CN105340661B - A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer - Google Patents

A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer Download PDF

Info

Publication number
CN105340661B
CN105340661B CN201510629998.6A CN201510629998A CN105340661B CN 105340661 B CN105340661 B CN 105340661B CN 201510629998 A CN201510629998 A CN 201510629998A CN 105340661 B CN105340661 B CN 105340661B
Authority
CN
China
Prior art keywords
layer
improve
original
block shape
soil moved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510629998.6A
Other languages
Chinese (zh)
Other versions
CN105340661A (en
Inventor
范敬龙
李守江
姚莫白
孙永强
李从娟
徐新文
雷加强
李正楷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SDIC Xinjiang Luobupo Potash Co., Ltd.
Xinjiang Institute of Ecology and Geography of CAS
Original Assignee
SDIC XINJIANG LUOBUPO POTASH CO Ltd
Xinjiang Institute of Ecology and Geography of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SDIC XINJIANG LUOBUPO POTASH CO Ltd, Xinjiang Institute of Ecology and Geography of CAS filed Critical SDIC XINJIANG LUOBUPO POTASH CO Ltd
Priority to CN201510629998.6A priority Critical patent/CN105340661B/en
Publication of CN105340661A publication Critical patent/CN105340661A/en
Application granted granted Critical
Publication of CN105340661B publication Critical patent/CN105340661B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B77/00Machines for lifting and treating soil
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Botany (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The present invention relates to a kind of methods block shape soil moved in improve the original plantation layer and planted trees using the plantation layer.The block shape soil moved in improve the original plantation layer includes the eolian fine silty layer on upper layer, the bulky grain nitride layer of lower layer and the grid cloth between upper and lower level;Wherein, the bottom of the bulky grain nitride layer is V-structure;Screen pipe in two slope surfaces of bulky grain nitride layer bottom on several screen pipes of slope parallel laid, two slope surfaces is intersected in bottom of slope lowest part;The surrounding of the block shape soil moved in improve the original plantation layer and bulky grain nitride layer bottom also coat geotextiles;One is additionally provided with perpendicular to the french drain for planting layer cross section in the bulky grain nitride layer bottom of slope lowest part of cladding geotextiles.Layer is planted using bulk soil moved in improve the original in varieties in saline-alkali areas of the present invention, in effectively control soil while salinity, can avoid the case where level of ground water rises in the invasion of surrounding salinity and soil moved in improve the original region.The planting plants in the soil after the improvement, plant grew well are conducive to restore local vegetation and rebuild ecological green land.

Description

A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer
Technical field
The present invention relates to a kind of methods block shape soil moved in improve the original plantation layer and planted trees using the plantation layer, belong to saline land greening Technical field.
Background technique
There are the saline-alkali wastelands that large area is not suitable for direct planting plants in China.In recent years due to development of resources demand, Ecological construction is carried out in saline-alkali wasteland, to restore local vegetation and rebuild ecological green land.And many heavy salinized wastelands are due to ground Lower water level is high, and violent evaporation makes salt accumulation in surface soil, forms the very big salt crust of hardness, and salt content, can not be direct up to 60% or more Planting plants, it is necessary to remove salt crust, and carry out planting by the means of soil moved in improve the original improvement soil.In fairly large soil moved in improve the original work It is two extremely crucial technology emphasis that Cheng Zhong, the invasion of control salinity and level of ground water, which rise, but up to the present, there is not yet Effective control method.
Summary of the invention
The problem of rising for control salinity more efficient in soil moved in improve the original engineering invasion and level of ground water, the present invention provides one The method that kind block shape soil moved in improve the original is planted layer and planted trees using the plantation layer, the plantation layer is it is possible to prevente effectively from salt is divided into around soil moved in improve the original It invades, avoids level of ground water in soil moved in improve the original region from rising, and the salinity accumulated in soil moved in improve the original soil is discharged, to make plant normal growth.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of block shape soil moved in improve the original plantation layer, plants layer, the eolian fine silty layer including upper layer, lower layer for block shape soil moved in improve the original Bulky grain nitride layer and the grid cloth between upper and lower level;
Wherein, the bottom of the bulky grain nitride layer is V-structure;
Mistake in two slope surfaces of bulky grain nitride layer bottom on several screen pipes of slope parallel laid, two slope surfaces Chimney filter is intersected in bottom of slope lowest part;
The surrounding of the block shape soil moved in improve the original plantation layer and bulky grain nitride layer bottom also coat geotextiles;
One is additionally provided with perpendicular to the french drain for planting layer cross section in the bulky grain nitride layer bottom of slope lowest part of cladding geotextiles.
In block shape soil moved in improve the original plantation layer of the present invention, the eolian fine silty layer is with a thickness of 90-110cm.
In block shape soil moved in improve the original plantation layer of the present invention, the large particle layer is with a thickness of 40-60cm.
In block shape soil moved in improve the original plantation layer of the present invention, the bottom of slope gradient of the bulky grain nitride layer is 6-8 ‰.
In block shape soil moved in improve the original plantation layer of the present invention, the bulky grain nitride layer is by clinker or railway ballast stone, cobblestone etc. The substance that particle diameter is 5-20cm is filled.
In block shape soil moved in improve the original plantation layer of the present invention, the grid cloth is colour bar grid cloth.
In block shape soil moved in improve the original plantation layer of the present invention, the geotextiles are with a thickness of 0.3-0.5cm.The material of the geotextiles Material is two cloth, one film composite water-proof impervious material.
In block shape soil moved in improve the original plantation layer of the present invention, the filtering tube spacing 1-1.2m.
In block shape soil moved in improve the original plantation layer of the present invention, the screen pipe material is PVC, PPR, PE.The screen pipe Diameter is 63-75mm (tubing of DN63 or DN75 are national standard diameter).It is small that multiple groups are equipped with along the screen pipe axial direction Hole, pitch of holes 20-30cm every group small;Aperture is 1-2cm;Every group of aperture is evenly distributed on each radial direction of screen pipe, every group small Hole number is 6-8;In filtering pipe outer wall, polyester mesh cloth is also wound along screen pipe direction, for all apertures to be covered, To prevent from entering finely ground particle substance in screen pipe, line clogging is caused.The polyester mesh cloth is 80-100 mesh, breadth 20- 30cm。
In block shape soil moved in improve the original plantation layer of the present invention, the width of the french drain is 0.5-0.7m.Filling in the french drain Partial size is the gravel of 5-20cm.Geotextiles above the french drain are equipped with multiple apertures.
The present invention also provides a kind of methods planted trees using block shape soil moved in improve the original plantation layer, include the following steps:
1) the salt crust at least 150cm depth for removing salt-soda soil, forms a block shape soil moved in improve the original planting area;
2) above-mentioned block shape soil moved in improve the original plantation layer is built into block shape soil moved in improve the original planting area;
3) it in eolian fine silty layer planting plants, irrigates, and periodic observation soil salt content;
4) when observing that soil salt content persistently increases, duty and irrigation time is increased, the water in soil is utilized Salinity is carried to discharge by screen pipe.
As preferred embodiment, the water in soil carries salinity by being discharged into french drain after screen pipe, realizes the soil water To the flow circuit of underground water.
In implantation methods of the present invention, the plant is arrow-leaved oleaster, diversiform-leaved poplar, sacsaoul, Chinese tamarisk, husky honey raisin tree, white thorn, small bell Thorn, fructus lycii etc..
In implantation methods of the present invention, the planting line space uses 1 × 1m;
In implantation methods of the present invention, the irrigation method uses trickle irrigation, and drip irrigation pipe is compensated using 1m spaced pressure Formula water dropper, duty 3-5l/h, watering period 2-3d.
Layer is planted using block shape soil moved in improve the original of the present invention, surrounding can be avoided in effectively control soil while salinity The case where level of ground water rises in salinity invasion and soil moved in improve the original region.The planting plants in the plantation layer, plant growth are good It is good, be conducive to restore local vegetation and rebuild ecological green land.
Detailed description of the invention
Fig. 1 is the structural profile illustration that block shape soil moved in improve the original of the present invention plants layer.
Fig. 2 is the positional diagram that block shape soil moved in improve the original of the present invention plants screen pipe and french drain in layer.
Fig. 3 is the sectional view that block shape soil moved in improve the original of the present invention plants screen pipe in layer.
Fig. 4 is another embodiment of screen pipe of the present invention.
In figure: 1, eolian fine silty layer;2, geotextiles;3, bulky grain nitride layer;4, grid cloth;5, filter screen;51, small Hole;52, polyester mesh cloth;6, french drain;61, aperture.
Specific embodiment
The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention..
A kind of block shape soil moved in improve the original of embodiment 1 plants layer
A kind of block shape soil moved in improve the original plants layer, as shown in Figs 1-4, specifically includes the eolian fine silty layer 1 on upper layer, lower layer Bulky grain nitride layer 3 and the grid cloth 4 between upper and lower level;
Wherein, the bottom of the bulky grain nitride layer is V-structure;
In two slope surfaces of bulky grain nitride layer bottom along several screen pipes 5 of slope parallel laid, two slope surfaces Screen pipe is intersected in bottom of slope lowest part;
The surrounding of the block shape soil moved in improve the original plantation layer and bulky grain nitride layer bottom also coat geotextiles 2;
One is additionally provided with perpendicular to the french drain 6 for planting layer cross section in the bulky grain nitride layer bottom of slope lowest part of cladding geotextiles;.
Wherein, the eolian fine silty layer is with a thickness of 90cm.The large particle layer is with a thickness of 40-60cm.
Wherein, the bottom of slope gradient of the bulky grain nitride layer is 6 ‰.
Wherein, the bulky grain nitride layer is filled out by the substance that the particle diameters such as clinker or railway ballast stone, cobblestone are 5-20cm It fills.
Wherein, the grid cloth is colour bar grid cloth.
Wherein, the geotextiles are with a thickness of 0.5cm.The material of the geotextiles is two cloth, one film composite water-proof antiseepage material Material.
Wherein, the filtering tube spacing 1.2m.
Wherein, the screen pipe material is pvc pipe, diameter 63mm.It is small that multiple groups are equipped with along the screen pipe axial direction Hole 51, pitch of holes 20-30cm every group small;Aperture is 1-2cm;Every group of aperture is evenly distributed on each radial direction of screen pipe, and every group Small hole number is 6-8;In filtering pipe outer wall, polyester mesh cloth 52 is also wound along screen pipe direction, is used for all apertures Covering causes line clogging to prevent from entering finely ground particle substance in screen pipe.The polyester mesh cloth is 80-100 mesh, breadth 20-30cm。
Wherein, the width of the french drain is 0.5m.The gravel that filling partial size is 5-20cm in the french drain.In the french drain The geotextiles of top are equipped with multiple apertures 61.
A kind of method planted trees using above-mentioned block shape soil moved in improve the original plantation layer of embodiment 2
A method of it is planted trees, is included the following steps: using above-mentioned plantation layer
1) the salt crust at least 150cm depth for removing salt-soda soil, forms a block shape soil moved in improve the original planting area;
2) above-mentioned block shape soil moved in improve the original plantation layer is built into block shape soil moved in improve the original planting area;
3) it in eolian fine silty layer planting plants, irrigates, and periodic observation soil salt content;
4) when observing that soil salt content persistently increases, duty and irrigation time is increased, the water in soil is utilized Salinity is carried by being discharged into french drain after screen pipe, realizes flow circuit of the soil water to underground water.
Wherein, the plant is arrow-leaved oleaster, diversiform-leaved poplar, sacsaoul, Chinese tamarisk, husky honey raisin tree, white thorn, small bell thorn, fructus lycii etc..
Wherein, the planting line space uses 1 × 1m;
Wherein, the irrigation method uses trickle irrigation, and drip irrigation pipe uses 1m spaced pressure compensating drop irrigation head, duty 3- 5l/h, watering period 2-3d.
Compliance test result
The technical effect of the scheme in order to further illustrate the present invention, the present invention select Xinjiang Lop Nur innerland, and state throws Salt-soda soil in Sylvite area is improved, and improvement front and back soil salt content is as shown in table 1.
Table 1
As shown in Table 1, salt content variation is fairly obvious before and after alkaline land improving, and it is saline and alkaline to illustrate that scheme of the present invention reduces Ground salt content significant effect.
Meanwhile typical plant is planted on the salt-soda soil after above-mentioned improvement, its average increment is measured, the results are shown in Table 2.
Table 2
Although above the present invention is described in detail with a general description of the specific embodiments, On the basis of the present invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Cause This, these modifications or improvements, fall within the scope of the claimed invention without departing from theon the basis of the spirit of the present invention.

Claims (6)

1. a kind of block shape soil moved in improve the original plants layer, which is characterized in that the large particle of eolian fine silty layer, lower layer including upper layer Layer and the grid cloth between upper and lower level;
Wherein, the eolian fine silty layer is with a thickness of 90-110cm;
The bottom of the bulky grain nitride layer is V-structure;
Screen pipe in two slope surfaces of bulky grain nitride layer bottom on several screen pipes of slope parallel laid, two slope surfaces It is intersected in bottom of slope lowest part;
The surrounding of the block shape soil moved in improve the original plantation layer and bulky grain nitride layer bottom also coat geotextiles;The material of the geotextiles is Two cloth, one film composite water-proof impervious material;The geotextiles are with a thickness of 0.3-0.5cm;
One is additionally provided with perpendicular to the french drain for planting layer cross section in the bulky grain nitride layer bottom of slope lowest part of cladding geotextiles;The french drain Width be 0.5-0.7m;The gravel that filling partial size is 5-20cm in the french drain;Geotextiles above the french drain are equipped with Multiple apertures;
The bulky grain nitride layer is filled by clinker, railway ballast stone or cobblestone;Particle diameter is 5-20cm;The bulky grain nitride layer With a thickness of 40-60cm;
The filtering tube spacing 1-1.2m;Diameter is 63-75mm;In filtering pipe outer wall, terylene is also wound along screen pipe direction Grid cloth;The polyester mesh cloth is 80-100 mesh, breadth 20-30cm;
Multiple groups aperture, pitch of holes 20-30cm every group small are equipped with along the screen pipe axial direction;Aperture is 1-2cm;Every group of aperture It is evenly distributed on each radial direction of screen pipe, every group of small hole number is 6-8.
2. block shape soil moved in improve the original plants layer according to claim 1, which is characterized in that the bottom of slope gradient of the bulky grain nitride layer is 6-8‰。
3. according to claim 1 block shape soil moved in improve the original plant layer, which is characterized in that the screen pipe material be PVC, PPR, PE。
4. a kind of method planted trees using any block shape soil moved in improve the original plantation layer of claim 1-3, which is characterized in that including such as Lower step:
1) the salt crust at least 150cm depth for removing salt-soda soil, forms a block shape soil moved in improve the original planting area;
2) block shape soil moved in improve the original plantation layer is built into block shape soil moved in improve the original planting area;
3) it in eolian fine silty layer planting plants, irrigates, and periodic observation soil salt content;
4) when observing that soil salt content persistently increases, duty and irrigation time are increased, is carried using the water in soil Salinity is discharged by screen pipe.
5. tree-planting method according to claim 4, which is characterized in that the water in soil carries salinity and passes through screen pipe heel row Enter french drain, realizes flow circuit of the soil water to underground water.
6. tree-planting method according to claim 4, which is characterized in that the irrigation method uses trickle irrigation, and drip irrigation pipe uses 1m spaced pressure compensating drop irrigation head, duty 3-5l/h, watering period 2-3d.
CN201510629998.6A 2015-09-25 2015-09-25 A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer Active CN105340661B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510629998.6A CN105340661B (en) 2015-09-25 2015-09-25 A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510629998.6A CN105340661B (en) 2015-09-25 2015-09-25 A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer

Publications (2)

Publication Number Publication Date
CN105340661A CN105340661A (en) 2016-02-24
CN105340661B true CN105340661B (en) 2019-08-30

Family

ID=55316953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510629998.6A Active CN105340661B (en) 2015-09-25 2015-09-25 A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer

Country Status (1)

Country Link
CN (1) CN105340661B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109983972A (en) * 2019-03-25 2019-07-09 太湖县天顺农业发展有限公司 A kind of plantation breeding method of nursery stock

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201630045U (en) * 2010-04-13 2010-11-17 启东建筑集团山水园林建设有限公司 Saline-alkali soil landscaping water-soil improvement facility
CN202232370U (en) * 2011-09-20 2012-05-30 北京正和恒基滨水生态环境治理有限公司 Greening system for treatment of high water level impervious saline-alkali soil
CN203896685U (en) * 2014-04-17 2014-10-29 山东潍坊东盛园艺有限公司 Tree planting structure in coastal saline-alkali land
CN204047087U (en) * 2014-06-29 2014-12-31 青岛海川建设集团有限公司 The salt discharge of drainage flexible pipe and the anti-salt system of separation layer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201630045U (en) * 2010-04-13 2010-11-17 启东建筑集团山水园林建设有限公司 Saline-alkali soil landscaping water-soil improvement facility
CN202232370U (en) * 2011-09-20 2012-05-30 北京正和恒基滨水生态环境治理有限公司 Greening system for treatment of high water level impervious saline-alkali soil
CN203896685U (en) * 2014-04-17 2014-10-29 山东潍坊东盛园艺有限公司 Tree planting structure in coastal saline-alkali land
CN204047087U (en) * 2014-06-29 2014-12-31 青岛海川建设集团有限公司 The salt discharge of drainage flexible pipe and the anti-salt system of separation layer

Also Published As

Publication number Publication date
CN105340661A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
US10383273B2 (en) Coastal severe saline-alkali soil improvement and vegetation construction system
CN101444155B (en) Device and method for improving saline land
CN110521322B (en) Saline-alkali soil improvement system and method
CN205030256U (en) Canopy is planted in saline and alkaline land
CN102138491B (en) Soil and ecological control method for coastal beaches
Hornbuckle et al. Controlled water table management as a strategy for reducing salt loads from subsurface drainage under perennial agriculture in semi-arid Australia
CN109168379A (en) One kind pressing salt desalting system for Saline-alkali Land In Hetao Irrigation Region
CN103718686A (en) Partial flow collecting, permeation enhancing and evaporation restraining saline land improvement system and method
CN202455773U (en) Concealed conduit device for discharging salt and reducing alkali on saline-alkali land
CN105340661B (en) A kind of method block shape soil moved in improve the original plantation layer and planted trees using the plantation layer
CN206433445U (en) A kind of saline land greening pattern of farming
CN108293831A (en) Heavy saline afforestation greening method
CN106958224A (en) A kind of method that wetland mud is administered
CN208357131U (en) A kind of fountain system in sinking wetland
CN208675986U (en) Planting fruit trees field
CN103650978A (en) Saline-alkali soil greening module and method
CN203646005U (en) Local collection permeation-enhancing evaporation-suppression saline-alkali land improvement system
CN203633091U (en) Salt eliminating system used for park green plant planting soil
CN215052658U (en) Ecological protection structure of falling zone of reservoir district
CN108040765A (en) One kind answers green and construction method based on raw basin formula rock side slope is planted
CN103947438B (en) Revegetation system and utilize this system to carry out the method for revegetation
CN207211326U (en) One kind is without slope lawn discharge structure
CN102172196A (en) Water supply and soil conservation facility for dry soil plants
CN208724492U (en) Rock side slope embeds tree planting structure
CN205883903U (en) Saline soil reclamation arranges salt device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Fan Jinglong

Inventor after: Li Shoujiang

Inventor after: Yao Mobai

Inventor after: Sun Yongqiang

Inventor after: Li Congjuan

Inventor after: Xu Xinwen

Inventor after: Lei Jiaqiang

Inventor after: Li Zhengkai

Inventor before: Fan Jinglong

Inventor before: Sun Yongqiang

Inventor before: Xu Xinwen

Inventor before: Lei Jiaqiang

Inventor before: Li Congjuan

Inventor before: Li Zhengkai

COR Change of bibliographic data
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170511

Address after: 839000 No. 68 West Construction Road, the Xinjiang Uygur Autonomous Region, Hami

Applicant after: SDIC Xinjiang Luobupo Potash Co., Ltd.

Applicant after: Xinjiang Institute of ecology and geography, Chinese Academy of Sciences

Address before: 830011 No. 818 South Beijing Road, the Xinjiang Uygur Autonomous Region, Urumqi

Applicant before: Xinjiang Institute of ecology and geography, Chinese Academy of Sciences

GR01 Patent grant
GR01 Patent grant