CN110175935A - Nuclear power data monitoring method, device, computer equipment and storage medium - Google Patents

Nuclear power data monitoring method, device, computer equipment and storage medium Download PDF

Info

Publication number
CN110175935A
CN110175935A CN201910463189.0A CN201910463189A CN110175935A CN 110175935 A CN110175935 A CN 110175935A CN 201910463189 A CN201910463189 A CN 201910463189A CN 110175935 A CN110175935 A CN 110175935A
Authority
CN
China
Prior art keywords
nuclear power
monitoring data
monitoring
feedback information
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910463189.0A
Other languages
Chinese (zh)
Inventor
王浩宇
洪振旻
姜磊
张宇宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
CGN Power Co Ltd
China Nuclear Power Operation Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201910463189.0A priority Critical patent/CN110175935A/en
Publication of CN110175935A publication Critical patent/CN110175935A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Public Health (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

This application involves a kind of nuclear power data monitoring method, device, computer equipment and storage mediums.The described method includes: receiving the first monitoring data based on current nuclear power running environment that measuring device is sent;The second monitoring data are obtained, second monitoring data are to carry out the monitoring data that analogue simulation obtains to the current nuclear power running environment;Measurement error value is calculated according to the second corresponding monitoring data of first monitoring data;When the measurement error value is no more than error threshold, first monitoring data are shown.Monitoring result accuracy can be improved using this method.

Description

Nuclear power data monitoring method, device, computer equipment and storage medium
Technical field
This application involves technical field of nuclear power, more particularly to a kind of nuclear power data monitoring method, device, computer equipment And storage medium.
Background technique
In order to guarantee the safety of nuclear power station, need to be monitored the relevant parameter of nuclear power station.In traditional technology, usually It is that measuring device will be installed in nuclear power station, measurement data is exported by measuring device, but measuring device is over time, Error is had, so that monitoring result is inaccurate.
Summary of the invention
Based on this, it is necessary in view of the above technical problems, provide a kind of nuclear power number that can be improved monitoring result accuracy According to monitoring method, device, computer equipment and storage medium.
A kind of nuclear power data monitoring method, which comprises receive running based on current nuclear power for measuring device transmission First monitoring data of environment;The second monitoring data are obtained, second monitoring data are to the current nuclear power running environment Carry out the monitoring data that analogue simulation obtains;Measurement is calculated according to the second corresponding monitoring data of first monitoring data Error amount;When the measurement error value is no more than error threshold, first monitoring data are shown.
In one of the embodiments, the method also includes: when the measurement error value be more than the error threshold when, Warning information is generated, the warning information is sent to default terminal and is shown.
In one of the embodiments, the method also includes: monitor the default terminal according to prefixed time interval Feedback information;When the feedback information is first kind feedback information, warning information is generated again and is sent to the default end End;When the feedback information is the second class feedback information, the feedback information is recorded.
In one of the embodiments, the method also includes: receive the log-on message of active user;According to the login Information determines the permission of the active user;When the permission of the active user meets preset condition, active user couple is received The modification of the error threshold operates, and is modified according to modification operation to the error threshold.
The second monitoring data of the acquisition in one of the embodiments, comprising: building and full scope simulator of nuclear power station The consistent full scope simulator of nuclear power station project file tree structure Simulation Interface view of project file organizational structure;Parsing institute The system interface for stating each simulation system under nuclear power plant analog machine project file tree structure Simulation Interface view extracts each system and draws Parametric variable in face;Target monitoring parameter is determined from the parametric variable, by the first number of target monitoring parameter write-in According to being sent to full scope simulator of nuclear power station server after report;It is found in the full scope simulator of nuclear power station server described After the real value of monitoring parameters, the carrying target monitoring parameter that the full scope simulator of nuclear power station server is sent is received Real value the second datagram;Extract the real value of the monitoring parameters in second datagram.
A kind of nuclear power data monitoring device, described device include: the first monitoring data receiving module, are set for receiving measurement The first monitoring data based on current nuclear power running environment that preparation is sent;Second monitoring data obtain module, for obtaining second Monitoring data, second monitoring data are to carry out the monitoring data that analogue simulation obtains to the current nuclear power running environment; Measurement error value computing module, for calculating measurement error according to the second corresponding monitoring data of first monitoring data Value;Display module, for being shown to first monitoring data when the measurement error value is no more than the error threshold Show.
Described device further includes alarm generation module in one of the embodiments, for surpassing when the measurement error value When crossing the error threshold, warning information is generated, the warning information is sent to default terminal and is shown.
Described device further includes that feedback information monitors module in one of the embodiments, for according between preset time Every the feedback information for monitoring the default terminal;When the feedback information is first kind feedback information, alarm signal is generated again It ceases and is sent to the default terminal;When the feedback information is the second class feedback information, the feedback information is recorded.
A kind of computer equipment, including memory and processor, the memory are stored with computer program, the processing The step of device realizes above-mentioned any embodiment the method when executing the computer program.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor The step of above-mentioned any embodiment the method is realized when row.
Above-mentioned nuclear power data monitoring method, device, computer equipment and storage medium, above-mentioned nuclear power data monitoring method In, current nuclear power is transported by receiving the first monitoring data based on current nuclear power running environment that measuring device is sent and obtaining Row environment carries out the second monitoring data that analogue simulation obtains, and calculates measurement according to the first monitoring data and the second monitoring data and misses Difference, judge measurement error value whether be more than setting error threshold, when measurement error value be no more than error threshold when, to measurement The first monitoring data that equipment is sent are shown, since the measurement data obtained when analogue simulation is not by the error of measuring device It influences, therefore, the accuracy of the monitoring data obtained at this time is higher.
Detailed description of the invention
Fig. 1 is the application scenario diagram of nuclear power data monitoring method in one embodiment;
Fig. 2 is the flow diagram of nuclear power data monitoring method in one embodiment;
Fig. 3 is the flow diagram of step S204 in one embodiment;
Fig. 4 is the structural block diagram of nuclear power data monitoring device in one embodiment;
Fig. 5 is the internal structure chart of computer equipment in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
Nuclear power data monitoring method provided by the present application, can be applied in application environment as shown in Figure 1.Wherein, it surveys Measure equipment 110 and monitoring device 120 it is wired or be wirelessly connected.Measuring device 110 is based on current nuclear power movement environment and is counted According to measurement, measurement data is sent to monitoring device 120, monitoring device 120 further obtain to current nuclear power running environment into The monitoring data that row analogue simulation obtains, and measurement error value is calculated, when measurement error value is no more than error threshold, to measurement The measurement data of equipment 110 carries out visualization display.
In one embodiment, as shown in Fig. 2, providing a kind of nuclear power data monitoring method, it is applied to Fig. 1 in this way In monitoring device for be illustrated, comprising the following steps:
Step S202 receives the first monitoring data based on current nuclear power running environment that measuring device is sent.
Wherein, the first monitoring data are the data for carrying out actual measurement in current nuclear power running environment and obtaining, including but These three types of pressure data, liquid level data, temperature data are not limited to, temperature data for example can be reactor core coolant Inlet temperature, reactor core coolant outlet temperature, it is steady that liquid level data for example can be fuel assembly coolant outlet temperature Depressor water level, steam generator water level, reactor refuling water tank water level, pressure data for example can be steam generator pressure Power.Measuring device can be fiber-optic grating sensor, and fiber-optic grating sensor can be connect by optical cable with monitoring device, and to Monitoring device transmits nuclear power measurement data.Under normal conditions, the nuclear power measurement data of measuring device transmission is analog signal, monitoring After device receives the analog signal of measuring device transmission, it is necessary first to convert analog signals into digital signal.
Step S204, obtains the second monitoring data, and the second monitoring data are to carry out emulation mould to current nuclear power running environment Quasi- obtained monitoring data.
Second measurement data is to carry out the monitoring data that analogue simulation obtains to current nuclear power running environment.It is being embodied In example, ring can be run to current nuclear power according to the operation data of current nuclear power running environment by full scope simulator of nuclear power station Border carries out analog simulation.
In one embodiment, it obtains the second monitoring data to specifically include: the work of building and full scope simulator of nuclear power station The consistent full scope simulator of nuclear power station project file tree structure Simulation Interface view of journey file organization framework;Parse nuclear power station The system interface of each simulation system, extracts the ginseng in each system interface under analog machine project file tree structure Simulation Interface view Number variable;Target monitoring parameter is determined from parametric variable, is sent to nuclear power after the first datagram is written in target monitoring parameter It stands Full scope simulator server;After full scope simulator of nuclear power station server finds the real value of monitoring parameters, receive Second datagram of the real value for the carrying target monitoring parameter that full scope simulator of nuclear power station server is sent;Extract the second number According to the real value of the monitoring parameters in report.
Step S206 calculates measurement error value according to the second corresponding monitoring data of the first monitoring data.
In the present embodiment, it is poor that the second corresponding monitoring data of the first monitoring data are made, and the absolute value of difference is true It is set to measurement error value.The second monitoring data corresponding with the first monitoring data refer to monitoring in the second monitoring data with first It includes that reactor core coolant inlet temperature is corresponding that data, which belong in the value of identical monitoring parameters, such as the first monitoring data, Value, then the second monitoring data corresponding with first monitoring data refer in the second monitoring data reactor core coolant into The corresponding value of mouth temperature.
Step S208 shows the first monitoring data when measurement error value is no more than error threshold.
Specifically, monitoring device judge above-mentioned calculated measurement error value whether be more than setting error threshold, if it is not, The first monitoring data for then illustrating that measuring device is sent are more accurate and reliable, at this point it is possible to which the first monitoring data are determined as mesh It marks monitoring data and real-time display is carried out to the first monitoring data, monitoring personnel is enabled to understand the currently monitored situation in real time. In the present embodiment, it is contemplated that there may be certain errors for nuclear power emulation itself, therefore, can set an error threshold, work as survey When measuring error amount no more than error threshold, illustrate that the accuracy of measurement data at this time is higher.Wherein, error threshold is by technology people Member is set according to the actual situation.
In above-mentioned nuclear power data monitoring method, the based on current nuclear power running environment that is sent by receiving measuring device One monitoring data and acquisition carry out the second monitoring data that analogue simulation obtains to current nuclear power running environment, according to the first monitoring Data and the second monitoring data calculate measurement error value, judge measurement error value whether be more than setting error threshold, work as measurement When error amount is no more than error threshold, the first monitoring data sent to measuring device are shown, due to obtaining when analogue simulation To measurement data do not influenced by the error of measuring device, therefore, the accuracy of the monitoring data obtained at this time is higher.
In one embodiment, when measurement error value is more than error threshold, warning information is generated, warning information is sent It is shown to default terminal.Wherein, default terminal can be the corresponding terminal of maintenance personal.In the present embodiment, when measurement misses When difference is more than preset threshold, illustrate the first monitoring data that measuring device at this time is sent it is very likely that there is mistake, to presetting It is to remind maintenance personal that measuring device is repaired or replaced in time that terminal, which sends warning information,.It is understood that In the present embodiment, when measurement error value be more than error threshold constantly, monitoring device for the first monitoring data without display, Corresponding prompt information can be shown on observation interface simultaneously, for example, " not getting accurate measurement data currently ".
In one embodiment, the above method further include: according to the feedback information of prefixed time interval preset monitored terminal; When feedback information is first kind feedback information, warning information is generated again and is sent to default terminal;When feedback information is the When two class feedback informations, feedback information is recorded.
Specifically, the feedback information that monitoring device is returned according to prefixed time interval preset monitored terminal, the preset time Interval can be set by technical staff according to practical business demand, such as can be 12 hours or one day, when listening to After the feedback information that default terminal returns, judge that the feedback information belongs to first kind feedback information or the second class feedback letter Breath generates warning information again and is sent to the warning information above-mentioned if the feedback information is first kind feedback information Default terminal, if feedback information be the second class feedback information, record the feedback information.Wherein, warning information is for table Sign measuring device can be capable of measuring the information of inaccuracy, and to warn, maintenance personal carries out troubleshooting to measuring device or replacement is surveyed Measure equipment;First kind feedback information characterizes temporarily untreated warning information of maintenance personal of default terminal;Second class feedback letter The maintenance personal that breath characterizes default terminal is handled the warning information.
In one embodiment, terminal can show " handling later " and " processed " when showing the warning information simultaneously Two options.When the corresponding maintenance personal of default terminal clicks one of option, presetting terminal should to monitoring device return The corresponding feedback information of option, after monitoring device receives the feedback information of default terminal, by the feedback information respectively with first Class feedback information is compared, if the feedback information is identical as first kind feedback information, determines the feedback information for the first kind Feedback information similarly if the feedback information is identical as the second class feedback information, determines that the feedback information is the second class feedback letter Breath.
In one embodiment, when monitoring device does not hear the feedback information of default terminal within a preset period of time, Warning information can be generated again, and the warning information is sent to default terminal and is shown.
In above-described embodiment, monitoring device passes through the feedback information of preset monitored terminal according to the preset time interval, and When judging feedback information is first kind feedback information, warning information is generated again and is sent, so as to supervise maintenance Personnel correct the error of measuring device in time, and further, when judging feedback information is the second class feedback information, record should Feedback information, in order to subsequent review and analysis.
In one embodiment, the above method further include: receive the log-on message of active user;It is determined according to log-on message The permission of active user;When the permission of active user meets preset condition, receives active user and the modification of error threshold is grasped Make, is modified according to modification operation to error threshold.
In the present embodiment, monitoring device is after receiving the log-on message of user, according to the user identifier in log-on message It determines the permission of active user, if the permission of active user meets preset condition, shows that active user can be to error threshold It modifies, the modification of error threshold is operated at this point, monitoring device can receive active user, operates corresponding mistake with modification Error threshold before poor threshold value replacement, to modify to error threshold.Wherein, preset condition can be default access etc. Grade, such as can be high, medium and low three grades by delineation of power, then default access grade can be super-ordinate right;Preset condition It can also be default access classification, such as administrator right.
It in above-described embodiment, is verified by the user right to active user, prevents error threshold from arbitrarily being modified, To further increase the accuracy of measurement data.
In one embodiment, it in above-mentioned steps S204, obtains nuclear power and emulates data, specifically include:
Step S204A, the full model of the consistent nuclear power station of project file organizational structure of building and full scope simulator of nuclear power station Enclose analog machine project file tree structure Simulation Interface view.
Specifically, SimDV program can be run in test device, show the interface dataviewerGUI on a display screen, with And full scope simulator of nuclear power station project file, building and nuclear power station gamut mould are downloaded at the interface dataviewerGUI The full scope simulator of nuclear power station project file tree structure Simulation Interface view of the quasi- consistent emulation of machine project file organizational structure Figure.
Step S204B parses each simulation system under nuclear power plant analog machine project file tree structure Simulation Interface view System interface extracts the parametric variable in each system interface.
Wherein, simulation system includes low-pressure feed heater system, feed-water heater drained water recovery system, water supply deaerator System, high-pressure feed-water heater system, steam generator blowdown system, condensate clean-up processing system, the distribution of nuclear island demineralized water System, waste oil and on-radiation water discharge system, boron recovery system, chemical reagent injecting systems, dressing room ventilating system, exhaust gas Processing system, discharging of waste liquid system.
Step S204C determines target monitoring parameter from parametric variable, after the first datagram is written in target monitoring parameter It is sent to full scope simulator of nuclear power station server.
Specifically, the determination of target monitoring parameter includes following two step: S1) user is in nuclear power plant analog machine engineering text The simulation system that need to be monitored and its parametric variable are chosen under part tree structure Simulation Interface view, by the parametric variable of selection It is added to the drop-down list box of the Simulation Interface;S2 the confirming button of the drop-down list box) is clicked.
Step S204D receives nuclear power after full scope simulator of nuclear power station server finds the real value of monitoring parameters Second datagram of the real value for the carrying target monitoring parameter that Full scope simulator server of standing is sent.
Step S204E extracts the real value of the monitoring parameters in the second datagram.
Specifically, each simulation system can upload parameter variable in real time real value to full scope simulator of nuclear power station service Device, full scope simulator of nuclear power station server save the real value of parameters variable, carry target prison receiving After surveying the first datagram of parameter, corresponding real value, the real value that will be found are searched according to target monitoring parameter therein The second datagram is written, and is sent to monitoring device, monitoring device parses the datagram after receiving the second datagram, with The real value for extracting monitoring parameters therein obtains the second monitoring data.Wherein, datagram is made of header and message, report Head includes type of message, message-length, and message includes target monitoring parameter and in message content, such as the first datagram Real value in two datagrams.
It should be understood that although each step in the flow chart of Fig. 2-3 is successively shown according to the instruction of arrow, These steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly stating otherwise herein, these steps Execution there is no stringent sequences to limit, these steps can execute in other order.Moreover, at least one in Fig. 2-3 Part steps may include that perhaps these sub-steps of multiple stages or stage are not necessarily in synchronization to multiple sub-steps Completion is executed, but can be executed at different times, the execution sequence in these sub-steps or stage is also not necessarily successively It carries out, but can be at least part of the sub-step or stage of other steps or other steps in turn or alternately It executes.
In one embodiment, as shown in figure 4, providing a kind of nuclear power data monitoring device 400, comprising: the first monitoring Data reception module 402, the second monitoring data obtain module 404, measurement error value computing module 406 and display module 408, Wherein:
First monitoring data receiving module 402, for receive measuring device transmission based on current nuclear power running environment First monitoring data;
Second monitoring data obtain module 404, and for obtaining the second monitoring data, the second monitoring data are to current nuclear power Running environment carries out the monitoring data that analogue simulation obtains;
Measurement error value computing module 406, for being calculated according to the second corresponding monitoring data of the first monitoring data Measurement error value;
Display module 408, for being shown to the first monitoring data when measurement error value is no more than error threshold.
In one embodiment, the above method further includes alarm generation module, for being more than error threshold when measurement error value When value, warning information is generated, warning information is sent to default terminal and is shown.
In one embodiment, above-mentioned apparatus further includes that feedback information monitors module, for supervising according to prefixed time interval Listen the feedback information of default terminal;When feedback information is first kind feedback information, warning information is generated again and is sent to pre- If terminal;When feedback information is the second class feedback information, feedback information is recorded.
In one embodiment, above-mentioned apparatus further include: error threshold modified module, for receiving the login of active user Information;The permission of active user is determined according to log-on message;When the permission of active user meets preset condition, current use is received Family operates the modification of error threshold, is modified according to modification operation to error threshold.
In one embodiment, the second monitoring data obtain module and are also used to construct the work with full scope simulator of nuclear power station The consistent full scope simulator of nuclear power station project file tree structure Simulation Interface view of journey file organization framework;Parse nuclear power station The system interface of each simulation system, extracts the ginseng in each system interface under analog machine project file tree structure Simulation Interface view Number variable;Target monitoring parameter is determined from parametric variable, is sent to nuclear power after the first datagram is written in target monitoring parameter It stands Full scope simulator server;After full scope simulator of nuclear power station server finds the real value of monitoring parameters, receive Second datagram of the real value for the carrying target monitoring parameter that full scope simulator of nuclear power station server is sent;Extract the second number According to the real value of the monitoring parameters in report.
Specific about nuclear power data monitoring device limits the limit that may refer to above for nuclear power data monitoring method Fixed, details are not described herein.Modules in above-mentioned nuclear power data monitoring device can fully or partially through software, hardware and its Combination is to realize.Above-mentioned each module can be embedded in the form of hardware or independently of in the processor in computer equipment, can also be with It is stored in the memory in computer equipment in a software form, in order to which processor calls the above modules of execution corresponding Operation.
In one embodiment, a kind of computer equipment is provided, internal structure chart can be as shown in Figure 5.The calculating Machine equipment includes processor, memory, network interface, display screen and the input unit connected by system bus.Wherein, the meter The processor of machine equipment is calculated for providing calculating and control ability.The memory of the computer equipment includes that non-volatile memories are situated between Matter, built-in storage.The non-volatile memory medium is stored with operating system and computer program.The built-in storage is non-volatile The operation of operating system and computer program in storage medium provides environment.The network interface of the computer equipment be used for it is outer The terminal in portion passes through network connection communication.To realize a kind of nuclear power data monitoring side when the computer program is executed by processor Method.The display screen of the computer equipment can be liquid crystal display or electric ink display screen, the input of the computer equipment Device can be the touch layer covered on display screen, be also possible to the key being arranged on computer equipment shell, trace ball or touching Plate is controlled, can also be external keyboard, Trackpad or mouse etc..
It will be understood by those skilled in the art that structure shown in Fig. 5, only part relevant to application scheme is tied The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment It may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment, including memory and processor are provided, which is stored with Computer program, the processor performed the steps of when executing computer program receive that measuring device sends based on working as pronucleus First monitoring data of electricity operation environment;Obtain the second monitoring data, the second monitoring data be to current nuclear power running environment into The monitoring data that row analogue simulation obtains;Measurement error is calculated according to the second corresponding monitoring data of the first monitoring data Value;When measurement error value is no more than error threshold, the first monitoring data are shown.
In one embodiment, it also performs the steps of when processor executes computer program when measurement error value is more than When error threshold, warning information is generated, warning information is sent to default terminal and is shown.
In one embodiment, it also performs the steps of when processor executes computer program according to prefixed time interval The feedback information of preset monitored terminal;When feedback information is first kind feedback information, warning information is generated again and is sent to Default terminal;When feedback information is the second class feedback information, feedback information is recorded.
In one embodiment, it is also performed the steps of when processor executes computer program and receives stepping on for active user Record information;The permission of active user is determined according to log-on message;When the permission of active user meets preset condition, receive current User operates the modification of error threshold, is modified according to modification operation to error threshold.
In one embodiment, the second monitoring data are obtained, comprising: the project file of building and full scope simulator of nuclear power station The consistent full scope simulator of nuclear power station project file tree structure Simulation Interface view of organizational structure;Parse nuclear power plant analog machine The system interface of each simulation system under project file tree structure Simulation Interface view, the parameter extracted in each system interface become Amount;Target monitoring parameter is determined from parametric variable, it is complete by nuclear power station is sent to after target monitoring parameter the first datagram of write-in Scope simulation machine server;After full scope simulator of nuclear power station server finds the real value of monitoring parameters, nuclear power is received Second datagram of the real value for the carrying target monitoring parameter that Full scope simulator server of standing is sent;Extract the second datagram In monitoring parameters real value.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program performs the steps of when being executed by processor receives first based on current nuclear power running environment that measuring device is sent Monitoring data;The second monitoring data are obtained, the second monitoring data carry out analogue simulation to current nuclear power running environment and obtain Monitoring data;Measurement error value is calculated according to the second corresponding monitoring data of the first monitoring data;When measurement error value not When more than error threshold, the first monitoring data are shown.
In one embodiment, it is also performed the steps of when computer program is executed by processor when measurement error value is super When crossing error threshold, warning information is generated, warning information is sent to default terminal and is shown.
In one embodiment, it also performs the steps of when computer program is executed by processor according between preset time Every the feedback information of preset monitored terminal;When feedback information is first kind feedback information, warning information is generated again and is sent To default terminal;When feedback information is the second class feedback information, feedback information is recorded.
In one embodiment, it is also performed the steps of when computer program is executed by processor and receives active user's Log-on message;The permission of active user is determined according to log-on message;When the permission of active user meets preset condition, reception is worked as Preceding user operates the modification of error threshold, is modified according to modification operation to error threshold.
In one embodiment, the second monitoring data are obtained, comprising: the project file of building and full scope simulator of nuclear power station The consistent full scope simulator of nuclear power station project file tree structure Simulation Interface view of organizational structure;Parse nuclear power plant analog machine The system interface of each simulation system under project file tree structure Simulation Interface view, the parameter extracted in each system interface become Amount;Target monitoring parameter is determined from parametric variable, it is complete by nuclear power station is sent to after target monitoring parameter the first datagram of write-in Scope simulation machine server;After full scope simulator of nuclear power station server finds the real value of monitoring parameters, nuclear power is received Second datagram of the real value for the carrying target monitoring parameter that Full scope simulator server of standing is sent;Extract the second datagram In monitoring parameters real value.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, To any reference of memory, storage, database or other media used in each embodiment provided herein, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.

Claims (10)

1. a kind of nuclear power data monitoring method, which comprises
Receive the first monitoring data based on current nuclear power running environment that measuring device is sent;
The second monitoring data are obtained, second monitoring data are to carry out analogue simulation to the current nuclear power running environment to obtain Monitoring data;
Measurement error value is calculated according to the second corresponding monitoring data of first monitoring data;
When the measurement error value is no more than error threshold, first monitoring data are shown.
2. the method according to claim 1, wherein the method also includes:
When the measurement error value is more than the error threshold, warning information is generated, the warning information is sent to default Terminal is shown.
3. according to the method described in claim 2, it is characterized in that, the method also includes:
The feedback information of the default terminal is monitored according to prefixed time interval;
When the feedback information is first kind feedback information, warning information is generated again and is sent to the default terminal;
When the feedback information is the second class feedback information, the feedback information is recorded.
4. according to claim 1 to method described in 3 any one, which is characterized in that the method also includes:
Receive the log-on message of active user;
The permission of the active user is determined according to the log-on message;
When the permission of the active user meets preset condition, receives active user and the modification of the error threshold is operated, It is modified according to modification operation to the error threshold.
5. the method according to claim 1, wherein the second monitoring data of the acquisition, comprising:
The consistent full scope simulator of nuclear power station engineering text of project file organizational structure of building and full scope simulator of nuclear power station Part tree structure Simulation Interface view;
The system interface for parsing each simulation system under the nuclear power plant analog machine project file tree structure Simulation Interface view, mentions Take the parametric variable in each system interface;
Target monitoring parameter is determined from the parametric variable, is sent to after the first datagram is written in the target monitoring parameter Full scope simulator of nuclear power station server;
After the full scope simulator of nuclear power station server finds the real value of the monitoring parameters, the nuclear power station is received Second datagram of the real value for the carrying target monitoring parameter that Full scope simulator server is sent;
Extract the real value of the monitoring parameters in second datagram.
6. a kind of nuclear power data monitoring device, which is characterized in that described device includes:
First monitoring data receiving module, for receiving the first monitoring based on current nuclear power running environment of measuring device transmission Data;
Second monitoring data obtain module, and for obtaining the second monitoring data, second monitoring data are to work as pronucleus to described Electricity operation environment carries out the monitoring data that analogue simulation obtains;
Measurement error value computing module, for calculating measurement according to the second corresponding monitoring data of first monitoring data Error amount;
Display module, for being carried out to first monitoring data when the measurement error value is no more than the error threshold Display.
7. device according to claim 6, which is characterized in that further include alarm generation module, for being missed when the measurement When difference is more than the error threshold, warning information is generated, the warning information is sent to default terminal and is shown.
8. device according to claim 7, which is characterized in that further include that feedback information monitors module, for according to default Time interval monitors the feedback information of the default terminal;When the feedback information is first kind feedback information, generate again Warning information is simultaneously sent to the default terminal;When the feedback information is the second class feedback information, the feedback letter is recorded Breath.
9. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 5 the method when executing the computer program.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of method described in any one of claims 1 to 5 is realized when being executed by processor.
CN201910463189.0A 2019-05-30 2019-05-30 Nuclear power data monitoring method, device, computer equipment and storage medium Pending CN110175935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910463189.0A CN110175935A (en) 2019-05-30 2019-05-30 Nuclear power data monitoring method, device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910463189.0A CN110175935A (en) 2019-05-30 2019-05-30 Nuclear power data monitoring method, device, computer equipment and storage medium

Publications (1)

Publication Number Publication Date
CN110175935A true CN110175935A (en) 2019-08-27

Family

ID=67696612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910463189.0A Pending CN110175935A (en) 2019-05-30 2019-05-30 Nuclear power data monitoring method, device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110175935A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105886A (en) * 2019-12-18 2020-05-05 岭东核电有限公司 Calibration-free temperature measurement method and device under strong radiation environment
CN111383784A (en) * 2020-02-27 2020-07-07 中广核核电运营有限公司 Error correction monitoring method and device for intelligent pressure vessel measuring system
CN112145966A (en) * 2020-08-28 2020-12-29 岭东核电有限公司 Deaerator starting control method, device and equipment and deaeration system for nuclear power plant
CN112765249A (en) * 2021-01-14 2021-05-07 广州禾顺环保科技有限公司 Data management method, data management device and environment-friendly detection equipment
CN112800107A (en) * 2021-01-18 2021-05-14 湖北宸威玺链信息技术有限公司 Novel data source security identification method, system, device and medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103973513A (en) * 2014-05-05 2014-08-06 中广核(北京)仿真技术有限公司 Remote monitoring method and system for full-range analog machines of nuclear power station
CN105512812A (en) * 2015-12-02 2016-04-20 中广核工程有限公司 Nuclear power plant equipment fault early warning analysis method and system based on dynamic simulation model
CN109241353A (en) * 2018-09-12 2019-01-18 北京英视睿达科技有限公司 A kind of data checking method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103973513A (en) * 2014-05-05 2014-08-06 中广核(北京)仿真技术有限公司 Remote monitoring method and system for full-range analog machines of nuclear power station
CN105512812A (en) * 2015-12-02 2016-04-20 中广核工程有限公司 Nuclear power plant equipment fault early warning analysis method and system based on dynamic simulation model
CN109241353A (en) * 2018-09-12 2019-01-18 北京英视睿达科技有限公司 A kind of data checking method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105886A (en) * 2019-12-18 2020-05-05 岭东核电有限公司 Calibration-free temperature measurement method and device under strong radiation environment
CN111383784A (en) * 2020-02-27 2020-07-07 中广核核电运营有限公司 Error correction monitoring method and device for intelligent pressure vessel measuring system
CN112145966A (en) * 2020-08-28 2020-12-29 岭东核电有限公司 Deaerator starting control method, device and equipment and deaeration system for nuclear power plant
CN112765249A (en) * 2021-01-14 2021-05-07 广州禾顺环保科技有限公司 Data management method, data management device and environment-friendly detection equipment
CN112800107A (en) * 2021-01-18 2021-05-14 湖北宸威玺链信息技术有限公司 Novel data source security identification method, system, device and medium

Similar Documents

Publication Publication Date Title
CN110175935A (en) Nuclear power data monitoring method, device, computer equipment and storage medium
US11176028B2 (en) System, method and storage device for CIM/E model standard compliance test
CN106597947A (en) Substation equipment test method and system, server and tester
CN103973513B (en) The remote monitoring method and system of a kind of full scope simulator of nuclear power station
CN108830391A (en) Wind power generating set operation management system, method and computer equipment
CN109213108B (en) Nuclear power station operator operation auxiliary support system and method
CN109784502A (en) On-site maintenance processing method and system based on fault equipment
CN108595390B (en) Method for verifying parameter consistency of SCD and IED of intelligent substation
KR102069442B1 (en) The operation support and monitoring system in the nuclear power plant
CN111354496A (en) Nuclear power plant accident online diagnosis and state tracking prediction method
CN111581191B (en) Nuclear safety data verification method, device, computer equipment and storage medium
CN112686773B (en) Electric power metering all-link key business anomaly positioning model construction method based on fusion business topology
CN109147975B (en) Reactor core state monitoring and analyzing system of pressurized water reactor nuclear power plant
CN113536537B (en) Method and system for analyzing large-break water loss accident
CN116431701A (en) Comprehensive power plant production data analysis and statistics system
CN103631232A (en) Data monitoring control method and data monitoring control device
Muhammad et al. Development of reliability monitor by GO-FLOW methodology for the safety related sub-systems in PWR
Greenwood et al. Nuclear hybrid energy systems south east regional case progress report
Osborn et al. Terry Turbopump Expanded Operating Band Full-Scale Integral Long-Term Low-Pressure Experiments? Preliminary Test Plan.
CN118095145B (en) CFSR-based analysis method and CFSR-based analysis device for expected power generation capacity sequence
SA et al. Unsupervised Neural Network Approach for Identifying Anomalous Events in Nuclear Power Plants
CN118780145A (en) Transient tracking and predicting method for pressurized water reactor
CN118228848A (en) Nuclear accident rapid source item calculation and prediction method
Lobanok et al. Automated chemical monitoring in new projects of nuclear power plant units
Sunder Raj Performance/Condition Monitoring and Optimization for Fossil Power Plants

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190827