CN105317065A - Synchronous grooving and plastic laying all-in-one machine - Google Patents

Synchronous grooving and plastic laying all-in-one machine Download PDF

Info

Publication number
CN105317065A
CN105317065A CN201410286216.9A CN201410286216A CN105317065A CN 105317065 A CN105317065 A CN 105317065A CN 201410286216 A CN201410286216 A CN 201410286216A CN 105317065 A CN105317065 A CN 105317065A
Authority
CN
China
Prior art keywords
paving
reel
moulds
grooving
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410286216.9A
Other languages
Chinese (zh)
Other versions
CN105317065B (en
Inventor
王永平
陈伟东
周琦
陈伟
李燕
张保童
周治江
管保华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
Guangzhou Harbor Engineering Quality Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd, GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd, CCCC Fourth Harbor Engineering Institute Co Ltd, Guangzhou Harbor Engineering Quality Inspection Co Ltd filed Critical CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201410286216.9A priority Critical patent/CN105317065B/en
Publication of CN105317065A publication Critical patent/CN105317065A/en
Application granted granted Critical
Publication of CN105317065B publication Critical patent/CN105317065B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a synchronous grooving and plastic laying all-in-one machine which comprises a walking track, a hydraulic system for providing power for the synchronous grooving and plastic laying all-in-one machine, a grooving mechanism and a plastic laying mechanism. The grooving mechanism comprises a drill rod, a hydraulic arm, a grouting system and a sand draining system. The synchronous grooving and plastic laying all-in-one machine can achieve all cross section continuous grooving and plastic laying construction in the horizontal direction, the effective width of grooving is controllable, the problems that grooving and plastic laying are separated from each other on the limited construction site during construction of an existing device, an initial grooved section cannot undergo plastic laying, plastic laying connectors are many and the construction quality cannot be guaranteed easily are solved, and the synchronous grooving and plastic laying all-in-one machine is particularly suitable for deep layer lateral sealing of sites with deep and thick sand layers, sand inclusion layers or miscellaneous fill.

Description

Synchronous slotting paving moulds all-in-one
Technical field
The present invention relates to construction machinery, particularly relate to fluting, paving molding apparatus that the vacuum drainage consolidation for soft base is constructed.
Background technology
In recent years, vacuum preloading consolidation, as a kind of economic, effective soft base processing method, is used widely in reclamation engineering.Conventional vacuum preloading deep layer lateral seal technology mainly adopts mud stirring wall technology, its sealing mechanism is: the soil nature of mud stirring wall is mud mulling, by the mix in proportion of mud and sand, particle reconfigures, glutinous grain is filled to the space between sand, forms the soil that particle is more uneven, grating is good, greatly reduces the transmission coefficient of layer of sand, cut off the contact of permeable (gas) layer inside and outside stabilization zone, made body of wall meet the needs of vacuum preloading lateral seal.
But part coastal area utilizes hydraulic reclamation or Cast-in-situ Piles in Sand-filling to carry out reclaiming land around sea, formed auger ground, on cover special formation condition compared with thick sand bed, or in self-assembling formation soil layer, there is deep burning into sand layer.Due to the existence of above-mentioned highly permeable (gas) layer of sand, after starting to vacuumize, occur liquid phase seepage flow, seepage flow accelerates, and in body of wall, fine grained is easily pulled away, and the lasting impermeability now stirring body of wall reduces, and then affects vacuum pre-press reinforcing effect.
For a difficult problem for above-mentioned deep layer lateral seal technology, be necessary to develop the better Apparatus and method for being beneficial to the construction of vacuum preloading deep layer lateral seal.
Summary of the invention
The object of the present invention is to provide a kind of equipment being applicable to the construction of vacuum preloading deep layer lateral seal.
To achieve these goals, present invention employs following technical scheme: synchronous slotting paving moulds all-in-one, it comprise traveling crawler, mould all-in-one for synchronous slotting paving the hydraulic system of power, grooving mechanism and plastic-laying machine structure are provided,
Described grooving mechanism comprises a drilling rod, and
One hydraulic arm, described hydraulic arm one end is articulated with the drilling rod other end and is articulated with hydraulic system, and described hydraulic arm controls adjustable height and the luffing angle of drilling rod, and
Filling system, described filling system comprises the grouting port, pump for mortar transmission and the feed pipe for mortar that is connected between grouting port and grouting pump that are arranged at boring bar head, and
Sand-removing system, described sand-removing system comprises to be taken out stock pump and takes out sandpipe;
Described paving is moulded structure and is comprised paving and mould reel, Double-gear transmission device, reel lifting motor and paving and mould motor, described Double-gear transmission device is symmetrically arranged at paving and moulds reel both sides, paving mould reel be fixedly connected on a locating rack and paving mould reel be equiped with geomembrane volume, the two ends of locating rack are fixedly connected on the tooth bar of both sides gear drive respectively, described reel lifting motor drives the driving wheel in the Double-gear transmission device of the left and right sides to rotate in opposite directions, thus orders about paving and mould reel and rise vertically or decline; Described paving is moulded motor and is driven paving to mould reel to rotate thus make geomembrane mould reel from paving and outwards unfold and come.
Preferably, it is hydraulic motor that described paving moulds drive motors, is connected with described hydraulic system by hydraulic tube.
Further specifically, described synchronous slotting paving is moulded all-in-one and is comprised a frame, frame is provided with the truss for fixing Double-gear device.
As a kind of concrete way, described in take out sandpipe and be fixed on a cross bar, described cross bar is fixedly connected on described truss.
Described drilling rod is spiral rotary drill rod.
Preferably, it is hollow cylinder that described paving moulds reel, and geomembrane being collected in winding manner is in cylinder bore, and cylinder barrel offers the slit of outwards unfolding out from cylinder bore for geomembrane, and the initiating terminal of geomembrane has a film initiating terminal fixed bar.
The present invention has the following advantages:
(1) this synchronous slotting paving is moulded all-in-one and can be realized the continuous grooving of tunneling boring in horizontal direction and paving moulds construction, and the effective width of fluting is controlled, overcome existing equipment construction fluting, paving in limited construction plant to mould and be separated from each other, initial slotted line cannot spread to mould and spread moulds that joint is many, construction quality is difficult to obtain the technical characterstics such as guarantee, is specially adapted to have the deep layer lateral seal in deep and thick sand, burning into sand layer or miscellaneous fill place.
(2) there is good sealing effect, the reliability that operates steadily high, and fluting, once paving are moulded and can be penetrated lower sleeping water-permeable and air permeable layer continuously, meet the advantages such as foundation treatment depth requirement.
(3) applied range, construction cost cost is low, and speed of application is fast, and handiness, automaticity is higher, the duration is short, has higher engineer applied and is worth and social and economic significance.
Accompanying drawing explanation
Fig. 1 a is synchronous slotting paving molding apparatus facade structures schematic diagram in the present invention, and its middle berth is moulded reel and is in contraction state; Fig. 1 b is synchronous slotting paving molding apparatus facade structures schematic diagram in the present invention, and its middle berth is moulded reel and is in lower slotting state;
Fig. 2 is the schematic top plan view that Fig. 1 shown device paving moulds operation;
Fig. 3 is the structural representation of plastic-laying machine structure.
In Fig. 1: 1 traveling crawler, 2 traction steel wires, 3 reel lifting motors, 4 single shaft pavings mould reel, 4.1 locating racks, 5 Double-gear transmission device, 6 pavings mould motor, 7 truss, 8 sediment outflow pipes, 9 auger stems, 10 grouting ports, 11 movable motors, 12 feed pipe for mortar, 13 hydraulic arms, 14 antiseepage volume films.
Detailed description of the invention
As shown in Fig. 1 ~ 2, for the fluting paving for the construction of deep layer lateral seal of the present invention moulds all-in-one, mainly comprise frame, traveling crawler 1, hydraulic system, grooving mechanism and plastic-laying machine structure.
Frame is used for fixing and supports each parts, and frame is also provided with truss 7.
Described hydraulic system is moulded all-in-one and is provided hydraulic power for synchronous slotting paving, such as grooving mechanism lifting and change angle and power be provided, mould operation for the lifting of plastic-laying machine structure and paving power is provided, power can also be provided for the walking of complete machine.
Described grooving mechanism comprises auger stem 9, hydraulic arm 13, filling system and sand-removing system.Hydraulic arm 13 one end is articulated with the piston rod that auger stem 9 other end is articulated with hydraulic system, stretching by piston rod, changes the luffing angle of hydraulic arm 13 thus the adjustable height of change auger stem 9 and luffing angle.The both sides of auger stem 9 are furnished with circular or square slideway as unit head 14, and unit head can slide up and down along slideway and detachable.Screw socket is adopted to be connected with auger stem under unit head.Can realize vertically advancing of auger stem by unit head, the walking of complete machine drives the level of auger stem to motion.Filling system comprises the grouting port 10, pump for mortar transmission and the feed pipe for mortar 12 that is connected between grouting port 10 and grouting pump that are arranged at auger stem head.Sand-removing system comprises to be taken out stock pump (not shown) and takes out sandpipe 8.Take out sandpipe 8 and be fixed on a cross bar, this cross bar is fixedly connected on truss 7.
Described paving mould structure comprise paving mould reel 4, Double-gear transmission device 5, reel lifting motor 3 and paving mould motor 6.Double-gear transmission device 5 is fixed on truss 7 both sides, and it is made up of two groups of chain and sprocket driving devices, often organizes chain and sprocket driving device and comprises driving wheel, follower and driving rack.Two groups of chain and sprocket driving devices are symmetrically arranged at the both sides that paving moulds reel 4.Often organize chain and sprocket driving device and include driving gear, driven gear and driving rack, wherein driving gear is individually fixed in the bottom of truss 7, and driven gear is individually fixed in the top of truss 7 and is meshed with driving rack.Paving is moulded reel 4 and is fixedly connected on a locating rack 4.1, and the two ends of locating rack 4.1 are fixedly connected on the tooth bar of both sides gear drive respectively.Reel lifting motor 3 drives the driving wheel in two groups of chain and sprocket driving devices to two opposite direction synchronous axial system, thus order about paving mould reel steadily vertically rise or decline.It is hollow cylinder that described paving moulds reel, and geomembrane being collected in winding manner is in cylinder bore, and cylinder barrel offers the slit of outwards unfolding out from cylinder bore for geomembrane, and the initiating terminal of geomembrane has a film initiating terminal fixed bar.When film initiating terminal fixed bar fixedly inserts in after in the soil body, traveling crawler is walked, and paving is moulded motor 6 and driven on one side paving to mould axle in reel and rotates, thus makes paving mould reel rotation, and geomembrane is moulded reel external surface from paving and unfolded and come.
Reel lift motor 3 is hydraulic drive motor, is fixed on the bottom of truss 7.The main oil pipe of reel lift motor 3 is connected with the turnover oil pipe of hydraulic system oil cylinder respectively with oil return pipe.
This synchronous slotting paving is moulded all-in-one constructing operation step and is:
1, primer fluid pressing system, hydraulic oil promotes hydraulic arm 13 through oil cylinder and piston, makes auger stem 9 be positioned at the construction line-putting position and perpendicular to ground, place, starts first guide hole of slotting of constructing.
2, open grouting pump slip casting, the elevation angle of screw drilling rod 9 after design elevation of constructing at construction guide hole simultaneously, make it tilting screw and cut sandy soils.After slot grooving certain length, put into deslagging pump and extract the sandstone falling into groove, control the proportion of mud, prevent collapse hole in work progress, if there is collapse hole to occur, adjustment auger stem angle is stirred again.By circulation slip casting and deslagging, form continuous print groove section.
3, construction about 2 ?start paving after the long one section of groove section of 4m and mould preparation, primer fluid pressing system, the main oil pipe of reel lift motor 3 passes in and out oil pipe with hydraulic arm 13 oil cylinder respectively with oil return pipe and is connected, hydraulic pump is utilized to be transmitted for hydraulic energy the mechanical energy of motor, then being turned by hydraulic energy by reel lift motor 3 returns as mechanical energy, drive the Double-gear transmission device being fixed on truss 7, driving gear drives the paving being fixedly welded on driving rack to mould reel 4 and moves up and down, complete that once paving moulds press down, lifting work.
Reel is pressed in the groove that step 2 digs by Double-gear transmission device, after arriving design elevation, volume film being loosened one section, film initiating terminal fixed bar is inserted slotted eye bottom and fixes, then by spreading the rotation of moulding motor 6, seepage by geo-textile material being unfolded in the mud of paving groove inlet section automatically.After first volume material has been established, lifting single shaft paving is moulded reel 4 and is completed the replacing of new film, press down paving by Double-gear transmission device and mould reel 4, with groove in oldly mould the place that lap length is no less than 2.0m and insert film initiating terminal fixed bar, reel is fixed in slotted eye bottom, completes whole laying work and so forth.As shown in Figure 1a, traction steel wire 2 is moulded reel bottom by the hoist engine be fixed on equipment support and wire rope and paving and is flexibly connected, and moulding in reel press-in groove paving and fixed by wire rope after projected depth, is that it reduces the deflection deformation in traveling process.
4, after completing the Work sectors laying geomembrane, the reserved geomembrane (being no less than 1.0m) exposed is layered in vacuum preloading district, is then in the milk in groove section, precipitate, and the construction that repeatedly circulates.Lay diaphragm seal in vacuum preloading district, diaphragm seal is pasted onto on reserved geomembrane, and treads in certain depth in grooving.

Claims (6)

1. synchronous slotting paving moulds all-in-one, it is characterized in that: comprise traveling crawler, mould all-in-one provide the hydraulic system of power, grooving mechanism and plastic-laying machine structure for synchronous slotting paving,
Described grooving mechanism comprises a drilling rod, and
One hydraulic arm, described hydraulic arm one end is articulated with the drilling rod other end and is articulated with hydraulic system, and described hydraulic arm controls adjustable height and the luffing angle of drilling rod, and
Filling system, described filling system comprises the grouting port, pump for mortar transmission and the feed pipe for mortar that is connected between grouting port and grouting pump that are arranged at boring bar head, and
Sand-removing system, described sand-removing system comprises to be taken out stock pump and takes out sandpipe;
Described paving is moulded structure and is comprised paving and mould reel, Double-gear transmission device, reel lifting motor and paving and mould motor, described Double-gear transmission device is symmetrically arranged at paving and moulds reel both sides, paving mould reel be fixedly connected on a locating rack and paving mould reel be equiped with geomembrane volume, the two ends of locating rack are fixedly connected on the tooth bar of both sides gear drive respectively, described reel lifting motor drives the driving wheel in the Double-gear transmission device of the left and right sides to rotate in opposite directions, thus orders about paving and mould reel and rise vertically or decline; Described paving is moulded motor and is driven paving to mould reel to rotate thus make geomembrane mould reel from paving and outwards unfold and come.
2. synchronous slotting paving according to claim 1 moulds all-in-one, it is characterized in that: it is hydraulic motor that described paving moulds drive motors, is connected with described hydraulic system by hydraulic tube.
3. synchronous slotting paving according to claim 1 moulds all-in-one, it is characterized in that: described synchronous slotting paving is moulded all-in-one and comprised a frame, frame is provided with the truss for fixing Double-gear device.
4. synchronous slotting according to claim 3 paving moulds all-in-one, it is characterized in that: described in take out sandpipe and be fixed on a cross bar, described cross bar is fixedly connected on described truss.
5. synchronous slotting paving according to claim 1 moulds all-in-one, it is characterized in that: described drilling rod is spiral rotary drill rod.
6. synchronous slotting paving according to claim 1 moulds all-in-one, it is characterized in that: it is hollow cylinder that described paving moulds reel, geomembrane being collected in winding manner is in cylinder bore, cylinder barrel offers the slit of outwards unfolding out from cylinder bore for geomembrane, and the initiating terminal of geomembrane has a film initiating terminal fixed bar.
CN201410286216.9A 2014-06-24 2014-06-24 Synchronous slotting paving modeling all-in-one machine Expired - Fee Related CN105317065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410286216.9A CN105317065B (en) 2014-06-24 2014-06-24 Synchronous slotting paving modeling all-in-one machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410286216.9A CN105317065B (en) 2014-06-24 2014-06-24 Synchronous slotting paving modeling all-in-one machine

Publications (2)

Publication Number Publication Date
CN105317065A true CN105317065A (en) 2016-02-10
CN105317065B CN105317065B (en) 2018-06-08

Family

ID=55245308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410286216.9A Expired - Fee Related CN105317065B (en) 2014-06-24 2014-06-24 Synchronous slotting paving modeling all-in-one machine

Country Status (1)

Country Link
CN (1) CN105317065B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729460A (en) * 2017-04-14 2018-11-02 神翼航空器科技(天津)有限公司 The method of the soft waterproof of deep basal pit
CN109024489A (en) * 2018-08-22 2018-12-18 内蒙古黄河工程局股份有限公司 A kind of synchronous vertical plastic-laying machine
CN113374006A (en) * 2021-06-09 2021-09-10 同济大学 Underground sneak sawing type curtain vertical laying seepage-isolating device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2289834Y (en) * 1996-12-02 1998-09-02 辽宁省水利水电科学研究院 Hydraulic slotted submerged membrance machine
US5873421A (en) * 1997-02-12 1999-02-23 Assenza; Antonio Tool for installing a pipeline under a structure
CN2756716Y (en) * 2004-12-15 2006-02-08 王文臣 Continuous deep laying earth work film device
EP1752583A2 (en) * 2003-02-27 2007-02-14 BAUER Maschinen GmbH Trench wall cutting apparatus and method for building a diaphragm wall in the ground
CN101644529A (en) * 2008-08-05 2010-02-10 骆立波 Induction heating device for end cover
CN203334335U (en) * 2013-07-09 2013-12-11 淮河工程有限公司 Large depth coarse sand soil embankment foundation vertical spreading membrane seepage cutoff grooving machine structure
CN203977482U (en) * 2014-06-24 2014-12-03 中交四航工程研究院有限公司 Synchronous slotting paving is moulded all-in-one

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2289834Y (en) * 1996-12-02 1998-09-02 辽宁省水利水电科学研究院 Hydraulic slotted submerged membrance machine
US5873421A (en) * 1997-02-12 1999-02-23 Assenza; Antonio Tool for installing a pipeline under a structure
EP1752583A2 (en) * 2003-02-27 2007-02-14 BAUER Maschinen GmbH Trench wall cutting apparatus and method for building a diaphragm wall in the ground
CN2756716Y (en) * 2004-12-15 2006-02-08 王文臣 Continuous deep laying earth work film device
CN101644529A (en) * 2008-08-05 2010-02-10 骆立波 Induction heating device for end cover
CN203334335U (en) * 2013-07-09 2013-12-11 淮河工程有限公司 Large depth coarse sand soil embankment foundation vertical spreading membrane seepage cutoff grooving machine structure
CN203977482U (en) * 2014-06-24 2014-12-03 中交四航工程研究院有限公司 Synchronous slotting paving is moulded all-in-one

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729460A (en) * 2017-04-14 2018-11-02 神翼航空器科技(天津)有限公司 The method of the soft waterproof of deep basal pit
CN109024489A (en) * 2018-08-22 2018-12-18 内蒙古黄河工程局股份有限公司 A kind of synchronous vertical plastic-laying machine
CN113374006A (en) * 2021-06-09 2021-09-10 同济大学 Underground sneak sawing type curtain vertical laying seepage-isolating device

Also Published As

Publication number Publication date
CN105317065B (en) 2018-06-08

Similar Documents

Publication Publication Date Title
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN103184734A (en) Implanted and grouted compound pile and construction method
CN105887876A (en) Construction method for cast-in-situ large-diameter combined thin-wall threaded pipe pile and pile forming device of cast-in-situ large-diameter combined thin-wall threaded pipe pile
CN103556628B (en) Spiral conical soil compaction pile construction method
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN106284317A (en) A kind of building pile foundation construction method
WO2023077863A1 (en) Super-large diameter deep well excavation system working with presence of water and construction method
US7707752B2 (en) Trench wall in the ground and method for the production thereof
CN105317065A (en) Synchronous grooving and plastic laying all-in-one machine
CN102330536A (en) Lifting type diving rotary drilling rig with turbine pump
CN107435541A (en) A kind of new TBM and its construction method for possessing pipe roof construction ability
CN203213101U (en) Embedding grouting combined pile
CN203977482U (en) Synchronous slotting paving is moulded all-in-one
CN109183790A (en) A kind of Screw Pile and its construction tool and construction method
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN112196494B (en) Construction process and construction equipment for geological pipeline jointed between rock and soil layer
CN105297702B (en) Vacuum preloading deep-layer lateral sealing construction method
CN109024489A (en) A kind of synchronous vertical plastic-laying machine
JP4625815B2 (en) Non-open-cutting construction method for underground structures
US20150299976A1 (en) Method for manufacturing a pile
CN117071611A (en) Seepage-proofing system of earth-rock dam cofferdam and construction method thereof
CN104790274B (en) A kind of road surface with soft subgrade dusts processing means
US20040208710A1 (en) Apparatus and a method for constructing underground curved multisectional stratum and wall
CN207828956U (en) A kind of stake holes processing unit of the pile foundation based on basement process
CN207131408U (en) A kind of new TBM for possessing pipe roof construction ability

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181217

Address after: 510000 Guangzhou Window Headquarters Building, 18 Xingxing Street, Haizhu District, Guangzhou City, Guangdong Province

Patentee after: CCCC Fourth Harbor Engineering Co., Ltd.

Address before: No. 157, Guangzhou City, Guangdong, Guangdong

Co-patentee before: CCCC Fourth Harbor Geotechnical Engineering Co., Ltd.

Patentee before: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Co-patentee before: Guangzhou Harbor Engineering Quality Examination Co., Ltd.

Co-patentee before: Guangzhou Sihang Material Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608

Termination date: 20210624