CN107339111B - The floating construction method of installation of more PE pipes in large-scale push pipe - Google Patents

The floating construction method of installation of more PE pipes in large-scale push pipe Download PDF

Info

Publication number
CN107339111B
CN107339111B CN201710520124.6A CN201710520124A CN107339111B CN 107339111 B CN107339111 B CN 107339111B CN 201710520124 A CN201710520124 A CN 201710520124A CN 107339111 B CN107339111 B CN 107339111B
Authority
CN
China
Prior art keywords
pipe
well
push pipe
wirerope
active well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710520124.6A
Other languages
Chinese (zh)
Other versions
CN107339111A (en
Inventor
开前正
李奎
汪世伟
燕来
张磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China City Investment Group Sixth Engineering Bureau Co Ltd
Original Assignee
China City Investment Group Sixth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China City Investment Group Sixth Engineering Bureau Co Ltd filed Critical China City Investment Group Sixth Engineering Bureau Co Ltd
Priority to CN201710520124.6A priority Critical patent/CN107339111B/en
Publication of CN107339111A publication Critical patent/CN107339111A/en
Application granted granted Critical
Publication of CN107339111B publication Critical patent/CN107339111B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Abstract

The present invention discloses a kind of floating construction method of installation of more PE pipes in large-scale push pipe, it is to dig active well and received well respectively at push pipe both ends, and ramp is dug down to active well reserving hole, the welding of PE pipe is completed outside active well, and drawing head is welded in head end, hoist engine is parked in one end of received well, fixed bracket and pulley blocks are set in received well, manually the wirerope being wrapped on hoist engine is drawn around pulley blocks into received well, and it is successively drawn along push pipe and active well to outside active well using trailer wagon, it is connect with drawing head, and in piece seizing wire of wirerope head end system, water filling reaches certain water level in push pipe, utilize rope traction PE pipe to commitment positions, it draws water, PE pipe is set to sink to predetermined position.Floating construction method of installation of the invention, improves the welding quality of PE pipe, is advanced using rope traction PE pipe, and the tractive resistance of PE pipe is reduced using the buoyancy of water, solves the problems, such as that more PE pipe installations are in place difficult in small space.

Description

The floating construction method of installation of more PE pipes in large-scale push pipe
Technical field
The invention belongs to technical field of municipal construction, it is specifically a kind of be suitable under wear river, lake, highway, railway The floating construction method of installation of more PE pipes in the large-scale push pipe that more PE pipes are installed in push pipe.
Background technique
The pipeline engineering that river, lake, highway, railway are worn under currently, generallys use the structure of more PE pipes built in casing Form.Construction is worn for more PE pipes in casing, can use there are two types of arrangement and method for construction: one is pour in sleeve bottom Bed course is laid with track, PE pipe is placed on travelling bogie, worn PE pipe in place by the way of traction;Another kind be Casing surrounding loads onto one group of directive wheel at a certain distance, in place using mode of traction.However, two schemes all Shortcomings it Place: the first easily occurs derailing and phenomena such as card wheel, and subsequent several PE manage difficulty in place and are gradually increased;Second is that PE pipe is whole After in place, casing internal orifice space is limited, and the dismounting of directive wheel is more troublesome, and this scheme is only used for the peace of first PE pipe Dress, the installation for not being suitable for several PE pipes below are in place.
Sewage treatment plant tail water pipeline engineering at present is all made of 3 × DN700PE pipe, housing DN2000 reinforced concrete sleeve Form, under wear river distance up to 600m, reinforced concrete sleeve uses and wears river bed under push pipe, therefore needs more in a kind of push pipe Root PE pipe wears construction method to solve the above problems.
Summary of the invention
Of the existing technology in order to solve the problems, such as, the present invention provides a kind of floating installation of more PE pipes in large-scale push pipe Construction method realizes that the installation of more PE pipes in small space is in place, and the installation for successfully solving more PE pipes in push pipe is in place Difficult problem.
The present invention adopts the following technical scheme: in large-scale push pipe more PE pipes floating construction method of installation, including it is following Step:
(1) active well excavating in push pipe head end, received well is excavated in push pipe end, and active well is connected to by push pipe with received well, Active well has reserving hole far from the side of push pipe, excavates out a gug to reserving hole from natural ground;
(2) PE that the quasi- PE pipe of several feast-brand marks is welded into a required length is managed, and welds drawing head in stem end;It is connecing It receives and fixed bracket and pulley blocks is manually set in well, hoist engine is arranged in received well exit;
(3) manually the wirerope head end being wrapped on hoist engine is introduced in received well around pulley blocks, it is small using drawing Wirerope head end is passed through and push pipe and is worn into active well by vehicle, using excavator by steel wire penetrating active well reserving hole to the Wirerope is manually connect by the stem of a piece PE pipe with drawing head, and in piece seizing wire of wirerope head end system, seizing wire One end be placed on outside active well;
(4) water filling in push pipe, starts hoist engine, draws first PE pipe and enter in push pipe through active well, after traction in place, Water in push pipe is taken away, first PE pipe sinks in place;
(5) wirerope is drawn back using excavator dragging seizing wire, is drawn out to the head end of wirerope outside active well, by steel Cord is connect with the drawing head of second PE pipe;
(6) step (4) and step (5) are repeated, until all PE pipes are respectively mounted in place.
The present invention uses floating method, sufficiently by the buoyancy of water, itself lower amount of deflection is managed using long range PE, along excavation Gug can smoothly enter into push pipe predetermined position, the installation for completing more PE pipes is in place, and tractive force is greatly reduced;Wirerope with lead To draw the advance of PE pipe, subsidiary seizing wire, which plays, draws back wirerope for leader connection, in case drawing the mobile effect of lower root PE pipe.
The first open area other than active well of the present invention completes the welding of PE pipe, solves narrow space in push pipe, applies The problem of work industry inconvenience, PE pipe welding quality are guaranteed;By the way of floating traction, the buoyancy of water is made full use of, is reduced The resistance of PE pipe traction after PE canal float is in place, without removing associated satellite device, is saved compared with other construction methods Construction time.The floating construction method of installation technical feasibility of more PE pipes, safe and reliable, economy are closed in large-scale push pipe of the invention Reason, has a large promotion value.
Detailed description of the invention
Fig. 1 is the construction deployment schematic diagram of the floating construction method of installation of more PE pipes in large-scale push pipe of the invention.
It is respectively marked in attached drawing as follows: 1, natural ground;2, excavator;3, PE is managed;4, gug;5, reserving hole;6, work Make well;7, truck crane;8, water level;9, protective device;10, push pipe;11, drawing head;12, received well;13, pulley blocks;14, steel wire Rope;15, fixed bracket;16, hoist engine;17, seizing wire.
Specific embodiment
The embodiment of the present invention is described specifically with reference to the accompanying drawing:
The floating construction method of installation of more PE pipes in large-scale push pipe, as shown in Figure 1, comprising the following steps:
(1) active well 6 is excavated in 10 head end of push pipe, received well 12 is excavated in 10 end of push pipe, and push pipe 10 is by active well 6 and connects Well 12 is received to be connected to, active well 6 has reserving hole 5 far from the side of push pipe 10, from natural ground 1 excavate out a gug 4 to Reserving hole 5;
(2) the quasi- PE pipe of several feast-brand marks is welded into the PE pipe 3 of a required length, and welds drawing head 11 in stem end; Fixed bracket 15 and pulley blocks 13 are manually set in received well 12, and hoist engine 16 is arranged in 12 exit of received well;
(3) it will manually be wrapped in 14 head end of the wirerope on hoist engine 16 to introduce in received well 12 around pulley blocks 13, benefit 14 head end of wirerope is passed through into push pipe 10 with trailer wagon and is worn into active well 6, wirerope 14 is passed through into work using excavator 2 Make the stem of well 6 reserving hole, 5 to the first PE pipes 3, manually connect wirerope 14 with drawing head 11, and is first in wirerope 14 End is a seizing wire 17, and one end of seizing wire 17 is placed on outside active well 6;
(4) into push pipe 10, water filling reaches certain water level 8, starts hoist engine 16, draws first PE using wirerope 14 Pipe 3 enters push pipe 10 through active well 6, before PE pipe 3 enters active well 6, can use excavator 2 and assists PE pipe 3 along descending Road 4 moves forward, and when PE pipe 3 enters active well 6, can use truck crane 7 and slightly slings PE pipe 3, auxiliary PE pipe 3 enters work Make in well 6;It is equipped with protective device 9 in the entrance of push pipe 10, PE pipe 3, inevitably can be with the end of push pipe 10 when entering push pipe 10 Wall collides, and the gouging abrasion of push pipe 10 can be preferably minimized by protective device 9;After traction in place, by the water in push pipe 10 It drains, first PE pipe 3 sinks in place;
(5) seizing wire 17 being dragged using excavator 2 and drawing back wirerope 14, the head end of wirerope 14 is made to be drawn out to active well Outside 6, wirerope 14 is connect with the drawing head 11 of second PE pipe 3;
(6) step (3) and step (4) are repeated, until all PE pipes 3 are respectively mounted in place.
Above-described is only one embodiment of the present invention.It should be pointed out that for those of ordinary skill in the art For, without departing from the principle of the present invention, several variations and modifications can also be made, these also should be regarded as belonging to this hair Bright protection scope.

Claims (3)

1. the floating construction method of installation of more PE pipes in large-scale push pipe, which comprises the following steps:
(1) active well is excavated in push pipe head end, received well is excavated in push pipe end, and active well is connected to by push pipe with received well, works Well has reserving hole far from the side of push pipe, excavates out a gug to reserving hole from natural ground;
(2) PE that standard PE pipe is welded into required length is managed, and welds drawing head in stem end;It is manually set in received well Fixed bracket and pulley blocks are set, hoist engine is arranged in received well exit;
(3) manually the wirerope head end being wrapped on hoist engine is introduced in received well around pulley blocks, it will using trailer wagon Wirerope head end passes through push pipe and wears into active well, using excavator by steel wire penetrating active well reserving hole to first Wirerope is manually connect by the stem of PE pipe with drawing head, and in piece seizing wire of wirerope head end system, and the one of seizing wire End is placed on outside active well;
(4) water filling in push pipe, starts hoist engine, draws first PE pipe and enter in push pipe through active well, after traction in place, will push up Water in pipe is taken away, and first PE pipe sinks in place;
(5) wirerope is drawn back using excavator dragging seizing wire, is drawn out to the head end of wirerope outside active well, by wirerope It is connect with the drawing head of second PE pipe;
(6) step (4) and step (5) are repeated, until all PE pipes are respectively mounted in place.
2. the floating construction method of installation of more PE pipes in large size push pipe according to claim 1, it is characterised in that: step (3) when PE pipe enters active well, PE is sling using truck crane and manages and PE pipe is assisted to enter active well.
3. the floating construction method of installation of more PE pipes in large size push pipe according to claim 1 or 2, it is characterised in that: The entrance of push pipe is equipped with protective device.
CN201710520124.6A 2017-06-30 2017-06-30 The floating construction method of installation of more PE pipes in large-scale push pipe Active CN107339111B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710520124.6A CN107339111B (en) 2017-06-30 2017-06-30 The floating construction method of installation of more PE pipes in large-scale push pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710520124.6A CN107339111B (en) 2017-06-30 2017-06-30 The floating construction method of installation of more PE pipes in large-scale push pipe

Publications (2)

Publication Number Publication Date
CN107339111A CN107339111A (en) 2017-11-10
CN107339111B true CN107339111B (en) 2019-01-15

Family

ID=60219290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710520124.6A Active CN107339111B (en) 2017-06-30 2017-06-30 The floating construction method of installation of more PE pipes in large-scale push pipe

Country Status (1)

Country Link
CN (1) CN107339111B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194137A (en) * 2017-11-22 2018-06-22 中国市政工程中南设计研究总院有限公司 A kind of penstock installation method in the straight tunnel of light section
CN108426094A (en) * 2018-03-22 2018-08-21 北京中润宝成工程技术有限公司 A kind of push pipe poling construction equipment and its method
CN108386608B (en) * 2018-05-02 2023-06-16 中国瑞林工程技术股份有限公司东莞分公司 Small-pipe-diameter plastic drain pipe jacking machine tool and plastic drain pipe jacking construction method
CN109610503A (en) * 2018-06-14 2019-04-12 中煤建工集团有限公司 A kind of prefabricated piping lane installation method
CN110067892B (en) * 2019-04-04 2021-07-30 中国市政工程中南设计研究总院有限公司 Method for construction of steel pipe by water buoyancy auxiliary casing internal dragging
CN112627181B (en) * 2020-12-29 2021-12-21 交通运输部上海打捞局 Pile inserting type ship external pile punching method
CN113187490B (en) * 2021-04-13 2024-04-02 中国电建集团华东勘测设计研究院有限公司 Water intake structure combined with shield machine receiving well and construction method thereof
CN113737671A (en) * 2021-09-22 2021-12-03 青岛安装建设股份有限公司 Culvert water buoyancy pipe penetrating construction device and construction method
CN114109498A (en) * 2021-11-12 2022-03-01 云南建投钢结构股份有限公司 Combined type movable installation system for steel pipes of small tunnels
CN114562276B (en) * 2022-02-28 2023-03-14 重庆大学 Rock jacking pipe construction method for reducing resistance by using underground water buoyancy
CN114562607A (en) * 2022-03-11 2022-05-31 北京市市政四建设工程有限责任公司 Method for municipal pipeline construction in jacking pipe

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2696227B1 (en) * 1992-09-25 1994-12-16 Sade Travaux Hydraulique Device and method for extracting from the ground without breaking a lead water supply connection and replacing it at the same time with a plastic connection.
JP3304051B2 (en) * 1997-04-16 2002-07-22 東邦瓦斯株式会社 Pipe updating equipment
GB9924112D0 (en) * 1999-10-13 1999-12-15 M P Burke Plc Lead pipe removal/replacement etc
CA2479961C (en) * 2002-03-29 2011-06-28 Fiberspar Corporation Systems and methods for pipeline rehabilitation
CN101280862B (en) * 2007-04-03 2012-07-18 上海市基础工程有限公司 Seabed PE pipe rim spreading and imbedding construction method
CN101614301A (en) * 2009-08-01 2009-12-30 宁海鑫城汽车配件有限公司 The continuous cropping method of construction that plastic long tube in site is continuously shaped, lay

Also Published As

Publication number Publication date
CN107339111A (en) 2017-11-10

Similar Documents

Publication Publication Date Title
CN107339111B (en) The floating construction method of installation of more PE pipes in large-scale push pipe
RU2573086C2 (en) Device to install pipelines in soil
CN105626088B (en) T-shaped bored tunnel shield machine is gone into the well shift method
CN106337493A (en) Underground bye wash dredging and fishing device and dredging and fishing method thereof
CN102155585A (en) Method for laying mine slurry pipeline in long and narrow section
CN109026032B (en) Lower shield translation construction method for limit invasion of downward-turning beam
CN107255188B (en) A kind of lifting pipeline method suitable at pipe gallery intersection node
CN208058113U (en) A kind of amendment construction system of construction push pipe
CN207195825U (en) A kind of buried oil-gas pipeline protection device in Sbusidence Damage area
CN106593454B (en) The shield side that boring construction starting well and lifting well combine originates tunneling construction method and structure
CN108899807A (en) Subway long steep grade entrance electromechanics construction method of installation
CN209353400U (en) A kind of totally-enclosed pipe-line transportation system of long range
CN207089490U (en) Conveying arrangement in the penstock hole that a kind of band turns to
CN101509265B (en) Pull-type soil shifter smoothing technique for soft foundation field and pull-type soil shifter
CN205369182U (en) A fill water energy absorber that is used for geomembrane storehouse basin prevention of seepage system
CN109237199A (en) Underground piping detects non-excavation rehabilitation and dredges maintaining process process
CN202416554U (en) Dredging device
KR20240038799A (en) How to Pass a Submerged Box Culvert for a Silt Transport Pipeline
CN100491792C (en) Construction method for transmitting and laying inflating capsule
CN205477629U (en) T -shaped undercut tunnel shield constructs owner's machine translation system that goes into well
CN108443580A (en) A kind of cliff slope large-scale pipeline mounting device
CN209353399U (en) A kind of band draws the pipe-line transportation system of slope structure
CN215759529U (en) Municipal administration rain sewage pipeline desilting system
CN202595751U (en) Elephant trunk riprapping vehicle for immersed tube foundation construction
CN106167229B (en) A kind of construction method of the underwater pipeline of dredging of marine lifting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20200717

Granted publication date: 20190115

PP01 Preservation of patent right