冶冶金工程有限公司 Method for installing hydraulic lifting equipment on top of gas cabinet
CN114991571A (en) * 2022-07-01 2022-09-02 中国二十二冶集团有限公司 Lifting method for large water tank of emergency water tower

Similar Documents

Publication Publication Date Title
CN102108786B (en) Overall lifting construction method of ultra-large type building member and device thereof
CN105366598A (en) Hydraulic lifting method for gas holder top
CN105421792A (en) Lifting construction process of modular steel structural components
CN105970819A (en) Installation construction method for steel anchor beams
CN205973618U (en) Shell ring hoisting device in chimney
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
CN103437563A (en) Installation method for steel skeleton of large steel structure factory building
CN102496771B (en) Method and device for installing large-sized steel structural antenna
CN101759098A (en) Crane beam frame construction method
CN201703776U (en) Inverted lifting device of storage tank
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN110273039B (en) Blast furnace surrounding pipe hoisting structure and installation method thereof
CN108545629B (en) Utilize the construction method of tower crane lifting girder truss
CN205709666U (en) A kind of jib fittable slackening device
CN103754908A (en) Large-scale seed precipitation tank body mounting construction method
CN211034860U (en) Hydraulic lifting construction device for steel structure net rack
CN103266777A (en) Large-span prestress double-arch frame hoisting process
CN203173741U (en) Steel strand lifting and clamping device
CN202148171U (en) Multi-purpose hoister for engineering installation
CN107053076B (en) Hydrogenerator brakes the disassembly of air lock, installation method
CN201704035U (en) Lifting device of large-sized gas holder top
CN201580966U (en) Fixing support of cabinet top hydraulic lifting device for large-scale gas cabinet
CN217102870U (en) High-altitude top-falling ultra-large heavy object device
CN205557816U (en) A hoisting frame for hoist and mount of large -scale truss
CN104564084B (en) Vertical shaft sliding formwork and grouting platform steel strand wires jack lifting construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302