CN105366576B - Underground monorail crane - Google Patents
Underground monorail crane Download PDFInfo
- Publication number
- CN105366576B CN105366576B CN201510619739.5A CN201510619739A CN105366576B CN 105366576 B CN105366576 B CN 105366576B CN 201510619739 A CN201510619739 A CN 201510619739A CN 105366576 B CN105366576 B CN 105366576B
- Authority
- CN
- China
- Prior art keywords
- slideway
- sliding machine
- steel
- pipeline
- pass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Railway Tracks (AREA)
Abstract
The invention discloses a kind of underground monorail cranies, it includes the rail winch for providing tractive force(1), rail winch(1)Pass through steel wire rope(2)Connect sliding machine(3), sliding machine(3)In the slideway of i-beam structure(4)On slide;Slideway(4)Pass through anchor ear(7)It is fixed on the monkey car beam of mine(6)Lower section;In slideway(4)On be additionally provided with more than two Obstruct apparatus(5);Sliding machine(3)Equipped with the matching used anti-pipeline downslide sleeve for transport pipeline.This monorail crane of the present invention is safe and reliable, operates steadily, is efficient and convenient, and opposite hand haulage not only increases working efficiency, saves project cost, and the installment work in upper optimization tunnel, reduces, liberated part labour to greatest extent;It also solves in tunnel without the transport problem for promoting track.
Description
Technical field
The present invention relates to a kind of Electromechanical Transportation in Coal Mine equipment, and in particular to a kind of underground for the transport of coal mine mechanic and electrical material
Monorail crane.
Background technology
Electromechanical Transportation in Coal Mine is the important component of shaft production link, it has run through each production link of mine,
Battle line length involves a wide range of knowledge, and transport uses lifting track means of transportation more in tunnel at present.But the well installing engineering in some coal mines
Carry out installment work when, because wait in tunnel be currently running, the gradient it is larger, and insufficient space can not attachment rail, according to people
Power is transported, not only of high cost, efficiency is low, and there is also prodigious security risks, therefore, the gradient is larger, insufficient space mounting rail
Electromechanical Transportation in Coal Mine how is carried out in the case of road is still the technical problem that this field needs solve.
Invention content
The purpose of the present invention is to provide a kind of underground monorail cranies for the transport of underground coal mine mechanic and electrical material, can be in nothing
The transport that equipment, material are carried out in track tunnel can improve safety caused by working efficiency and manpower transport
Hidden danger.
Technical scheme is as follows:
A kind of underground monorail crane, it includes the rail winch for providing tractive force, and rail winch is connected by steel wire rope
Sliding machine, sliding machine slide on the slideway of i-beam structure;Slideway is fixed on the monkey car beam of mine by anchor ear
Lower section;More than two Obstruct apparatus are additionally provided on slideway;Sliding machine is equipped with matching used for the anti-of transport pipeline
Pipeline downslide sleeve.Wherein, it is preferred that crab winch is JD-4 type car haulers.Since colliery engineering haulage drift is mainly
Inclined gallery, and transportation equipment needs anywhere loading, unloading in tunnel, therefore respectively one JD-4 types scheduling of installation twists on every tunnel top
Vehicle ensures the stabilization transported, lowering velocity and conveniently loads and unloads at any time.
Further, anchor ear is U-type groove structure, is to be processed into bar bending, top, that is, groove bottom part latch closure is in monkey
In bicycle beam, bipod is equipped with silk mouth and after the I-steel top plate of slideway by two waist of I-steel of nut clamping slideway at notch
After fix.The best combination of two of anchor ear uses, to improve stability.
It is used when anti-pipeline downslide sleeve is as transport pipeline, is sleeved on conduit running direction, it is small to be fixed on sliding with steel wire rope
Che Shang, to prevent pipeline from gliding.Anti- pipeline downslide sleeve is formed by steel bar meter, including longitudinal framework, circumferential skeleton and chassis
The tube structure surrounded is set at top there are four the lifting lug made of bar bending.
Obstruct apparatus is arranged on slideway, is installed on the lower part of equipment loading, unloading point, if winch cable fracture or de- occurs
Stop trolley when hook situation.Obstruct apparatus is equipped with component of holding up traffic made of channel steel, which is two pieces, from the work of slideway
It is solid to tensing by least two connection bolts after the fastening of word steel both sides;Component of holding up traffic be equipped with steel plate structure front apron and with this
The rubber pad that front apron is superimposed together.Front apron is as the main member held up traffic, and rubber pad then provides delaying when holding up traffic
Punching acts on.Front apron is connect with Member Welding of holding up traffic, and rubber pad is connected to become entirety with after front apron perforation with screw.
Further, sliding machine is the transport assembly of monorail crane, is made of pulley, bolt, channel steel, and hanging has been equipped with
Point promotes hanging point, is main sliding equipment on monorail crane.Specifically, sliding machine clamps hanging in institute by two pulleys
It states on the I-steel both sides of slideway, sliding machine agent structure is made of the hanging steel plate of both sides and bottom, sliding machine both sides
Hanging steel plate by two pieces of channel members from outside clamp and fastened by Fixed latches.The rear portion of sliding machine is additionally provided with work
To promote the elevator bolt of hanging point.
This monorail crane of the present invention is safe and reliable, operates steadily, is efficient and convenient, and opposite hand haulage not only increases work
Make efficiency, save project cost, the installment work in upper optimization tunnel, reduces, liberated part labour to greatest extent;Also solve
It has determined in tunnel without the transport problem for promoting track.
Description of the drawings
Fig. 1 is apparatus of the present invention complete layout;
Fig. 2 is the slideway fixed installation diagram of the present invention;
Fig. 3 is the left view of Fig. 2;
Fig. 4 is to prevent pipeline downslide tube-in-tube structure schematic diagram;
Fig. 5 is the vertical view of Fig. 4;
Fig. 6 is Obstruct apparatus mounting structure schematic diagram;
Fig. 7 is component schematic diagram of holding up traffic;
Fig. 8 is the sectional view along A-A in Fig. 6;
Fig. 9 is sliding machine handling schematic diagram;
Figure 10 is sliding machine side view.
Reference sign:1- rail winch, 2- steel wire ropes, 3- sliding machines, 4- slideways, 5- Obstruct apparatus, 6- monkey cars
Beam, 7- anchor ears, 8- nuts, 9- lifting lugs, 10- longitudinal frameworks, 11- circumferential direction skeletons, 12- chassis, 13- rubber pads, 14- bolts hole,
15- holds up traffic component, 16- front aprons, 17- connection bolts, 18- pulleys, 19- Fixed latches, 20- channel members, and 21- hangs steel
Plate, 22- elevator bolts.
Specific implementation mode
The present invention is described in further detail with reference to the accompanying drawings and examples.
Referring initially to Fig. 1, the present invention is such a underground monorail crane, it includes the rail winch 1 for providing tractive force, rail
Road winch 1 connects sliding machine 3 by steel wire rope 2, and sliding machine 3 slides on the slideway 4 of i-beam structure;On slideway 4
More than two Obstruct apparatus 5 are additionally provided with, Obstruct apparatus 5 is arranged on slideway 4, is installed on the lower part of equipment loading, unloading point, if hair
Stop sliding machine 3 when the fracture of steel wire rope 2 of raw rail winch 1 or unhook situation.The present invention is as underground transportation single-rail crane
Tool draws sliding machine 3 with steel wire rope 2 by surface-mounted rail winch 1 and slides transport material on slideway 4.According to one
As colliery engineering demand, each transport amount at 2.4 tons hereinafter, by calculating such as lifting weight and rope capacities, rail winch 1
Select JD-4 type car haulers, 6 × 19 15.5mm of specification of steel wire rope 2, you can meet transport and require.
As shown in Figures 2 and 3, slideway 4 is fixed on 6 lower section of monkey car beam of mine by anchor ear 7;Anchor ear 7 is U-type groove
Structure, top loop are buckled on monkey car beam 6, and bipod is equipped with silk mouth and is clamped by nut 8 after the I-steel top plate of slideway 4 and slided
It is fixed after two waist of I-steel in road.
As shown in Figure 4 and Figure 5, sliding machine 3 is equipped with the matching used anti-pipeline downslide sleeve for transport pipeline.It is anti-
Pipeline downslide sleeve is formed by steel bar meter, including the tube structure that longitudinal framework 10, circumferential skeleton 11 and chassis 12 surround,
Top is set there are four lifting lug 9 made of bar bending.Wherein, chassis 12 is in cross-shaped, indulges in the bottom of tube structure
It is fixed on chassis 12 to the setting of skeleton 10, tubular is then surrounded by twice commutation skeleton 11 again, and lifting lug is set at top
9.It is used when anti-pipeline downslide sleeve is as transport pipeline, is sleeved on conduit running direction, be fixed on sliding machine 3 with cable wire, with
Prevent pipeline from gliding.
As Figure 6-Figure 8, Obstruct apparatus 5 is equipped with component 15 of holding up traffic made of channel steel, which is two pieces,
It is solid to tensing by least two connection bolts 17 after being fastened from the I-steel both sides of slideway 4(As shown in Figure 8).It holds up traffic component 15
Slot bottom be drilled with the bolt hole 14 passed through for connecting bolt 17, correspondingly, the corresponding position on slideway 4 also is provided with bolt
Hole 14, in this way, Obstruct apparatus 5 can be at any time by connecting the installation of bolt 17 and dismounting.
As shown in fig. 7, front apron 16 of the component 15 of holding up traffic equipped with steel plate structure and being superimposed together with the front apron 16
Rubber pad 13.Front apron 16 is welded to connect with component 15 of holding up traffic, and rubber pad 13 is connected to become after perforating with front apron 16 with screw
It is whole.
As shown in Figure 9 and Figure 10, sliding machine 3 clamps hanging on the I-steel both sides of slideway 4 by two pulleys 18,
3 agent structure of sliding machine is made of the hanging steel plate 21 of both sides and bottom, and the hanging steel plate 21 of 3 both sides of sliding machine passes through two
Block channel members 22 are clamped from outside and are fastened by Fixed latches 19.In addition, as shown in Figure 10, the rear portion of sliding machine 3 is also
Equipped with as the elevator bolt 22 for promoting hanging point.
Slideway 4 must be parallel with roadway floor, side slope point and falls flat spot in tunnel, slideway needs to be processed into circular arc, is convenient for
Sliding machine 3 is run.
Certainly, the specific application example of the above only present invention, the present invention also has other embodiments, all using equivalent
The technical solution that replacement or equivalent transformation are formed, all falls within protection domain of the presently claimed invention.
Claims (5)
1. a kind of underground monorail crane, it is characterised in that:It includes the rail winch for providing tractive force(1), rail winch(1)
Pass through steel wire rope(2)Connect sliding machine(3), sliding machine(3)In the slideway of i-beam structure(4)On slide;Slideway(4)It is logical
Cross anchor ear(7)It is fixed on the monkey car beam of mine(6)Lower section;In slideway(4)On be additionally provided with more than two Obstruct apparatus
(5);Sliding machine(3)Equipped with the matching used anti-pipeline downslide sleeve for transport pipeline;The anti-pipeline downslide sleeve
It is formed by steel bar meter, including longitudinal framework(10), circumferential skeleton(11)And chassis(12)The tube structure surrounded is set at top
There are four the lifting lugs made of bar bending(9);Chassis(12)It is in cross-shaped, longitudinal framework in the bottom of tube structure
(10)Setting is fixed on chassis(12)On, then pass through twice circumferential direction skeleton again(11)Tubular is surrounded, and lifting lug is set at top
(9);It is used when anti-pipeline downslide sleeve is as transport pipeline, is sleeved on conduit running direction, sliding machine is fixed on cable wire(3)
On, to prevent pipeline from gliding;The Obstruct apparatus(5)Equipped with component of holding up traffic made of channel steel(15), the component of holding up traffic(15)
It it is two pieces, from slideway(4)I-steel both sides fastening after pass through at least two connection bolts(17)It is solid to tensing;It holds up traffic component
(15)Front apron equipped with steel plate structure(16)With with the front apron(16)The rubber pad being superimposed together(13);The front apron
(16)With the component of holding up traffic(15)It is welded to connect, the rubber pad(13)With front apron(16)It is connected to become with screw after perforation
It is whole.
2. underground monorail crane according to claim 1, it is characterised in that:The rail winch(1)It dispatches and twists for JD-4 types
Vehicle.
3. underground monorail crane according to claim 1, it is characterised in that:The anchor ear(7)For U-type groove structure, top loop
It is buckled in monkey car beam(6)On, bipod is equipped with silk mouth and passes through slideway(4)I-steel top plate after pass through nut(8)Clamping slideway
It is fixed after two waist of I-steel.
4. underground monorail crane according to claim 1, it is characterised in that:The sliding machine(3)Pass through two pulleys
(18)Hanging is clamped in the slideway(4)I-steel both sides on, sliding machine(3)Agent structure by both sides and bottom hanging
Steel plate(21)It is made, sliding machine(3)The hanging steel plate of both sides(21)Pass through two pieces of channel members(22)It clamps and leads to from outside
Cross Fixed latches(19)Fastening.
5. underground monorail crane according to claim 4, it is characterised in that:The sliding machine(3)Rear portion be additionally provided with work
To promote the elevator bolt of hanging point(22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510619739.5A CN105366576B (en) | 2015-09-25 | 2015-09-25 | Underground monorail crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510619739.5A CN105366576B (en) | 2015-09-25 | 2015-09-25 | Underground monorail crane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105366576A CN105366576A (en) | 2016-03-02 |
CN105366576B true CN105366576B (en) | 2018-10-12 |
Family
ID=55369301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510619739.5A Expired - Fee Related CN105366576B (en) | 2015-09-25 | 2015-09-25 | Underground monorail crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105366576B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105822309A (en) * | 2016-05-23 | 2016-08-03 | 张进才 | Large-scale ore storage bin overall self-propelled lifting transportation system for strip mine |
CN107651590B (en) * | 2017-11-15 | 2019-06-21 | 天津开发区桑博技术服务有限公司 | A kind of ocean platform replacing torch heads construction method of installation |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5765662A (en) * | 1996-08-30 | 1998-06-16 | Mellen; James | Wheeled raise skip |
CN101327886A (en) * | 2008-06-24 | 2008-12-24 | 张小玲 | Cable car elevator |
CN201713189U (en) * | 2010-07-01 | 2011-01-19 | 山东科技大学 | Novel winch-driven single-rail crane transportation system |
CN202574259U (en) * | 2012-05-18 | 2012-12-05 | 徐州大恒测控技术有限公司 | Mine inclined roadway catcher |
CN203742156U (en) * | 2013-12-13 | 2014-07-30 | 中建三局第一建设工程有限责任公司 | Beret frame lower chord downward-hanging joist steel hoop type device |
CN204452476U (en) * | 2014-12-31 | 2015-07-08 | 淮北矿业股份有限公司 | A kind of stop device |
-
2015
- 2015-09-25 CN CN201510619739.5A patent/CN105366576B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5765662A (en) * | 1996-08-30 | 1998-06-16 | Mellen; James | Wheeled raise skip |
CN101327886A (en) * | 2008-06-24 | 2008-12-24 | 张小玲 | Cable car elevator |
CN201713189U (en) * | 2010-07-01 | 2011-01-19 | 山东科技大学 | Novel winch-driven single-rail crane transportation system |
CN202574259U (en) * | 2012-05-18 | 2012-12-05 | 徐州大恒测控技术有限公司 | Mine inclined roadway catcher |
CN203742156U (en) * | 2013-12-13 | 2014-07-30 | 中建三局第一建设工程有限责任公司 | Beret frame lower chord downward-hanging joist steel hoop type device |
CN204452476U (en) * | 2014-12-31 | 2015-07-08 | 淮北矿业股份有限公司 | A kind of stop device |
Also Published As
Publication number | Publication date |
---|---|
CN105366576A (en) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204185126U (en) | Monorail crane system light rail track connection structure | |
CN203200622U (en) | Monorail crane rail connection suspension device | |
CN203284165U (en) | Side slope material transporting system | |
CN105366576B (en) | Underground monorail crane | |
CN204623449U (en) | Mining electric haul cableway | |
CN213976674U (en) | Lifting beam for monorail crane | |
CN105905128B (en) | SQ-1200 endless rope series tractor gets rid of the technology of shunting the multilevel transport inclined gallery of mine | |
CN204490353U (en) | A kind of device that can effectively prevent steel-wire rope type electric block from falling | |
CN208650908U (en) | A kind of simultaneous raking loader anti-skid device of Inclined Lane Lifting guiding | |
CN204980977U (en) | A promote hoist for colliery underground transportation | |
CN215974612U (en) | Lifting beam device for starting chamber of full-face hard rock heading machine | |
CN2193871Y (en) | Simple monorail crane type conveying device | |
CN212355355U (en) | Suspension monorail transportation device | |
CN203713876U (en) | Mining anchor cable vehicle | |
CN103303831B (en) | Rope Locking device | |
CN205668879U (en) | A kind of monorail crane lifting beam | |
CN204184347U (en) | Wire saws monorail crane system rear-mounted installation | |
CN219117847U (en) | Single-rail hanging device | |
CN215208106U (en) | Single track hangs track with buffering car arrester | |
CN206265064U (en) | SQ-1200 endless rope series tractor gets rid of the technology of shunting the multilevel transport inclined gallery of mine | |
CN102490758A (en) | Emergency braking device for descending mine car | |
CN201012875Y (en) | Continuous rope hoist steering device | |
CN204110064U (en) | A kind of mine safety flexible vehicle stop | |
CN202337270U (en) | Positioning device for inclined-tunnel mine car | |
CN204823937U (en) | Personnel's that can transport conveyer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181012 Termination date: 20210925 |
|
CF01 | Termination of patent right due to non-payment of annual fee |