CN105278955B - A kind of pier facilities facilities management reporting system - Google Patents

A kind of pier facilities facilities management reporting system Download PDF

Info

Publication number
CN105278955B
CN105278955B CN201510622460.2A CN201510622460A CN105278955B CN 105278955 B CN105278955 B CN 105278955B CN 201510622460 A CN201510622460 A CN 201510622460A CN 105278955 B CN105278955 B CN 105278955B
Authority
CN
China
Prior art keywords
report
data
page
basic data
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510622460.2A
Other languages
Chinese (zh)
Other versions
CN105278955A (en
Inventor
陈宏伟
袁清
赵健宇
霍德生
林炳城
薛金梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cosco Pacific Ltd
Dawson Automation Technology Co Ltd
GUANGZHOU SOUTH CHINA OCEANGATE CONTAINER TERMINAL Co Ltd
Original Assignee
Cosco Pacific Ltd
Dawson Automation Technology Co Ltd
GUANGZHOU SOUTH CHINA OCEANGATE CONTAINER TERMINAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cosco Pacific Ltd, Dawson Automation Technology Co Ltd, GUANGZHOU SOUTH CHINA OCEANGATE CONTAINER TERMINAL Co Ltd filed Critical Cosco Pacific Ltd
Priority to CN201510622460.2A priority Critical patent/CN105278955B/en
Publication of CN105278955A publication Critical patent/CN105278955A/en
Application granted granted Critical
Publication of CN105278955B publication Critical patent/CN105278955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

It include: for the customized editor module to report template modification adjustment the invention discloses a kind of pier facilities facilities management reporting system;Instruction is imported for generating report template, and the report template import modul that instruction selection from report template library imports a kind of report is imported according to the report template;Wherein, the customized editor module includes to generate the start unit of the customized editing interface of user for starting the customized editing environment of user;For adjusting the Format adjusting unit of report template format;For modifying the equation editing unit of default calculation formula and/or default statistical formula.A kind of this self-defined report system that user can adjust accordingly report and modify according to self-demand, by the customized editor of user, quickly modification obtains the report of oneself needs.

Description

A kind of pier facilities facilities management reporting system
Technical field
The present invention relates to a kind of reporting systems for pier facilities facilities management.
Background technique
Currently, the software systems of most management types are all made of .Net platform development, as pier facilities manage platform Emergency maintenance, maintenance, project maintenance, equipment report, staff's benefits and system setting etc. are generally comprised.Wherein setting It then include that gantry crane report, the report of field bridge, raft of pontoons report, the report of stream machine, energy consumption report etc. are various in standby reporting system Report, and these reports can generally be developed with standard controls such as such as datagridview, including report tableau format and report Unit calculation formula etc..
And in the use process in user's later period, as the factors such as pier facilities increase, use environment variation change, User then generally requires to make corresponding adjustment to report according to some changes in demand of itself and change.Such as increase pier facilities Afterwards, then it needs to do corresponding adjustment on original reporting system, changes statement form, such as when conditions for equipment use changes When, then it influences apparatus factor and changes, then need to change corresponding report calculation formula.
But since the report of software management system is using the exploitation such as standard control such as DataGridView, wherein report Format, calculation method completes in software development process as a part of software development and fixed.
, can only be by being upgraded on the basis of original on software system development to be modified to report, user oneself It has no ability to complete these modifications at all not also to be allowed to carry out these modifications.The result is that user carries out software liter caused by this way The cost of grade improves, while can generate a large amount of upgrade cost.
Summary of the invention
The purpose of the present invention, exactly overcoming the deficiencies of the prior art and provide a kind of user can be according to self-demand to report The self-defined report system that table is adjusted accordingly and modified, by the customized editor of user, quickly modification obtains oneself needs Report.
In order to achieve the above object, a kind of pier facilities facilities management reporting system is adopted the following technical scheme that, comprising:
Customized editor module for modifying report template, adjusting;Instruction, and root are imported for generating report template The report template import modul that instruction selection from report template library imports a kind of report is imported according to the report template;
Wherein, the customized editor module includes and generates user for starting the customized editing environment of user and make by oneself The start unit of adopted editing interface;For adjusting the Format adjusting unit of report template format;For modifying default calculation formula And/or the equation editing unit of default statistical formula.
As a kind of specific embodiment, the Format adjusting unit is also used to generate in the customized editing interface One Format adjusting navigation bar;The equation editing unit is also used to generate an equation editing frame in the customized editing interface.
Further, the customized editor module further includes storage unit, for that will modify and/or report adjusted Template is saved to report template library.
As a kind of specific embodiment, the report template includes several basic data pages, net data page and report Page is presented.
Further, pier facilities facilities management reporting system according to claim 4 further includes that basic data is adopted Collect module, for generating basic data acquisition instruction, phase is acquired from central database according to basic data acquisition instruction Basic data is closed, collected basic data is filled in the basic data page;
Basic data computing module calls the relevant rudimentary data in the basic data page, according to default calculation formula Report net amount evidence is calculated, and the report net amount evidence is filled in the net data page;
Net data statistics module calls the report net amount evidence in the net data page to be counted according to default statistical formula To statistical reports data, and the statistical report data is filled in the report, page is presented.
Further, pier facilities facilities management reporting system according to claim 5 further includes that basic data is sentenced Whether disconnected module, the basic data arrived for judgement basis data collecting module collected match with report data constraint condition, if No, then the basic data acquisition module does not acquire the basic data;If so, the basic data acquisition module acquires the base Plinth data.
Further, the report data constraint condition includes Report Type, initial time, deadline.
Further, the central database includes fault information database, equipment maintenance information database, rises Beginning time device amr message database, deadline equipment amr message database;
Correspondingly, the basic data page includes fault information data page, equipment unexpected message page, equipment maintenance Information page, initial time equipment amr message page, deadline equipment amr message page.
Further, the pier facilities facilities management reporting system further includes data type judgment module, for judging The type of the collected basic data of basic data acquisition module.
Further, the basic data acquisition module is used for the judging result according to the data type judgment module, Fault message in fault information database is filled in fault message page, by the equipment in equipment maintenance information database Maintenance information solicitation is to equipment maintenance information page, by the initial time in initial time equipment amr message database Equipment amr message is filled in initial time equipment amr message page, by the cut-off in deadline equipment amr message database Time device amr message is filled in deadline equipment amr message page.
Compared with prior art, the beneficial effects of the present invention are:
The present invention starts the customized editing environment of user by customized editor module, generates customized editor circle of user Face imports report template then by report template import modul from report template library, then by Format adjusting unit, Equation editing unit modifies report template accordingly, finally stores modified report template to report template library, Realize the customized of report.So that user is in use, report can be carried out according to the actual demand of oneself corresponding Adjustment and modification, realize to the customized of preset report template.It is fixed to overcome traditional reporting system report template, User cannot voluntarily change, can only by developer to system upgrade come the shortcomings that completion.On the one hand it eliminates because of system liter On the other hand the high cost of grade increases user and experiences to the practical operation of system, easy to use.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of pier facilities facilities management reporting system of the present invention;
Fig. 2 is the structural schematic diagram of customized editor module in Fig. 1.
Fig. 3 is pier facilities facilities management reporting system self-defined report template schematic diagram of the present invention.
Specific embodiment
Come that the present invention will be described in detail below in conjunction with attached drawing and specific implementation method, it is of the invention it is schematic implement and Illustrate for explaining the present invention, but not as a limitation of the invention.
Referring to FIG. 1, it is a kind of structural schematic diagram of pier facilities facilities management reporting system of the invention.
A kind of pier facilities facilities management reporting system of the present embodiment, including customized editor module 100, report template Import modul 200, basic data acquisition module 300, basic data judgment module 400, data type judgment module 500, basis Data computation module 600, net data statistics module 700, central database 800.
By taking the gantry crane equipment report of gantry crane equipment in pier facilities as an example, as a kind of specific embodiment, report of the invention Table module includes that page is presented in several basic data pages, net data page and report.Wherein, the basic data page includes faulty Information data page, equipment unexpected message page, equipment maintenance information page, initial time equipment amr message page, deadline Equipment amr message page, it should be noted that may include different basic data pages, this reality in different equipment reports Apply the type not represented in illustration gantry crane equipment report report comprising these basic data pages in example to basic data page With the limitation of quantity.
Correspondingly, the central database for storing relevant rudimentary data includes fault information database, plant maintenance The databases such as emm message database, initial time equipment amr message database, deadline equipment amr message database, Concrete database type can carry out additions and deletions according to actual needs, and similarly, the above-mentioned several databases specifically enumerated do not represent this The limitation of invention type of database and quantity.
It is elaborated respectively below for the modules in pier facilities facilities management reporting system of the invention:
Customized editor module 100:
The customized editor module 100 is used for adjustment of modifying to report template, includes for starting user certainly Editing environment is defined, the start unit 101 of the customized editing interface of user is generated;For adjusting the format tune of report template format Whole unit 102;For modifying the equation editing unit 103 of default calculation formula and/or default statistical formula.Wherein, the lattice Formula adjustment unit 102 is also used to generate a Format adjusting navigation bar in the customized editing interface;The equation editing unit 103 are also used to generate an equation editing frame in the customized editing interface.
Such as, corresponding to need to embody the number in reporting system when increasing a gantry crane equipment in actual use process According to, then can pass through the Format adjusting unit 102 increase a line cell row.It is adjustable in the Format adjusting navigation bar The line width of cell arranges height, cell background color, font and font color.
Further, 100 storage unit 104 of customized editor module, for that will modify and/or report adjusted Template is saved to report template library.It is all to use the report after report template after user is customized is stored into report template library Table template library with the modified report template can be used per family.
Report template import modul 200
The report template import modul 200 imports instruction for generating report template, and is led according to the report template Enter instruction selection from report template library and imports a report template.
Basic data acquisition module 300
The basic data acquisition module 300, for generating basic data acquisition instruction, according to the basic data acquisition Instruction acquires relevant rudimentary data from central database, and collected basic data is filled in the basic data page.
Basic data judgment module 400
The basic data judgment module 400 is for the collected basic data of judgement basis data acquisition module 300 It is no to be matched with report data constraint condition, if it is not, then the basic data acquisition module 300 does not acquire the basic data;If so, Then the basic data acquisition module 300 acquires the basic data.
Wherein, the report data constraint condition is for defining data source, specifically, the report data constraint condition packet Include but be not limited to the constraint conditions such as Report Type, initial time, deadline.
Data type judgment module 500
The data type judgment module 500, for the collected basic data of judgement basis data acquisition module 300 Type.Specifically, the collected basic data of judgement basis data acquisition module 300 is fault information data, plant maintenance guarantor Support the data types such as information data, initial time equipment amr message data or deadline equipment amr message data.
The basic data acquisition module 300 is also used to the judging result according to the data type judgment module 500, will Fault message in fault information database is filled in fault message page, and the equipment in equipment maintenance information database is tieed up Shield emm message is filled in equipment maintenance information page, and the initial time in initial time equipment amr message database is set Standby amr message is filled in initial time equipment amr message page, when by cut-off in deadline equipment amr message database Between equipment amr message fill in deadline equipment amr message page.
Basic data computing module 600
The basic data computing module 600 calls the relevant rudimentary data in the basic data page, according to pre-designed It calculates formula and report net amount evidence is calculated, and the report net amount evidence is filled in the net data page.
Net data statistics module 700
The net data statistics module 700 calls the report net amount evidence in the net data page, public according to default statistics Formula, statistics obtains statistical reports data, and the statistical report data is filled in the report, page is presented.
Pier facilities reporting system of the invention, when have it is customized editor report template permission user carry out it is customized When editor, the customized editing environment of user is started by start unit 101 first, the customized editing interface of user is generated, in life It further include that Format adjusting unit 102 is led in customized editing interface one Format adjusting of generation when editing interface customized at user Navigate column, and equation editing unit 103 generates an equation editing frame in the customized editing interface.
User generates report template by report template import modul 200 and imports instruction, and is led according to the report template Enter instruction selection from report template library and import a report template, then passes through the report mould of 102 pairs of Format adjusting unit importings The format of plate is adjusted or modifies, and increases/delete corresponding cell row such as equipment increase/deletion.Format can be passed through simultaneously Adjustment navigation bar is adjusted modification to formats such as the backgrounds, font, font color of cell;By equation editing frame to a certain The calculation formula of unit is modified, and data source is redefined.The formula of a certain cell is such as modified in net data page, it is again fixed The data source of the adopted cell, namely from the data in basic data page.After the completion of to report redjustment and modification, preservation can be passed through Unit 104 saves modification and/or report template adjusted to report template library, modification and/or report template adjusted To used effective per family using the use of the reporting system.
Commonly pass through first when using pier facilities management system of the invention without the user of customized editing authority Report template import modul 200, selection imports a report template from report template library, and user defines data source first, namely Report data presets constraint condition, clicks after generating report, and basic data acquisition module 300 generates basic data acquisition instruction, Relevant rudimentary data are acquired from central database according to basic data acquisition instruction, specifically, respectively from fault message Database, equipment maintenance information database, initial time equipment amr message database, deadline equipment amr message Relevant rudimentary data are acquired in the databases such as database, 400 judgement basis data acquisition module 300 of basic data judgment module is adopted Whether the basic data collected matches with report data constraint condition, if it is not, then the basic data acquisition module 300 does not acquire The basic data;If so, the basic data acquisition module 300 acquires the basic data, and further, data type judgement The type of the collected basic data of 500 judgement basis data acquisition module of module 300, then the basic data acquisition module 300 according to the judging result of the data type judgment module 500, by the fault message in fault information database fill in therefore Hinder information page, by the equipment maintenance information solicitation in equipment maintenance information database to equipment maintenance information Page, the initial time equipment amr message in initial time equipment amr message database is filled in initial time equipment meter reading Information page fills in the deadline equipment amr message in deadline equipment amr message database to deadline equipment Amr message page.
Basic data computing module 600 calls the relevant rudimentary data in the basic data page, public according to default calculating Report net amount evidence is calculated in formula, and the report net amount evidence is filled in the net data page, net data statistics module 700, The report net amount evidence in the net data page is called, according to default statistical formula, statistics obtains statistical reports data, and will The statistical report data fill in the report and page are presented.
The present invention starts the customized editing environment of user by customized editor module, generates customized editor circle of user Face imports report template then by report template import modul from report template library, then by Format adjusting unit, Equation editing unit modifies report template accordingly, finally stores modified report template to report template library, Realize the customized of report.So that user is in use, report can be carried out according to the actual demand of oneself corresponding Adjustment and modification, realize to the customized of preset report template.It is fixed to overcome traditional reporting system report template, User cannot voluntarily change, can only by developer to system upgrade come the shortcomings that completion.On the one hand it eliminates because of system liter On the other hand the high cost of grade increases user and experiences to the practical operation of system, easy to use.
The foregoing is only a preferred embodiment of the present invention, not illustrating that protection scope of the present invention is confined to This.It is all within ideals and principles of the invention, any modification, equivalent replacement, improvement and so on should all cover in this hair Within bright protection scope.

Claims (7)

1. a kind of pier facilities facilities management reporting system characterized by comprising
Customized editor module for modifying report template, adjusting;
The customized editor module includes:
Start the customized editing environment of user for the user with customized editor's report template permission, it is customized to generate user The start unit of editing interface;
For generating the Format adjusting unit of a Format adjusting navigation bar in the customized editing interface;
For generating the equation editing unit of an equation editing frame in the customized editing interface;
The system further include: import instruction for generating report template, and instruction is imported from report mould according to the report template Selection imports a kind of report template import modul of report template in plate library;
The Format adjusting unit is also used to be adjusted the format of the report template of importing or modify;The Format adjusting is led Boat column is for being adjusted or modifying to the format of cell;
The equation editing unit is also used to through equation editing frame to the default calculation formula of a certain unit and/or default statistics Formula is modified;
The customized editor module further include:
Storage unit, for that will modify and/or report template adjusted is saved to report template library;
Wherein, when using the system, report template is imported by the report template import modul, which includes Page is presented in several basic data pages, net data page and report, and the data page of three types not only shows independently of each other but also there are numbers According to association.
2. pier facilities facilities management reporting system according to claim 1, which is characterized in that further include:
Basic data acquisition module is instructed according to the basic data acquisition from center for generating basic data acquisition instruction Relevant rudimentary data are acquired in database, and collected basic data is filled in the basic data page;
Basic data computing module calls the relevant rudimentary data in the basic data page, is calculated according to default calculation formula Report net amount evidence is obtained, and the report net amount evidence is filled in the net data page;
Net data statistics module calls the report net amount evidence in the net data page, and according to default statistical formula, statistics is counted Data reporting according to statistics, and the statistical report data are filled in the report, page is presented.
3. pier facilities facilities management reporting system according to claim 2, which is characterized in that further include:
Basic data judgment module, the basic data arrived for judgement basis data collecting module collected whether with report data about Beam condition matching, if it is not, then the basic data acquisition module does not acquire the basic data;If so, the basic data is adopted Collection module acquires the basic data.
4. pier facilities facilities management reporting system according to claim 3, it is characterised in that:
The report data constraint condition includes Report Type, initial time, deadline.
5. pier facilities facilities management reporting system according to claim 4, it is characterised in that:
The central database includes that fault information database, equipment maintenance information database, initial time equipment are copied Table information database, deadline equipment amr message database;
Correspondingly, the basic data page includes fault information data page, equipment unexpected message page, equipment maintenance information Page, initial time equipment amr message page, deadline equipment amr message page.
6. pier facilities facilities management reporting system according to claim 5, which is characterized in that the system further include:
Data type judgment module, the type for the basic data that judgement basis data collecting module collected arrives.
7. pier facilities facilities management reporting system according to claim 6, it is characterised in that:
The basic data acquisition module is used for the judging result according to the data type judgment module, by fault information data Fault message in library is filled in fault message page, and the equipment maintenance information in equipment maintenance information database is filled out It is written to equipment maintenance information page, the initial time equipment amr message in initial time equipment amr message database is filled out It is written to initial time equipment amr message page, the deadline equipment meter reading in deadline equipment amr message database is believed Breath is filled in deadline equipment amr message page.
CN201510622460.2A 2015-09-25 2015-09-25 A kind of pier facilities facilities management reporting system Active CN105278955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510622460.2A CN105278955B (en) 2015-09-25 2015-09-25 A kind of pier facilities facilities management reporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510622460.2A CN105278955B (en) 2015-09-25 2015-09-25 A kind of pier facilities facilities management reporting system

Publications (2)

Publication Number Publication Date
CN105278955A CN105278955A (en) 2016-01-27
CN105278955B true CN105278955B (en) 2019-06-21

Family

ID=55148013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510622460.2A Active CN105278955B (en) 2015-09-25 2015-09-25 A kind of pier facilities facilities management reporting system

Country Status (1)

Country Link
CN (1) CN105278955B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107944236A (en) * 2017-10-19 2018-04-20 陈伟麟 A kind of checking method and auditing system of measurement verification calibration original record certificate
CN109829147B (en) * 2019-01-31 2023-06-30 恒生电子股份有限公司 Report export method and device
CN112668929B (en) * 2021-01-08 2023-12-22 上海振华重工(集团)股份有限公司 Production operation performance index system for automatic wharf and statistical method thereof
CN113791590B (en) * 2021-08-24 2024-03-05 天津港第二集装箱码头有限公司 Method for emergency recovery of production faults of full-automatic quay for coastal side loading and unloading

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719119A (en) * 2009-11-18 2010-06-02 上海众恒信息产业有限公司 Report management system and method
CN102193782A (en) * 2010-03-01 2011-09-21 北京中企开源信息技术有限公司 Method for operating table model

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7266763B2 (en) * 2002-11-26 2007-09-04 Microsoft Corporation User defined spreadsheet functions

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719119A (en) * 2009-11-18 2010-06-02 上海众恒信息产业有限公司 Report management system and method
CN102193782A (en) * 2010-03-01 2011-09-21 北京中企开源信息技术有限公司 Method for operating table model

Also Published As

Publication number Publication date
CN105278955A (en) 2016-01-27

Similar Documents

Publication Publication Date Title
CN105278955B (en) A kind of pier facilities facilities management reporting system
CN104504490B (en) A kind of high intelligent meter register method of taking pictures
CN106445987B (en) The building of CIR geographic information database and verification method
CN108493828A (en) Real time information Three-Dimensional Dynamic intelligence display systems
CN106484716A (en) Organizational structure method of adjustment and system
CN104680320A (en) BIM-based project management system and method
CN111585349B (en) Power grid model management and monitoring system
CN109446494B (en) Water affair calculation method based on report engine
CN102945629B (en) Generating method and system of three-dimensional simulation training case of power grid substation
CN102117444A (en) System for comprehensive arrangement and execution management of production equipment maintenance plan
CN103455591A (en) Standard data exchange interface method of parallel cooperative system
CN103676896A (en) Nuclear power plant digital control room man-machine interface improvement method
CN110175935A (en) Nuclear power data monitoring method, device, computer equipment and storage medium
CN106355256A (en) Multivariate visualization overhaul management system
CN105976262A (en) Power plant granularity based power grid model version sharing method
CN103903106A (en) Nuclear emergency decision supporting platform and method based on operation disturbance level
CN112598815A (en) Distribution network inspection method based on Internet
CN107505851A (en) Ovation control analogue systems and emulation mode based on Rinsim platforms
CN109450102A (en) The supervisory systems of work is maked an inspection tour by a kind of power supply line
CN102222109B (en) Data processing device and method
CN107423912A (en) A kind of method and system for becoming dynamic mesh dynamic division based on personnel
CN109582345B (en) Report automatic generation method, apparatus, storage medium and computer device
CN113010624B (en) Intelligent power distribution inspection system
CN104299065B (en) A kind of method that Correctness of model is verified between dispatching automation main preparation system
CN111627281B (en) Nuclear accident emergency simulation training system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant