CN105260810B - A kind of distribution back scheduling control system building method based on major network scheduling system - Google Patents
A kind of distribution back scheduling control system building method based on major network scheduling system Download PDFInfo
- Publication number
- CN105260810B CN105260810B CN201510465946.XA CN201510465946A CN105260810B CN 105260810 B CN105260810 B CN 105260810B CN 201510465946 A CN201510465946 A CN 201510465946A CN 105260810 B CN105260810 B CN 105260810B
- Authority
- CN
- China
- Prior art keywords
- distribution
- control system
- major network
- scheduling
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The invention discloses a kind of distribution back scheduling control system building methods based on major network scheduling system, with economic and practical, resource multiplex, information sharing, safe and reliable principle, system is dispatched based on major network, use same support platform, by data resource, technical resource, device resource it is shared, the acquisition of extension distribution data and monitoring, application to distribution network function in existing dispatch automated system, realize a kind of distribution back scheduling control system construction.A kind of distribution back scheduling control system building method based on major network scheduling system provided by the invention, wiring diagram electronic management software is extended on the basis of existing major network Dispatching Control System, the functions such as newly-increased distribution data acquisition, the analysis of distribution SCADA, power distribution network basic network, feeder automation processing, the system Construction period is reduced, the efficiency that puts into operation is improved.
Description
Technical field
The present invention relates to distribution back scheduling control system fields in distribution automation system, are distribution back scheduling controls
A kind of application of the system Construction mode processed in distribution automation field.
Background technique
As State Grid Corporation of China " three collection five big " System Construction is carried out in a deep going way, the construction of power distribution automation main station is also just
It pushes forward comprehensively.But since Sichuan province power grid scale difference is big, Midwest and part coastal area weak foundation, it is mostly
Small grids.Each department power distribution network scale, especially urban distribution network scale is generally less than normal, the requirement to data acquisition and processing (DAP)
It is not high.Simultaneously during " three collection five are big " System Construction, Sichuan each department Dispatching Control System is according to " regulation integration "
" county integration " mode is created, and is all put into operation in 2012.Except construction Chengdu power supply company and eyebrow earlier
Outside the power supply company of mountain, remaining 19 regional dispatching control system is all made of home equipment, and server is configured using 4 tunnel, 8 core CPU,
Memory size 32G, operation load are lower.
In conjunction with above first and second system situation of power grid, Sichuan company has carried out case study, proposes based on the existing tune in area
It spends control system and carries out perfect, the abundant multiplexed resource of function expansion, realize regional power distribution automation main station function, propose a kind of base
In the distribution back scheduling control system building method of major network scheduling system.
Summary of the invention
Insufficient in the prior art to overcome, it is an object of that present invention to provide one kind to be provided based on existing major network Dispatching Control System
Main distribution integration Dispatching Control System, i.e., a kind of distribution back scheduling control based on major network scheduling system have efficiently been built up in source
System Construction method processed.It is multiplexed by the integration of system hardware and software resource, in the case where not increasing hardware, before having increased distribution newly
The functions such as data acquisition, distribution SCADA, distribution wiring diagram electronization, feeder automation are set, realizes and system is dispatched based on major network
Distribution back scheduling control system construction, meet distribution regulation operation demand.
Technical solution:In order to solve the above technical problems, the technical solution adopted by the present invention is:
Distribution back scheduling control system based on major network scheduling system, which is built, is multiplexed with construction principle, distribution tune with resource
Disk array, database server, front server, SCADA server, the advanced application server, interface service of degree business
Device, auxiliary tone work station are multiplexed major network Dispatching Control System equipment, increase distribution public network data acquisition server newly, and key node is set
It is standby to be configured using dual redundant.County's tune side auxiliary tone work station is multiplexed the original work station of county's tune.
A kind of distribution back scheduling control system building method based on major network scheduling system, it is characterised in that:Based on
It is built the major network that puts into operation and dispatches system, using same support platform, be total to by data resource, technical resource, device resource
It enjoys, distribution data acquisition and monitoring, application to distribution network is extended on system application, realize a kind of distribution back scheduling control system
Construction in a systematic way is set;The realization process of the building method is as follows:
(1) analyze built major network Dispatching Control System using situation, former base in save adjust the application of application function into
The resource that row selection distribution back scheduling control system uses;It is the disk array of distribution scheduling business, database server, preposition
Server, SCADA (distribution data processing) server, advanced application server, interface server, auxiliary tone work station are multiplexed master
Net Dispatching Control System equipment;
(2) the independent modeling in major network Dispatching Control System legacy data library, preposition correlation table, protection node table structure are replicated
Distribution back scheduling control system database is built, realizes the independent modeling of distribution net equipment, preposition correlation table protects the complete of node table
It is complete to separate;Meanwhile application to distribution network model and measurement model being answered with major network in distribution back scheduling control system database sharing
It is arranged in same table space with model and measurement model, belongs to different model tables;
(3) alarm type, the alarm history table according to major network scheduling system establishes independent distribution alarm type, alarm
History lists establishes the alarm type not having in major network scheduling system, alarm history table in distribution back scheduling control system,
With the warning information process flow for improving original major network scheduling system platform, to the warning information of distribution back scheduling control system
Optimization processing, optimization processing are as follows:
(31) the affiliated logical relation of content for modifying original warning information, is revised as distribution subordinate relation for affiliated plant stand
Switchyard and feeder line;Distribution alarming processing is handled using batch packing, is alerted number according to every packet maximum of configuration, is packet-by-packet accused
Alert batch processing simplifies alarm storage format.
(32) increase the said container judgement of distribution net equipment;It is carried out according to the judgment module in original Dispatching Control System standby
Part, and the judgment module after backup is increased and increases affiliated two feeder line, affiliated switchyard fields in distribution net equipment table, it constitutes
The said container judgment module of the said container judgment module of distribution back scheduling control system, the distribution net equipment passes through in distribution
Two feeder line, affiliated switchyard fields belonging to increasing in equipment list, realize accurate positioning belonging to equipment;
(4) public network data acquisition server is increased by safety insulating device in major network scheduling system, as distribution public network
Data acquisition server, completely isolated with the acquisition module of major network scheduling using independent treatment progress, distribution back scheduling control
System acquisition processed (is replicating original major network front-end system application code in application program, the processing that setting distribution network model accesses is patrolled
Volume, delete major network model treatment logic.Simultaneously by data channel management by a process level i.e. channel by management of process
Mode is revised as a thread-level management i.e. channel by the mode of a thread management;
(5) distribution back scheduling control system is established, removes original major network scheduling system using lower all using journey
Sequence module and its with being associated between former major network Dispatching Control System support platform, is adjusted to distribution back scheduling control for application name
System application processed, the message channel in the original application of concurrent multiplexing, the content of service processes;
(6) look & feel for changing original major network scheduling system optimizes adjustment to original major network scheduling system, makes
System from single major network Dispatching Control System interface be extended to for main distribution integration, the integrated system interface in county;
(7 divide individually in WAMS (redundancy tracking system real-time dynamic) application in original major network Dispatching Control System
Application to distribution network, establish the application system of distribution back scheduling control system, the distribution back scheduling control system application system
System include distribution FES (distribution data acquisition) and distribution SCADA (distribution data processing), realization distribution net equipment data acquire and
Distribution net equipment monitoring and control are completed distribution back scheduling control system and are established.
Application extension is carried out based on built major network scheduling system, any variation is not done on hardware, does not change original system
It unites hardware structure, original major network scheduling system software function is not modified on software view, can be matched in major network scheduling system
It carries out increasing distribution function in the application more than needed set.Distribution function does not have an impact major network function, and message channel is actively unidirectional
Major network information is monitored, does not send information to major network.
Beneficial effect:The construction of distribution automation independent master station system needs individually according to medium configuration standard less than normal
Configuration storage equipment, server and work station, the network equipment and secondary safety protection equipment, a prefecture-level company is than more conservative
Investment is about 500-600 ten thousand, based on the distribution back scheduling control system of major network scheduling system, only need to be to the scheduling of original major network
System carries out Software adapting, completes the construction fund of system in 1,500,000 yuan.
Detailed description of the invention
Fig. 1 is the hardware structure diagram of the method for the present invention;
Fig. 2 is the software architecture diagram of the method for the present invention.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to
Specific embodiment, the present invention is further explained.
Such as Fig. 1 and Fig. 2, a kind of distribution back scheduling control system Construction Party based on major network scheduling system of the present embodiment
Method, it is characterised in that:Pass through data resource, skill using same support platform based on the major network scheduling system to put into operation has been built
Art resource, device resource it is shared, distribution data acquisition and monitoring, application to distribution network are extended on system application, realizes one
Kind distribution back scheduling control system construction;The realization process of the building method is as follows:
(1) analyze built major network Dispatching Control System using situation, former base in save adjust the application of application function into
The resource that row selection distribution back scheduling control system uses;It is the disk array of distribution scheduling business, database server, preposition
Server, SCADA server, advanced application server, interface server, auxiliary tone work station are multiplexed major network Dispatching Control System
Equipment;
(2) the independent modeling in major network Dispatching Control System legacy data library, preposition correlation table, protection node table structure are replicated
Distribution back scheduling control system database is built, realizes the independent modeling of distribution net equipment, preposition correlation table protects the complete of node table
It is complete to separate;Meanwhile application to distribution network model and measurement model being answered with major network in distribution back scheduling control system database sharing
It is arranged in same table space with model and measurement model, belongs to different model tables;
(3) alarm type, the alarm history table according to major network scheduling system establishes independent distribution alarm type, alarm
History lists establishes the alarm type not having in major network scheduling system, alarm history table in distribution back scheduling control system,
With the warning information process flow for improving original major network scheduling system platform, to the warning information of distribution back scheduling control system
Optimization processing, optimization processing are as follows:
(31) the affiliated logical relation of content for modifying original warning information, is revised as distribution subordinate relation for affiliated plant stand
Switchyard and feeder line;Distribution alarming processing is handled using batch packing, is alerted number according to every packet maximum of configuration, is packet-by-packet accused
Alert batch processing simplifies alarm storage format.
(32) increase the said container judgement of distribution net equipment;It is carried out according to the judgment module in original Dispatching Control System standby
Part, and the judgment module after backup is increased and increases affiliated two feeder line, affiliated switchyard fields in distribution net equipment table, it constitutes
The said container judgment module of the said container judgment module of distribution back scheduling control system, the distribution net equipment passes through in distribution
Two feeder line, affiliated switchyard fields belonging to increasing in equipment list, realize accurate positioning belonging to equipment;
(4) public network data acquisition server is increased by safety insulating device in major network scheduling system, as distribution public network
Data acquisition server, completely isolated with the acquisition module of major network scheduling using independent treatment progress, distribution back scheduling control
System acquisition processed (is replicating original major network front-end system application code in application program, the processing that setting distribution network model accesses is patrolled
Volume, delete major network model treatment logic.Simultaneously by data channel management by a process level i.e. channel by management of process
Mode is revised as a thread-level management i.e. channel by the mode of a thread management;
(5) distribution back scheduling control system is established, removes original major network scheduling system using lower all using journey
Sequence module and its with being associated between former major network Dispatching Control System support platform, is adjusted to distribution back scheduling control for application name
System application processed, the message channel in the original application of concurrent multiplexing, the content of service processes;
(6) look & feel for changing original major network scheduling system optimizes adjustment to original major network scheduling system, makes
System from single major network Dispatching Control System interface be extended to for main distribution integration, the integrated system interface in county;
(7) it is divided in WAMS (redundancy tracking system real-time dynamic) application in original major network Dispatching Control System independent
Application to distribution network, establish the application system of distribution back scheduling control system, the distribution back scheduling control system application system
System includes distribution FES and distribution SCADA (distribution automation system), realizes the acquisition of distribution net equipment data and distribution net equipment monitoring
And control, it completes distribution back scheduling control system and establishes.
System hardware structure is as shown in Figure 1:
Distribution back scheduling control system based on major network scheduling system is due to being multiplexed existing major network Dispatching Control System
Hardware device, therefore have certain flexibility on hardware architecture:
1. front server and SCADA server can dispose major network simultaneously and distribution is preposition and SCADA is applied.Using can adopt
With mode is cross-deployed, realize that the redundancy of application is spare.
2. public network data acquisition front server can not be disposed in the case where no public network data terminal.In this feelings
Under condition, system can upgrade to main distribution one from major network Dispatching Control System in the case where not increasing any hardware server
Change Dispatching Control System, realizes distribution adjusting function.
3. a staging server can be increased in escalation process, as the volatile data base service during database upgrade
Backed off after random is completed in device, upgrading.
Main one area of distribution integration Dispatching Control System is shared therein using former major network Dispatching Control System support platform
The public services such as database service, real-time database service, messaging service;The program of distribution involved in support platform is such as alerted, is adopted
Sample etc. be transformed with networking;Extend the functions such as distribution SCADA application, feeder automation processing, the advanced application of power distribution network, data
Acquisition acquires the distributed capture mutually separated with distribution using major network acquisition, and distinguishes public network and two kinds of acquisition modes of private network.Three
Area shares original WEB delivery system.
Software architecture diagram is as shown in Figure 2:
Affiliated plant stand, is revised as the switch of distribution subordinate relation by the affiliated logical relation of content for modifying original warning information
It stands and feeder line;Distribution alarming processing is no longer handled by number one by one, but the processing of packing in batch is transformed, according to every packet of configuration
Maximum alarm number, packet-by-packet carries out alarm batch processing, improves treatment effeciency.Simplifying alarm storage format is, will be in original system
Affiliated interval, voltage class, the information reductions such as affiliated plant stand fall, shorten data length, improve storage efficiency.
Original major network said container only one field of affiliated plant stand, positions relatively easy.Judge with network capacity by matching
Two feeder line, affiliated switchyard fields belonging to increasing in net equipment list, realize accurate positioning belonging to equipment.The judgement of distribution container
Process, the backup module by the way that original major network judgment module is transformed are realized.Distribution container judgment module by transformation is distribution
One part of back scheduling control system.
The acquisition of distribution back scheduling control system is replicating original major network front-end system application code in application program,
Increase the processing logic of distribution network model access, deletes major network model treatment logic.Major network is much larger than for data scale simultaneously
The status of data scale optimizes preposition processing mode, and by data channel management, by process level, (channel is by a process pipe
Reason) it is transformed into thread-level management (channel is by a thread management), data access scale is improved, meets distribution data and connects
The demand entered.
To elaborate the present invention, detailed functions of the invention are as follows:
1, transformation is adjusted to existing major network Dispatching Control System platform, according to separated principle is applied, provides and have
Platform base function needed for supporting distribution scheduling.
● distribution net equipment individually models, and preposition correlation table, protection node table etc. are completely separable.
In order to support application to distribution network reasonable layout, running efficiency of system is improved, convenient for management, is needed on database bottom
The relevant device model table of main distribution, trigger etc. are separated.Wherein it is divided into distribution network model class and distribution network model institute with mesh portions
Two class of measurement class of triggering.This partial content can refer to the database structure in original major network Dispatching Control System, be transplanted
And make corresponding transformation.
● warning system.
Independent distribution alarm type, alarm history table are established, the warning information process flow of original system platform is improved,
To the warning information optimization processing of distribution, increase the said container judgement of distribution net equipment.Warning information is deposited respectively with major network information
Storage, it is unified to show, apply.In conjunction with system responsibility area, to main distribution warning information according to user role (adjust, auxiliary tone, county's tune)
Exhibition strategy is customized respectively, and the monitoring for improving system alarm information is horizontal.
● sampling system.
Increase distribution sampling, is different from major network sampling, it is more for distribution sampled point, sweeping feature is sampled, sampling is only
Vertical treatment progress separates processing with major network sampling, improves sampling efficiency, meet system monitoring requirement.In sampled data
It keeps look & feel consistent in application program, had both realized the efficient process of distribution sampling, also ensure user in use
Continue.
● application extension.
All application program modules and its being associated between platform under original application are removed, application name is adjusted to distribution tune
Degree control application.Message channel in the original application of concurrent multiplexing, the contents such as service processes.
● man-machine interface.
Adjustment is optimized for the look & feel of original major network scheduling system, makes system from single major network scheduling controlling
System interface extends the system interface of distribution monitoring.Increase for county-level scheduling user in system main with unified management interface;Needle
The distributions special topics such as distribution artwork management, thematic map management, distribution network feeder automation are increased to distribution scheduling user and show interface.
2, the system globe area of application to distribution network.
For the architecture of original major network Dispatching Control System, individual application to distribution network, including distribution acquisition are established
And two class of application to distribution network.
● individually increase preposition application, realizes the acquisition of distribution net equipment data.
In view of major network data acquire the mechanism acquired with distribution data difference, increase the preposition application of distribution
(DFES), make that it has controller switching equipment data acquisition function and the preposition application of existing Dispatching Control System is completely independent.Distribution
Original major network front-end system application code is being replicated in preposition application (DFES) application program, the processing for increasing distribution access is patrolled
Volume, it deletes major network and handles logic.Simultaneously for the status for being much larger than major network data scale with data scale, optimize preposition processing side
Data channel is transformed into thread-level management by process level, improves data access scale by formula, meets the need of distribution data access
It asks.
● individually increase distribution SCADA application, realizes distribution net equipment monitoring and control.
Increase and distribution net equipment monitoring and control function and existing major network SCADA application are completely independent.Program processing mode
It is similar with the preposition application (DFES) of distribution, increase the processing logic of distribution network model, the major network in original code is handled into logic screen
It covers.By increasing DSCADA application, realizes the code dehind of main application to distribution network, be managed collectively, simultaneously because a point application is realized, mention
The high processing speed of distribution data, matches netlist in conjunction with independent, lays the foundation for the smooth upgrade of system, realize system without
Seam extension.
3, the data interaction between main distribution.
Due to the separation of main application to distribution network and its data structure, system needs to carry out model when handling main distribution data
Splicing, relates generally to the following aspects:
● message channel interaction.
To guarantee the main efficient process for matching network information, system is in design by the different message channel of the message of main distribution
It is transmitted.But since distribution needs to monitor the message of major network on the application functions such as feeder automation processing, in journey
In sequence processing, this subprogram not only has registered the message channel of distribution, while also having registered the message channel of major network, it is ensured that
Program processing on actual effect.It also is to avoid the main cross snoop for matching network information.
● application program interaction
The interaction of application program is concentrated mainly on the program of application to distribution network side, this subprogram not only needs to read major network
Model data, while also reading the model data of distribution.Accordingly when needing operation model data, also synchronized update master
The two-part data of distribution, program need to wait for that main distribution data is successfully modified just to be returned in reading, modification, case-deleted models data
Return success value.
● analysis program interaction
Similar with application program, analysis program needs main distribution two of synchronous reading in the part for being related to main distribution interaction
Sub-model data are simultaneously spliced.The model splicing of program is analyzed based on the Topology connection of main distribution network model.Due to original major network
Not in view of mesolow models in system, therefore need in distribution modeling to major network model polishing partial-topology connection relationship
(node).Model topology verification is carried out after polishing connection relationship, completing verification post analysis program can be realized main distribution full model
Analysis and calculating
This method is technically feasible, and existing regional dispatching control system supports distribution automation required by general headquarters completely
The expansion of function;Good economy performance, system software function expand the expense of construction far below independent construction required cost;Construction period
Short, system achievement can promote and apply rapidly in the whole network;Intensive degree is high, can adapt to regulation personnel integrated monitoring and one
System operation expense is greatly decreased in the demand of body O&M;Expandability is good, can adapt to distribution construction iterative method
It is required that substantial contribution early period is avoided disposably to put into.This be suitble to Sichuan Electric Power Network actual conditions, be convenient for promote construction compared with
Good selection.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (3)
1. a kind of distribution back scheduling control system building method based on major network scheduling system, it is characterised in that:Based on
Build the major network scheduling system to put into operation, using same support platform, by data resource, technical resource, device resource it is shared,
Distribution data acquisition and monitoring, application to distribution network are extended on system application, realize a kind of distribution back scheduling control system
Construction;The realization process of the building method is as follows:
(1) built major network Dispatching Control System is analyzed using situation, on the basis of adjusting application function based on former province, selection
The resource that distribution back scheduling control system uses;The disk array of distribution scheduling business, database server, preposition service
Device, SCADA server, advanced application server, interface server, auxiliary tone work station are multiplexed major network Dispatching Control System and set
It is standby;
(2) independent modeling data, preposition correlation table, the protection node table structure in major network Dispatching Control System legacy data library are replicated
Distribution back scheduling control system database is built, realizes the independent modeling of distribution net equipment, preposition correlation table and protection node table
It is completely separable;Meanwhile by application to distribution network model and measurement model and major network in distribution back scheduling control system database sharing
Application model and measurement model are arranged in same table space, belong to different model tables;
(3) alarm type, the alarm history table according to major network scheduling system, establishes independent distribution alarm type, alarm history
The alarm type not having in major network scheduling system, alarm history table are established in distribution back scheduling control system, are used for by table
The warning information process flow of original major network scheduling system platform is improved, it is excellent to the warning information of distribution back scheduling control system
Change processing, optimization processing are as follows:
(31) affiliated plant stand, is revised as the switch of distribution subordinate relation by the affiliated logical relation of content for modifying original warning information
It stands and feeder line;Distribution alarming processing is handled using batch packing, is alerted number according to every packet maximum of configuration, is packet-by-packet carried out alarm batch
Amount processing simplifies alarm storage format;
(32) increase the said container judgement of distribution net equipment;It is backed up according to the judgment module in original Dispatching Control System,
Judgment module after backup is increased in distribution net equipment table, and increases affiliated two feeder line, affiliated switchyard fields, composition is matched
The said container judgment module of net back scheduling control system, the said container judgment module of the distribution net equipment in distribution by setting
Two feeder line, affiliated switchyard fields belonging to increasing in standby table, realize accurate positioning belonging to equipment;
(4) public network data acquisition server is increased by safety insulating device in major network scheduling system, as distribution public network data
Acquisition server, completely isolated with the acquisition module of major network scheduling using independent treatment progress, distribution back scheduling control system
System acquisition applications program, then original major network front-end system application code is replicated, the processing logic that setting distribution network model accesses is deleted
Major network model treatment logic;Simultaneously by data channel management by a process level i.e. channel by the mode of a management of process, repair
A thread-level management i.e. channel is changed to by the mode of a thread management;
(5) distribution back scheduling control system is established, removes original major network scheduling system using lower all application program moulds
Block and its with being associated between former major network Dispatching Control System support platform, is adjusted to distribution back scheduling control system for application name
System is applied, the message channel in the original application of concurrent multiplexing, the content of service processes;
(6) look & feel for changing original major network scheduling system optimizes adjustment to original major network scheduling system, makes system
From single major network Dispatching Control System interface be extended to for main distribution integration, the integrated system interface in county;
(7) the redundancy tracking system real-time dynamic in original major network Dispatching Control System is answered using the upper individual distribution of division
With establishing the application system of distribution back scheduling control system, the application system of the distribution back scheduling control system includes matching
Network data acquisition and distribution data processing realize the acquisition of distribution net equipment data and distribution net equipment monitoring and control, complete distribution
Back scheduling control system is established.
2. the distribution back scheduling control system building method according to claim 1 based on major network scheduling system, special
Sign is:The message channel that distribution back scheduling control system is established is actively unidirectional to monitor major network information, does not send and believes to major network
Breath.
3. the distribution back scheduling control system building method according to claim 1 based on major network scheduling system, special
Sign is:The Information Collecting & Processing of the distribution back scheduling control system construction is independently from major network system, is advised using standard
It about accesses, distribution SCADA data process flow.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510465946.XA CN105260810B (en) | 2015-07-31 | 2015-07-31 | A kind of distribution back scheduling control system building method based on major network scheduling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510465946.XA CN105260810B (en) | 2015-07-31 | 2015-07-31 | A kind of distribution back scheduling control system building method based on major network scheduling system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105260810A CN105260810A (en) | 2016-01-20 |
CN105260810B true CN105260810B (en) | 2018-11-30 |
Family
ID=55100489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510465946.XA Active CN105260810B (en) | 2015-07-31 | 2015-07-31 | A kind of distribution back scheduling control system building method based on major network scheduling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105260810B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105633970B (en) * | 2016-03-15 | 2019-02-12 | 国家电网公司 | Distribution back scheduling control system building method based on major network scheduling system |
CN105846473A (en) * | 2016-04-06 | 2016-08-10 | 北京科东电力控制系统有限责任公司 | Prefecture-county integration method based on intelligent power grid dispatching control system |
CN108242143A (en) * | 2016-12-27 | 2018-07-03 | 天津贝瓦科技有限公司 | A kind of dispatching management information system |
CN107180393B (en) * | 2017-06-22 | 2020-09-11 | 国网山东省电力公司诸城市供电公司 | Centralized platform server for monitoring power transformation system |
CN109980776B (en) * | 2017-12-28 | 2021-04-13 | 中国电力科学研究院有限公司 | Intelligent distribution and transformation system and application method thereof |
CN108985601B (en) * | 2018-07-03 | 2022-03-18 | 国网江西省电力有限公司经济技术研究院 | Integrated management system for main network and distribution network |
CN109086331B (en) * | 2018-07-03 | 2022-05-13 | 国网江西省电力有限公司经济技术研究院 | Method and device for updating data of main network and distribution network and computer readable storage medium |
CN112333687B (en) * | 2020-10-19 | 2023-09-29 | 北京许继电气有限公司 | Terminal data batch processing method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202634491U (en) * | 2012-06-20 | 2012-12-26 | 湖州电力局 | Integral technical support system for city and county regulation and control |
CN202817897U (en) * | 2012-07-05 | 2013-03-20 | 山西省电力公司长治供电分公司 | Power grid system for integrating grid distribution, scheduling and centralized control in one |
CN104333131A (en) * | 2014-10-17 | 2015-02-04 | 国家电网公司 | Method for establishing prefecture and county power grid regulation data integration |
-
2015
- 2015-07-31 CN CN201510465946.XA patent/CN105260810B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202634491U (en) * | 2012-06-20 | 2012-12-26 | 湖州电力局 | Integral technical support system for city and county regulation and control |
CN202817897U (en) * | 2012-07-05 | 2013-03-20 | 山西省电力公司长治供电分公司 | Power grid system for integrating grid distribution, scheduling and centralized control in one |
CN104333131A (en) * | 2014-10-17 | 2015-02-04 | 国家电网公司 | Method for establishing prefecture and county power grid regulation data integration |
Also Published As
Publication number | Publication date |
---|---|
CN105260810A (en) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105260810B (en) | A kind of distribution back scheduling control system building method based on major network scheduling system | |
CN103675600B (en) | Based on the Fault Diagnosis of Distribution Network system and method for topological knowledge | |
CN107330056B (en) | Wind power plant SCADA system based on big data cloud computing platform and operation method thereof | |
CN105095600B (en) | A kind of intelligent substation and regulation and control center cooperative modeling method | |
CN103500173B (en) | A kind of querying method of track traffic Monitoring Data | |
CN103577936B (en) | A kind of distributed maintenance of electric network model and globally shared system and its implementation | |
CN102957205B (en) | A kind of method and system setting up electricity distribution network model | |
CN106451761B (en) | Large-area power failure automatic monitoring and analyzing system based on dynamic data driving | |
CN105447611A (en) | OMS equipment transaction management and control information system supported by GID platform | |
CN105447175A (en) | Power grid model sharing method applicable to distributed computation of power system | |
CN112698953A (en) | Power grid intelligent operation and detection platform based on micro-service | |
CN103546541B (en) | Remote data based on intelligent telecontrol communication machine subscribes to dissemination method | |
CN104156835A (en) | Wide-area distributed integrated topology analysis method for large power grid | |
CN105470928A (en) | Zoned and layered load transferring method based on urban power transmission network fault recovery | |
CN103366311A (en) | Data fusion processing method based on transformer substation multi-system | |
CN108664666A (en) | A kind of underground pipe gallery three dimensional device cruising inspection system | |
CN108183869A (en) | A kind of electric quantity data acquisition system based on Distributed Message Queue | |
CN105071376B (en) | Method for implementing integrated framework of main distribution network | |
CN104361457A (en) | Information modeling method for production overhaul management of power distribution network and information interactive system and method | |
CN110380512A (en) | The intelligent distribution network coordinated control system and method for the information containing synchronized phasor | |
CN107948008A (en) | A kind of modeling method for low-voltage network monitoring system | |
CN107944661B (en) | Integrated regulation and control system for main network and distribution network | |
CN105897914A (en) | System and method for accessing information of I area by III area efficiently in EMS (Energy Management System) system | |
CN102957206B (en) | Many granularities off-line model joining method of smart grid-oriented | |
CN104391949A (en) | Data dictionary based wide area data resource management method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |