CN105317439B - A kind of adjustable comprehensive chassis of rail tunnel cross-section - Google Patents

A kind of adjustable comprehensive chassis of rail tunnel cross-section Download PDF

Info

Publication number
CN105317439B
CN105317439B CN201410340841.7A CN201410340841A CN105317439B CN 105317439 B CN105317439 B CN 105317439B CN 201410340841 A CN201410340841 A CN 201410340841A CN 105317439 B CN105317439 B CN 105317439B
Authority
CN
China
Prior art keywords
door frame
fixedly connected
steel plate
review
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410340841.7A
Other languages
Chinese (zh)
Other versions
CN105317439A (en
Inventor
张元海
李洪明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Original Assignee
Guangdong Water Power Urban Rail Transit Construction Co Ltd
Filing date
Publication date
Application filed by Guangdong Water Power Urban Rail Transit Construction Co Ltd filed Critical Guangdong Water Power Urban Rail Transit Construction Co Ltd
Priority to CN201410340841.7A priority Critical patent/CN105317439B/en
Publication of CN105317439A publication Critical patent/CN105317439A/en
Application granted granted Critical
Publication of CN105317439B publication Critical patent/CN105317439B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of simple in construction, it is easy for construction, the adjustable comprehensive chassis of new rail tunnel cross-section of outline excavation review can be realized, it includes stage mechanism, profiled outline review mechanism, walking mechanism and operating platform mechanism, profiled outline review mechanism and is installed on the periphery of stage mechanism;Walking mechanism is installed on the bottom of stage mechanism;Operating platform mechanism is installed on stage mechanism, to realize the section review of tunnel double-lining construction, reinforcing bar positioning and sample rack function, just waterproof material laying positioning, the lining concrete grouting platform of branch two and two lining defect processing platform features.The present invention can be checked the outline excavation of the section in tunnel, to ensure the normalization of the outline excavation of the section in tunnel, the crooked radian of crown profile muscle and sidewall profile muscle can also be changed, section review and waterproof construction suitable for the tunnel of different section, are especially suitable for same tunnel and take different supporting sections because of different surrounding rock grade.

Description

A kind of adjustable comprehensive chassis of rail tunnel cross-section
Technical field
The present invention relates to a kind of chassis suitable for constructing tunnel, it particularly relates to a kind of simple in construction, construction party Just, it is possible to achieve the adjustable comprehensive chassis of new rail tunnel cross-section of outline excavation review.
Background technology
Domestic tunnel trolley Typical Representative has two kinds, and one kind is separate type reinforcement trolley, for example middle iron 23 of Typical Representative The Wu Shenghong establishment of three companies of group of office《Adjustable positioning device reinforcement trolley installs tunnel arch reinforcing bar engineering method》([1] Wu Sheng Red adjustable positioning devices reinforcement trolley installation tunnel arch reinforcing bar engineering method [J] scientific and technological information exploitation is with economical, and 2008,16); Another kind be with the two preposition chassis that be connecteds of the lining car, its Typical Representative such as SINOHYDRO Bureau 7 Co., Ltd. answers Small stream Lip river crosses 2# flood discharging tunnels and falls endpiece reinforcing bar telescoping steel form, and their structure is all heavier, and function is excessively single, and design is not Enough hommizations.
The content of the invention
Deficiency for more than, it is easy for construction, it is possible to achieve outline excavation is checked the invention provides a kind of simple in construction The adjustable comprehensive chassis of new rail tunnel cross-section, it includes stage mechanism and walking mechanism, and walking mechanism is installed on stand machine The bottom of structure, to realize chassis front and rear walking in tunnel, in addition to profiled outline review mechanism, profiled outline review mechanism peace Periphery loaded on stage mechanism, the outline excavation of the section in tunnel is checked with realizing.
In order to further realize the present invention, the profiled outline review mechanism includes at least one crown profile review group Part, each crown profile review component include drag link bearing, at least two pull bars and crown profile muscle, the drag link bearing Door frame crossbeam is fixedly connected with, the inner of each pull bar is fixedly connected with drag link bearing, and its other end is protruding and is connected to Crown profile muscle.
In order to further realize the present invention, the crown profile muscle is made of elastomeric material, set on the drag link bearing Angle index is equipped with, the angle index according to drag link bearing fixes each pull bar.
In order to further realize the present invention, in addition at least two guiding constraint pipes, each guiding constraint pipe difference The outer end of every pull bar is fixedly connected with, each guiding constraint pipe entangles crown profile muscle respectively, and can be slided along crown profile muscle It is dynamic.
In order to further realize the present invention, the profiled outline review mechanism includes at least one sidewall profile review group Part, each sidewall profile review component include drag link bearing, at least two pull bars and sidewall profile muscle, the drag link bearing Door frame column is fixedly connected with, the inner of each pull bar is fixedly connected with drag link bearing, and its other end is protruding and is connected to Sidewall profile muscle.
In order to further realize the present invention, the sidewall profile muscle is made of elastomeric material, set on the drag link bearing Angle index is equipped with, the angle index according to drag link bearing fixes each pull bar.
In order to further realize the present invention, in addition at least two guiding constraint pipes, each guiding constraint pipe difference The outer end of every pull bar is fixedly connected with, each guiding constraint pipe entangles sidewall profile muscle respectively, and can be slided along sidewall profile muscle It is dynamic.
In order to further realize the present invention, each pull bar uses bi-directional expansion screw-rod structure.
In order to further realize the present invention, in addition to the operating platform mechanism being installed on stage mechanism, to realize tunnel Two lining constructions, the operating platform mechanism includes at least one top layer operating platform and at least two intermediary operation platforms, each The top layer operating platform is respectively and fixedly installed between two door frame crossbeams, and each intermediary operation platform is fixed respectively to pacify On four door frame columns.
In order to further realize the present invention, the stage mechanism is above indulged including four door frame columns, two lower longerons, two Beam and two door frame crossbeams, each door frame column are in longitudinally disposed, are set between door frame column in parallel interval, Mei Yimen The both ends for erecting post are respectively fixedly connected with one piece of junction steel plate laterally set, and the lower longeron be arranged in parallel in fore-and-aft direction, Often once two surfaces up and down at the both ends of longeron are respectively fixedly connected with one piece of junction steel plate laterally set, often once on longeron It is fixedly connected between the junction steel plate on surface and the junction steel plate of each door frame column bottom by bolt assembly, the upper longeron It is be arranged in parallel in fore-and-aft direction, two surfaces up and down at the both ends of each upper longeron are respectively fixedly connected with one piece of company laterally set Steel plate is connect, passes through bolt assembly between the junction steel plate of each upper longeron lower surface and the junction steel plate of each door frame column top It is fixedly connected, the door frame crossbeam be arranged in parallel in left and right directions, and the bottom of each door frame crossbeam corresponds to upper longeron upper surface The position of junction steel plate be respectively fixedly connected with one piece of junction steel plate laterally set, each junction steel plate of each door frame crossbeam It is fixedly connected between the junction steel plate of each upper longeron upper surface by bolt assembly.
Beneficial effects of the present invention:
1st, the present invention can be checked the outline excavation of the section in tunnel using profiled outline review mechanism, to ensure The normalization of the outline excavation of the section in tunnel.
2nd, crown profile muscle and sidewall profile muscle of the invention are made of elastomeric material, are set on drag link bearing angled Scale, the angle index according to drag link bearing fix each pull bar, thus it is possible to vary the arc of curvature of crown profile muscle and sidewall profile muscle Degree, suitable for different section tunnel section review and waterproof construction, be especially suitable for same tunnel because of different surrounding rock grade and Take different supporting sections.
3rd, pull bar of the invention uses bi-directional expansion screw-rod structure, and crown profile muscle and side are adjusted by bi-directional expansion screw rod Wall profile muscle position, so that crown profile muscle and sidewall profile muscle meet section requirement, play section review(Chassis is coordinated to determine To traveling)And splash guard(Coiled material)Fixed effect.
4th, the present invention can meet tunnel double-lining arch wall reinforcing bar by adjusting crown profile muscle and sidewall profile muscle position The requirement of positioning bar and sample rack, it is suitable for tunnel double-lining arch wall reinforcement construction.
5th, the present invention is connected by screw bolts and welds, and is adapted to install in the hole excavated.
Brief description of the drawings
Fig. 1 is the structural representation of the adjustable comprehensive chassis of new rail tunnel cross-section of the present invention;
Fig. 2 is the structural representation of the component of actively walking of the present invention;
Fig. 3 is the scheme of installation of the driven pulley of the present invention.
Embodiment
The present invention is further elaborated below in conjunction with the accompanying drawings, wherein, direction of the invention is using Fig. 1 as standard.
As shown in Figure 1, Figure 2 and Figure 3, the adjustable comprehensive chassis of new rail tunnel cross-section of the invention include stage mechanism 1, Profiled outline review mechanism 2, walking mechanism 3 and operating platform mechanism 4, profiled outline review mechanism 2 are installed on stage mechanism 1 Periphery, the outline excavation of the section in tunnel is checked with realizing;Walking mechanism 3 is installed on the bottom of stage mechanism 1, with reality Existing chassis front and rear walking in tunnel;Operating platform mechanism 4 is installed on stage mechanism 1, to realize that tunnel double-lining is constructed.
Stage mechanism 1 uses tower structure, and stage mechanism 1 includes the lower longeron 12, two of four 11, two, door frame columns Upper 13, two door frame crossbeams 14 of longeron and four angle steel 15, every door frame column 11 in longitudinally disposed, all door frame columns 11 it Between in parallel interval set, the both ends of every door frame column 11 are respectively fixedly connected with(Welding)One piece of junction steel plate laterally set 5;Two lower longerons 12 are respectively arranged in the bottom of each door frame column 11, and two lower longerons 12 be arranged in parallel in fore-and-aft direction, often Longeron 12 uses Two bors d's oeuveres structure under root, and two surfaces up and down at the both ends of every lower longeron 12 are respectively fixedly connected with(Welding)One piece The junction steel plate 5 laterally set, the junction steel plate 5 of the every lower upper surface of longeron 12 and the connection steel of the every bottom of door frame column 11 It is fixedly connected between plate 5 by bolt assembly 6;Two upper longerons 13 are respectively arranged in the top of each door frame column 11, on two Longeron 13 be arranged in parallel in fore-and-aft direction, and every upper longeron 13 uses Two bors d's oeuveres structure, and up and down the two of the both ends of every upper longeron 13 Individual surface is respectively fixedly connected with(Welding)One piece of junction steel plate 5 laterally set, the junction steel plate 5 of the every upper lower surface of longeron 13 It is fixedly connected between the junction steel plate 5 on the every top of door frame column 11 by bolt assembly 6;Two door frame crossbeams 14 are pacified respectively Top loaded on two upper longerons 13, two door frame crossbeams 14 be arranged in parallel in left and right directions, the bottom of every door frame crossbeam 14 It is respectively fixedly connected with corresponding to the position of the junction steel plate 5 of the upper upper surface of longeron 13(Welding)One piece of junction steel plate laterally set 5, pass through bolt group between each junction steel plate 5 and the every junction steel plate 5 for going up the upper surface of longeron 13 of every door frame crossbeam 14 Part 6 is fixedly connected;Four angle steel 15 are respectively arranged between all upper longerons 13 and door frame column 11, and all angle steel 15 are in 40 Five degree are obliquely installed, and one end of every angle steel 15 is respectively fixedly connected with(Welding)Each door frame column 11, its other end are fixed respectively Connection(Welding)Two door frame crossbeams 14.
Profiled outline review mechanism 2 includes a crown profile and checks component 21 and two sidewall profile review components 22, Wherein, crown profile review component 21 includes 211, three pull bars 212 of drag link bearing, crown profile muscle 213 and three guiding about Beam tube 214, drag link bearing 211 are fixedly connected(Welding)Door frame crossbeam 14, angle index is provided with drag link bearing 211, utilize Angle index on drag link bearing 211 determines the fixed position of three pull bars 212, so as to change the bending of crown profile muscle 213 Radian, the crooked radian of crown profile muscle 213 is determined to meet workmen when assembling trolley, utilize crown profile muscle 213 crooked radian goes to check the top radian in tunnel;Three pull bars 212 are in same shaft section(Left and right directions), three pull bars 212 the inner is fixedly connected with drag link bearing 211, and their other end is protruding, and every pull bar 212 uses bi-directional expansion screw rod Structure, every pull bar 212 is provided with length scale along its length, after the top radian in tunnel has been checked, while to Three pull bars 212 of contract, tunnel double-lining arch wall reinforcement construction can be verified again using crown profile muscle 213(Maintain like Radian);Crown profile muscle 213 is made of elastomeric material, and one end of crown profile muscle 213 is fixed, its other end stay it is tediously long, Utilize the fixed position of the tediously long end adjusting yoke 212 of crown profile muscle 213;Three guiding constraint pipes 214 are respectively fixedly connected with The outer end of three pull bars 212(Relative to the other end of drag link bearing 211), three guiding constraint pipes 214 entangle crown wheel respectively Wide muscle 213, and can be slided along crown profile muscle 213.Two sidewall profile review separation crown profile review components of components 22 21 left and right sides, each sidewall profile review component 22 include drag link bearing 221, three pull bars 222, sidewall profile muscle 223 With three guiding constraint pipes 224, drag link bearing 221 is fixedly connected(Welding)Door frame column 11, angle is provided with drag link bearing 221 Scale is spent, the fixed position of three pull bars 222 is determined using the angle index on drag link bearing 221, so as to change sidewall profile The crooked radian of muscle 223, the crooked radian of sidewall profile muscle 223 is determined to meet workmen when assembling trolley, profit Gone to check the abutment wall radian in tunnel with the crooked radian of sidewall profile muscle 223;Three pull bars 222 are in same shaft section(Right and left To), the inner of three pull bars 222 is fixedly connected with drag link bearing 221, and their other end is protruding, and every pull bar 222 uses Bi-directional expansion screw-rod structure, every pull bar 222 are provided with length scale along its length, are checking the abutment wall radian in tunnel After, while to three pull bars 222 of contract, again can be to tunnel double-lining abutment wall reinforcement construction school using sidewall profile muscle 223 Test(The radian maintained like);Sidewall profile muscle 223 is made of elastomeric material, and one end of sidewall profile muscle 223 is fixed, and its is another One end is stayed tediously long, utilizes the fixed position of the tediously long end adjusting yoke 222 of sidewall profile muscle 223;Three guiding constraint pipes 224 divide The outer end of three pull bars 222 is not fixedly connected with(Relative to the other end of drag link bearing 221), three guiding constraint pipes 224 distinguish Sidewall profile muscle 223 is entangled, and can be slided along sidewall profile muscle 223.
Walking mechanism 3 is actively walked component 33 and two driven pulleys 34 including two pieces of 31, two, sleeper, 32, two, tracks, Wherein, depth direction parallel laid of two blocks of sleepers 31 along tunnel is in tunnel;Two track 32 is respectively and fixedly installed to two On block sleeper 31, two tracks 32 are set in parallel;Two components 33 of actively walking are respectively arranged in two lower rear ends of longeron 12 Lower surface correspond to the position of every piece of junction steel plate 5, each component 33 of actively walking includes road wheel 331, paperback motor 332nd, hook 333, lanyard 334 and resistance rail device 335, pass through spiral shell between road wheel 331 and the junction steel plate 5 of the lower lower surface of longeron 12 Bolt assembly 6 is fixedly connected, and drives chassis to be walked along the track 32 in tunnel is front and rear using road wheel 331, paperback motor 332 It is installed on road wheel 331, to drive road wheel 331 to rotate forward, hook 333 is fixedly installed on door frame column 11, lanyard 334 one end coupling hook 333, the other end connection resistance rail device 335 of lanyard 334, after resistance rail device 335 is located at road wheel 331 Side, to prevent road wheel 331 from sliding;The lower surface that two driven pulleys 34 are respectively arranged in two lower front ends of longeron 12 corresponds to often The position of block junction steel plate 5.
Operating platform mechanism 4 includes three top layer operating platforms 41 and two intermediary operation platforms 42, three top layer operations Platform 41 is respectively and fixedly installed between two door frame crossbeams 14, and two intermediary operation platforms 42 are respectively and fixedly installed to four doors Erect on post 11, tunnel double-lining is carried out using three top layer operating platforms 41 and two convenient construction personnel of intermediary operation platform 42 Construction, three top layer operating platforms 41 and two intermediary operation platforms 42 typically use light-duty grid section steel platform.
The better embodiment of the present invention is the foregoing is only, the invention is not limited in above-mentioned embodiment, is implementing During there may be local small structural modification, if not departing from the essence of the present invention to the various changes or modifications of the present invention God and scope, and belong within the scope of the claim and equivalent technologies of the present invention, then the present invention is also intended to comprising these changes And modification.

Claims (8)

1. a kind of adjustable comprehensive chassis of rail tunnel cross-section, it includes stage mechanism and walking mechanism, and walking mechanism is installed on platform The bottom of frame mechanism, to realize chassis front and rear walking in tunnel, it is characterised in that also check mechanism including profiled outline, break Facial contour review mechanism is installed on the periphery of stage mechanism, and the outline excavation of the section in tunnel is checked with realizing;It is described Profiled outline review mechanism includes at least one crown profile review component, and each crown profile review component includes pull bar Bearing, at least two pull bars and crown profile muscle, the drag link bearing are fixedly connected with door frame crossbeam, the inner of each pull bar Drag link bearing is fixedly connected with, its other end is protruding and is connected to crown profile muscle;Also include at least two guiding constraint pipes, Each guiding constraint pipe is respectively fixedly connected with the outer end of every pull bar, and each guiding constraint pipe entangles crown profile respectively Muscle, and can be slided along crown profile muscle.
2. the adjustable comprehensive chassis of rail tunnel cross-section according to claim 1, it is characterised in that the crown profile muscle is adopted It is made of elastomeric material, angle index is provided with the drag link bearing, the angle index according to drag link bearing fixes each institute State pull bar.
3. the adjustable comprehensive chassis of rail tunnel cross-section according to claim 1, it is characterised in that the profiled outline review Mechanism includes at least one sidewall profile review component, and each sidewall profile review component includes drag link bearing, at least two Root pull bar and sidewall profile muscle, the drag link bearing are fixedly connected with door frame column, and the inner of each pull bar is fixedly connected with drawing Rod bearing, its other end is protruding and is connected to sidewall profile muscle.
4. the adjustable comprehensive chassis of rail tunnel cross-section according to claim 3, it is characterised in that the sidewall profile muscle is adopted It is made of elastomeric material, angle index is provided with the drag link bearing, the angle index according to drag link bearing fixes each institute State pull bar.
5. the adjustable comprehensive chassis of rail tunnel cross-section according to claim 3, it is characterised in that also led including at least two To confinement tube, each guiding constraint pipe is respectively fixedly connected with the outer end of every pull bar, and each guiding constraint pipe entangles respectively Sidewall profile muscle, and can be slided along sidewall profile muscle.
6. the adjustable comprehensive chassis of rail tunnel cross-section according to claim 1 or 3, it is characterised in that each pull bar Using bi-directional expansion screw-rod structure.
7. the adjustable comprehensive chassis of rail tunnel cross-section according to claim 1, it is characterised in that also include being installed on stand Operating platform mechanism in mechanism, to realize that tunnel double-lining is constructed, the operating platform mechanism operates including at least one top layer Platform and at least two intermediary operation platforms, each top layer operating platform be respectively and fixedly installed to two door frame crossbeams it Between, each intermediary operation platform is respectively and fixedly installed on six roots of sensation door frame column.
8. the adjustable comprehensive chassis of rail tunnel cross-section according to claim 1, it is characterised in that the stage mechanism includes Four door frame columns, two lower longerons, two upper longerons and two door frame crossbeams, each door frame column in longitudinally disposed, Set between door frame column in parallel interval, the both ends of each door frame column are respectively fixedly connected with the one block of connection laterally set steel Plate, the lower longeron are be arranged in parallel in fore-and-aft direction, and one is respectively fixedly connected with per two surfaces up and down at the both ends of longeron once The junction steel plate that block is laterally set, per the once junction steel plate of longeron upper surface with the junction steel plate of each door frame column bottom it Between be fixedly connected by bolt assembly, the upper longeron be arranged in parallel in fore-and-aft direction, up and down the two of the both ends of each upper longeron Individual surface is respectively fixedly connected with one piece of junction steel plate laterally set, junction steel plate and each door frame of each upper longeron lower surface It is fixedly connected between the junction steel plate of column top by bolt assembly, the door frame crossbeam be arranged in parallel in left and right directions, often The position that the bottom of one door frame crossbeam corresponds to the junction steel plate of upper longeron upper surface is respectively fixedly connected with one piece and laterally set Pass through bolt group between the junction steel plate of junction steel plate, each junction steel plate of each door frame crossbeam and each upper longeron upper surface Part is fixedly connected.
CN201410340841.7A 2014-07-17 A kind of adjustable comprehensive chassis of rail tunnel cross-section Active CN105317439B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410340841.7A CN105317439B (en) 2014-07-17 A kind of adjustable comprehensive chassis of rail tunnel cross-section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410340841.7A CN105317439B (en) 2014-07-17 A kind of adjustable comprehensive chassis of rail tunnel cross-section

Publications (2)

Publication Number Publication Date
CN105317439A CN105317439A (en) 2016-02-10
CN105317439B true CN105317439B (en) 2018-02-09

Family

ID=

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1553698A1 (en) * 1987-03-25 1990-03-30 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт Method of mechanized erection of support at steep beds
CN103089278A (en) * 2013-02-27 2013-05-08 中交隧道工程局有限公司 Continuous operation rolling over docking type tunnel lining formwork trolley
CN203499697U (en) * 2013-10-11 2014-03-26 北京住总集团有限责任公司 Trolley used for concrete construction of various cross sections through mining method
CN203515607U (en) * 2013-10-23 2014-04-02 唐文明 Adjustable steel mould trolley of tunnel widening section
CN204002794U (en) * 2014-07-17 2014-12-10 粤水电轨道交通建设有限公司 The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1553698A1 (en) * 1987-03-25 1990-03-30 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт Method of mechanized erection of support at steep beds
CN103089278A (en) * 2013-02-27 2013-05-08 中交隧道工程局有限公司 Continuous operation rolling over docking type tunnel lining formwork trolley
CN203499697U (en) * 2013-10-11 2014-03-26 北京住总集团有限责任公司 Trolley used for concrete construction of various cross sections through mining method
CN203515607U (en) * 2013-10-23 2014-04-02 唐文明 Adjustable steel mould trolley of tunnel widening section
CN204002794U (en) * 2014-07-17 2014-12-10 粤水电轨道交通建设有限公司 The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section

Similar Documents

Publication Publication Date Title
CN204002794U (en) The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section
Bonnett Practical railway engineering
CN101230785B (en) Construction method for large section and multiple sections tunnel lining
CN105370287B (en) Large Underground parking lot machinery excavating construction method
CN201221206Y (en) Movable anti-electricity protection shed rack
CN102733317B (en) Plane rotation construction technique for steel truss girder for existing bridge spanning construction
CN104372743B (en) Trestle rapid constructing method
JP4731387B2 (en) How to build a subway
CN108005654B (en) Construction process for overhead mining large-mining-height working face old roadway passing
CN109723445A (en) Parallel three steps full section of tunnel entirety driving method
CN106703856A (en) Shed-style step forward combination support with multi-drill
CN206608198U (en) A kind of canopy formula with gang drill is taken a step sectional shelf-unit
CN105544409A (en) Erecting composite beam on-site section splicing girder construction technology of double guide beam bridge erecting machine
CN108899807A (en) Subway long steep grade entrance electromechanics construction method of installation
CN105317439B (en) A kind of adjustable comprehensive chassis of rail tunnel cross-section
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN204200257U (en) A kind of colliery driving suspension device
RU103817U1 (en) STATION DEVELOPMENT METRO COMPLEX
RU2692518C1 (en) Method for constructing a three-span subway station of an open method of performing works with a lateral arrangement of passenger platforms and a double-track still tunnel
CN103967052A (en) Method for protecting height difference soil bodies of bases of new frame structure bridge and old frame structure bridge
CN206280081U (en) A kind of tunnel reinforcement trolley
CN110500104B (en) Propelling method for shield tunneling machine to pass through shallow-buried underground excavation tunnel
CN1807838A (en) Bridge type shield construction method for box type bridge
CN108443580A (en) A kind of cliff slope large-scale pipeline mounting device
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant