CN105649672B - The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face - Google Patents

The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face Download PDF

Info

Publication number
CN105649672B
CN105649672B CN201511006344.4A CN201511006344A CN105649672B CN 105649672 B CN105649672 B CN 105649672B CN 201511006344 A CN201511006344 A CN 201511006344A CN 105649672 B CN105649672 B CN 105649672B
Authority
CN
China
Prior art keywords
belt
leather belt
head
belt head
leather
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201511006344.4A
Other languages
Chinese (zh)
Other versions
CN105649672A (en
Inventor
殷起龙
王郡武
马占元
章才光
王海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATONG COAL MINE TASHAN COAL MINE CO., LTD.
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201511006344.4A priority Critical patent/CN105649672B/en
Publication of CN105649672A publication Critical patent/CN105649672A/en
Application granted granted Critical
Publication of CN105649672B publication Critical patent/CN105649672B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/08Shifting conveyors or other transport devices from one location at the working face to another

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

The present invention relates to the mobile resettlement of underground coal mine elevating conveyor, elevating conveyor, the integral moving method of leather belt head during specially a kind of small removal of home of high working face.Solve high working face elevating conveyor and belt feeder removal of home under current colliery and waste time and energy, the technical problem that working strength is big.At present for large-scale mine main, large-scale equipment is the configuration of its standard, and equipment is moved in relatively short distance, it is not appropriate for transporting in place after taking apart, then is re-assemblied, is otherwise wasted time and energy very much, and safety cannot be ensured, considerably increase operating risk.But three kinds of innovations of the present invention such as small removal of home of elevating conveyor, the overall leaping over obstacles of leather belt head and belt feeder rapid belt replacing all make use of the power of machine in itself surely to be filled, not only ensured in safety, and substantially increase steady dress efficiency, produce coal for the production of fully mechanized mining and won valuable time, it is believed that these innovations are worth most of mines to use for reference and learn.

Description

The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face
Technical field
The present invention relates to the mobile resettlement of underground coal mine elevating conveyor, reprinted during specially a kind of small removal of home of high working face The integral moving method of machine, leather belt head.
Background technology
Datong Coal Group Company Jin Hua palaces ore deposit large-mining-height working surface is in South Mountain well 12#Layer, with the propulsion of working face, 110#O'clock to 85# 250 meters of coal seams of point are weakened region, and dirt band accounts for adopting 4th/1 to five/2nds of thickness, and dirt band is all hard sandstone, Unsuitable normal exploitation, if with coal-winning machine using cutting by the way of rock hardness crosses, the not only cut caused by cutting power is excessive Motor damage, wastes a large amount of picks, and propulsion progress slows down.The fltting speed of working face is sometimes only normal to produce the eight of class / mono-, and the gangue amount of institute's output is excessive, considerably increases washing cost.Determined by ore deposit research, decision is beaten again Open-off cut carries out small removal of home.
At the same time, minister's degree of high working face is 850m belt feeder due to serious wear, it is necessary to which belt is carried out more Change, belt total length is about 1700m up and down, in order to not influence normally to produce coal, safely and fast can finish changing belt, allow belt Machine is run well as early as possible, is the key for ensureing normally to produce.
When the advance of the face is close to when stopping adopting line, in order to increase the recovery of resource, determined after being calculated through ore deposit research, will Stop adopting line and delimit again, working face is more late than original plan to stop adopting 30 meters, and leather belt head is exactly in the position of this 30 meters of centres, institute With must surely dress just can guarantee that and normally produce coal that the leather belt head position surely set again is across panel belt again by leather belt head Position, how quickly and safely leather belt head can surely be installed again, be to concern quickly to put into production, it is ensured that normally produce coal Key factor.
The content of the invention
The present invention wastes time and energy to solve high working face elevating conveyor and belt feeder removal of home under current colliery, the skill that working strength is big There is provided the integral moving method of elevating conveyor, leather belt head during a kind of small removal of home of high working face for art problem.
The present invention is realized using following technical scheme:Elevating conveyor during a kind of small removal of home of high working face, leather belt head Integral moving method, including allow elevating conveyor to carry out the method that the mode of integral translation is migrated:Reprinting drive end unit or so two A frame hydraulic support is respectively arranged in side, and reprinting drive end unit is withstood using the passage cylinder of hydraulic support;When elevating conveyor needs to translate forward When, two hydraulic supports connect top, gradually stretch out passage cylinder, promote elevating conveyor to advance;It is located at respectively using two simultaneously and is reprinted The passage oil cylinder of head both sides promotes belt tail, and the head of passage oil cylinder is connected with belt tail, the afterbody and monomer of passage oil cylinder Post footwear are connected, and monomer column footwear are clashed by hydraulic single prop and top plate and are fixed;Stretched when the secondary cylinder of passage oil cylinder When, before belt tail is just pushed away, when passage oil cylinder is reached, belt tail is also just in place;In conjunction with utilizing hydraulic support With ride on belt tail reprint head on oily motor-car thrust, before just elevating conveyor is integrally pushed away.
When the obstacle of leap in need is run into front of leather belt head, the overall shifting for carrying out leather belt head with the following method is adopted It is dynamic:Step(a), put up a bridge using multiple I-steel above the barrier in front of leather belt head, the width of bridge is overall wide for leather belt head 1.5 times of degree;Step(b), in front of leather belt head be provided with winch, be used as traction power;From the top position of leather belt head to belt The destination locations that head will surely be set start, and just make a call to two groups every two meters and play ring rope;When construction, first leather belt head Two motor reducers, which are removed, is placed into specified location, afterwards using four groups cats being suspended near leather belt head front end Leather belt head front portion is carried out inclined pull hoisting by four chain blocks on rope, while making leather belt head with the haulage cable cooperation of winch Reach;As chain block chain length contracts shorter and shorter, leather belt head is vertically sling, and hinders the advance of leather belt head, this Shi Chongxin hangs chain block, i.e., be sequentially suspended on adjacent first four groups play ring rope four groups and rise on ring rope, continue to keep oblique Drawing mode, until chain block comes back to vertical position, successively back and forth, until leather belt head reaches specified location, puts down belt Head;
During whole journeys are drawn, winch will keep the close fit with chain block, bit by bit by belt Head traction is in place.
The obstacle that the leather belt head is crossed over is to move towards vertical panel belt with leather belt head;When leather belt head reaches specified location Afterwards, after motor reducer is reinstalled, a drag conveyor is surely set in the side of leather belt head, and in working face belt Top is installed above a gear coal brush, the coal " scraping " that will be transported out to drag conveyor, so that will by drag conveyor Coal Transport is to panel belt.
After leather belt head installation, in addition to the method for belt feeder rapid belt replacing:New belt is all accomplished fluently into card Son, and transport to underground, it is first that old belt is therefrom separated afterwards, by the front end of new belt and the front end of old belt gap Connection, wherein three groups of H framves of tie point will remove, and start belt feeder, so using the power of belt feeder, gradually operate belt Come, with the operation of belt, old one section of belt one section is gradually resigned from office, and new belt is gradually pulled on, until by new belt Head and the tail connection, old belt backed off completely, and belt replacing is completed.
The integral moving of the elevating conveyor whole three day time faster than traditional approach, the integral moving of leather belt head is than tradition Take apart after carry out steady dress again and save two day time, and the quick-replaceable of belt also saves two day time, thus for Fully mechanized mining totally saves seven day time, it may be said that very big economic benefit is generated for colliery, according to the production of average high working face Ability is calculated, and the yield of one day is in 6000t or so, then seven day time was exactly 42000t, 168,000,000 yuan of direct economic benefit.
Overall performance compares
Three innovations of the present invention(The small removal of home of elevating conveyor, the overall leaping over obstacles of leather belt head, belt feeder quick-replaceable skin Band)Task is not only safely and efficiently completed, and the labor intensity of workman's per tour is greatly reduced, while most importantly sending out The advantage of machine in itself has been waved, from traditional all artificial dismounting, has become man-machine cooperation, the form that machine is automatically performed.
Carrying to large scale equipment in the past, be all one take apart successively after, carry out entrucking, then transport to after destination again Installed, such a method is only suitable for the carrying of relatively long distance.But for short-haul operation, overall carry just has been given play to Its safety, quick advantage is carried out, has also substantially reduced the labor intensity of workman simultaneously, when can strive for production to greatest extent Between, and also provide good technical guarantee to safety.
Prospect for promotion and application of the present invention
At present for large-scale mine main, large-scale equipment is the configuration of its standard, and equipment is entered in relatively short distance Row resettlement, is not appropriate for transporting in place after taking apart, then is re-assemblied, and otherwise wastes time and energy very much, and unsafe To guarantee, operating risk is considerably increased.But three kinds of above-mentioned innovations all make use of the power of machine in itself surely to be filled, no But ensured in safety, and substantially increase steady dress efficiency, be that the production of fully mechanized mining is produced coal and won valuable time, Believe that these innovations are worth most of mines to use for reference and learn.
Brief description of the drawings
Fig. 1 working face elevating conveyor dimension plane schematic diagrames.
Fig. 2 hydraulic supports and passage oil cylinder coordinate the schematic diagram that elevating conveyor and belt tail advance.
The arrangement schematic diagram that Fig. 3 leather belt heads are crossed over before the belt of panel.
Schematic diagram is arranged in bridging and a ring rope when Fig. 4 leather belt heads cross over panel belt.
Fig. 5 leather belt head bulk migration lifting method schematic diagrames.
Gear coal brush and drag conveyor arrangement schematic diagram after the completion of the migration of Fig. 6 leather belt heads.
Fig. 7 belt feeders change the operation schematic diagram of belt.
1- hydraulic supports, 2- oil motor-cars and reprinting head, 3- passage oil cylinders, 4- belt tails, 5- monomer column footwear, 6- belts Head, 7- leather belt head motor reducers, 8- stops to adopt line always, and 9- newly stops to adopt line, and 10- panels belt lane, 11- I-steel, 12- plays cat Rope, 13- double-speed winch, 14- haulage cables, 15- chain blocks, 16- gear coal brushes, 17- drag conveyors, 18- thongs flat Wooden handcart, 19- belt lacers, 20- crossheading tracks.
Embodiment
1st, the integral moving of elevating conveyor
The elevating conveyor model SZE1000/375 of the working face of 402 panel of South Mountain well 8206, i.e. trough internal diameter are 1000mm, Power of motor is 375KW, and total length is 34.45m, its planar dimension schematic diagram such as Fig. 1.
The elevating conveyor total length 34.5m, gross mass nearly 40t, if all taken apart, are surely filled, count motor reducer in, 13-15 cars, then steady dress elevating conveyor again must be filled, is not a simple thing, and also belt tail carries out entrucking simultaneously Transport.Above-mentioned produced problem must be solved, it is ensured that elevating conveyor can quickly and safely reach specified location, so as to ensure comprehensive The normal of mining face puts into production.
By carefully investigating calculating, determine that the mode for allowing elevating conveyor to carry out integral translation is migrated, in order to be able to Enough elevating conveyor is preferably moved integrally, increase the translational speed of elevating conveyor, two frame ZZS13000/ are arranged reprinting drive end unit The hydraulic support 1 of 28/60 type is coordinated, and is withstood reprinting drive end unit using the push unit of hydraulic support 1, is so just made reprinting Machine entirety stress is bigger, and resettlement is more prone to, at the same can also make face end support with elevating conveyor it is quick in place, save and remove branch The process of frame.When elevating conveyor is translated forward, two hydraulic supports connect top, gradually stretch out passage cylinder, promote elevating conveyor to advance (Such as Fig. 2).
Next is two passage oil cylinders 3 of elevating conveyor side, plays the key effect for promoting elevating conveyor, first oil cylinder Head is connected with belt tail 4, and afterbody is connected with monomer column footwear 5, is clashed and is fixed by hydraulic monomer and top plate.Work as passage oil cylinder When 3 secondary cylinder is stretched, before belt tail 4 is just pushed away, because elevating conveyor is more many than the weight of belt tail 4, so elevating conveyor is not Can and then it move.When passage oil cylinder 3 is reached, belt tail 4 is also just in place(Such as Fig. 2), and head is reprinted in belt tail Track on " ride ", so using elevating conveyor oily motor-car and branch hydraulic pressure frame thrust, before just elevating conveyor is integrally pushed away.
Due to passage oil cylinder, once maximum extension elongation is 2.5m, and therefore, the distance that belt tail once advances is also 2.5m, Such as Fig. 2.
One class, which averagely elapses cylinder, can shrink ten times or so, and by the class of three or eight systems, the distance advanced for average one day is 75m, As long as ten round classes can be in place(It is actual only to have used the whole three day time), dismounted than original plan, then reconfigured, totally It is advanced by three day time.
2nd, the integral translation of leather belt head
According to on-site actual situations, ore deposit determine by high working face stop adopt line and delimit again, it is more late than original plan to stop adopting 30 meters, Position relationship such as Fig. 3 of leather belt head position relationship originally and panel belt.
Traditional leather belt head arrangement is all that leather belt head raised into the top that coal carrying roller is surely located at panel belt, and present Stop adopting the position that line has been in gateway belt head, the distance that the old and new stop adopting line is 30m, so for normal produce coal, The position of leather belt head must surely be set again, if it will open and be re-assemblied again per assembling and dismantling, certainly will waste substantial amounts of Time, and transport distance is nor very long, so taking the overall mode carried to be best.
It is overall to carry the problem of being related to leather belt head entirety across panel belt, in order to not influence the normal fortune of panel belt Turn, use 11#I-steel is put up a bridge, and width is 1.5 times of the overall width of leather belt head 6.The two ends of I-steel 11 and ground cash enter Row is fixed, and is slided when preventing leather belt head 6 from being pulled above, I-steel is fallen on the belt of panel, caused the accident.
Next to that surely set 45KW double-speed winch 13 at entrance to a lane, as the power of traction, and double-speed winch 13 Rope footpath can not be less than 1 inch(Such as Fig. 4).
Since the destination locations that the top position of leather belt head 6 is surely set to new leather belt head, just two groups of liftings are played every two meters Anchor cable 12, the spacing of four anchor cables is 30cm × 30cm, so as to constitute a square Heave Here.
When specifically construction, first two leather belt head motor reducers 7 are removed and are discharged to specified location, are made afterwards With four five tons of chain blocks(Jack)Leather belt head front portion is subjected to inclined pull hoisting, rubbing for leather belt head and ground had so both been ensure that Wipe and reduce, and can coordinate simultaneously with haulage cable makes leather belt head move forward(Such as Fig. 5).
Fig. 5 is exactly simplified schematic diagram when leather belt head integral lifting is translated forward, as the length of chain block 15 contracts and must got over When coming shorter, leather belt head 6 certainly will be caused vertically to be sling, the advance of leather belt head is hindered on the contrary, be so accomplished by again Jack is hung, continues to keep oblique pull mode, until jack comes back to vertical position, successively back and forth, is referred to until leather belt head is reached Positioning is put.
During whole journeys are drawn, double-speed winch 13 will keep the close fit with jack, bit by bit will Leather belt head is drawn in place.
After leather belt head reaches specified location, after motor reducer 7 is reinstalled, now the side of leather belt head 6 is also Need surely to set a model SGZ764/132 types drag conveyor 17 again and upside down the coal that leather belt head is transported out coming and retract To panel belt(Such as Fig. 6).
After Fig. 6 is the panel belt that has surely set again, equipment rearranges figure, and drag conveyor 17 is positioned at gateway belt Work surface side, and install a gear coal brush 16 in upper belt, the coal " scraping " that comes will be transported out to above drag conveyor, So as to by drag conveyor 17 by Coal Transport to panel belt.
Two day time, and both safety, and laborsaving have only been used in whole leather belt head translation, it may be said that must on be Jin Huagong last years The model of technological innovation in 1 year.
3rd, the quick-replaceable innovative technology of belt
According to downhole production actual conditions, the minister 850m of high working face one belt needs to change, due to being pressed for time, task Weight, so more quickly and safely belt replacing can be finished, just into the key of task, but traditional replacing belt side Method can not meet production needs, therefore, for this subtask, it is necessary to which the replacing technology to belt is innovated, so as to reach fast Speed is safely completed task.
Conventional belt is all that a roll is transported to underground appointed place with rolling up, and progress is then pulled open respectively with changing, this time belt Crossheading, so 1700m belts are all just accomplished fluently into belt lacer 19 in workshop, is divided into four flat cars that thong due to being pressed for time 18 transport to underground, first that old belt is therefrom separated afterwards, are attached with new belt, and wherein three groups of H framves of tie point will Remove, start belt feeder, so using the power of belt feeder, gradually belt gets into smooth, while leather belt head specially has a team People puts away the old belt ground in good order heap resigned from office(Such as Fig. 7).
Fig. 7 is the schematic diagram of operation field, with the operation of belt, and old belt is gradually resigned from office, and new belt is gradually Pulled on belt, such four railway carriages band is only needed to make a call to four road belt lacers in underground just can rapidly change and finished, and is this time appointed The completion of business, has only just been completed with the time of a class.If obtaining two day time according in the past traditional method is minimum Whole replacings of this belt could be completed.
So long belt can be changed with so fast speed and finished, still belonged to the first time in the ore deposit history of Jin Hua palaces, it may be said that It is very safe, quick, satisfactorily complete this subtask, be worth other fraternal mine research learnings.
Integral moving method of the present invention is in my ore deposit South Mountain well 12#402 panel of layer have been carried out, for the peace in colliery Full production and technological innovation have great meaning, and each single item is all to have striven for valuable time for production, specifically detailed Describe in detail bright, will not be repeated here.

Claims (5)

1. elevating conveyor, the integral moving method of leather belt head during a kind of small removal of home of high working face, it is characterised in that including allowing reprinting Machine carries out the method that the mode of integral translation is migrated:A frame hydraulic support is each side arranged reprinting drive end unit, profit Reprinting drive end unit is withstood with the passage cylinder of hydraulic support;When elevating conveyor needs to translate forward, two hydraulic supports connect top, gradually Passage cylinder is stretched out, promotes elevating conveyor to advance;It is located at the passage oil cylinder promotion skin for reprinting head both sides respectively using two simultaneously Magnetic tape trailer, the head of passage oil cylinder is connected with belt tail, and the afterbody of passage oil cylinder is connected with monomer column footwear, and monomer column footwear are by hydraulic pressure list Pillar body and top plate, which are clashed, to be fixed;When the secondary cylinder of passage oil cylinder is stretched, before belt tail is just pushed away, work as passage When oil cylinder is reached, belt tail is also just in place;In conjunction with using hydraulic support and riding on reprinting head on belt tail Oily motor-car thrust, before just elevating conveyor is integrally pushed away;When the obstacle of leap in need is run into front of leather belt head, using such as Lower method carries out moving integrally for leather belt head:Step(a), taken using multiple I-steel above the barrier in front of leather belt head Bridge, the width of bridge is 1.5 times of leather belt head overall width;Step(b), in front of leather belt head be provided with winch, be used as traction power; Since the destination locations that the top position of leather belt head to leather belt head will surely be set, just make a call to two groups every two meters and play ring rope;Enter When row construction, first two motor reducers of leather belt head are removed is placed into specified location, afterwards using being suspended on most Leather belt head front portion is subjected to inclined pull hoisting close to four groups of leather belt head front end four chain blocks risen on ring ropes, at the same with strand The haulage cable of car, which coordinates, makes leather belt head move forward;As chain block chain length contracts shorter and shorter, leather belt head is vertical Sling, hinder the advance of leather belt head, chain block is at this moment hung again, i.e., be sequentially suspended on adjacent first four groups and play ring rope Four groups are risen on ring rope, continue to keep oblique pull mode, until chain block comes back to vertical position, successively back and forth, Zhi Daopi Take the lead to reach specified location, put down leather belt head;
During whole journeys are drawn, winch will keep the close fit with chain block, bit by bit lead leather belt head Guide to position.
2. elevating conveyor, the integral moving method of leather belt head during the small removal of home of high working face as claimed in claim 1, its feature exist In the obstacle that the leather belt head is crossed over is to move towards vertical panel belt with leather belt head;, will after leather belt head reaches specified location After motor reducer is reinstalled, a drag conveyor is surely set in the side of leather belt head, and above working face belt A gear coal brush is installed, the coal " scraping " that comes will be transported out to above drag conveyor, so that by drag conveyor by coal Transport to panel belt.
3. elevating conveyor, the integral moving method of leather belt head during the small removal of home of high working face as claimed in claim 1 or 2, it is special Levy and be, after leather belt head installation, in addition to the method for belt feeder rapid belt replacing:New belt is all accomplished fluently into card Son, and transport to underground, it is first that old belt is therefrom separated afterwards, by the front end of new belt and the front end of old belt gap Connection, wherein three groups of H framves of tie point will remove, and start belt feeder, so using the power of belt feeder, gradually operate belt Come, with the operation of belt, old one section of belt one section is gradually resigned from office, and new belt is gradually pulled on, until by new belt Head and the tail connection, old belt backed off completely, and belt replacing is completed.
4. elevating conveyor, the integral moving method of leather belt head during the small removal of home of high working face as claimed in claim 1 or 2, it is special Levy and be, every group is played ring rope and include four anchor cables, the spacing of four anchor cables is 30cm × 30cm, composition one is square Heave Here;The winch is double-speed winch.
5. elevating conveyor, the integral moving method of leather belt head during the small removal of home of high working face as claimed in claim 2, its feature exist In the hydraulic support model ZZS13000/28/60 types;Drag conveyor model SGZ764/132 types.
CN201511006344.4A 2015-12-29 2015-12-29 The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face Expired - Fee Related CN105649672B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511006344.4A CN105649672B (en) 2015-12-29 2015-12-29 The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511006344.4A CN105649672B (en) 2015-12-29 2015-12-29 The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face

Publications (2)

Publication Number Publication Date
CN105649672A CN105649672A (en) 2016-06-08
CN105649672B true CN105649672B (en) 2017-08-04

Family

ID=56477719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511006344.4A Expired - Fee Related CN105649672B (en) 2015-12-29 2015-12-29 The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face

Country Status (1)

Country Link
CN (1) CN105649672B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108361034B (en) * 2017-11-24 2019-08-30 枣庄矿业(集团)付村煤业有限公司 A kind of order mining large-mining-height working surface is quickly moved technique
CN110094223A (en) * 2019-04-10 2019-08-06 山西马堡煤业有限公司 Cooperate monorail crane dedicated unit for large-mining-height working surface hydraulic support withdrawing
CN111022423B (en) * 2019-12-25 2022-03-25 山东里能鲁西矿业有限公司 Portable belt tail pulling and moving device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10134338A1 (en) * 2001-07-14 2003-01-23 Pohle & Rehling Gmbh Transfer block for belt conveyors in underground mine tunnel construction has support frame fixedly connected to crusher through rear beam which serves as alignment device
CN102168578A (en) * 2011-04-16 2011-08-31 山东济宁花园煤矿有限公司 Self-moving device for elevating conveyor
CN202611759U (en) * 2012-06-21 2012-12-19 铁法煤业(集团)有限责任公司晓南矿 Self-moving belt conveyor tail displacement device
CN203362221U (en) * 2013-07-12 2013-12-25 徐州矿务集团有限公司 Pushing device for single-prop face scraper conveyer
CN204312130U (en) * 2014-09-11 2015-05-06 安徽恒源煤电股份有限公司祁东煤矿 Rake cash machine, conveyor tail associating automatic moving type device
CN204492887U (en) * 2014-12-23 2015-07-22 淮北矿业股份有限公司 Coal mine fully-mechanized mining face elevating conveyor pulling and moving equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10134338A1 (en) * 2001-07-14 2003-01-23 Pohle & Rehling Gmbh Transfer block for belt conveyors in underground mine tunnel construction has support frame fixedly connected to crusher through rear beam which serves as alignment device
CN102168578A (en) * 2011-04-16 2011-08-31 山东济宁花园煤矿有限公司 Self-moving device for elevating conveyor
CN202611759U (en) * 2012-06-21 2012-12-19 铁法煤业(集团)有限责任公司晓南矿 Self-moving belt conveyor tail displacement device
CN203362221U (en) * 2013-07-12 2013-12-25 徐州矿务集团有限公司 Pushing device for single-prop face scraper conveyer
CN204312130U (en) * 2014-09-11 2015-05-06 安徽恒源煤电股份有限公司祁东煤矿 Rake cash machine, conveyor tail associating automatic moving type device
CN204492887U (en) * 2014-12-23 2015-07-22 淮北矿业股份有限公司 Coal mine fully-mechanized mining face elevating conveyor pulling and moving equipment

Also Published As

Publication number Publication date
CN105649672A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN102094675B (en) Safe moving and withdrawing method of complex-structured thick coal seam fully mechanized heavy equipment
CN1932240B (en) Full-seam cutting, retreating, separate moving and full-caving comprehensive mechanized coal mining method
CN103452574B (en) Auxiliary bracket moving device of circular self-moving advance support
CN109113745B (en) Method for carrying out large-inclination-angle large-section mountain-down construction cutting by using fully-mechanized excavating machine
CN105649672B (en) The integral moving method of elevating conveyor, leather belt head during the small removal of home of high working face
CN103233761A (en) Reversed loader moving-assisted large-cycle tunnel advance support bracket
CN103410561B (en) Self-moving belt machine tail
CN202611728U (en) Hydraulic rope type withdrawal equipment
CN102979521B (en) Rocker-type transverse shearer
CN101775993A (en) Self-moving type reversed loader for coal mine
CN102518008A (en) Movable turnout platform used for shield tunnel
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN102094673A (en) Method for quickly moving fully mechanized mining face under special geological condition
CN103821530A (en) Continuous excavating equipment and process for roadways
CN205708614U (en) Crawler type apron conveyer
RU2383736C2 (en) Method of professor kariman for underground development of bedded deposits of minerals with their excavation in blocks and transportation by escalators
CN202595586U (en) Movable turnout platform used for shield tunnel
CN112576293B (en) Transportation roadway supporting and transporting integrated system
CN109931087A (en) Mobile scalable stack-type bar timber
CN113622982B (en) Supporting device for coal mine composite roof and application method thereof
CN211342941U (en) Movable inverted arch trestle
CN211058804U (en) Belt conveying system and tunneling equipment with same
CN208453121U (en) A kind of reinforced mesh transport trolley
CN112434903A (en) Fully mechanized mining equipment matching method suitable for three-soft two-large inclined medium-thickness coal seam
CN206008942U (en) A kind of mill of magnetic iron ore underground mill selects system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190924

Address after: 037000 Yangjiayao Village, Southern Suburb of Datong City, Shanxi Province

Patentee after: DATONG COAL MINE TASHAN COAL MINE CO., LTD.

Address before: 037003 Shanxi province Datong Xinping Wang School North

Patentee before: Datong Coal Mine Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20191229