CN207828956U - A kind of stake holes processing unit of the pile foundation based on basement process - Google Patents

A kind of stake holes processing unit of the pile foundation based on basement process Download PDF

Info

Publication number
CN207828956U
CN207828956U CN201820198483.4U CN201820198483U CN207828956U CN 207828956 U CN207828956 U CN 207828956U CN 201820198483 U CN201820198483 U CN 201820198483U CN 207828956 U CN207828956 U CN 207828956U
Authority
CN
China
Prior art keywords
gear
mud
stake holes
fixed
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820198483.4U
Other languages
Chinese (zh)
Inventor
王晋宝
刘校麟
王杰
童焯煜
田美灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201820198483.4U priority Critical patent/CN207828956U/en
Application granted granted Critical
Publication of CN207828956U publication Critical patent/CN207828956U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model proposes a kind of stake holes processing units of the pile foundation based on basement process, including pedestal, supporting mechanism and processing mechanism;Pedestal is equipped with the first passage of square structure, and the length of side of first passage is more than the diameter of stake holes;Supporting mechanism includes support cylinder, support platform and supporting rod, processing mechanism includes the first transfer platform, the second transfer platform, roller mechanism and mud scraping rod, the utility model carries out micronization processes to the stake holes dug, stake holes can be made more regular, conducive to the casting and constructing in later stage, the bearing capacity for being conducive to improve pile foundation, ensure that construction safety, the stake holes big especially suitable for, depth small to bore is handled.

Description

A kind of stake holes processing unit of the pile foundation based on basement process
Technical field
The utility model is related to a kind of stake holes processing unit, more particularly to it is a kind of based on basement process in pile foundation construction The device that stake holes is handled in the process.
Background technology
Ground problem encountered mainly has the following aspects:1) bearing capacity and stability problem;2) compression and unevenness Even settlement issues;3) leakage problems;4) Liquefaction;5) specific question of special soils.When there are above-mentioned five classes to ask for subsoil Topic one of or in which it is several when, measures of foundation treatment need to be used to ensure the safety and normal use of superstructure.
By basement process, reach following one or more of purposes:
(1) bearing capacity of foundation soil is improved;(2) compressibility of foundation soil is reduced;(3) improve the Permeable characteristic of ground;(4) Improve the dynamic characteristics of foundation soil;(5) improve special soils unfavorable foundation characteristic.
Pile foundation engineering is one of important component in field of civil engineering, and currently used engineering pile form mainly has pre- Stake processed is other with bored concrete pile two major classes, and wherein prefabricated pile includes the shapes such as steel-pipe pile, precast square pile, PHC pile piles, pre-stress hollow square pile Formula provides resistance to compression, resistance to plucking, bending resistance its main feature is that the prefabricated forming postposition of engineering pile is entered the soil body using stake and the collective effect of soil Or horizontal bearing capacity.For concrete placed under water in pile body, such as cast-in-situ bored pile, it is sufficiently large to be both needed to bore diameter, using leading Pipe casting method is poured, but when stake diameter is smaller, and if stake holes diameter is less than 500, underwater coagulation is then difficult to pour success.
Patent 201010558314.5 discloses a kind of construction method for concrete bagged pouring in small-diameter pile hole, the construction party Method includes the following steps:A) true fixed pile completes stake holes (1) and constructs;B) non-condensing concrete (2) is packed into section and is less than stake In the bag (3) in hole (1) section;C) the non-condensing concrete (2) being fitted into bag (3) in step b) is positioned over together with bag (3) In stake holes (1);D) according to the size for needing penetration concrete amount, it is determined whether repeat step b) and step c), such as a groundwater increment It meets the requirements, does not then need this step;E) make to pour into non-condensing concrete (2) sold stowing stake holes (1) in stake holes (1), The utility model also proposed to be poured using the hollow part of hollow prefabricated pile (6) as a kind of concrete of stake holes (1) is packed The precast compacting-enlarging pile construction method built, the perfusion that the utility model can smoothly complete cast-in-place concrete in minor diameter stake holes (1) are applied Work, construction technology is simple, reliable in quality.
Patent 200910058778.7 discloses a kind of karst strata protection wall of bored pile construction and construction method, it is intended to effectively Ground enhances hole wall stability, and improves the construction efficiency of caisson.The construction is to form stake holes by the stake holes segment of excavation section by section, It is mounted with piecemeal steel form on the hole wall of stake holes segment and forms confining bed, it is circumferentially-spaced in piecemeal steel form plate face, longitudinal It is intervally distributed with preformed hole, mud jacking hole is drilled with into unstable karst scall from preformed hole and is being mounted therein with slip casting Unstable karst scall consolidation is integrated by the cement grout of Grouting Pipe pressurization injection after diffusion and solidification by pipe.It applies Work method includes the following steps:It is installed on hole wall when there is unstable karst scall the stake holes segment of excavation section by section Fixed block steel form;The Drilling mud jacking hole into unstable karst scall, and into each mud jacking hole it is fixedly secured enter slip casting Pipe;Pressurizeed by Grouting Pipe into unstable karst scall injection cement grout.
It is directly to carry out back cover casting and constructing after stake holes is dug in the work progress of above-mentioned pile foundation, stake holes is not carried out Further refinement working process, brings many inconvenience to the on-site construction operations in later stage, and the quality of final pile is not yet It is fine, seriously affects the bearing capacity of ground.
Utility model content
The utility model proposes a kind of stake holes processing unit of the pile foundation based on basement process regarding to the issue above, right The stake holes dug carries out micronization processes, and stake holes can be made more regular, is conducive to the casting and constructing in later stage, is conducive to improve pile foundation Bearing capacity, ensure that construction safety, the stake holes big especially suitable for, depth small to bore is handled.
Specific technical solution is as follows:
A kind of stake holes processing unit of the pile foundation based on basement process, including pedestal, supporting mechanism and processing mechanism;
Pedestal is equipped with the first passage of square structure, and the length of side of first passage is more than the diameter of stake holes;
Supporting mechanism includes support cylinder, support platform and supporting rod;The quantity of support platform is two, and two supports are flat Platform is symmetrically fixed on the both sides of supporting rod, and the section of supporting rod is square structure, and multiple support cylinders are divided to two groups to be fixed on On pedestal, two groups of support cylinders are located at the both sides of first passage, and the push rod of two groups of support cylinders is flat with two supports respectively For platform to connection, processing mechanism is fixed on the bottom of supporting rod, and the lifting of support platform is controlled, to control process machine by cylinder The lifting of structure;
Processing mechanism includes the first transfer platform, the second transfer platform, roller mechanism and mud scraping rod;
Vertical on second transfer platform of circular configuration to be equipped with head rod, head rod is spindle rotationally arranged in First gear is fixed on the outer wall of head rod in the bottom of first transfer platform, and first gear is meshed with second gear, and Two gears are fixed by the first transmission shaft and third gear and are linked, and third gear is rotatably fixed on the tune of the first transfer platform It saving in chamber, third gear is connected by the first chain with the 4th gear, and the 4th gear is rotatably fixed in adjusting cavity, the That links on four gears fixes the 5th gear, and the 5th gear is meshed with the 6th gear being fixed in first motor, the first electricity Machine rotation drives the second rotatable platform to be rotated;
The quantity of roller mechanism is two, and Liang Ge rollers mechanism is rotatably fixed on the second transfer platform bottom;
Roller mechanism includes roller, fixes the second connecting rod at the top of roller, and the second connecting rod is rotatably fixed on second On transfer platform, the top of the second connecting rod is fixedly connected across the second transfer platform with the 7th gear, Liang Ge rollers mechanism It is connected by the second chain between 7th gear, the fixation eighth gear to link on one of them the 7th gear, octadentate It takes turns and is meshed with the 9th gear being fixed on the second motor, the rotation of the second motor drives two rollers to be rotated in the same direction;
If being uniformly provided with dry and soft mud plate on the side wall of roller, loose mud plate is arc-shaped structure, and loose mud plate is movably arranged In the regulating tank of roller, spring, the arrangement phase of the loose mud plate of Liang Ge rollers mechanism are equipped between loose mud plate and regulating tank Together, the opening direction of loose mud plate is identical as its rotation direction;
Mud scraping rod one end is fixed on the first transfer platform, its other end pass through supporting rod setting Liang Ge rollers mechanism it Between, mud scraping rod bottom is equipped with mud guard, and mud guard is located at the lower section of roller mechanism;There are two symmetrically being set on the side wall of mud scraping rod Mud shelves item is scraped, the cross sectional shape of mud shelves item is scraped and connects for the loose mud plate on right angled triangle, its corresponding roller of its right-angle side It touches.
Further, overhead gage there are one movably being set respectively in two opposite inner walls of first passage, overhead gage It is equipped with the first slot, two overhead gage relative movement splicings are integral, and supporting rod is connected in the first slot.
Further, mud guard is horizontally disposed circular slab, and the periphery of mud guard is acclivitous to be equipped with circle guiding Plate.
Further, pedestal is equipped with liftable wheel, for fixing or moving stake holes processing unit.
The beneficial effects of the utility model are:
When the utility model is used, moving down supporting mechanism makes processing mechanism enter in stake holes, by two overhead gage phases It is integral to mobile splicing, supporting rod is connected in the first slot, avoid in the construction process soil splash to outside stake holes;
Control first motor and the second electric motor starting are also pivoted about with mud scraping rod while making roller rotation, Simultaneous buffering moves up and down processing mechanism, is operated with this and carries out full circle operation to stake holes inner wall by loose mud plate, at the same time, also Irregular shallow hole is formed on the inner wall of stake holes, is convenient for subsequent constructing operation;
Loose mud plate can stretch along regulating tank, and the soil in work progress drops down onto on mud guard, when loose mud plate is by scraping To contract when mud shelves, making to be stuck in soil in loose mud plate, removing drops down onto on mud guard automatically, will be on mud guard after the completion of operation Soil take out of stake holes carry out subsequent processing;
In conclusion the utility model carries out micronization processes to the stake holes dug, stake holes can be made more regular, after being conducive to The casting and constructing of phase is conducive to the bearing capacity for improving pile foundation, construction safety is ensure that, especially suitable for, depth small to bore Big stake holes is handled.
Description of the drawings
Fig. 1 is the utility model section view.
Fig. 2 is processing mechanism sectional view.
Fig. 3 is B-B sectional views in Fig. 2.
Fig. 4 is part A enlarged drawing in Fig. 3.
Fig. 5 is overhead gage structure chart.
Specific implementation mode
It is clear to make the technical solution of the utility model be more clear, below in conjunction with the accompanying drawings to the utility model into advancing one Step description, any technical characteristic to technical solutions of the utility model carry out the scheme that equivalencing is obtained with conventional reasoning and fall Enter scope of protection of the utility model.
Reference numeral
Pedestal 1, processing mechanism 2, first passage 3, stake holes 4, support cylinder 5, support platform 6, supporting rod 7, first are transferred Platform 8, the second transfer platform 9, roller mechanism 10, mud scraping rod 11, head rod 12, first gear 13, second gear 14, Three gears 15, the first chain 16, the 4th gear 17, the 5th gear 18, roller 19, the second connecting rod 20, the 7th gear 21, second Chain 22, loose mud plate 24, regulating tank 25, spring 26, mud guard 27, scrapes mud shelves item 28, overhead gage 29, first at eighth gear 23 Slot 30, guide plate 31.
A kind of stake holes processing unit of the pile foundation based on basement process as shown in the figure, including pedestal 1, supporting mechanism and place Manage mechanism 2;
Pedestal is equipped with the first passage 3 of square structure, and the length of side of first passage is more than the diameter of stake holes 4;
Supporting mechanism includes support cylinder 5, support platform 6 and supporting rod 7;The quantity of support platform is two, two branch Support platform is symmetrically fixed on the both sides of supporting rod, and the section of supporting rod is square structure, and multiple support cylinders are divided to two groups to consolidate Be scheduled on pedestal, two groups of support cylinders are located at the both sides of first passage, the push rods of two groups of support cylinders respectively with two branch Platform is supportted to connection, processing mechanism is fixed on the bottom of supporting rod, and the lifting of support platform is controlled, at control by cylinder Manage the lifting of mechanism;
Processing mechanism includes the first transfer platform 8, the second transfer platform 9, roller mechanism 10 and mud scraping rod 11;
Vertical on second transfer platform of circular configuration to be equipped with head rod 12, head rod is rotatably arranged In the bottom of the first transfer platform, first gear 13, first gear and 14 phase of second gear are fixed on the outer wall of head rod Engagement, second gear are fixed by the first transmission shaft and third gear 15 and are linked, and third gear is rotatably fixed on first turn It connects in the adjusting cavity of platform, third gear is connected by the first chain 16 with the 4th gear 17, and the 4th gear is rotatably solid Be scheduled in adjusting cavity, that links on the 4th gear fixes the 5th gear 18, the 5th gear and be fixed in first motor the 6th Gear is meshed, and first motor rotation drives the second rotatable platform to be rotated;
The quantity of roller mechanism is two, and Liang Ge rollers mechanism is rotatably fixed on the second transfer platform bottom;
Roller mechanism includes roller 19, fixes the second connecting rod 20 at the top of roller, and the second connecting rod is rotatably fixed on On second transfer platform, the top of the second connecting rod is fixedly connected across the second transfer platform with the 7th gear 21, two rollers It is connected by the second chain 22 between 7th gear of mechanism, the fixation eighth gear to link on one of them the 7th gear 23, eighth gear is meshed with the 9th gear being fixed on the second motor, the second motor rotation drive two rollers in the same direction into Row rotation;
If being uniformly provided with dry and soft mud plate 24 on the side wall of roller, loose mud plate is arc-shaped structure, and loose mud plate is movably set It sets in the regulating tank 25 of roller, spring 26, the arrangement of the loose mud plate of Liang Ge rollers mechanism is equipped between loose mud plate and regulating tank Mode is identical, and the opening direction of loose mud plate is identical as its rotation direction;
Mud scraping rod one end is fixed on the first transfer platform, its other end pass through supporting rod setting Liang Ge rollers mechanism it Between, mud scraping rod bottom is equipped with mud guard 27, and mud guard is located at the lower section of roller mechanism;Two are symmetrically equipped on the side wall of mud scraping rod It is a to scrape mud shelves item 28, the cross sectional shape of mud shelves item is scraped as the loose mud plate on right angled triangle, its corresponding roller of its right-angle side It is in contact.
Further, overhead gage 29 there are one movably being set respectively in two opposite inner walls of first passage, upper gear Plate is equipped with the first slot 30, and two overhead gage relative movement splicings are integral, and supporting rod is connected in the first slot.
Further, mud guard is horizontally disposed circular slab, and the periphery of mud guard is acclivitous to be equipped with circle guiding Plate 31.
Further, pedestal is equipped with liftable wheel, for fixing or moving stake holes processing unit.
When the utility model is used, moving down supporting mechanism makes processing mechanism enter in stake holes, by two overhead gage phases It is integral to mobile splicing, supporting rod is connected in the first slot, avoid in the construction process soil splash to outside stake holes;
Control first motor and the second electric motor starting are also pivoted about with mud scraping rod while making roller rotation, Simultaneous buffering moves up and down processing mechanism, is operated with this and carries out full circle operation to stake holes inner wall by loose mud plate, at the same time, also Irregular shallow hole is formed on the inner wall of stake holes, is convenient for subsequent constructing operation;
Loose mud plate can stretch along regulating tank, and the soil in work progress drops down onto on mud guard, when loose mud plate is by scraping To contract when mud shelves, making to be stuck in soil in loose mud plate, removing drops down onto on mud guard automatically, will be on mud guard after the completion of operation Soil take out of stake holes carry out subsequent processing.

Claims (4)

1. a kind of stake holes processing unit of the pile foundation based on basement process, it is characterized in that, including pedestal, supporting mechanism and processing Mechanism;
Pedestal is equipped with the first passage of square structure, and the length of side of first passage is more than the diameter of stake holes;
Supporting mechanism includes support cylinder, support platform and supporting rod;The quantity of support platform is two, two support platforms pair The both sides for being fixed on supporting rod claimed, the section of supporting rod are square structure, and multiple support cylinders are divided to two groups to be fixed on pedestal On, two groups of support cylinders are located at the both sides of first passage, the push rods of two groups of support cylinders respectively with two support platforms to Connection, processing mechanism are fixed on the bottom of supporting rod, and the lifting of support platform is controlled, to control process mechanism by cylinder Lifting;
Processing mechanism includes the first transfer platform, the second transfer platform, roller mechanism and mud scraping rod;
Vertical on second transfer platform of circular configuration to be equipped with head rod, head rod is spindle rotationally arranged in first First gear is fixed on the outer wall of head rod in the bottom of transfer platform, and first gear is meshed with second gear, the second tooth Wheel is fixed with third gear by the first transmission shaft and is linked, and third gear is rotatably fixed on the adjusting cavity of the first transfer platform In, third gear is connected by the first chain with the 4th gear, and the 4th gear is rotatably fixed in adjusting cavity, the 4th tooth That links on wheel fixes the 5th gear, and the 5th gear is meshed with the 6th gear being fixed in first motor, first motor rotation Turn that the second rotatable platform is driven to be rotated;
The quantity of roller mechanism is two, and Liang Ge rollers mechanism is rotatably fixed on the second transfer platform bottom;
Roller mechanism includes roller, fixes the second connecting rod at the top of roller, and the second connecting rod is rotatably fixed on the second switching On platform, the top of the second connecting rod is fixedly connected across the second transfer platform with the 7th gear, and the 7th of Liang Ge rollers mechanism the Connected by the second chain between gear, the fixation eighth gear to link on one of them the 7th gear, eighth gear with The 9th gear being fixed on the second motor is meshed, and the rotation of the second motor drives two rollers to be rotated in the same direction;
If being uniformly provided with dry and soft mud plate on the side wall of roller, loose mud plate is arc-shaped structure, and loose mud plate is movably disposed at roller In the regulating tank of cylinder, spring is equipped between loose mud plate and regulating tank, the arrangement of the loose mud plate of Liang Ge rollers mechanism is identical, pine The opening direction of mud plate is identical as its rotation direction;
Mud scraping rod one end is fixed on the first transfer platform, its other end is arranged across supporting rod Liang Ge rollers mechanism, Mud scraping rod bottom is equipped with mud guard, and mud guard is located at the lower section of roller mechanism;It is scraped there are two symmetrically being set on the side wall of mud scraping rod Mud shelves item scrapes the cross sectional shape of mud shelves item and is in contact for the loose mud plate on right angled triangle, its corresponding roller of its right-angle side.
2. a kind of stake holes processing unit of the pile foundation based on basement process as described in claim 1, it is characterized in that, first is logical It is movably set respectively in two opposite inner walls in road there are one overhead gage, overhead gage is equipped with the first slot, two upper gears Plate relative movement splicing is integral, and supporting rod is connected in the first slot.
3. a kind of stake holes processing unit of the pile foundation based on basement process as described in claim 1, it is characterized in that, mud guard For horizontally disposed circular slab, the periphery of mud guard is acclivitous to be equipped with a circle guide plate.
4. a kind of stake holes processing unit of the pile foundation based on basement process as described in claim 1, it is characterized in that, on pedestal Equipped with liftable wheel, for fixing or moving stake holes processing unit.
CN201820198483.4U 2018-02-05 2018-02-05 A kind of stake holes processing unit of the pile foundation based on basement process Expired - Fee Related CN207828956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820198483.4U CN207828956U (en) 2018-02-05 2018-02-05 A kind of stake holes processing unit of the pile foundation based on basement process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820198483.4U CN207828956U (en) 2018-02-05 2018-02-05 A kind of stake holes processing unit of the pile foundation based on basement process

Publications (1)

Publication Number Publication Date
CN207828956U true CN207828956U (en) 2018-09-07

Family

ID=63396879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820198483.4U Expired - Fee Related CN207828956U (en) 2018-02-05 2018-02-05 A kind of stake holes processing unit of the pile foundation based on basement process

Country Status (1)

Country Link
CN (1) CN207828956U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528514A (en) * 2019-09-05 2019-12-03 浙江海洋大学 A kind of civil engineering built pile
CN115839085A (en) * 2023-02-22 2023-03-24 广州市海珠工程建设有限公司 Construction device is cut off to construction tubular pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528514A (en) * 2019-09-05 2019-12-03 浙江海洋大学 A kind of civil engineering built pile
CN110528514B (en) * 2019-09-05 2020-12-08 浙江海洋大学 Civil engineering composite pile
CN115839085A (en) * 2023-02-22 2023-03-24 广州市海珠工程建设有限公司 Construction device is cut off to construction tubular pile

Similar Documents

Publication Publication Date Title
CN100455731C (en) Guide pit type manual pot holing pile reinforing and underpinning method for building foundation and composite supporting pile
CN105804007B (en) A kind of reinforced earth quaywall structure based on the soft base of beach
CN207828956U (en) A kind of stake holes processing unit of the pile foundation based on basement process
CN103243740B (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN109723055B (en) Underground diaphragm wall bottom reinforcing structure and construction method thereof
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN117488769A (en) Static pressure pore-forming vibration impact solid sand pebble expanding grouting and static pressure pile technology
CN209243732U (en) A kind of efficient mini steel-pipe pile constructing structure
CN1740457A (en) Vibration process of eliminating wet foundation falling for CFG pile
CN109056747A (en) A kind of efficient mini steel-pipe pile constructing structure, method
CN212801508U (en) Grouting spiral steel pile for foundation stabilization
CN104480940B (en) Double-deck stirring type concrete castinplace pile builds device
CN106149709B (en) The pile making method of pre-poured stake
CN2172311Y (en) Earther taking apparatus for planting pile
CN104612159B (en) The cast-in-place concrete pile with agitator builds device
CN116516941B (en) Construction device and method for mechanical excavation pile plate wall
CN203569559U (en) Small heavy object supporting post for garden
CN214573906U (en) Constructional engineering pile
CN221118464U (en) Vacuum drainage device for soft foundation
CN104480941B (en) Cast-in-place concrete pile builds device
CN114411679B (en) Deep silt foundation treatment device and method thereof
CN220704538U (en) Beam bottom formwork structure of limited space under construction is done in contrary
CN111926836B (en) Combined cofferdam construction device and construction method
CN219261048U (en) Working well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180907

Termination date: 20190205