CN105303308A - 基于3d图形信息平台的钢筋工程全过程管理系统及方法 - Google Patents

基于3d图形信息平台的钢筋工程全过程管理系统及方法 Download PDF

Info

Publication number
CN105303308A
CN105303308A CN201510685296.XA CN201510685296A CN105303308A CN 105303308 A CN105303308 A CN 105303308A CN 201510685296 A CN201510685296 A CN 201510685296A CN 105303308 A CN105303308 A CN 105303308A
Authority
CN
China
Prior art keywords
reinforcing bar
bar
steel
reinforcing
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510685296.XA
Other languages
English (en)
Inventor
张玉英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510685296.XA priority Critical patent/CN105303308A/zh
Publication of CN105303308A publication Critical patent/CN105303308A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种基于3D图形信息平台的钢筋工程全过程管理系统及方法,为钢筋工程的优化设计、加工、运输、堆放管理及现场施工提供的一体化解决方案。系统包括四大模块:钢筋三维设计优化模块、钢筋数控加工模块、钢筋ERP管理模块、钢筋现场施工模块。方法步骤包括:钢筋三维信息模型设计优化及数量统计;钢筋数控文件导出进行数控加工;ERP模块进行钢筋加工及现场信息管理;通过钢筋三维信息模型指导现场施工及现场钢筋质量检查。通过钢筋三维信息在数据库平台中流动达到对钢筋工程控制、协调及管理。改进了传统钢筋加工模式,节约了钢材及能源、提高了钢筋生产及施工质量、提升了钢筋生产及施工效率、增强了施工中对钢筋的管理。

Description

基于3D图形信息平台的钢筋工程全过程管理系统及方法
技术领域
本发明是一种基于3D图形信息平台的钢筋工程全过程管理系统及方法。包含钢筋的优化设计、加工、运输、堆放管理及现场施工的全过程。涉及一种钢筋加工、钢筋运输、现场钢筋管理、钢筋施工领域。具体为一种利用三维图形信息、工程数据库开发软件进行建筑钢筋数控加工技术、钢筋物流管理、钢筋现场管理技术、钢筋混凝土结构施工及质量检查技术领域。
背景技术
常规BIM软件及3D建模软件对符合国内混凝土规范要求的钢筋建模能力较弱,完成钢筋三维建模往往非常耗时。由于钢筋量巨大影响钢筋在软件的三维显示。
钢筋混凝土工程中,钢筋是整个结构的骨架。钢筋分项工程是整个建筑施工过程的关键部分。现有钢筋的设计、加工及现场施工过程相对独立,配筋部分由设计院负责,钢筋材料购买一般由施工单位负责、翻样加工及现场钢筋安装由施工队负责。由于参与部门较多,对钢筋的管理过程存在大量的信息断层,无法完成对钢筋进行精细化管理。
常规设计院对钢筋混凝土结构进行设计给出的二维深化图纸,无法清晰的描述钢筋三维具体形态,会出现局部钢筋过密无法施工或梁柱、梁梁节点钢筋过密的状况。后期施工过程中需要大量人力后期在现场进行调整,影响了施工效率。
常规施工单位对设计院提供的钢筋深化图纸,进行钢筋翻样整理出钢筋配料单,并进行钢筋算量,最后进行钢筋采购。钢筋放样质量受结构设计质量及翻样人员水平影响,审核配料单工作复杂且技术要求较高。
常规钢筋加工由工地钢筋工负责,钢筋除锈、调直、切断机、连接处理大部分都是利用现场机械就地完成。钢筋的取用合理性及现场机械运行情况对钢筋充分利用造成巨大影响,造成一定程度浪费。
常规钢筋架立绑扎过程,质量主要取决钢筋工人的施工水平,质量检查成为施工中重要环节。检查人员需对钢筋分项工程充分了解,包括受力钢筋的品种、级别、规格和数量,钢筋位置间距及骨架变形等因素进行检查。现场检查主要依赖施工企业的管理制度和检查人员的责任心。受人为因素影响严重。
发明内容
本发明的目的在于解决上述技术问题,为钢筋混凝土结构钢筋工程提供一套基于三维图形信息平台的解决方案。通过一套系统解决钢筋混凝土结构中钢筋生产、加工、运输、堆放管理及现场施工全过程管理的问题。基于3D图形信息平台的钢筋工程全过程管理系统由钢筋三维设计优化模块、钢筋数控加工模块、钢筋ERP管理模块和钢筋现场施工模块四个模块组成。
钢筋三维设计优化模块用于对钢筋混凝土结构配筋进行优化、钢筋数量统计及钢筋翻样下料,包括钢筋三维钢筋管理、钢筋数量统计、钢筋下料单管理三个分模块。其中钢筋三维钢筋管理分模块进行三维钢筋快速建模、钢筋碰撞检查、钢筋续接方式调整及钢筋批量修改;钢筋数量统计分模块则是基于三维钢筋模型进行钢筋数量计算;钢筋下料单管理分模块将对设计钢筋三维信息模型进行钢筋下料单的导出、优化及管理。
钢筋数控加工模块用于实现对钢筋下料数据进行优化、生成数控文件、进行钢筋条码加工的功能。包括钢筋下料优化分析系统、钢筋数控文件转化系统、钢筋数控加工模拟系统及钢筋条码管理信息系统。钢筋下料优化分析系统用于对数控钢筋下料单进行优化,使其满足钢筋数控加工的要求;钢筋数控文件转化系统用于将钢筋三维几何信息转化成钢筋的数控加工信息格式,数控机床可以通过读取该格式得以进行数控加工;钢筋施工加工模拟系统用于对钢筋加工过程中,各加工工序中钢筋的状态进行模拟。把握钢筋实际的加工状态;钢筋条码管理信息系统用于对加工后钢筋成品、半成品进行生成条码、印刷条码标识。对成品钢筋进行搬运装卸,将待配送钢筋进行物流编码。
钢筋ERP管理模块用于编制工程钢筋生产计划、采购计划、仓储管理及运输计划,达到合理配置资源最优化钢筋加工生产的目的。包括钢筋加工管理系统、钢筋采购系统、钢筋库存管理系统和钢筋运输派送系统。钢筋加工管理系统用于配合钢筋现场施工计划进行钢筋生产加工的计划与控制。钢筋加工管理系统又分为钢筋主生产计划、钢筋物料需求计划、钢筋能力需求计划及钢筋车间管理四个模块。钢筋主生产计划模块用于根据接到钢筋工程生产订单,进行钢筋生产加工的计划安排;钢筋物料需求计划模块用于根据钢筋加工工艺及钢筋主生产计划,进行钢筋半成品、成品需求计划和时间进度安排;钢筋能力需求计划用于根据物料计划要求,在生产设备和人员一定的情况下,安排不同时段钢筋生产能力计划。钢筋车间管理模块用于实时控制车间加工系统,按钢筋物料需求计划的要求,按时、按质、按量的完成钢筋加工任务。钢筋库存管理系统用于管理钢筋工厂钢筋原材的入库、半成品、成品钢筋存储及钢筋成品出库。钢筋运输派送系统用于管理钢筋产品分类配载、安排配送车辆、选择配送路线及规划协调运输能力。
钢筋现场施工模块用于钢筋工地现场堆放管理、绑扎施工管理及施工质量检查。钢筋现场施工模块还包含一个现场施工模块移动客户端,包括钢筋现场存放系统、钢筋绑扎架立系统和钢筋质量检查系统。钢筋现场存放系统主要用于管理钢筋材料在现场存放及取用。通过现场施工移动客户端对钢筋条码及料牌进行定期盘点。钢筋绑扎架立系统用于通过钢筋三维信息模型及既定工序,利用编码的钢筋辅助进行钢筋绑扎架立。钢筋质量检查系统用于比对现场钢筋施工现场与钢筋三维信息模型差异,检查施工质量。
本发明的基于3D图形信息平台的钢筋工程全过程管理系统模块间信息传递过程如下:钢筋三维设计模块进行三维钢筋建模,并按施工要求进行批量修改,最后将三维钢筋模型传递到钢筋现场施工模块;钢筋三维设计模块中钢筋信息与钢筋下料单对应匹配,通过钢筋下料单将加工信息传递给钢筋数控加工模块;钢筋数控加工模块对钢筋下料单以定长钢筋进行优化,将优化分析的结果传递给钢筋ERP管理模块;钢筋ERP管理模块进行物料生产计划、能力计划及采购计划,将钢筋物料编码写入钢筋数控文件,最后将钢筋数控文件及生产计划返回钢筋数控加工模块,将采购材料信息通过编码匹配传递给钢筋现场施工模块中的三维模型;钢筋数控加工模块将钢筋数控文件及生产计划导入数控机床进行加工,并对成品进行物料编码及物流编码的印刷;工地现场钢筋加工件信息通过条码识别器读入到钢筋现场管理客户端,再传递回钢筋ERP管理模块和钢筋现场施工模块;钢筋现场施工模块通过现场钢筋加工成品及三维钢筋模型进行钢筋现场架立安装及施工后安全检查。
本发明的基于3D图形信息平台的钢筋工程全过程管理方法包括如下步骤:
步骤一
根据钢筋混凝土结构结构分析计算结果,对钢筋计算书、钢筋计算的CAD图纸或BIM模型进行钢筋二次建模,通过本发明开发的三维图形信息平台快速建模工具完成带工程信息的钢筋三维信息模型。
步骤二
根据施工要求调整三维钢筋模型进行钢筋连接方式及锚固长度,完成符合钢筋翻样规则的钢筋三维信息模型,并利用数据库后台对钢筋模型进行统计计算导出施工所需的钢筋下料单。
步骤三
根据钢筋下料清单,利用三维图形信息平台的钢筋数控加工模块对定长钢筋进行加工的最优化分析,根据优化结果导出优化后的钢筋数控加工文件。对加工中各位置钢筋进行编码,与三维信息模型中的钢筋模型一一对应。
步骤四
根据钢筋加工优化结果及实际施工进度,利用三维图形信息平台的钢筋ERP管理模块进行钢筋统计编制钢筋物料需求计划、钢筋能力需求计划及钢筋采购计划。
步骤五
根据钢筋生产计划,将优化后的钢筋加工数控文件自动导入数控机床,进行钢筋的分断、折弯、校直、弯箍等操作。对加工后钢筋进行生成条码、印刷条码标识。对成品钢筋进行搬运装卸,将待配送钢筋进行物流编码。
步骤六
利用三维图形信息平台的钢筋ERP管理模块规划运输配送作业,根据运输计划进行货物分类配载、安排配送车辆选定配送路线,进行钢筋成品的运输配送。
步骤七
通用手持式条码识别器对运输到现场的钢筋进行入场盘点,通过三维图形信息平台客户端将钢筋入场信息返回数据库平台。质量保证资料及验收结果返回到平台数据库。
步骤八
对钢筋堆放区域进行并对钢筋堆放区域进行划分,安装施工顺序对编码过钢筋按施工部位进行盘点。确定无误时,配合施工由工人进行钢筋领料由塔吊运至相应位置。
步骤九
钢筋工调用手持式平板电脑对照三维钢筋模型及钢筋架立顺序模拟过程,对安装工序编号后的钢筋进行绑扎架立。
步骤十
质检人员通过手持式平板电脑将三维钢筋模型与现场钢筋进行对比,并拍照记录钢筋接头外观、箍筋配置间距情况。并将相关数据通过客户端返回到三维图形信息平台。
附图说明
图1所示是本发明3D图形信息平台的钢筋工程全过程管理方法流程图;
图2所示是3D图形信息平台的钢筋工程全过程管理系统;
图3所示是3D图形信息平台钢筋数控加工模块中显示数控钢筋加工下料钢筋图;
图4所示是钢筋工程全过程管理3D图形信息平台现场施工模块界面。
具体实施方法
本发明的目的在于解决上述技术问题,为钢筋混凝土结构提供一套基于三维图形信息平台的解决方案。
步骤一
根据钢筋混凝土结构结构分析计算结果,对钢筋计算书、钢筋计算的CAD图纸或BIM模型进行钢筋二次建模,通过本发明开发的三维图形信息平台快速建模工具完成带工程信息的钢筋三维信息模型。
1.通过结构分析软件得到配筋计算书及CAD二维配筋图纸内容,通过钢筋布置规则,利用3D图形信息平台,完成钢筋的三维建模。包括其它BIM软件(Revit/Tekla)中完成的三维钢筋建模通过特定格式导入到3D图形信息平台中。
2.3D图形信息平台通过针对混凝土、钢筋的实体模型及工程信息的匹配及修改,然后通过3D图形显示平台显示转换后的钢筋混凝土结构三维信息模型,点击图形即可获得模型所附含的工程信息。
3.利用3D图形平台中的钢筋3DMesh碰撞,汇总钢筋碰撞关系列表。
4.对得到的钢筋碰撞关系列表中的钢筋进行定位,利用钢筋建模工具完成对钢筋的修改。
步骤二
根据施工要求调整三维钢筋模型进行钢筋连接方式及锚固长度,完成符合钢筋翻样规则的钢筋三维信息模型,并利用数据库后台对钢筋模型进行统计计算导出施工所需的钢筋下料单。
1.根据钢筋构造及连接关系在3D图形信息平台进行批量模型修改及钢筋工程信息修改。
2.利用3D图形信息平台内置钢筋翻样规则,检查钢筋三维模型翻样的正确性并进行钢筋模型修改。
3.利用3D图形信息平台几何信息数据库,依照钢筋属性信息进行分类及数量统计。
4.利用3D图形信息平台钢筋加工信息进行存储,并按钢筋下料单格式进行钢筋下料单输出。
步骤三
根据钢筋下料清单,利用三维图形信息平台的钢筋数控加工模块对定长钢筋进行加工的最优化分析,根据优化结果导出优化后的钢筋数控加工文件。对加工中各位置钢筋进行编码,与三维信息模型中的钢筋模型一一对应。
图2为钢筋进行定长优化后,在钢筋数控加工模块中导出的定长钢筋的2D加工模式图。并可在数控加工模块视图中进行显示。
步骤四
根据钢筋加工优化结果及实际施工进度,利用三维图形信息平台的钢筋ERP管理模块进行钢筋统计编制钢筋物料需求计划、钢筋能力需求计划及钢筋采购计划。
1.按钢筋物料清单及工艺流程,从3D图形信息平台的钢筋ERP管理模块导出钢筋物料需求计划,包含成品钢筋数量及生产过程中半成品数量。
2.根据钢筋半成品依照工艺要求从钢筋ERP管理模块导出钢筋上一级钢筋半成品数量并确定工艺编号。
3.最终汇总所需生产钢筋总数量,结合各级生产工艺及生产能力制定钢筋能力需求计划。
4通过钢筋ERP管理模块里仓储钢筋数量,分析确定钢筋的采购计划,包含批次及数量。
步骤五
根据钢筋生产计划,将优化后的钢筋加工数控文件自动导入数控机床,进行钢筋的分断、折弯、校直、弯箍等操作。对加工后钢筋进行生成条码、印刷条码标识。对成品钢筋进行搬运装卸,将待配送钢筋进行物流编码。
1.根据钢筋ERP管理模块导出的工艺顺序编码及半成品信息,钢筋数控加工模块配合相应的工艺流程导出加工的数控加工文件。
2.将数控加工文件导入到数控机床系统,通过数控机床进行钢筋的数控加工,得到相应工序的半成品。
3.通过钢筋半成品上的工序编码对半成品分拣系统,按工序进行下一步的数控加工。
4.将数控加工得到钢筋成品按批次、位置及安装部分进行仓库堆放。
5.对堆放钢筋进行成捆包装,并通过钢筋ERP管理模块进行物流编码。
步骤六
利用三维图形信息平台的钢筋ERP管理模块规划运输配送作业,根据运输计划进行货物分类配载、安排配送车辆选定配送路线,进行钢筋成品的运输配送。
步骤七
通用手持式条码识别器对运输到现场的钢筋进行入场盘点,通过三维图形信息平台客户端将钢筋入场信息返回数据库平台。质量保证资料及验收结果返回到平台数据库。
通过条码识读设备将钢筋加工成品信息读取到返回信息平台客户端进行储存。最后将现场钢筋信息返回三维图形信息平台数据库。
步骤八
对钢筋堆放区域进行并对钢筋堆放区域进行划分,安装施工顺序对编码过钢筋按施工部位进行盘点。确定无误时,配合施工由工人进行钢筋领料由塔吊运至相应位置。
根据钢筋三维信息模型对照现场位置架立绑扎钢筋,核对钢筋的品种、规格、尺寸和数量及钢筋安装位置。
步骤九
钢筋工调用手持式平板电脑对照三维钢筋模型及钢筋架立顺序模拟过程,对安装工序编号后的钢筋进行绑扎架立。
三维图形信息平台对钢筋三维模型进行安装编号及钢筋架立过程模拟。钢筋工在施工前,通过钢筋现场管理客户端浏览钢筋施工模拟辅助进行现场钢筋绑扎架立。图3为钢筋现场施工模块显示局部施工部分钢筋三维信息模型及钢筋信息。
步骤十
质检人员通过手持式平板电脑将三维钢筋模型与现场钢筋进行对比,并拍照记录钢筋接头外观、箍筋配置间距情况。并将相关数据通过客户端返回到三维图形信息平台。
利用平板电脑登陆钢筋现场管理客户端,对钢筋绑扎现场与三维模型对照,按质检流程对钢筋安装工程质量进行检验。检验内容包括:钢筋安装时钢筋品种、级别、规格、数量是否符合设计要求、钢筋绑扎方式是否正确、牢固可靠、钢筋绑扎位置交叉点铁丝是否扎牢、框架结构节点核心区箍筋设置是否符合要求。利用平板电脑的进行拍照并填写检查表单,将结果上传3D图形信息平台。

Claims (8)

1.一种3D图形信息平台的钢筋工程全过程管理系统,其特征在于所述管理系统由钢筋三维设计优化模块、钢筋数控加工模块、钢筋ERP管理模块和钢筋现场施工模块四个模块组成:
钢筋三维设计优化模块用于对钢筋混凝土结构配筋进行优化、钢筋数量统计及钢筋翻样下料;
钢筋数控加工模块用于实现对钢筋下料数据进行优化、生成数控文件、进行钢筋条码加工的功能;
钢筋ERP管理模块用于编制工程钢筋生产计划、采购计划、仓储管理及运输计划,达到合理配置资源最优化钢筋加工生产的目的;
钢筋现场施工模块用于钢筋工地现场堆放管理、绑扎施工管理及施工质量检查。
2.如权利要求1所述的钢筋工程全过程管理系统,所述钢筋三维设计优化模块包括钢筋三维钢筋管理、钢筋数量统计、钢筋下料单管理三个分模块。其中钢筋三维钢筋管理分模块进行三维钢筋快速建模、钢筋碰撞检查、钢筋续接方式调整及钢筋批量修改;钢筋数量统计分模块则是基于三维钢筋模型进行钢筋数量计算;钢筋下料单管理分模块将对设计钢筋三维信息模型进行钢筋下料单的导出、优化及管理。
3.如权利要求1-2任一所述的钢筋工程全过程管理系统,所述钢筋数控加工模块包括钢筋下料优化分析系统、钢筋数控文件转化系统、钢筋数控加工模拟系统及钢筋条码管理信息系统。钢筋下料优化分析系统用于对数控钢筋下料单进行优化,使其满足钢筋数控加工的要求;钢筋数控文件转化系统用于将钢筋三维几何信息转化成钢筋的数控加工信息格式,数控机床可以通过读取该格式得以进行数控加工;钢筋施工加工模拟系统用于对钢筋加工过程中,各加工工序中钢筋的状态进行模拟。把握钢筋实际的加工状态;钢筋条码管理信息系统用于对加工后钢筋成品、半成品进行生成条码、印刷条码标识。对成品钢筋进行搬运装卸,将待配送钢筋进行物流编码。
4.如权利要求1-3任一所述的钢筋工程全过程管理系统,所述钢筋ERP管理模块包括钢筋加工管理系统、钢筋采购系统、钢筋库存管理系统和钢筋运输派送系统。钢筋加工管理系统用于配合钢筋现场施工计划进行钢筋生产加工的计划于控制。钢筋加工管理系统又分为钢筋主生产计划、钢筋物料需求计划、钢筋能力需求计划及钢筋车间管理四个模块。钢筋主生产计划模块用于根据接到钢筋工程生产订单,进行钢筋生产加工的计划安排;钢筋物料需求计划模块用于根据钢筋加工工艺及钢筋主生产计划,进行钢筋成品、半成品需求计划和时间进度安排;钢筋能力需求计划用于根据物料计划要求,在生产设备和人员一定的情况下,安排不同时段钢筋生产能力计划。钢筋车间管理模块用于实时控制车间加工系统,按钢筋物料需求计划的要求,按时、按质、按量的完成钢筋加工任务。钢筋库存管理系统用于管理钢筋工厂钢筋原材的入库、半成品、成品钢筋存储及钢筋成品出库。钢筋运输派送系统用于管理钢筋产品分类配载、安排配送车辆、选择配送路线及规划协调运输能力。
5.如权利要求1-4任一所述的钢筋工程全过程管理系统,所述钢筋现场施工模块包括钢筋现场存放系统、钢筋绑扎架立系统和钢筋质量检查系统,还包含一个现场施工模块移动客户端。钢筋现场存放系统主要用于管理钢筋材料在现场存放及取用。通过现场施工移动客户端对钢筋条码及料牌进行定期盘点。钢筋绑扎架立系统用于通过钢筋三维信息模型及既定工序,利用编码的钢筋辅助进行钢筋绑扎架立。钢筋质量检查系统用于比对现场钢筋施工现场与钢筋三维信息模型差异,检查施工质量。
6.如权利要求1-5任一所述的钢筋工程全过程管理系统,其中模块间信息传递过程如下:钢筋三维设计模块进行三维钢筋建模,并按施工要求进行批量修改,最后将三维钢筋模型传递到钢筋现场施工模块;钢筋三维设计模块中钢筋信息与钢筋下料单对应匹配,通过钢筋下料单将加工信息传递给钢筋数控加工模块;钢筋数控加工模块对钢筋下料单以定长钢筋进行优化,将优化分析的结果传递给钢筋ERP管理模块;钢筋ERP管理模块进行物料生产计划、能力计划及采购计划,将钢筋物料编码写入钢筋数控文件,最后将钢筋数控文件及生产计划返回钢筋数控加工模块,将采购材料信息通过编码匹配传递给钢筋现场施工模块中的三维模型;钢筋数控加工模块将钢筋数控文件及生产计划导入数控机床进行加工,并对成品进行物料编码及物流编码的印刷;工地现场钢筋加工件信息通过条码识别器读入到钢筋现场管理客户端,再传递回钢筋ERP管理模块和钢筋现场施工模块;钢筋现场施工模块通过现场钢筋加工成品及三维钢筋模型进行钢筋现场架立安装及施工后安全检查。
7.一种基于3D图形信息平台的钢筋工程全过程管理方法,其特征在于所述管理方法包括如下步骤:步骤一、进行钢筋三维建模;步骤二、导出钢筋下料单;步骤三、定长钢筋最优化调整;步骤四、编制钢筋的生产计划及采购计划;步骤五、导出数控加工文件及产品编码;步骤六、编制运输计划;步骤七、钢筋入场盘点;步骤八、钢筋区域存放管理;步骤九、现场钢筋绑扎;步骤十、钢筋绑扎质量验收。
8.如权利要求7所述的钢筋工程全过程管理方法,其中:
步骤一具体为根据钢筋混凝土结构结构分析计算结果,对钢筋计算书、钢筋计算的CAD图纸或BIM模型进行钢筋二次建模,通过本发明开发的三维图形信息平台快速建模工具完成带工程信息的钢筋三维信息模型;
步骤二具体为根据施工要求调整三维钢筋模型进行钢筋连接方式及锚固长度,完成符合钢筋翻样规则的钢筋三维信息模型,并利用数据库后台对钢筋模型进行统计计算导出施工所需的钢筋下料单;
步骤三具体为根据钢筋下料清单,利用三维图形信息平台的钢筋数控加工模块对定长钢筋进行加工的最优化分析,根据优化结果导出优化后的钢筋数控加工文件。对加工中各位置钢筋进行编码,与三维信息模型中的钢筋模型一一对应;
步骤四根据钢筋加工优化结果及实际施工进度,利用三维图形信息平台的钢筋ERP管理模块进行钢筋统计编制钢筋物料需求计划、钢筋能力需求计划及钢筋采购计划;
步骤五具体为根据钢筋生产计划,将优化后的钢筋加工数控文件自动导入数控机床,进行钢筋的分断、折弯、校直、弯箍等操作。对加工后钢筋进行生成条码、印刷条码标识。对成品钢筋进行搬运装卸,将待配送钢筋进行物流编码;
步骤六具体为利用三维图形信息平台的钢筋ERP管理模块规划运输配送作业,根据运输计划进行货物分类配载、安排配送车辆选定配送路线,进行钢筋成品的运输配送;
步骤七具体为通用手持式条码识别器对运输到现场的钢筋进行入场盘点,通过三维图形信息平台客户端将钢筋入场信息返回数据库平台。质量保证资料及验收结果返回到平台数据库;
步骤八具体为对钢筋堆放区域进行并对钢筋堆放区域进行划分,安装施工顺序对编码过钢筋按施工部位进行盘点。确定无误时,配合施工由工人进行钢筋领料由塔吊运至相应位置;
步骤九具体为钢筋工调用手持式平板电脑对照三维钢筋模型及钢筋架立顺序模拟过程,对安装工序编号后的钢筋进行绑扎架立;
步骤十具体为质检人员通过手持式平板电脑将三维钢筋模型与现场钢筋进行对比,并拍照记录钢筋接头外观、箍筋配置间距情况。并将相关数据通过客户端返回到三维图形信息平台。
CN201510685296.XA 2015-10-22 2015-10-22 基于3d图形信息平台的钢筋工程全过程管理系统及方法 Pending CN105303308A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510685296.XA CN105303308A (zh) 2015-10-22 2015-10-22 基于3d图形信息平台的钢筋工程全过程管理系统及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510685296.XA CN105303308A (zh) 2015-10-22 2015-10-22 基于3d图形信息平台的钢筋工程全过程管理系统及方法

Publications (1)

Publication Number Publication Date
CN105303308A true CN105303308A (zh) 2016-02-03

Family

ID=55200545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510685296.XA Pending CN105303308A (zh) 2015-10-22 2015-10-22 基于3d图形信息平台的钢筋工程全过程管理系统及方法

Country Status (1)

Country Link
CN (1) CN105303308A (zh)

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105931029A (zh) * 2016-05-17 2016-09-07 中建三局第建设工程有限责任公司 一种基于bim的梁场生产管理系统
CN106121246A (zh) * 2016-06-28 2016-11-16 安徽海龙建筑工业有限公司 钢筋绑扎流水工艺
CN106295078A (zh) * 2016-08-31 2017-01-04 中建安装工程有限公司 一种基于bim技术的钢筋翻样计算‑模块化加工系统及方法
CN106934855A (zh) * 2017-03-20 2017-07-07 王凯 建筑3d模型构建方法及装置
CN106933184A (zh) * 2017-05-05 2017-07-07 广州市镒辰智造科技有限公司 一种基于bim的非标风管预制加工系统及其方法
CN107169230A (zh) * 2017-06-09 2017-09-15 深圳市斯维尔科技股份有限公司 配筋方法、装置、终端及计算机可读存储介质
CN107219825A (zh) * 2016-03-22 2017-09-29 赫克斯冈技术中心 自我控制
CN107256005A (zh) * 2017-08-15 2017-10-17 广东星层建筑科技股份有限公司 一种基于bim技术的钢筋数控加工方法及设备
CN107305362A (zh) * 2016-04-18 2017-10-31 秦皇岛烟草机械有限责任公司 一种基于三维cad设计的管路钢管加工系统
CN107315397A (zh) * 2017-06-19 2017-11-03 东莞市索康自动化设备有限公司 一种实时精细化管理系统
CN107729662A (zh) * 2017-10-23 2018-02-23 朱海涛 基于bim技术的钢筋下料匹配方法
CN107958121A (zh) * 2017-11-30 2018-04-24 连云港美步家居有限公司 基于五面钻的产品加工方法及系统
CN107967399A (zh) * 2017-12-19 2018-04-27 广东建远建筑装配工业有限公司 一种基于bim软件的装配式建筑深化设计方法
CN108038653A (zh) * 2018-01-26 2018-05-15 山东送变电工程有限公司 一种钢筋管理方法
CN108197802A (zh) * 2017-12-29 2018-06-22 湖南大学 一种基于bim技术对混凝土结构施工质量管控的方法及系统
CN108427817A (zh) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 基于bim装配式建筑构件的装车顺序确定方法及装置
CN108427818A (zh) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 一种基于bim装配式构件钢筋数据处理方法及装置
CN108472777A (zh) * 2018-03-30 2018-08-31 深圳市君盈建筑科技有限公司 迁移式钢筋加工方法
CN108513548A (zh) * 2018-03-30 2018-09-07 深圳市君盈建筑科技有限公司 钢筋预制加工方法
CN108521763A (zh) * 2018-03-30 2018-09-11 深圳市君盈建筑科技有限公司 钢筋骨架的网片弯折成型方法
CN108536933A (zh) * 2018-03-26 2018-09-14 何登富 一种自动布置钢筋的系统和方法
CN109032075A (zh) * 2018-06-28 2018-12-18 中铁山桥集团有限公司 一种智能化钢结构备料方法及系统
CN109267753A (zh) * 2018-11-22 2019-01-25 南通四建集团有限公司 一种基于bim的清水混凝土施工方法
CN109726499A (zh) * 2019-01-09 2019-05-07 武汉一冶建筑安装工程有限责任公司 基于bim技术的钢筋施工管理方法
CN110000305A (zh) * 2018-11-05 2019-07-12 中铁九局集团第二工程有限公司 一种基于bim钢筋无图化加工方法
CN110340260A (zh) * 2019-07-15 2019-10-18 浙江精筑实业投资有限公司 一种钢筋加工配筋绑扎自动生产线系统及其作业方法
CN110457775A (zh) * 2019-07-22 2019-11-15 中冶京诚工程技术有限公司 不规则结构的三维配筋方法及装置
CN111507595A (zh) * 2020-04-08 2020-08-07 广州高新工程顾问有限公司 一种基于bim的工程项目智能动态安全监管系统
CN111598496A (zh) * 2020-03-16 2020-08-28 中国建筑第二工程局有限公司 一种钢筋加工管理系统及加工管理方法
CN111612332A (zh) * 2020-05-19 2020-09-01 中铁四局集团有限公司 一种铁路桥梁钢筋集中加工自动优化软件系统及优化方法
CN111914326A (zh) * 2020-07-22 2020-11-10 中国一冶集团有限公司 基于bim技术的钢筋下料匹配方法
CN112270522A (zh) * 2020-10-14 2021-01-26 广东博智林机器人有限公司 一种钢筋作业方法和系统
CN113515834A (zh) * 2020-04-10 2021-10-19 任逸切科技(上海)有限公司 一种钢筋结构制造系统及方法
CN114293777A (zh) * 2022-01-19 2022-04-08 中建八局第二建设有限公司 一种基于精益化管理的钢筋集中加工配送的施工方法
CN114329693A (zh) * 2021-11-30 2022-04-12 中国建筑第二工程局有限公司 钢筋翻样碰撞检查方法、装置、设备及存储介质
CN115017580A (zh) * 2022-06-01 2022-09-06 上海宝冶集团有限公司 一种弧形板结构钢筋的快速配料方法
CN116092012A (zh) * 2023-03-06 2023-05-09 安徽数智建造研究院有限公司 基于视频流的钢筋绑扎工序监测方法及监测装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103337006A (zh) * 2013-05-31 2013-10-02 中建钢构有限公司 一种钢结构工程管理系统的管理方法
CN103679345A (zh) * 2013-11-27 2014-03-26 上海国际航运服务中心开发有限公司 用于水工结构的预埋件的全生命周期处理方法及系统
CN104281729A (zh) * 2014-07-02 2015-01-14 哈尔滨工业大学 一种应用于钢结构建筑数字化加工制造的bim方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103337006A (zh) * 2013-05-31 2013-10-02 中建钢构有限公司 一种钢结构工程管理系统的管理方法
CN103679345A (zh) * 2013-11-27 2014-03-26 上海国际航运服务中心开发有限公司 用于水工结构的预埋件的全生命周期处理方法及系统
CN104281729A (zh) * 2014-07-02 2015-01-14 哈尔滨工业大学 一种应用于钢结构建筑数字化加工制造的bim方法

Cited By (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10789556B2 (en) 2016-03-22 2020-09-29 Hexagon Technology Center Gmbh Self control
CN107219825A (zh) * 2016-03-22 2017-09-29 赫克斯冈技术中心 自我控制
CN107219825B (zh) * 2016-03-22 2020-02-14 赫克斯冈技术中心 提供检查指令的方法、施工现场管理系统、存储介质
CN107305362A (zh) * 2016-04-18 2017-10-31 秦皇岛烟草机械有限责任公司 一种基于三维cad设计的管路钢管加工系统
CN105931029A (zh) * 2016-05-17 2016-09-07 中建三局第建设工程有限责任公司 一种基于bim的梁场生产管理系统
CN106121246A (zh) * 2016-06-28 2016-11-16 安徽海龙建筑工业有限公司 钢筋绑扎流水工艺
CN106295078A (zh) * 2016-08-31 2017-01-04 中建安装工程有限公司 一种基于bim技术的钢筋翻样计算‑模块化加工系统及方法
CN106934855A (zh) * 2017-03-20 2017-07-07 王凯 建筑3d模型构建方法及装置
CN106933184A (zh) * 2017-05-05 2017-07-07 广州市镒辰智造科技有限公司 一种基于bim的非标风管预制加工系统及其方法
CN107169230A (zh) * 2017-06-09 2017-09-15 深圳市斯维尔科技股份有限公司 配筋方法、装置、终端及计算机可读存储介质
CN107315397A (zh) * 2017-06-19 2017-11-03 东莞市索康自动化设备有限公司 一种实时精细化管理系统
CN108427817A (zh) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 基于bim装配式建筑构件的装车顺序确定方法及装置
CN108427818A (zh) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 一种基于bim装配式构件钢筋数据处理方法及装置
CN107256005A (zh) * 2017-08-15 2017-10-17 广东星层建筑科技股份有限公司 一种基于bim技术的钢筋数控加工方法及设备
CN107256005B (zh) * 2017-08-15 2023-06-06 广东星层建筑科技股份有限公司 一种基于bim技术的钢筋数控加工方法及设备
CN107729662A (zh) * 2017-10-23 2018-02-23 朱海涛 基于bim技术的钢筋下料匹配方法
CN107958121A (zh) * 2017-11-30 2018-04-24 连云港美步家居有限公司 基于五面钻的产品加工方法及系统
CN107958121B (zh) * 2017-11-30 2019-01-29 连云港美步家居有限公司 基于五面钻的产品加工方法及系统
CN107967399A (zh) * 2017-12-19 2018-04-27 广东建远建筑装配工业有限公司 一种基于bim软件的装配式建筑深化设计方法
CN107967399B (zh) * 2017-12-19 2021-02-02 广东建远建筑装配工业有限公司 一种基于bim软件的装配式建筑深化设计方法
CN108197802A (zh) * 2017-12-29 2018-06-22 湖南大学 一种基于bim技术对混凝土结构施工质量管控的方法及系统
CN108038653A (zh) * 2018-01-26 2018-05-15 山东送变电工程有限公司 一种钢筋管理方法
CN108536933A (zh) * 2018-03-26 2018-09-14 何登富 一种自动布置钢筋的系统和方法
CN108521763A (zh) * 2018-03-30 2018-09-11 深圳市君盈建筑科技有限公司 钢筋骨架的网片弯折成型方法
CN108513548A (zh) * 2018-03-30 2018-09-07 深圳市君盈建筑科技有限公司 钢筋预制加工方法
CN108472777A (zh) * 2018-03-30 2018-08-31 深圳市君盈建筑科技有限公司 迁移式钢筋加工方法
CN109032075A (zh) * 2018-06-28 2018-12-18 中铁山桥集团有限公司 一种智能化钢结构备料方法及系统
CN110000305A (zh) * 2018-11-05 2019-07-12 中铁九局集团第二工程有限公司 一种基于bim钢筋无图化加工方法
CN109267753A (zh) * 2018-11-22 2019-01-25 南通四建集团有限公司 一种基于bim的清水混凝土施工方法
CN109726499A (zh) * 2019-01-09 2019-05-07 武汉一冶建筑安装工程有限责任公司 基于bim技术的钢筋施工管理方法
CN110340260A (zh) * 2019-07-15 2019-10-18 浙江精筑实业投资有限公司 一种钢筋加工配筋绑扎自动生产线系统及其作业方法
CN110457775A (zh) * 2019-07-22 2019-11-15 中冶京诚工程技术有限公司 不规则结构的三维配筋方法及装置
CN110457775B (zh) * 2019-07-22 2023-07-11 中冶京诚工程技术有限公司 不规则结构的三维配筋方法及装置
CN111598496A (zh) * 2020-03-16 2020-08-28 中国建筑第二工程局有限公司 一种钢筋加工管理系统及加工管理方法
CN111507595A (zh) * 2020-04-08 2020-08-07 广州高新工程顾问有限公司 一种基于bim的工程项目智能动态安全监管系统
CN111507595B (zh) * 2020-04-08 2021-02-23 广州高新工程顾问有限公司 一种基于bim的工程项目智能动态安全监管系统
CN113515834A (zh) * 2020-04-10 2021-10-19 任逸切科技(上海)有限公司 一种钢筋结构制造系统及方法
CN111612332A (zh) * 2020-05-19 2020-09-01 中铁四局集团有限公司 一种铁路桥梁钢筋集中加工自动优化软件系统及优化方法
CN111914326A (zh) * 2020-07-22 2020-11-10 中国一冶集团有限公司 基于bim技术的钢筋下料匹配方法
CN112270522A (zh) * 2020-10-14 2021-01-26 广东博智林机器人有限公司 一种钢筋作业方法和系统
CN114329693A (zh) * 2021-11-30 2022-04-12 中国建筑第二工程局有限公司 钢筋翻样碰撞检查方法、装置、设备及存储介质
CN114329693B (zh) * 2021-11-30 2023-03-24 中国建筑第二工程局有限公司 钢筋翻样碰撞检查方法、装置、设备及存储介质
CN114293777A (zh) * 2022-01-19 2022-04-08 中建八局第二建设有限公司 一种基于精益化管理的钢筋集中加工配送的施工方法
CN115017580A (zh) * 2022-06-01 2022-09-06 上海宝冶集团有限公司 一种弧形板结构钢筋的快速配料方法
CN116092012A (zh) * 2023-03-06 2023-05-09 安徽数智建造研究院有限公司 基于视频流的钢筋绑扎工序监测方法及监测装置

Similar Documents

Publication Publication Date Title
CN105303308A (zh) 基于3d图形信息平台的钢筋工程全过程管理系统及方法
CN111210199B (zh) 一种桥梁预制件bim信息化管理系统
CN107256005B (zh) 一种基于bim技术的钢筋数控加工方法及设备
Aram et al. Requirements for BIM platforms in the concrete reinforcement supply chain
CN110909972B (zh) 一种基于bim的钢结构全寿命周期的管理系统及方法
CN104314310B (zh) 一种基于bim的砌块标准化施工方法
CN104281729B (zh) 一种应用于钢结构建筑数字化加工制造的bim方法
Choi et al. A diagnosis and evaluation method for strategic planning and systematic design of a virtual factory in smart manufacturing systems
CN110110442A (zh) 一种装配式建筑的参数化建模设计方法
CN105868502A (zh) 基于bim的材料管理系统及其控制方法
CN106326536A (zh) 基于bim的水工预制构件标准化施工方法
CN112163256B (zh) 基于有限元分析与bim的模板支架模型的建立与分析方法
KR101167850B1 (ko) 직접 공사비 구성 항목별 확장 단가 정보의 생성을 포함하는 건설 공사비 정보 처리 시스템의 정보 처리 방법
CN104978696A (zh) 一种基于bim技术的电子验收及移交方法
CN111914326A (zh) 基于bim技术的钢筋下料匹配方法
CN113269527A (zh) 一种基于bim钢筋形状和参数精确加工钢筋方法
Ko et al. Making formwork design lean
Si et al. A solution to Just-in-Time delivery for off-site construction: a conceptual model
Ting et al. Identification of significant factors impacting precast utilization in Cambodia construction industry
Ghammad et al. Transforming building renovation: A holistic, strategic approach with construction robot management
CN112765711A (zh) 一种绿色建筑模拟计算的bim建模方法
Shi Framework for integration of BIM and RFID in steel construction
Fosse et al. Deploying BIM in a Heavy Civil Project
Li Process automation for flexible residential wall panel manufacturing
KR102411112B1 (ko) 플랜트 장치기계류의 bm 자동 산출 방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160203

WD01 Invention patent application deemed withdrawn after publication