CN107339111B - The floating construction method of installation of more PE pipes in large-scale push pipe - Google Patents
The floating construction method of installation of more PE pipes in large-scale push pipe Download PDFInfo
- Publication number
- CN107339111B CN107339111B CN201710520124.6A CN201710520124A CN107339111B CN 107339111 B CN107339111 B CN 107339111B CN 201710520124 A CN201710520124 A CN 201710520124A CN 107339111 B CN107339111 B CN 107339111B
- Authority
- CN
- China
- Prior art keywords
- pipe
- well
- push pipe
- wirerope
- active well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Abstract
The present invention discloses a kind of floating construction method of installation of more PE pipes in large-scale push pipe, it is to dig active well and received well respectively at push pipe both ends, and ramp is dug down to active well reserving hole, the welding of PE pipe is completed outside active well, and drawing head is welded in head end, hoist engine is parked in one end of received well, fixed bracket and pulley blocks are set in received well, manually the wirerope being wrapped on hoist engine is drawn around pulley blocks into received well, and it is successively drawn along push pipe and active well to outside active well using trailer wagon, it is connect with drawing head, and in piece seizing wire of wirerope head end system, water filling reaches certain water level in push pipe, utilize rope traction PE pipe to commitment positions, it draws water, PE pipe is set to sink to predetermined position.Floating construction method of installation of the invention, improves the welding quality of PE pipe, is advanced using rope traction PE pipe, and the tractive resistance of PE pipe is reduced using the buoyancy of water, solves the problems, such as that more PE pipe installations are in place difficult in small space.
Description
Technical field
The invention belongs to technical field of municipal construction, it is specifically a kind of be suitable under wear river, lake, highway, railway
The floating construction method of installation of more PE pipes in the large-scale push pipe that more PE pipes are installed in push pipe.
Background technique
The pipeline engineering that river, lake, highway, railway are worn under currently, generallys use the structure of more PE pipes built in casing
Form.Construction is worn for more PE pipes in casing, can use there are two types of arrangement and method for construction: one is pour in sleeve bottom
Bed course is laid with track, PE pipe is placed on travelling bogie, worn PE pipe in place by the way of traction;Another kind be
Casing surrounding loads onto one group of directive wheel at a certain distance, in place using mode of traction.However, two schemes all Shortcomings it
Place: the first easily occurs derailing and phenomena such as card wheel, and subsequent several PE manage difficulty in place and are gradually increased;Second is that PE pipe is whole
After in place, casing internal orifice space is limited, and the dismounting of directive wheel is more troublesome, and this scheme is only used for the peace of first PE pipe
Dress, the installation for not being suitable for several PE pipes below are in place.
Sewage treatment plant tail water pipeline engineering at present is all made of 3 × DN700PE pipe, housing DN2000 reinforced concrete sleeve
Form, under wear river distance up to 600m, reinforced concrete sleeve uses and wears river bed under push pipe, therefore needs more in a kind of push pipe
Root PE pipe wears construction method to solve the above problems.
Summary of the invention
Of the existing technology in order to solve the problems, such as, the present invention provides a kind of floating installation of more PE pipes in large-scale push pipe
Construction method realizes that the installation of more PE pipes in small space is in place, and the installation for successfully solving more PE pipes in push pipe is in place
Difficult problem.
The present invention adopts the following technical scheme: in large-scale push pipe more PE pipes floating construction method of installation, including it is following
Step:
(1) active well excavating in push pipe head end, received well is excavated in push pipe end, and active well is connected to by push pipe with received well,
Active well has reserving hole far from the side of push pipe, excavates out a gug to reserving hole from natural ground;
(2) PE that the quasi- PE pipe of several feast-brand marks is welded into a required length is managed, and welds drawing head in stem end;It is connecing
It receives and fixed bracket and pulley blocks is manually set in well, hoist engine is arranged in received well exit;
(3) manually the wirerope head end being wrapped on hoist engine is introduced in received well around pulley blocks, it is small using drawing
Wirerope head end is passed through and push pipe and is worn into active well by vehicle, using excavator by steel wire penetrating active well reserving hole to the
Wirerope is manually connect by the stem of a piece PE pipe with drawing head, and in piece seizing wire of wirerope head end system, seizing wire
One end be placed on outside active well;
(4) water filling in push pipe, starts hoist engine, draws first PE pipe and enter in push pipe through active well, after traction in place,
Water in push pipe is taken away, first PE pipe sinks in place;
(5) wirerope is drawn back using excavator dragging seizing wire, is drawn out to the head end of wirerope outside active well, by steel
Cord is connect with the drawing head of second PE pipe;
(6) step (4) and step (5) are repeated, until all PE pipes are respectively mounted in place.
The present invention uses floating method, sufficiently by the buoyancy of water, itself lower amount of deflection is managed using long range PE, along excavation
Gug can smoothly enter into push pipe predetermined position, the installation for completing more PE pipes is in place, and tractive force is greatly reduced;Wirerope with lead
To draw the advance of PE pipe, subsidiary seizing wire, which plays, draws back wirerope for leader connection, in case drawing the mobile effect of lower root PE pipe.
The first open area other than active well of the present invention completes the welding of PE pipe, solves narrow space in push pipe, applies
The problem of work industry inconvenience, PE pipe welding quality are guaranteed;By the way of floating traction, the buoyancy of water is made full use of, is reduced
The resistance of PE pipe traction after PE canal float is in place, without removing associated satellite device, is saved compared with other construction methods
Construction time.The floating construction method of installation technical feasibility of more PE pipes, safe and reliable, economy are closed in large-scale push pipe of the invention
Reason, has a large promotion value.
Detailed description of the invention
Fig. 1 is the construction deployment schematic diagram of the floating construction method of installation of more PE pipes in large-scale push pipe of the invention.
It is respectively marked in attached drawing as follows: 1, natural ground;2, excavator;3, PE is managed;4, gug;5, reserving hole;6, work
Make well;7, truck crane;8, water level;9, protective device;10, push pipe;11, drawing head;12, received well;13, pulley blocks;14, steel wire
Rope;15, fixed bracket;16, hoist engine;17, seizing wire.
Specific embodiment
The embodiment of the present invention is described specifically with reference to the accompanying drawing:
The floating construction method of installation of more PE pipes in large-scale push pipe, as shown in Figure 1, comprising the following steps:
(1) active well 6 is excavated in 10 head end of push pipe, received well 12 is excavated in 10 end of push pipe, and push pipe 10 is by active well 6 and connects
Well 12 is received to be connected to, active well 6 has reserving hole 5 far from the side of push pipe 10, from natural ground 1 excavate out a gug 4 to
Reserving hole 5;
(2) the quasi- PE pipe of several feast-brand marks is welded into the PE pipe 3 of a required length, and welds drawing head 11 in stem end;
Fixed bracket 15 and pulley blocks 13 are manually set in received well 12, and hoist engine 16 is arranged in 12 exit of received well;
(3) it will manually be wrapped in 14 head end of the wirerope on hoist engine 16 to introduce in received well 12 around pulley blocks 13, benefit
14 head end of wirerope is passed through into push pipe 10 with trailer wagon and is worn into active well 6, wirerope 14 is passed through into work using excavator 2
Make the stem of well 6 reserving hole, 5 to the first PE pipes 3, manually connect wirerope 14 with drawing head 11, and is first in wirerope 14
End is a seizing wire 17, and one end of seizing wire 17 is placed on outside active well 6;
(4) into push pipe 10, water filling reaches certain water level 8, starts hoist engine 16, draws first PE using wirerope 14
Pipe 3 enters push pipe 10 through active well 6, before PE pipe 3 enters active well 6, can use excavator 2 and assists PE pipe 3 along descending
Road 4 moves forward, and when PE pipe 3 enters active well 6, can use truck crane 7 and slightly slings PE pipe 3, auxiliary PE pipe 3 enters work
Make in well 6;It is equipped with protective device 9 in the entrance of push pipe 10, PE pipe 3, inevitably can be with the end of push pipe 10 when entering push pipe 10
Wall collides, and the gouging abrasion of push pipe 10 can be preferably minimized by protective device 9;After traction in place, by the water in push pipe 10
It drains, first PE pipe 3 sinks in place;
(5) seizing wire 17 being dragged using excavator 2 and drawing back wirerope 14, the head end of wirerope 14 is made to be drawn out to active well
Outside 6, wirerope 14 is connect with the drawing head 11 of second PE pipe 3;
(6) step (3) and step (4) are repeated, until all PE pipes 3 are respectively mounted in place.
Above-described is only one embodiment of the present invention.It should be pointed out that for those of ordinary skill in the art
For, without departing from the principle of the present invention, several variations and modifications can also be made, these also should be regarded as belonging to this hair
Bright protection scope.
Claims (3)
1. the floating construction method of installation of more PE pipes in large-scale push pipe, which comprises the following steps:
(1) active well is excavated in push pipe head end, received well is excavated in push pipe end, and active well is connected to by push pipe with received well, works
Well has reserving hole far from the side of push pipe, excavates out a gug to reserving hole from natural ground;
(2) PE that standard PE pipe is welded into required length is managed, and welds drawing head in stem end;It is manually set in received well
Fixed bracket and pulley blocks are set, hoist engine is arranged in received well exit;
(3) manually the wirerope head end being wrapped on hoist engine is introduced in received well around pulley blocks, it will using trailer wagon
Wirerope head end passes through push pipe and wears into active well, using excavator by steel wire penetrating active well reserving hole to first
Wirerope is manually connect by the stem of PE pipe with drawing head, and in piece seizing wire of wirerope head end system, and the one of seizing wire
End is placed on outside active well;
(4) water filling in push pipe, starts hoist engine, draws first PE pipe and enter in push pipe through active well, after traction in place, will push up
Water in pipe is taken away, and first PE pipe sinks in place;
(5) wirerope is drawn back using excavator dragging seizing wire, is drawn out to the head end of wirerope outside active well, by wirerope
It is connect with the drawing head of second PE pipe;
(6) step (4) and step (5) are repeated, until all PE pipes are respectively mounted in place.
2. the floating construction method of installation of more PE pipes in large size push pipe according to claim 1, it is characterised in that: step
(3) when PE pipe enters active well, PE is sling using truck crane and manages and PE pipe is assisted to enter active well.
3. the floating construction method of installation of more PE pipes in large size push pipe according to claim 1 or 2, it is characterised in that:
The entrance of push pipe is equipped with protective device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710520124.6A CN107339111B (en) | 2017-06-30 | 2017-06-30 | The floating construction method of installation of more PE pipes in large-scale push pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710520124.6A CN107339111B (en) | 2017-06-30 | 2017-06-30 | The floating construction method of installation of more PE pipes in large-scale push pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107339111A CN107339111A (en) | 2017-11-10 |
CN107339111B true CN107339111B (en) | 2019-01-15 |
Family
ID=60219290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710520124.6A Active CN107339111B (en) | 2017-06-30 | 2017-06-30 | The floating construction method of installation of more PE pipes in large-scale push pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107339111B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108194137A (en) * | 2017-11-22 | 2018-06-22 | 中国市政工程中南设计研究总院有限公司 | A kind of penstock installation method in the straight tunnel of light section |
CN108426094A (en) * | 2018-03-22 | 2018-08-21 | 北京中润宝成工程技术有限公司 | A kind of push pipe poling construction equipment and its method |
CN108386608B (en) * | 2018-05-02 | 2023-06-16 | 中国瑞林工程技术股份有限公司东莞分公司 | Small-pipe-diameter plastic drain pipe jacking machine tool and plastic drain pipe jacking construction method |
CN109610503A (en) * | 2018-06-14 | 2019-04-12 | 中煤建工集团有限公司 | A kind of prefabricated piping lane installation method |
CN110067892B (en) * | 2019-04-04 | 2021-07-30 | 中国市政工程中南设计研究总院有限公司 | Method for construction of steel pipe by water buoyancy auxiliary casing internal dragging |
CN112627181B (en) * | 2020-12-29 | 2021-12-21 | 交通运输部上海打捞局 | Pile inserting type ship external pile punching method |
CN113187490B (en) * | 2021-04-13 | 2024-04-02 | 中国电建集团华东勘测设计研究院有限公司 | Water intake structure combined with shield machine receiving well and construction method thereof |
CN113737671A (en) * | 2021-09-22 | 2021-12-03 | 青岛安装建设股份有限公司 | Culvert water buoyancy pipe penetrating construction device and construction method |
CN114109498A (en) * | 2021-11-12 | 2022-03-01 | 云南建投钢结构股份有限公司 | Combined type movable installation system for steel pipes of small tunnels |
CN114562276B (en) * | 2022-02-28 | 2023-03-14 | 重庆大学 | Rock jacking pipe construction method for reducing resistance by using underground water buoyancy |
CN114562607A (en) * | 2022-03-11 | 2022-05-31 | 北京市市政四建设工程有限责任公司 | Method for municipal pipeline construction in jacking pipe |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2696227B1 (en) * | 1992-09-25 | 1994-12-16 | Sade Travaux Hydraulique | Device and method for extracting from the ground without breaking a lead water supply connection and replacing it at the same time with a plastic connection. |
JP3304051B2 (en) * | 1997-04-16 | 2002-07-22 | 東邦瓦斯株式会社 | Pipe updating equipment |
GB9924112D0 (en) * | 1999-10-13 | 1999-12-15 | M P Burke Plc | Lead pipe removal/replacement etc |
CA2479961C (en) * | 2002-03-29 | 2011-06-28 | Fiberspar Corporation | Systems and methods for pipeline rehabilitation |
CN101280862B (en) * | 2007-04-03 | 2012-07-18 | 上海市基础工程有限公司 | Seabed PE pipe rim spreading and imbedding construction method |
CN101614301A (en) * | 2009-08-01 | 2009-12-30 | 宁海鑫城汽车配件有限公司 | The continuous cropping method of construction that plastic long tube in site is continuously shaped, lay |
-
2017
- 2017-06-30 CN CN201710520124.6A patent/CN107339111B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107339111A (en) | 2017-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107339111B (en) | The floating construction method of installation of more PE pipes in large-scale push pipe | |
RU2573086C2 (en) | Device to install pipelines in soil | |
CN105626088B (en) | T-shaped bored tunnel shield machine is gone into the well shift method | |
CN106337493A (en) | Underground bye wash dredging and fishing device and dredging and fishing method thereof | |
CN102155585A (en) | Method for laying mine slurry pipeline in long and narrow section | |
CN109026032B (en) | Lower shield translation construction method for limit invasion of downward-turning beam | |
CN107255188B (en) | A kind of lifting pipeline method suitable at pipe gallery intersection node | |
CN208058113U (en) | A kind of amendment construction system of construction push pipe | |
CN207195825U (en) | A kind of buried oil-gas pipeline protection device in Sbusidence Damage area | |
CN106593454B (en) | The shield side that boring construction starting well and lifting well combine originates tunneling construction method and structure | |
CN108899807A (en) | Subway long steep grade entrance electromechanics construction method of installation | |
CN209353400U (en) | A kind of totally-enclosed pipe-line transportation system of long range | |
CN207089490U (en) | Conveying arrangement in the penstock hole that a kind of band turns to | |
CN101509265B (en) | Pull-type soil shifter smoothing technique for soft foundation field and pull-type soil shifter | |
CN205369182U (en) | A fill water energy absorber that is used for geomembrane storehouse basin prevention of seepage system | |
CN109237199A (en) | Underground piping detects non-excavation rehabilitation and dredges maintaining process process | |
CN202416554U (en) | Dredging device | |
KR20240038799A (en) | How to Pass a Submerged Box Culvert for a Silt Transport Pipeline | |
CN100491792C (en) | Construction method for transmitting and laying inflating capsule | |
CN205477629U (en) | T -shaped undercut tunnel shield constructs owner's machine translation system that goes into well | |
CN108443580A (en) | A kind of cliff slope large-scale pipeline mounting device | |
CN209353399U (en) | A kind of band draws the pipe-line transportation system of slope structure | |
CN215759529U (en) | Municipal administration rain sewage pipeline desilting system | |
CN202595751U (en) | Elephant trunk riprapping vehicle for immersed tube foundation construction | |
CN106167229B (en) | A kind of construction method of the underwater pipeline of dredging of marine lifting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20200717 Granted publication date: 20190115 |
|
PP01 | Preservation of patent right |