CN205936693U - Underground ore dressing plant system of overhauing - Google Patents

Underground ore dressing plant system of overhauing Download PDF

Info

Publication number
CN205936693U
CN205936693U CN201620935306.0U CN201620935306U CN205936693U CN 205936693 U CN205936693 U CN 205936693U CN 201620935306 U CN201620935306 U CN 201620935306U CN 205936693 U CN205936693 U CN 205936693U
Authority
CN
China
Prior art keywords
work
magnetic separation
maintenance
mill
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620935306.0U
Other languages
Chinese (zh)
Inventor
李国洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC North Dalian Engineering Technology Co Ltd
Original Assignee
MCC North Dalian Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC North Dalian Engineering Technology Co Ltd filed Critical MCC North Dalian Engineering Technology Co Ltd
Priority to CN201620935306.0U priority Critical patent/CN205936693U/en
Application granted granted Critical
Publication of CN205936693U publication Critical patent/CN205936693U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to an underground ore dressing plant system of overhauing, select the tunnel including setting up mill in mining haulage drift below the mill select the tunnel to be equipped with a plurality of ore grinding work along length direction to stride and stride with a plurality of magnetic separation work, dehydration work is striden to stride with final magnetic separation work and is set up side by side, every ore grinding work is striden to stride with magnetic separation work and is selected tunnel length direction to be the range of vertical linear ladder along grinding in proper order according to the priority of operation, by the ball mill the closed circuit grinding attachment setting that swirler group constitutes in ore grinding work is striden, the magnet separator setting is in magnetic separation work is striden, its characterized in that overhauls the transition operation and strides the afterbody that the setting was striden in final magnetic separation work, pulley shaft system configuration strides one side in overhauing the transition operation. The utility model has the advantages that: the equipment that can overhaul the needs of all operation areas is carried maintenance transition operation through the maintenance transport trolley and is striden and promote the overhead traveling crane, through promoting overhead traveling crane fortune to earth's surface, the smooth effectual maintenance that realizes secret ore dressing plant.

Description

A kind of underground mill examination and repair system
Technical field
This utility model belongs to service technique field, especially relates to a kind of underground mill examination and repair system.
Background technology
Ore dressing plant is the work that Ore out is enriched with to beneficial metal through the technique such as broken, mill, choosing by underground mining Factory.Earth's surface is built in current ore dressing plant in, the mine tailing of ore dressing, barren rock process bad easily cause environmental pollution, and these ore dressings The accumulation of waste needs to take larger soil, and these soils almost cannot recycle.The ore-dressing technique of some particulate metal, such as The ore dressing of gold needs to use the toxic articles such as cyanide, and the pollution to environment is bigger.And ore dressing plant build earth's surface, the mine tailing of ore dressing in Also it is deposited in earth's surface with barren rock, this will lead to underground large-area goaf, and these goafs easily subside and occur one A little geological disasters, for avoiding the occurrence of similar danger, currently country also requires that the waste such as mine tailing and barren rock that produce ore dressing fill again Fill out go back to Goaf Area.Current earth's surface ore dressing plant needs first Ore to be risen to earth's surface, and the mine tailing after choosing and barren rock refill Goaf Area, complex process, energy consumption is higher.And underground is built in ore dressing plant, solve above-mentioned all problems by effective.But It is the limited width that be can bear due to underground passage, general underground mill is dug a mill according to technique and selected tunnel, in mill Select complete all ore grindings and the magnetic separation process in an elongated tunnel of order from front to back in tunnel.Select tunnel along length in mill Degree direction be provided with the work of multiple ore grindings across with multiple magnetic separation work across, dewatering work across with last magnetic separation work across setting side by side Put, the work of each ore grinding is in vertical linear rank across selecting tunnel length direction across the sequencing according to operation along mill with magnetic separation work Ladder arrangement, using this arrangement, the width every section of operation area for the tunnel is inconsistent, and in order to adapt to feeding of material Smooth with discharging, tunnel is continually changing in the terrace h eight of length direction and head-room.And underground mill is a lot Equipment needs to rise to earth's surface maintenance, and for example various crane of repair apparatus can only adapt to a kind of width, and can only be in sustained height Track on walk, this just be underground mill overhaul of the equipments bring difficulty.Finally because Ore is in the depth of land burial Degree a lot of all up to hundreds of meters it would be desirable to maintenance equipment lifting to earth's surface be also a difficult problem.It is therefore necessary in order to be able to suitable Answer the needs that underground mill is built, exploitation one kind safely and effectively, can solve the problems, such as the underground of overhaul of the equipments in underground passage Ore dressing plant examination and repair system.
Content of the invention
The purpose of this utility model is to provide one kind safely and effectively, can solve the problems, such as the ground of overhaul of the equipments in underground passage Lower ore dressing plant examination and repair system.
Underground mill examination and repair system of the present utility model, selects tunnel including the mill being arranged on below mining haul tunnel, Described mill select tunnel be provided with along its length the work of multiple ore grindings across with multiple magnetic separation work across, dewatering work across with last Across being set up in parallel, the work of each ore grinding selects tunnel across the sequencing according to operation along mill across working with magnetic separation for one magnetic separation work Length direction is in vertical linear step arrangement, is arranged on ore grinding work by the closed circuit grinding equipment that ball mill-cyclone group forms Across interior, magnetic separator is arranged on magnetic separation work across interior it is characterised in that maintenance transition operation is across being arranged on last magnetic separation work Across afterbody, winding shaft system be arranged at maintenance transition operation across side;
The work of each ore grinding across top be provided with overhead crane I, each magnetic separation work across top be provided with bridge-type and hang Car II, maintenance transition operation across top be provided with overhead crane III, each work across bottom be provided with maintenance transport overhaul Trolley track, described inspection trolley track each ore grinding work across, magnetic separation work across with maintenance transition operation across interior for level The conveying track of setting, ore grinding work across and magnetic separation work between linking for the linking track that is obliquely installed, maintenance conveying Dolly is placed on inspection trolley track, and rolls with maintenance transport trolley track and is connected, first ore grinding work across lower end If hoist engine I, maintenance transition operation across bottom be provided with hoist engine II, what inspection trolley two ends connected has drag rope, Drag rope also respectively be arranged on the hoist engine I across lower end for first ore grinding work and being arranged on overhaul transition operation across under Portion has hoist engine II to be connected.
Further, described maintenance transport trolley is connected gradient≤1 of track:10.
Further, four sides of described maintenance transport trolley are symmetrically welded with four hangers.
Further, described winding shaft system, mainly by the lifting overhead traveling crane being arranged at earth's surface, is connected to lifting main beam of overhead travelling crane On guiding fixed pulley, guiding pull rope and with the reversible elevator locomotive institute group positioned at earth's surface that is connected of guiding pull rope one end Become, a walking track part for lifting overhead traveling crane is located above winding shaft, and a part is located above earth's surface inspection platform.
The utility model has the advantages that:This utility model can be by the equipment needing maintenance in All Jobs area, by one Individual public maintenance transport trolley be transported to maintenance transition operation across, then by overhaul transition operation step up overhead crane IV general Band maintenance part hands to lifting overhead traveling crane, is transported to earth's surface by lifting overhead traveling crane, smoothly effectively achieves the inspection of underground mill Repair.
Brief description
Fig. 1 is structural representation of the present utility model.
Specific embodiment
Further illustrate specific embodiment of the present utility model below in conjunction with the accompanying drawings.
As shown in figure 1, underground mill examination and repair system of the present utility model, transport including being arranged on mining Mill below defeated tunnel selects tunnel, selects tunnel to be provided with the work of multiple ore grindings along its length across 1 and multiple magnetic separation in described mill Across 2, it is in vertical that the work of each ore grinding selects tunnel length direction according to the sequencing of operation along mill across 2 across 1 and magnetic separation work for work To linear step arrangement, ore grinding work is arranged on across interior by the closed circuit grinding equipment that ball mill-cyclone group forms, magnetic separator sets Put in magnetic separation work across interior it is characterised in that maintenance transition operation is arranged on last magnetic separation work across 2 afterbody across 3, carry Gug system is arranged at maintenance transition operation across 3 sides;
It is provided with overhead crane I 1-1 in the work of each ore grinding across 1 top, be provided with bridge in each magnetic separation work across 2 top Formula crane II 2-1, maintenance transition operation be provided with overhead crane III 3-1 across 3 top, each work across bottom be provided with maintenance Transport inspection trolley track, described inspection trolley track works in each ore grinding and makees across 2 and maintenance transition across 1, magnetic separation work Industry is horizontally disposed conveying track 6 in 3, for the rank being obliquely installed between ore grinding work is connected across 2 across 1 and magnetic separation work Integrate with 9, maintenance transport trolley 7 is placed on inspection trolley track, and roll with maintenance transport trolley track and be connected, at first The hoist engine I 4 that ore grinding work sets across 1 lower end, is provided with hoist engine II 10, inspection trolley 7 in maintenance transition operation across 3 bottom What two ends connected has a drag rope 5, drag rope also respectively be arranged on the hoist engine I 4 across lower end for the first ore grinding work Hoist engine II 10 is had to be connected with being arranged on maintenance transition operation across 3 bottoms.
Maintenance transport trolley described in the utility model is connected gradient≤1 of track 9:10, to adapt in vertical linear The each mill of step arrangement select work across setting.
It is little that tunnel of the present utility model is provided with band acclive maintenance conveying in the different adjacent operation area of terrace h eight Car is connected track, is provided with the trolley track section with bend in the different adjacent operation area of tunnel insied width, can use multiple The tunnel of version, applied range.
Four sides of maintenance transport trolley 7 described in the utility model are symmetrically welded with four hangers 8, convenient maintenance transport trolley 7 transport ground to.
Winding shaft system described in the utility model, mainly by the lifting overhead traveling crane 13 being arranged in earth's surface 12, is connected to and carries Rise overhead traveling crane 13 girder on guiding fixed pulley 14, guiding pull rope 16 and with guiding pull rope one end be connected positioned at earth's surface can Inverse elevator locomotive 17 is formed, and walking track 15 part for lifting overhead traveling crane 13 is located above winding shaft 11, and a part is located at ground Above table inspection platform 18.
Work process of the present utility model is:The part that need to overhaul transports mill and selects the process in tunnel to be:The part that need to overhaul By place work across overhead crane, be transported to maintenance transport trolley 7, component feed need overhauled by maintenance transport trolley 7 to Position excessively service work across interior, then will overhaul transport trolley 7 together with treating by excessive service work across interior overhead crane III 3-1 To winding shaft 11, transfer to lift overhead traveling crane 13 together by horizontal feed for repair apparatus, maintenance conveying under the traction of ground elevator 17 Dolly 7 is together promoted to earth's surface, then the space for maintenance by lifting overhead traveling crane 13 horizontal feed to earth's surface or straight together with Awaiting Overhaul equipment Connect and overhaul shop is transported to by automobile.The process that part is transported into the process in tunnel and part is transported into is contrary.

Claims (4)

1. a kind of underground mill examination and repair system, selects tunnel including the mill being arranged on below mining haul tunnel, in described mill Select tunnel be provided with along its length the work of multiple ore grindings across with multiple magnetic separation work across, dewatering work across with last magnetic separation work Make across being set up in parallel, the work of each ore grinding is across selecting the tunnel length direction to be in across the sequencing according to operation along mill with magnetic separation work Vertical linear step arrangement, ore grinding is arranged on by the closed circuit grinding equipment that ball mill-cyclone group forms and works across interior, magnetic separation Machine be arranged on magnetic separation work across interior it is characterised in that maintenance transition operation across be arranged on last magnetic separation work across afterbody, Winding shaft system is arranged at maintenance transition operation across side;
Each ore grinding work across top be provided with overhead crane I, each magnetic separation work across top be provided with overhead crane II, Maintenance transition operation across top be provided with overhead crane III, each work across bottom be provided with maintenance transport inspection trolley rail Road, described inspection trolley track each ore grinding work across, magnetic separation work across with maintenance transition operation across interior for horizontally disposed Conveying track, ore grinding work across and magnetic separation work between linking for the linking track that is obliquely installed, maintenance transport trolley is put On inspection trolley track, and roll with maintenance transport trolley track and be connected, first ore grinding work across the volume that sets of lower end Raise machine I, maintenance transition operation across bottom be provided with hoist engine II, what inspection trolley two ends connected has drag rope, pull rope Rope also respectively be arranged on the hoist engine I across lower end for first ore grinding work and be arranged on and overhaul transition operation and have volume across bottom Raise machine II to be connected.
2. underground mill examination and repair system according to claim 1 is it is characterised in that the gradient of described linking track ≤1:10.
3. underground mill examination and repair system according to claim 1 is it is characterised in that four sides of described maintenance transport trolley It is symmetrically welded with four hangers.
4. underground mill examination and repair system according to claim 1 is it is characterised in that described winding shaft system, mainly by It is arranged at the lifting overhead traveling crane of earth's surface, is connected to the guiding fixed pulley on lifting main beam of overhead travelling crane, guide pull rope and draw with guiding The reversible elevator locomotive positioned at earth's surface that rope one end connects is formed, and a walking track part for lifting overhead traveling crane is located on winding shaft Side, a part is located above earth's surface inspection platform.
CN201620935306.0U 2016-08-25 2016-08-25 Underground ore dressing plant system of overhauing Withdrawn - After Issue CN205936693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620935306.0U CN205936693U (en) 2016-08-25 2016-08-25 Underground ore dressing plant system of overhauing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620935306.0U CN205936693U (en) 2016-08-25 2016-08-25 Underground ore dressing plant system of overhauing

Publications (1)

Publication Number Publication Date
CN205936693U true CN205936693U (en) 2017-02-08

Family

ID=57952712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620935306.0U Withdrawn - After Issue CN205936693U (en) 2016-08-25 2016-08-25 Underground ore dressing plant system of overhauing

Country Status (1)

Country Link
CN (1) CN205936693U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121715A (en) * 2016-08-25 2016-11-16 中冶北方(大连)工程技术有限公司 A kind of underground mill examination and repair system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121715A (en) * 2016-08-25 2016-11-16 中冶北方(大连)工程技术有限公司 A kind of underground mill examination and repair system
CN106121715B (en) * 2016-08-25 2017-12-29 中冶北方(大连)工程技术有限公司 A kind of underground mill examination and repair system

Similar Documents

Publication Publication Date Title
CN203624403U (en) Rail guided trolley for conveying materials for high-slope pitching
CN107100639B (en) Shield transportation system for large-particle-size sand pebbles
CN104775825A (en) Shield machine single well overall originating construction method
CN106638272A (en) Self-moving type vehicular bridge for striding over belt conveyors
CN104594141A (en) Track laying and transporting engineering truck
CN206189492U (en) Deposit clear device that digs of tunnel coal slime
CN205936693U (en) Underground ore dressing plant system of overhauing
CN110700835B (en) Shallow underground mining, selecting and charging integrated system for lead-zinc ores
CN105649672B (en) The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face
CN106939536B (en) A kind of coal mine inclined shaft assembled is laid a railway track construction method
CN2597445Y (en) Caterpillar lifting girder integrated crane
CN102322290A (en) Adhesive tape inclined shaft exploitation way for large-scale underground metal mine
CN106121715B (en) A kind of underground mill examination and repair system
CN102979532A (en) Development method of transportation through auxiliary slope ramp matched with rubber belt inclined shaft
CN206008942U (en) A kind of mill of magnetic iron ore underground mill selects system
CN108443580A (en) A kind of cliff slope large-scale pipeline mounting device
CN106111303B (en) A kind of mill of magnetic iron ore underground mill selects system
CN205804063U (en) Point tongue and stock rail assembly slide device on bridge
CN206156620U (en) Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction
CN107686012A (en) A kind of conveying device
CN104386602A (en) Inclined roadway trackless auxiliary transportation method and device
CN105735065B (en) Point tongue and basic rail assembly slide device and transfer method on bridge
CN211058804U (en) Belt conveying system and tunneling equipment with same
CN104444209B (en) Belt feeder crosses track conveying device
CN207686758U (en) A kind of shield machine multi-stage slide material transportation trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20171229

AV01 Patent right actively abandoned