CN105297905A - 一种预制楼板与预制竖向构件的连接方法 - Google Patents
一种预制楼板与预制竖向构件的连接方法 Download PDFInfo
- Publication number
- CN105297905A CN105297905A CN201510662553.8A CN201510662553A CN105297905A CN 105297905 A CN105297905 A CN 105297905A CN 201510662553 A CN201510662553 A CN 201510662553A CN 105297905 A CN105297905 A CN 105297905A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- floor
- vertical component
- prefabricated vertical
- concrete cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
一种预制楼板与预制竖向构件的连接方法,其特征在于,步骤为:1)混凝土现浇板带预制楼板与预制竖向构件的连接;其中,将混凝土现浇板带设在预制楼板与预制竖向构件交接处,预制楼板连接端面设有粗糙面或齿状面;预制楼板上下钢筋形成闭合环并伸进后浇带,预制竖向构件伸出环向钢筋的一角,两种钢筋形成新的闭合环,闭合环内插入纵向钢筋;2)混凝土现浇板带采用细石混凝土浇筑。本发明的有益效果是大量减少楼板湿作业;可实现墙体与楼板的整体预制。本发明提高了建筑的装配率,减小楼板厚度;避免楼板支座处产生裂缝,楼板整体性亦可得到满足。
Description
背景技术
目前我国建造房子的方式还主要是以湿作业为主,具有材料浪费、冬期施工困难、落地灰和其他建筑垃圾较多、工地扬尘影响城市空气质量、建筑质量不易得到有效保障,装修可能破坏原有结构等问题,因此装配式混凝土结构形式逐渐推进。
目前国内出现的装配式混凝土结构楼板与竖向构件的连接形式基本有两种。第一种形式为:采用预制叠合板,然后整层后浇筑一层混凝土。此方式虽然减少楼板底模板,但仍有较多的现场湿作业,预制装配率尚较低。第二种形式为:预制板搁置在墙上,后浇混凝土接缝处钢筋可靠连接,此方式连接较多,且无法实现墙体与楼板的整体预制。
发明内容
本发明的目的正是为了克服上述现有技术存在的缺陷而提供一种预制楼板与预制竖向构件的连接方法。
本发明的目的是通过如下技术方案来实现的。
一种预制楼板与预制竖向构件的连接方法,本发明的特征是,步骤为:
1)混凝土现浇板带预制楼板与预制竖向构件的连接;其中,将混凝土现浇板带设在预制楼板与预制竖向构件交接处,预制楼板连接端面设有粗糙面或齿状面;预制楼板上下钢筋形成闭合环并伸进后浇带,预制竖向构件伸出环向钢筋的一角,两种钢筋形成新的闭合环(闭合环位置在预制竖向构件上),闭合环内插入纵向钢筋;
2)混凝土现浇板带采用细石混凝土浇筑。
本发明提高了建筑的装配率,减小楼板厚度;避免楼板支座处产生裂缝,楼板整体性亦可得到满足;
本发明优点是,与叠合板相比,楼板受力性能更优,可减小小跨度楼板厚度。与采用叠合板普通装配式混凝土结构相比,提高了预制装配率;
本发明通过钢筋闭合环加纵向插筋的连接,可减少楼板在竖向构件上的搁置长度,并不会产生楼板支座处产生裂缝,楼板整体性亦可得到满足。
改进前后的效果对比突出了以下优点:
1、大量减少楼板湿作业;
2、可实现墙体与楼板的整体预制;
附图说明
图1为本发明结构示意图;图中1为楼板,2为后浇带,3为剪力墙(连梁)。
具体实施方式
见图1,一种预制楼板与预制竖向构件的连接方法,本发明的特征是,步骤为:
1)混凝土现浇板带预制楼板与预制竖向构件的连接;其中,将混凝土现浇板带设在预制楼板与预制竖向构件交接处,预制楼板连接端面设有粗糙面或齿状面;预制楼板上下钢筋形成闭合环并伸进后浇带,预制竖向构件伸出环向钢筋的一角,两种钢筋形成新的闭合环(闭合环位置在预制竖向构件上),闭合环内插入纵向钢筋;
2)混凝土现浇板带采用细石混凝土浇筑。
本发明提高了建筑的装配率,减小楼板厚度1;避免楼板支座处产生裂缝,楼板整体性亦可得到满足2;
本发明优点是,与叠合板相比,楼板受力性能更优,可减小小跨度楼板厚度。与采用叠合板普通装配式混凝土结构相比,提高了预制装配率;
本发明通过钢筋闭合环加纵向插筋的连接,可减少楼板在竖向构件上的搁置长度,并不会产生楼板支座处产生裂缝,楼板整体性亦可得到满足。
Claims (1)
1.一种预制楼板与预制竖向构件的连接方法,其特征在于,步骤为:
1)混凝土现浇板带预制楼板与预制竖向构件的连接;其中,将混凝土现浇板带设在预制楼板与预制竖向构件交接处,预制楼板连接端面设有粗糙面或齿状面;预制楼板上下钢筋形成闭合环并伸进后浇带,预制竖向构件伸出环向钢筋的一角,两种钢筋形成新的闭合环,闭合环内插入纵向钢筋;
2)混凝土现浇板带采用细石混凝土浇筑。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510662553.8A CN105297905A (zh) | 2015-10-14 | 2015-10-14 | 一种预制楼板与预制竖向构件的连接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510662553.8A CN105297905A (zh) | 2015-10-14 | 2015-10-14 | 一种预制楼板与预制竖向构件的连接方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105297905A true CN105297905A (zh) | 2016-02-03 |
Family
ID=55195656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510662553.8A Pending CN105297905A (zh) | 2015-10-14 | 2015-10-14 | 一种预制楼板与预制竖向构件的连接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105297905A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106284685A (zh) * | 2016-10-14 | 2017-01-04 | 南通联泷建筑材料有限公司 | 一种墙板与楼层板的后浇带连接结构 |
CN106759951A (zh) * | 2017-01-18 | 2017-05-31 | 黄坤坤 | 一种装配式环筋扣合锚接混凝土剪力墙单侧楼板连接结构 |
CN106759952A (zh) * | 2017-01-18 | 2017-05-31 | 黄坤坤 | 一种装配式环筋扣合锚接混凝土剪力墙结构 |
CN106760114A (zh) * | 2017-01-18 | 2017-05-31 | 黄坤坤 | 装配式环筋扣合锚接混凝土叠合楼板连接结构 |
CN106869330A (zh) * | 2017-01-18 | 2017-06-20 | 黄坤坤 | 一种装配式环筋扣合锚接混凝土剪力墙双侧楼板连接结构 |
CN108612244A (zh) * | 2016-12-13 | 2018-10-02 | 广西矿建集团有限公司 | 整体预制楼板及其构筑方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168455A (zh) * | 2011-03-15 | 2011-08-31 | 东南大学 | 装配剪力墙结构水平缝u型闭合筋连接构造 |
US20120216475A1 (en) * | 2011-02-27 | 2012-08-30 | Kamal Safari Kermanshahi | Cold Formed Roof and Columns Building Structure System |
CN104612241A (zh) * | 2015-02-05 | 2015-05-13 | 潘树宾 | 民用建筑成套预制件及其装配方法 |
CN204326335U (zh) * | 2014-11-24 | 2015-05-13 | 湖北弘毅建设有限公司 | 一种预制钢筋混凝土楼板与叠合梁一体装配连接结构 |
CN104847018A (zh) * | 2015-01-23 | 2015-08-19 | 云南省建筑科学研究院 | 一种预制混凝土箱形结构建筑的整体式装配方法 |
-
2015
- 2015-10-14 CN CN201510662553.8A patent/CN105297905A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120216475A1 (en) * | 2011-02-27 | 2012-08-30 | Kamal Safari Kermanshahi | Cold Formed Roof and Columns Building Structure System |
CN102168455A (zh) * | 2011-03-15 | 2011-08-31 | 东南大学 | 装配剪力墙结构水平缝u型闭合筋连接构造 |
CN204326335U (zh) * | 2014-11-24 | 2015-05-13 | 湖北弘毅建设有限公司 | 一种预制钢筋混凝土楼板与叠合梁一体装配连接结构 |
CN104847018A (zh) * | 2015-01-23 | 2015-08-19 | 云南省建筑科学研究院 | 一种预制混凝土箱形结构建筑的整体式装配方法 |
CN104612241A (zh) * | 2015-02-05 | 2015-05-13 | 潘树宾 | 民用建筑成套预制件及其装配方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106284685A (zh) * | 2016-10-14 | 2017-01-04 | 南通联泷建筑材料有限公司 | 一种墙板与楼层板的后浇带连接结构 |
CN108612244A (zh) * | 2016-12-13 | 2018-10-02 | 广西矿建集团有限公司 | 整体预制楼板及其构筑方法 |
CN106759951A (zh) * | 2017-01-18 | 2017-05-31 | 黄坤坤 | 一种装配式环筋扣合锚接混凝土剪力墙单侧楼板连接结构 |
CN106759952A (zh) * | 2017-01-18 | 2017-05-31 | 黄坤坤 | 一种装配式环筋扣合锚接混凝土剪力墙结构 |
CN106760114A (zh) * | 2017-01-18 | 2017-05-31 | 黄坤坤 | 装配式环筋扣合锚接混凝土叠合楼板连接结构 |
CN106869330A (zh) * | 2017-01-18 | 2017-06-20 | 黄坤坤 | 一种装配式环筋扣合锚接混凝土剪力墙双侧楼板连接结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105297905A (zh) | 一种预制楼板与预制竖向构件的连接方法 | |
CN204531066U (zh) | 装配式钢管混凝土剪力墙拆分拼装连接结构 | |
CN100469995C (zh) | 后浇带梁板模板的施工方法 | |
CN107299699A (zh) | 装配式空腔剪力墙水平接缝齿槽式干式连接结构 | |
CN209924233U (zh) | 一种装配式建筑楼板结构 | |
CN204212286U (zh) | 一种带肋加强型钢板-混凝土组合剪力墙 | |
CN104895230A (zh) | 一种预制叠合楼板的后浇带及其施工方法 | |
CN210766862U (zh) | 一种预制双面现浇叠合板挡土墙 | |
CN208685933U (zh) | 一种后浇带免拆卸模板 | |
CN108643382A (zh) | 装配式剪力墙板竖向连接的施工方法 | |
CN105696453B (zh) | 一种钢—混凝土组合梁 | |
CN109339245B (zh) | 一种预制剪力墙与叠合板连接构造及施工方法 | |
CN112112295A (zh) | 一种后封闭外墙后浇带加固施工方法 | |
CN103669193B (zh) | 一种横向拼装波形钢腹板组合t梁及施工方法 | |
CN206888274U (zh) | 叠合板式剪力墙环锚连接节点 | |
CN105952044B (zh) | 一种全预制预应力混凝土楼板结构及预应力装配方法 | |
CN213837169U (zh) | 一种双面混凝土导流槽钢丝网架保温板内置复合墙体 | |
CN105019656B (zh) | 楼盖混凝土后浇带悬挂模板施工方法 | |
CN103590427A (zh) | 基础板后浇混凝土带构造 | |
CN207003738U (zh) | 一种具有箍筋的预制钢板组合墙 | |
CN208918280U (zh) | 一种防止混凝土墙柱根部漏浆的防漏浆条 | |
CN208009729U (zh) | 装配式马牙槎搭接边-冲孔薄钢板带肋楼板 | |
CN206110423U (zh) | 一种预留后浇缝装配整体式钢筋混凝土楼板 | |
CN107447675B (zh) | 基于折形钢板闭口肋的钢-超高性能混凝土组合梁的现浇施工方法 | |
CN112064824A (zh) | 组合连接的预制剪力墙体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160203 |