CN105298503A - Separate launching construction method of shield tunneling machine in narrow space - Google Patents
Separate launching construction method of shield tunneling machine in narrow space Download PDFInfo
- Publication number
- CN105298503A CN105298503A CN201510593304.8A CN201510593304A CN105298503A CN 105298503 A CN105298503 A CN 105298503A CN 201510593304 A CN201510593304 A CN 201510593304A CN 105298503 A CN105298503 A CN 105298503A
- Authority
- CN
- China
- Prior art keywords
- trolleys
- launching
- tunneling machine
- shield tunneling
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention relates to the field of civil engineering, in particular to a separate launching construction method of a shield tunneling machine in narrow space. First, second, third and fifth trolleys of the shield tunneling machine are bilaterally separated and separately fitted correspondingly to prefabricated empty trolleys, the trolleys are then lifted sequentially into a well for assembly, remaining auxiliary trolleys are placed on the ground near a launching end well, pipelines among the trolleys are connected, launching is started after the shield tunneling machine is finished, the upper half of a negative ring segment is removed after 40 rings of shield launching are finished, the trolleys are drawn to the launching end well by using a battery vehicle and are lifted to the surface for reassembly according to design drawings, the trolleys are lifted into the well in a sequence of first to seven, and assembly and debugging are then carried in at the bottom hole before launching is carried out again. By modifying the trolleys and re-sequencing the trolleys, at the premise of ensuring smooth launching of the shield tunneling machine, the modification quantity and connection length of various pipelines are reduced as far as possible. The shield tunneling machine is separately launched, a full-ring unearthing construction technique is used, and thus a construction period is greatly shortened.
Description
Technical field
The present invention relates to field of civil engineering, specifically relate to a kind of small space shield machine separate launching construction method.
Background technology
In the subway Line 1 work progress of Hefei, station, Pueraria lobota large shop is an island platform station, and adopt cut and cover tunneling, because first bus station structure clear span is narrow and small, (station side wall is to column clear span only 4.1m, shield machine station clear span 4.5m), vehicle frame entirety cannot pass through station smoothly.
Summary of the invention
For the technical problem existed in prior art, the object of wood invention is to provide a kind of small space shield machine separate launching construction method.
To achieve these goals, the technical solution adopted in the present invention is: a kind of small space shield machine separate launching construction method, it is characterized in that: by shield machine No. 1, No. 2, No. 3, No. 5 chassis left and right sides are taken apart, and correspondingly with the empty station car made in advance respectively to assemble, shield machine frame width is transform as 3.8m by 4.5m, hang in down-hole more in order to assemble, the auxiliary chassis of residue is positioned over ground near starting end head well, then the pipeline between each chassis is connected, shield machine starts after having debugged, complete after 40 rings (60m) until shield launching, remove the first half and bear endless tube sheet, adopt battery truck by chassis traction to starting end head well, winch to ground to re-assembly by plan again, and lift into well according to the order of 1 ~ No. 7 chassis, assemble in down-hole again, debugging, again start.
Small space shield machine separate launching construction method of the present invention, its beneficial effect shows:
1, by transformation chassis, again organize into groups chassis order, ensureing, under the prerequisite that shield machine can start smoothly, to decrease each road pipeline modification quantity and connecting length as much as possible.
2, adopt shield machine separate launching, the construction technology that the domain is unearthed, shorten construction period greatly.
Accompanying drawing explanation
Fig. 1 is the workflow diagram of small space shield machine separate launching construction method of the present invention.
Detailed description of the invention
For further describing small space shield machine separate launching construction method of the present invention, below in conjunction with accompanying drawing, it is described further.
Refer to shown in Fig. 1, a kind of small space shield machine separate launching construction method, by shield machine No. 1, No. 2, No. 3, No. 5 chassis left and right sides are taken apart, and correspondingly with the empty station car made in advance respectively to assemble, shield machine frame width is transform as 3.8m by 4.5m, hang in down-hole more in order to assemble, the auxiliary chassis of residue is positioned over ground near starting end head well, then the pipeline between each chassis is connected, shield machine starts after having debugged, complete after 40 rings (60m) until shield launching, remove the first half and bear endless tube sheet, adopt battery truck by chassis traction to starting end head well, winch to ground to re-assembly by plan again, and lift into well according to the order of 1 ~ No. 7 chassis, assemble in down-hole again, debugging, again start.
The Third Construction Co., Ltd. is in the subway Line 1 work progress of Hefei, technician is by on-the-spot construction technology of being unearthed by shield machine separate launching, the domain under the narrow and small working space of introduction employing, preferably resolve because of the narrow and small problem of station structure clear span, and the operating mode of 4# shield machine separate launching is analyzed, draw the clear superiority of this kind of construction method in duration, economic dispatch: effectively improve construction speed, ensure that construction safety, save construction cost.Under this novel narrow and small working space, shield machine separate launching is marked in station, Pueraria lobota large shop-water Yangjiang way station (right line) shield launching work in November, 2014 for Hefei track traffic Line 15.
Above content is only to design example of the present invention and explanation; affiliated those skilled in the art make various amendment to described specific embodiment or supplement or adopt similar mode to substitute; only otherwise depart from the design of invention or surmount this scope as defined in the claims, protection scope of the present invention all should be belonged to.
Claims (1)
1. a small space shield machine separate launching construction method, it is characterized in that: by shield machine No. 1, No. 2, No. 3, No. 5 chassis left and right sides are taken apart, and correspondingly with the empty station car made in advance respectively to assemble, shield machine frame width is transform as 3.8m by 4.5m, hang in down-hole more in order to assemble, the auxiliary chassis of residue is positioned over ground near starting end head well, then the pipeline between each chassis is connected, shield machine starts after having debugged, complete after 40 rings (60m) until shield launching, remove the first half and bear endless tube sheet, adopt battery truck by chassis traction to starting end head well, winch to ground to re-assembly by plan again, and lift into well according to the order of 1 ~ No. 7 chassis, assemble in down-hole again, debugging, again start.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510593304.8A CN105298503B (en) | 2015-09-16 | 2015-09-16 | Small space shield machine separate launching construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510593304.8A CN105298503B (en) | 2015-09-16 | 2015-09-16 | Small space shield machine separate launching construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105298503A true CN105298503A (en) | 2016-02-03 |
CN105298503B CN105298503B (en) | 2017-12-19 |
Family
ID=55196232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510593304.8A Active CN105298503B (en) | 2015-09-16 | 2015-09-16 | Small space shield machine separate launching construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105298503B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106930772A (en) * | 2017-05-11 | 2017-07-07 | 北京市政建设集团有限责任公司 | One kind is based on the lateral separate launching construction method of mining sectbn shield, constructing structure and construction equipment |
CN107725059A (en) * | 2017-09-27 | 2018-02-23 | 中铁十二局集团有限公司 | The ultrashort miniature shield machine main frame separate launching construction method originated under steric requirements |
CN108131148A (en) * | 2018-01-22 | 2018-06-08 | 中交第二航务工程局有限公司 | Extra small starting well shield separate launching construction method |
CN108756904A (en) * | 2018-06-12 | 2018-11-06 | 中铁隧道局集团有限公司 | Shield machine integrally originates construction method |
CN108775243A (en) * | 2018-06-26 | 2018-11-09 | 中铁隧道局集团有限公司 | A kind of shield machine narrow space originates construction method |
CN108952733A (en) * | 2017-05-17 | 2018-12-07 | 沈阳市政集团有限公司 | Separate launching shield technique application construction method in municipal sewerage engineering |
CN108999637A (en) * | 2018-09-28 | 2018-12-14 | 中铁工程装备集团技术服务有限公司 | The booster pump station and construction method of shield machine hydraulic system deep-well separate launching |
CN109184706A (en) * | 2018-09-27 | 2019-01-11 | 中国电建集团铁路建设有限公司 | A kind of method of large-diameter shield machine separate launching |
CN110185458A (en) * | 2019-07-04 | 2019-08-30 | 中建五局土木工程有限公司 | Two-way shield launching method |
CN110645004A (en) * | 2019-10-16 | 2020-01-03 | 中铁十一局集团城市轨道工程有限公司 | Method for turning over shield tunneling machine trolley in negative two-layer of operated station |
CN110714774A (en) * | 2019-10-28 | 2020-01-21 | 中建三局基础设施建设投资有限公司 | Bidirectional split starting method for small shield in narrow shaft |
CN113006806A (en) * | 2021-03-24 | 2021-06-22 | 中铁十二局集团有限公司 | Split starting method for stacking deep starting well shield machine trolleys |
CN113982608A (en) * | 2021-12-17 | 2022-01-28 | 中铁隧道局集团有限公司 | Split initial construction method for ultra-deep narrow shaft shield |
CN114622920A (en) * | 2022-01-28 | 2022-06-14 | 中铁四局集团有限公司 | Lateral split starting construction method for shield machine in narrow space |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08260878A (en) * | 1995-03-24 | 1996-10-08 | Taisei Corp | Connection method for adjacent shield tunnel and underground space construction method |
JP2001040981A (en) * | 1999-07-30 | 2001-02-13 | Mitsui Kyodo Kensetsu Consultant Kk | Tunnel water stopping method in master-slave shield tunneling method |
CN103032072A (en) * | 2012-12-08 | 2013-04-10 | 中铁十二局集团第二工程有限公司 | Method for disassembling, lifting and transferring closed type station shield to transferring line to be hoisted out |
CN103711499A (en) * | 2014-01-08 | 2014-04-09 | 中铁十三局集团第六工程有限公司 | Shield tunneling machine split starting construction method |
CN104695968A (en) * | 2015-02-11 | 2015-06-10 | 河南工程学院 | Method for in-tunnel starting of shield tunneling machine |
-
2015
- 2015-09-16 CN CN201510593304.8A patent/CN105298503B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08260878A (en) * | 1995-03-24 | 1996-10-08 | Taisei Corp | Connection method for adjacent shield tunnel and underground space construction method |
JP2001040981A (en) * | 1999-07-30 | 2001-02-13 | Mitsui Kyodo Kensetsu Consultant Kk | Tunnel water stopping method in master-slave shield tunneling method |
CN103032072A (en) * | 2012-12-08 | 2013-04-10 | 中铁十二局集团第二工程有限公司 | Method for disassembling, lifting and transferring closed type station shield to transferring line to be hoisted out |
CN103711499A (en) * | 2014-01-08 | 2014-04-09 | 中铁十三局集团第六工程有限公司 | Shield tunneling machine split starting construction method |
CN104695968A (en) * | 2015-02-11 | 2015-06-10 | 河南工程学院 | Method for in-tunnel starting of shield tunneling machine |
Non-Patent Citations (2)
Title |
---|
张俊英: "盾构机分体始发施工技术", 《铁道建筑技术》 * |
贺飞: "盾构分体始发技术总结", 《山东交通科技》 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106930772B (en) * | 2017-05-11 | 2018-11-16 | 北京市政建设集团有限责任公司 | One kind being based on the lateral separate launching construction method of mining sectbn shield and equipment |
CN106930772A (en) * | 2017-05-11 | 2017-07-07 | 北京市政建设集团有限责任公司 | One kind is based on the lateral separate launching construction method of mining sectbn shield, constructing structure and construction equipment |
CN108952733A (en) * | 2017-05-17 | 2018-12-07 | 沈阳市政集团有限公司 | Separate launching shield technique application construction method in municipal sewerage engineering |
CN107725059A (en) * | 2017-09-27 | 2018-02-23 | 中铁十二局集团有限公司 | The ultrashort miniature shield machine main frame separate launching construction method originated under steric requirements |
CN108131148A (en) * | 2018-01-22 | 2018-06-08 | 中交第二航务工程局有限公司 | Extra small starting well shield separate launching construction method |
CN108756904A (en) * | 2018-06-12 | 2018-11-06 | 中铁隧道局集团有限公司 | Shield machine integrally originates construction method |
CN108775243B (en) * | 2018-06-26 | 2020-06-26 | 中铁隧道局集团有限公司 | Shield tunneling machine narrow space starting construction method |
CN108775243A (en) * | 2018-06-26 | 2018-11-09 | 中铁隧道局集团有限公司 | A kind of shield machine narrow space originates construction method |
CN109184706A (en) * | 2018-09-27 | 2019-01-11 | 中国电建集团铁路建设有限公司 | A kind of method of large-diameter shield machine separate launching |
CN108999637A (en) * | 2018-09-28 | 2018-12-14 | 中铁工程装备集团技术服务有限公司 | The booster pump station and construction method of shield machine hydraulic system deep-well separate launching |
CN110185458A (en) * | 2019-07-04 | 2019-08-30 | 中建五局土木工程有限公司 | Two-way shield launching method |
CN110645004A (en) * | 2019-10-16 | 2020-01-03 | 中铁十一局集团城市轨道工程有限公司 | Method for turning over shield tunneling machine trolley in negative two-layer of operated station |
CN110645004B (en) * | 2019-10-16 | 2024-02-02 | 中铁十一局集团城市轨道工程有限公司 | Method for turning shield machine trolley in negative two layers of operated station |
CN110714774A (en) * | 2019-10-28 | 2020-01-21 | 中建三局基础设施建设投资有限公司 | Bidirectional split starting method for small shield in narrow shaft |
CN110714774B (en) * | 2019-10-28 | 2021-06-08 | 中建三局基础设施建设投资有限公司 | Bidirectional split starting method for small shield in narrow shaft |
CN113006806A (en) * | 2021-03-24 | 2021-06-22 | 中铁十二局集团有限公司 | Split starting method for stacking deep starting well shield machine trolleys |
CN113982608A (en) * | 2021-12-17 | 2022-01-28 | 中铁隧道局集团有限公司 | Split initial construction method for ultra-deep narrow shaft shield |
CN113982608B (en) * | 2021-12-17 | 2024-01-05 | 中铁隧道局集团有限公司 | Shield split initiation construction method for ultra-deep narrow vertical shaft |
CN114622920A (en) * | 2022-01-28 | 2022-06-14 | 中铁四局集团有限公司 | Lateral split starting construction method for shield machine in narrow space |
CN114622920B (en) * | 2022-01-28 | 2023-02-28 | 中铁四局集团有限公司 | Lateral split starting construction method for shield machine in narrow space |
Also Published As
Publication number | Publication date |
---|---|
CN105298503B (en) | 2017-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298503A (en) | Separate launching construction method of shield tunneling machine in narrow space | |
CN203961989U (en) | A kind of full section rock drilling stand for the short benching tunnelling method construction in tunnel | |
CN102650118B (en) | Construction device and method for erecting prefabricated beam by slip method | |
CN105626088B (en) | T-shaped bored tunnel shield machine is gone into the well shift method | |
CN105317202B (en) | A kind of device for being easy to ceramic tile to smear cement | |
CN105391259B (en) | Large Rotor installation method and device | |
CN202039858U (en) | Automatically-folded multifunctional tunnel construction scaffolding | |
CN105545313A (en) | T-shaped concealed excavated tunnel shield tunneling machine backup trolley lowering translation system and method thereof | |
CN107285190A (en) | Gantry crane transverse translation flat car and method for traversing | |
CN101183779A (en) | Overhead rail type integral moving monorail crane | |
CN104074145B (en) | A kind of closure segment Hanging Basket repacking construction method | |
CN203684224U (en) | Static pile press machine capable of traveling | |
CN204877502U (en) | Interval shield constructs multi -functional platform of secondary slip casting | |
CN205259074U (en) | Basket traveling system is hung to triangle | |
CN203319248U (en) | Automatic plate feeder | |
CN206187044U (en) | Fully mechanized mining equipment train liquid accuse traction system | |
CN202413995U (en) | Loading system for scraped vehicle disassembly line | |
CN207276051U (en) | Gantry crane transverse translation flat car | |
CN203383155U (en) | Fully automatic traveling gear | |
CN109748049A (en) | A kind of auxiliary transfer device for rail above and below equipment | |
CN104806250A (en) | Heading machine start traction method | |
CN204919324U (en) | Variable cross section pier inspection device | |
CN205590196U (en) | A winch system for moving material | |
CN204212501U (en) | vehicle locating device | |
CN104499418B (en) | A kind of vehicle-mounted bridge of foldable assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |