CN108443580A - A kind of cliff slope large-scale pipeline mounting device - Google Patents
A kind of cliff slope large-scale pipeline mounting device Download PDFInfo
- Publication number
- CN108443580A CN108443580A CN201810064204.XA CN201810064204A CN108443580A CN 108443580 A CN108443580 A CN 108443580A CN 201810064204 A CN201810064204 A CN 201810064204A CN 108443580 A CN108443580 A CN 108443580A
- Authority
- CN
- China
- Prior art keywords
- pipelines
- support
- pipeline
- sliding rail
- travelling bogie
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F19/00—Hoisting, lifting, hauling or pushing, not otherwise provided for
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/0243—Laying or reclaiming pipes on land, e.g. above the ground above ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/01—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets for supporting or guiding the pipes, cables or protective tubing, between relatively movable points, e.g. movable channels
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Railway Tracks (AREA)
Abstract
The present invention relates to a kind of cliff slope large-scale pipeline mounting devices, including sliding rail, connecting steel wire ropes, haulage cable, hoist engine, travelling bogie, support of pipelines, pipeline presss from both sides, rubber wheel, pivot pin, spring, and bolt, the wherein described sliding rail is mounted at pipe element paving location, several travelling bogies are equipped at intervals on the sliding rail, and several travelling bogies are connected by steel wire rope, it is slided along sliding rail by rope traction travelling bogie, it is correspondingly provided with pin hole among the travelling bogie and support of pipelines, the travelling bogie is mounted on support of pipelines by pivot pin and spring, the support of pipelines is for placing pipeline, on the inside of the spring protrusion support of pipelines, for playing the role of damping and adjusting in transportational process, the pipeline sandwiched is set in support of pipelines upper end, for pipeline to be fixed on support of pipelines.The present invention can be reduced by mountain shape pipe laying to appropriation of land amount, it is possible to reduce large area excavates the destruction to massif, especially has the advantages that environmental geological protection certain.
Description
Technical field
The invention belongs to cliff slope large-scale pipeline mounting technique fields, pacify more particularly to a kind of cliff slope large-scale pipeline
Assembling device.
Background technology
With the continuous development of China's economy, the technological innovation of building field, construction environment is more and more diversified, in complexity
Geographical environment in construction become the problem that we have to face.In the environment of cliff heavy grade, vertical transport is always
A great problem under the overall situation of green building, reduces the broken of vegetation to the greatest extent other than considering stress and load ability to bear
Bad and our first purpose to be achieved, generally carrying out Pipe installing in the small place of flat site or angle changing rate can
To be constructed by pipeline docking machine, then uses and manually the pipeline of docking is welded.However it will be on cliff hillside
The abutting joint one side sideboom tractor of row pipeline cannot directly walk, stones of endangering, constructional difficulties on hillside more.On the other hand due to pipe
Road is bigger, the specified installation site that operating personnel cannot transport the pipeline of installation by manpower.Even if passing through machinery
It is installed, it is necessary to heavy excavation be carried out to massif, form the work surface that mechanical equipment meets construction, the expense ratio generated in this way
Higher, the duration is long, and also bigger to the environmental disruption of massif, it is possible to produce landslide, the secondary disasters such as mud-rock flow.
Invention content
Technical problem to be solved by the invention is to provide a kind of cliff slope large-scale pipeline mounting devices, solve in cliff
Large-scale pipeline is installed on hillside, construction machinery can not operation the problem of.
The technical solution adopted by the present invention to solve the technical problems is:A kind of cliff slope large-scale pipeline installation dress is provided
It sets, including sliding rail, connecting steel wire ropes, haulage cable, hoist engine, travelling bogie, support of pipelines, pipeline folder, rubber wheel, axis
Pin, spring and bolt are equipped at intervals with several fortune wherein the sliding rail is mounted at pipe element paving location on the sliding rail
Defeated trolley, and several travelling bogies are connected by steel wire rope, are slided along sliding rail by rope traction travelling bogie, the transport
Pin hole is correspondingly provided among trolley and support of pipelines, the travelling bogie is mounted on support of pipelines by pivot pin and spring, described
Support of pipelines is for placing pipeline, the spring protrusion support of pipelines inside, for playing damping and adjusting in transportational process
Effect, the pipeline sandwiched is set in support of pipelines upper end, for pipeline to be fixed on support of pipelines.
The further technical solution of the present invention is that the travelling bogie wheel is rubber wheel, for reducing wheel and sliding rail
Between friction.
The further technical solution of the present invention is smaller than equal to 6m between two neighboring travelling bogie.
The further technical solution of the present invention is that two travelling bogies are equipped at intervals on the sliding rail.
The further technical solution of the present invention is that the pipeline folder is bolted with support of pipelines.
The further technical solution of the present invention is that the direction of motion of the travelling bogie is controlled by hoist engine, and
Travelling bogie can on sliding rail art skating.
Advantageous effect
The present invention greatly reduces the manpower and materials of element tunnel vertical transport in use, solves the spy in heavy grade
The problem that can not be transported in different environment, substantially increases the docking of pipeline or component, uses and more pacify in use
It is complete convenient, and the present invention can be reduced by mountain shape pipe laying to appropriation of land amount, it is possible to reduce large area is excavated to mountain
The destruction of body especially has the advantages that environmental geological protection certain.
Description of the drawings
Fig. 1 is travelling bogie of the present invention, pipeline folder and pipeline support structure schematic diagram.
Fig. 2 is inventive pipeline transport diagram.
Specific implementation mode
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention
Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, people in the art
Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited
Range.
Embodiment 1
As depicted in figs. 1 and 2, a kind of cliff slope large-scale pipeline mounting device, including sliding rail 1, connecting steel wire ropes 2, lead
Draw steel wire rope 3, hoist engine 4, travelling bogie 5, support of pipelines 6, pipeline folder 7, rubber wheel 8, pivot pin 9, spring 10 and bolt 11,
The wherein described sliding rail 1 is mounted at pipe element paving location, several travelling bogies 5 is equipped at intervals on the sliding rail 1, and several
Travelling bogie 5 is connected by connecting steel wire ropes 2, is drawn travelling bogie 5 by 4 haulage cable 5 of hoist engine and is slided along sliding rail 1,
Pin hole is correspondingly provided among the travelling bogie 5 and support of pipelines 6, the travelling bogie 5 is mounted on by pivot pin 9 and spring 10
Support of pipelines 6, the support of pipelines 6 is for placing pipeline, and the spring 10 protrudes 2 inside of support of pipelines, for transporting
Play the role of damping and adjusting in journey, the pipeline folder 7 is arranged in 6 upper end of support of pipelines, for pipeline to be fixed on pipeline
On holder 6.Support of pipelines 6 and pipeline folder 7 are connected by bolt 11, prevent from generating string pipe during pipeline transportation.
5 wheel of the travelling bogie is rubber wheel 8, and for reducing the friction between wheel and sliding rail, two neighboring transport is small
It is smaller than equal to 6m between vehicle 5.
Two travelling bogies 5 are equipped at intervals on the sliding rail 1.
The pipeline folder 6 is connect with support of pipelines 7 by bolt 11.
The direction of motion of the travelling bogie 5 is controlled by hoist engine 4, and travelling bogie 5 can the free skating on sliding rail 1
Row.
In actual use:
Certain Guizhou province urban water supply project, for boiled water room, water treatment facilities mainly be built on mountain top, water source far from water at
It is 200m that the distance in reason room, which has 1000m, wherein flat segments 800m, cliff hillside segment length, and the gradient substantially 45 on cliff hillside is spent
The every segment length of pipeline of left and right, installation is 12m, a diameter of 0.6m, weight 1.48T, is spiral welded steel pipe.Due to mainframe
Tool can not the operation on cliff hillside, installation site can not be carried to by manpower.
Cliff slope large-scale pipeline mounting device of the present invention is now used, steps are as follows for the use of apparatus of the present invention:
1, the position for needing pipe laying is determined;
2, it is laid with Pipe installing track 1 in installation site;
3, Pipe installing trolley 5 is placed in running track, two installation carriages of front and back placement, is passed through between two trolleies
Connecting steel wire ropes 2 connect, and the spacing of two trolleies is not more than 6m, passes through lower rail on 4 haulage cable of hoist engine, 3 installation carriage
Road;
4, large-scale pipeline is placed on above front and back trolley support of pipelines 6, then covers pipeline folder 7;
5, support of pipelines 6 and pipeline folder 7 are connected by bolt 11;
6, support of pipelines is mounted on trolley, is connect with trolley 5 by spring 10, pivot pin 9, and rail is avoided in transportational process
Road is not straight, plays the role of damping and adjusting;
7, so that large-scale pipeline is transported designated mounting position by hoist engine traction steel wire wire saws installation carriage, then and
Already installed pipeline is docked before;
8, trolley is taken out after the completion of docking transport other pipelines to corresponding position by its above-mentioned steps.
Claims (6)
1. a kind of cliff slope large-scale pipeline mounting device, including sliding rail (1), connecting steel wire ropes (2), haulage cable (3), volume
Raise machine (4), travelling bogie (5), support of pipelines (6), pipeline folder (7), rubber wheel (8), pivot pin (9), spring (10) and bolt
(11), it is characterised in that:The sliding rail (1) is mounted at pipe element paving location, is equipped at intervals on the sliding rail (1) several
Travelling bogie (5), 4 rubber wheels (8) are arranged in each trolley, and several travelling bogies (5) are connected by connecting steel wire ropes (2),
It is slided along sliding rail (1) by hoist engine (4) haulage cable (3) travelling bogie (5), the travelling bogie (5) and support of pipelines
(6) intermediate to be correspondingly provided with pin hole, the travelling bogie (5) is mounted on support of pipelines (6), institute by pivot pin (9) and spring (10)
Support of pipelines (6) is stated for placing pipeline, spring (10) protrusion support of pipelines (6) inside, for being risen in transportational process
To the effect of damping and adjusting, the pipeline folder (7) is arranged in support of pipelines (6) upper end, for pipeline to be fixed on pipeline branch
On frame (6), support of pipelines (6) and pipeline folder (7) are connected by bolt (11), prevent from generating string pipe during pipeline transportation.
2. a kind of cliff slope large-scale pipeline mounting device according to claim 1, it is characterised in that:The travelling bogie
(5) wheel is rubber wheel (8), for reducing the friction between wheel and sliding rail.
3. a kind of cliff slope large-scale pipeline mounting device according to claim 1, it is characterised in that:Two neighboring transport
Trolley is smaller than between (5) equal to 6m.
4. a kind of cliff slope large-scale pipeline mounting device according to claim 1, it is characterised in that:The sliding rail (1)
On be equipped at intervals with two travelling bogies (5).
5. a kind of cliff slope large-scale pipeline mounting device according to claim 1, it is characterised in that:The pipeline folder
(6) it is connect by bolt (11) with support of pipelines (7).
6. a kind of cliff slope large-scale pipeline mounting device according to claim 1, it is characterised in that:The travelling bogie
(5) the direction of motion is controlled by hoist engine (4), and travelling bogie (5) can on sliding rail (1) art skating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810064204.XA CN108443580A (en) | 2018-01-23 | 2018-01-23 | A kind of cliff slope large-scale pipeline mounting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810064204.XA CN108443580A (en) | 2018-01-23 | 2018-01-23 | A kind of cliff slope large-scale pipeline mounting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108443580A true CN108443580A (en) | 2018-08-24 |
Family
ID=63191225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810064204.XA Pending CN108443580A (en) | 2018-01-23 | 2018-01-23 | A kind of cliff slope large-scale pipeline mounting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108443580A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108799623A (en) * | 2018-09-10 | 2018-11-13 | 四川商鼎建设有限公司 | Pipe installation method |
CN112502173A (en) * | 2020-10-26 | 2021-03-16 | 浙江世润建创科技发展有限公司 | Construction method for excavating whole sewer pipeline by high-water-content soft soil precipitation |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0681979A (en) * | 1992-09-02 | 1994-03-22 | Shimizu Corp | Method for placing pipe on slope |
CN101813214A (en) * | 2010-04-29 | 2010-08-25 | 中国石油化工集团公司 | Mounting and construction method of U-shaped tunnel pipelines |
CN106151682A (en) * | 2016-07-15 | 2016-11-23 | 中国葛洲坝集团机电建设有限公司 | The large-scale penstock of high slope installs downward putting device and penstock installation method |
CN205737550U (en) * | 2016-05-12 | 2016-11-30 | 云南省第二安装工程公司 | A kind of light rail trailer system of abrupt slope stringing |
-
2018
- 2018-01-23 CN CN201810064204.XA patent/CN108443580A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0681979A (en) * | 1992-09-02 | 1994-03-22 | Shimizu Corp | Method for placing pipe on slope |
CN101813214A (en) * | 2010-04-29 | 2010-08-25 | 中国石油化工集团公司 | Mounting and construction method of U-shaped tunnel pipelines |
CN205737550U (en) * | 2016-05-12 | 2016-11-30 | 云南省第二安装工程公司 | A kind of light rail trailer system of abrupt slope stringing |
CN106151682A (en) * | 2016-07-15 | 2016-11-23 | 中国葛洲坝集团机电建设有限公司 | The large-scale penstock of high slope installs downward putting device and penstock installation method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108799623A (en) * | 2018-09-10 | 2018-11-13 | 四川商鼎建设有限公司 | Pipe installation method |
CN112502173A (en) * | 2020-10-26 | 2021-03-16 | 浙江世润建创科技发展有限公司 | Construction method for excavating whole sewer pipeline by high-water-content soft soil precipitation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107339111B (en) | The floating construction method of installation of more PE pipes in large-scale push pipe | |
CN107100639B (en) | Shield transportation system for large-particle-size sand pebbles | |
CN107237649A (en) | The long steep inclined shaft transportation system of light section and construction method | |
CN107830243A (en) | A kind of natural gas line Construction Support device | |
CN108443580A (en) | A kind of cliff slope large-scale pipeline mounting device | |
CN212531167U (en) | Simple material conveying device under mountain abrupt slope condition | |
CN108590745B (en) | Transportation method and transportation structure for shield tunnel construction | |
CN110593880A (en) | Inclined shaft excavation system and method | |
CN108899807A (en) | Subway long steep grade entrance electromechanics construction method of installation | |
CN106480825A (en) | Railway nonstandard Beams Erection Construction engineering method | |
CN210566648U (en) | Installation device for directional sliding of large pipeline in limited space | |
CN202730569U (en) | Simply-supported beam track skeleton laying car | |
CN110053936B (en) | Pipeline conveying device and pipeline conveying method | |
CN105692447B (en) | A kind of method that handling is carried out using underground railway line track switch component handling apparatus | |
WO2023025325A1 (en) | Construction method for corrugated pipe to pass through pipeline by means of rail sliders in small underground space | |
CN207089490U (en) | Conveying arrangement in the penstock hole that a kind of band turns to | |
CN106939536B (en) | A kind of coal mine inclined shaft assembled is laid a railway track construction method | |
CN202809414U (en) | Track panel paving equipment | |
CN205936693U (en) | Underground ore dressing plant system of overhauing | |
CN212837840U (en) | Tunnel wet blasting trolley walking device hinge lifting device | |
CN206942772U (en) | A kind of shield transportation system of big particle diameter sandy gravel | |
CN111270577A (en) | Assembly machine suitable for narrow space of subway underground line and overhead line cross-track section and construction method thereof | |
CN220845068U (en) | TBM multi-point position hoisting structure | |
CN205576656U (en) | Rail that bridge floor railway was laid welds rail production line | |
JP2002285800A (en) | Rail and wide truck for tunnel driving work |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180824 |
|