CN104333131A - Method for establishing prefecture and county power grid regulation data integration - Google Patents
Method for establishing prefecture and county power grid regulation data integration Download PDFInfo
- Publication number
- CN104333131A CN104333131A CN201410551985.7A CN201410551985A CN104333131A CN 104333131 A CN104333131 A CN 104333131A CN 201410551985 A CN201410551985 A CN 201410551985A CN 104333131 A CN104333131 A CN 104333131A
- Authority
- CN
- China
- Prior art keywords
- county
- scheduling
- data
- power grid
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a method for establishing prefecture and county power grid regulation data integration. The method comprises the steps of establishing prefecture division scheduling support system integration, establishing a regional data access network, establishing a regulatory business working linkage mechanism, establishing a prefecture division jurisdiction substation automation information classification, establishing the method control integration scheduling automatic system of prefecture and county power grid regulation data integration in a distributed way, and realizing the prefecture and county power grid scheduling integration. The prefecture and county support system integration, the power grid control integration and power gird prefecture distribution integration are achieved, scheduling information resources are planned, a power grid data platform is integrated and standardized, and the scheduling data integration is realized. A power scheduling operation management flow is scientifically carded and optimized, the traditional prefecture and county company boundary is broken, the 'smallness and completeness' of a county level power supply enterprise is solved by using specialization and intension, the original compartmentalization is changed into collaborative operation, the flattening management is realized, and an integrated management system with standardized operation, high efficiency and full information communication is formed.
Description
Technical field
The present invention relates to power grid regulation technical field, particularly relate to and set up the data integrated method of ground county power grid regulation.
Background technology
Along with the continuous expansion of electrical network scale, dispatching of power netwoks and the control of higher level and subordinate are divided into different systems, higher level can not get the electrical network allotment of subordinate and the source of control information, subordinate can not get the source of the allotment of higher level's electrical network and control information, all obtain electronics or written relevant information by application, like this in the process used, bring very large trouble, and operating efficiency is very low, scheduling decision efficiency is reduced greatly, thus it is data integrated to pursue ground county's dispatching of power netwoks, the problem improving scheduling decision efficiency is very urgent.
Summary of the invention
The present invention, just for the deficiency that prior art exists, provides and sets up the data integrated method of ground county power grid regulation, effectively can increase work efficiency, greatly improve the scheduling decision efficiency of the superior and the subordinate.
For solving the problem, the technical solution used in the present invention is as follows:
Set up the method that ground county power grid regulation is data integrated, comprise the following steps:
Step one: set up ground point scheduling support system integration;
Set up ground point scheduling scheduling private data communication network, realize the on-line monitoring of ground point two-stage electric network information, and realize electric network data and circulate in real time, Improvement and perfection data exchange system, the DMIS system that multiple counties of regional dispatch and subordinate adjust realizes interconnected by data exchange system on a wide area network, electrical network real-time running data is obtained by SCADA system, electric quantity data is obtained by electric quantity acquisition main station system, the unified maintenance in artwork storehouse, strange land and information sharing is realized by OPEN-3000 platform, wide-area distribution type data collection, Data disaster and for subsequent use and electric power adjust ground point to adjust the functions such as Combined anti-accident maneuver,
Step 2: set up area data Access Network;
Scheduling is divided to access the optical fiber ring network of regional dispatch administration 110kV transformer station nearby, from both direction access regional dispatch information network;
Step 3: set up regulation and control vocational work joint-action mechanism;
In conjunction with regional power grid control station actual conditions, carry out monitor staff 10kV feeder line accident treatment, clear stipulaties is without the line tripping of small power station's unit online and non-cable, and monitor can directly try to send, and tries to send unsuccessfully to report dispatch deal again;
Step 4: set up ground point administration automation of transformation substations information classification;
County's dispatched users carries out information classification, work out typical User Interface, during accident treatment, according to the importance of electric network information, by power grid accident, abnormal information by different classes ofly carrying out classifying on alarm window, multi-section display, ensure that dispatcher can pay close attention to main information rapidly, ignore secondary information;
Step 5: the control integrated dispatch automated system of method that distributed foundation ground county power grid regulation is data integrated;
Be that the function that county power grid regulation data integrated method integration dispatch automated system in ground possesses conventional automation system is set up in the distributed power scheduling of platform with OPEN-3000, simultaneously can according to different construction mode, realize the unified maintenance in artwork storehouse, strange land, information sharing, wide-area distribution type data collection, Data disaster and for subsequent use, and the method that scheduling sets up ground county power grid regulation data integrated adjusts the functions such as Combined anti-accident maneuver, wide-area distribution type power scheduling is adopted to set up the data integrated method integration dispatch automated system of ground county power grid regulation, progressively set up power scheduling and set up the data integrated method integral system Technical Standard System of ground county power grid regulation, management standard system, realize power scheduling and set up the data integrated method data dispatching resource of ground county power grid regulation, technical resource, sharing of device resource, effective saving manpower maintenance cost and system Construction cost,
Step 6: realize the dispatching of power netwoks integration of ground county;
Realize the dispatching of power netwoks integration of ground county, first cancel distribution scheduling, regional dispatch and auxiliary tone unite two into one, home zone dispatching office in organizational system, regulation and control class, except bearing the whole responsibility of former scheduling, also bears the 10KV circuit of former distribution scheduling administration and the dispatching management etc. of 10KV Switching Station simultaneously; The management and running business integration adjusted in regulation and control class, county is unified regional power regulation center, personnel depaly is totally 35 people, wherein administrative staff 5 people, director 1 people, deputy director 1 people (being in charge of scheduling, monitoring business respectively), technician, each 1 people of security official, operator on duty 30 people, 4 value 2 runnings are adopted to operate, often be worth 4 people, value is long to be responsible for major network scheduling, distribution scheduling and to monitor work coordination and the commander of tripartite, bears safety supervision management responsibility to all working on duty; Main value dispatcher is responsible for assisting the coordinative command work of the dispatching of power netwoks production of the long regional major network of value on duty and distribution, operation monitoring, exception and accident treatment, works exercise supervision, instruct and train two secondary value dispatchers; Major network pair value dispatcher and distribution pair value dispatcher are responsible for the grid switching operation of master network equipment (distribution net equipment) respectively, under main value dispatcher leader, carry out exception and the accident treatment of master network equipment (distribution net equipment); Power system monitor person is responsible for the supervision of the above equipment run signal of administrative 110KV transformer station, analysis, collection work, is responsible for this value value is long.
Further, in described step 5, the method integration dispatch automated system that wide-area distribution type power scheduling sets up ground county power grid regulation data integrated adopts distributed capture mode to carry out Information Monitoring, and embodiment is as follows:
Independently front-collection equipment is put in the allotment of each county, gather local electric network data, deliver in the server of regional dispatch main system and carry out unifying process, and configure unified application service by regional dispatch, maintenance work station is put in county's allotment, dispatching workstations, realize maintenance system, adjusting function, realize distributed capture mode, need to adopt: first: the electric power resource Unified coding technology setting up the data integrated method regulator control system of ground county power grid regulation, second: the distributed proccessing of the large node capacity of regional dispatch system, 3rd: the two-forty of communication network, highly reliable technology,
County under this kind of mode adjusts side system to need to be sent to regional dispatch system after the data acquisition of administrative plant stand arrangement unified, regional dispatch system data acquisition pressure is less, and county's adjusting system can realize whole analytical applications functions of regional dispatch system, county's adjusting system to communicate with the interconnection network of regional dispatch system disconnect time, allow and the front server of tune side, county can be utilized to carry out acquisition process, overall local real time data Monitor and Control function can be realized.
Compared with prior art, implementation result of the present invention is as follows in the present invention:
Successful Jiang Di county support system is integrated, power grid regulation is integrated, join integration, programming dispatching information resources electrical network, integrates specification electric network data platform, realizes data dispatching integration; Science combing and optimization dispatching of power netwoks operational management flow process, break traditions company of cities and counties boundary line, with specialized and intensive solution County Power Plant is "small and self-contained", will change from original barrier between different departments to Collaboration, realize management compression, form operational regulations, work in coordination with integrated management system that is efficient, information opened, effective lifting large operation architecture safe collection reduction, can effectively increase work efficiency, and greatly improves the scheduling decision efficiency of the superior and the subordinate.
Accompanying drawing explanation
Fig. 1 is the method schematic diagram that distributed capture mode of the present invention carries out Information Monitoring.
Embodiment
Below in conjunction with specific embodiments content of the present invention is described.
The method that described foundation ground county power grid regulation is data integrated, comprises the following steps:
Step one: set up ground point scheduling support system integration;
Set up ground point scheduling scheduling private data communication network, realize the on-line monitoring of ground point two-stage electric network information, and realize electric network data and circulate in real time, Improvement and perfection data exchange system, the DMIS system that multiple counties of regional dispatch and subordinate adjust realizes interconnected by data exchange system on a wide area network, electrical network real-time running data is obtained by SCADA system, electric quantity data is obtained by electric quantity acquisition main station system, the unified maintenance in artwork storehouse, strange land and information sharing is realized by OPEN-3000 platform, wide-area distribution type data collection, Data disaster and for subsequent use and electric power adjust ground point to adjust the functions such as Combined anti-accident maneuver,
Step 2: set up area data Access Network;
Scheduling is divided to access the optical fiber ring network of regional dispatch administration 110kV transformer station nearby, from both direction access regional dispatch information network;
Step 3: set up regulation and control vocational work joint-action mechanism;
In conjunction with regional power grid control station actual conditions, carry out monitor staff 10kV feeder line accident treatment, clear stipulaties is without the line tripping of small power station's unit online and non-cable, and monitor can directly try to send, and tries to send unsuccessfully to report dispatch deal again;
Step 4: set up ground point administration automation of transformation substations information classification;
County's dispatched users carries out information classification, work out typical User Interface, during accident treatment, according to the importance of electric network information, by power grid accident, abnormal information by different classes ofly carrying out classifying on alarm window, multi-section display, ensure that dispatcher can pay close attention to main information rapidly, ignore secondary information;
Step 5: the control integrated dispatch automated system of method that distributed foundation ground county power grid regulation is data integrated;
Be that the function that county power grid regulation data integrated method integration dispatch automated system in ground possesses conventional automation system is set up in the distributed power scheduling of platform with OPEN-3000, simultaneously can according to different construction mode, realize the unified maintenance in artwork storehouse, strange land, information sharing, wide-area distribution type data collection, Data disaster and for subsequent use, and the method that scheduling sets up ground county power grid regulation data integrated adjusts the functions such as Combined anti-accident maneuver, wide-area distribution type power scheduling is adopted to set up the data integrated method integration dispatch automated system of ground county power grid regulation, progressively set up power scheduling and set up the data integrated method integral system Technical Standard System of ground county power grid regulation, management standard system, realize power scheduling and set up the data integrated method data dispatching resource of ground county power grid regulation, technical resource, sharing of device resource, effective saving manpower maintenance cost and system Construction cost,
Step 6: realize the dispatching of power netwoks integration of ground county;
Realize the dispatching of power netwoks integration of ground county, first cancel distribution scheduling, regional dispatch and auxiliary tone unite two into one, home zone dispatching office in organizational system, regulation and control class, except bearing the whole responsibility of former scheduling, also bears the 10KV circuit of former distribution scheduling administration and the dispatching management etc. of 10KV Switching Station simultaneously; The management and running business integration adjusted in regulation and control class, county is unified regional power regulation center, personnel depaly is totally 35 people, wherein administrative staff 5 people, director 1 people, deputy director 1 people (being in charge of scheduling, monitoring business respectively), technician, each 1 people of security official, operator on duty 30 people, 4 value 2 runnings are adopted to operate, often be worth 4 people, value is long to be responsible for major network scheduling, distribution scheduling and to monitor work coordination and the commander of tripartite, bears safety supervision management responsibility to all working on duty; Main value dispatcher is responsible for assisting the coordinative command work of the dispatching of power netwoks production of the long regional major network of value on duty and distribution, operation monitoring, exception and accident treatment, works exercise supervision, instruct and train two secondary value dispatchers; Major network pair value dispatcher and distribution pair value dispatcher are responsible for the grid switching operation of master network equipment (distribution net equipment) respectively, under main value dispatcher leader, carry out exception and the accident treatment of master network equipment (distribution net equipment); Power system monitor person is responsible for the supervision of the above equipment run signal of administrative 110KV transformer station, analysis, collection work, is responsible for this value value is long.
Refer to Fig. 1, Fig. 1 is the method schematic diagram that distributed capture mode of the present invention carries out Information Monitoring.
In described step 5, the method integration dispatch automated system that wide-area distribution type power scheduling sets up ground county power grid regulation data integrated adopts distributed capture mode to carry out Information Monitoring, and embodiment is as follows:
Independently front-collection equipment is put in the allotment of each county, gather local electric network data, deliver in the server of regional dispatch main system and carry out unifying process, and configure unified application service by regional dispatch, maintenance work station is put in county's allotment, dispatching workstations, realize maintenance system, adjusting function, realize distributed capture mode, need to adopt: first: the electric power resource Unified coding technology setting up the data integrated method regulator control system of ground county power grid regulation, second: the distributed proccessing of the large node capacity of regional dispatch system, 3rd: the two-forty of communication network, highly reliable technology,
County under this kind of mode adjusts side system to need to be sent to regional dispatch system after the data acquisition of administrative plant stand arrangement unified, regional dispatch system data acquisition pressure is less, and county's adjusting system can realize whole analytical applications functions of regional dispatch system, county's adjusting system to communicate with the interconnection network of regional dispatch system disconnect time, allow and the front server of tune side, county can be utilized to carry out acquisition process, overall local real time data Monitor and Control function can be realized.
The present invention successful Jiang Di county support system is integrated, power grid regulation is integrated, join integration, programming dispatching information resources electrical network, integrates specification electric network data platform, realizes data dispatching integration; Science combing and optimization dispatching of power netwoks operational management flow process, break traditions company of cities and counties boundary line, with specialized and intensive solution County Power Plant is "small and self-contained", will change from original barrier between different departments to Collaboration, realize management compression, form operational regulations, work in coordination with integrated management system that is efficient, information opened, effective lifting large operation architecture safe collection reduction, can effectively increase work efficiency, and greatly improves the scheduling decision efficiency of the superior and the subordinate.
Above content is detailed description made for the present invention in conjunction with specific embodiments, can not assert that the present invention specifically implements to be only limitted to these explanations.For those skilled in the art, without departing from the inventive concept of the premise, some simple deduction or replace can also be made, all should be considered as belonging to the scope of protection of the invention.
Claims (2)
1. set up the method that ground county power grid regulation is data integrated, it is characterized in that, comprise the following steps:
Step one: set up ground point scheduling support system integration;
Set up ground point scheduling scheduling private data communication network, realize the on-line monitoring of ground point two-stage electric network information, and realize electric network data and circulate in real time, Improvement and perfection data exchange system, the DMIS system that multiple counties of regional dispatch and subordinate adjust realizes interconnected by data exchange system on a wide area network, electrical network real-time running data is obtained by SCADA system, electric quantity data is obtained by electric quantity acquisition main station system, the unified maintenance in artwork storehouse, strange land and information sharing is realized by OPEN-3000 platform, wide-area distribution type data collection, Data disaster and for subsequent use and electric power adjust ground point to adjust the functions such as Combined anti-accident maneuver,
Step 2: set up area data Access Network;
Scheduling is divided to access the optical fiber ring network of regional dispatch administration 110kV transformer station nearby, from both direction access regional dispatch information network;
Step 3: set up regulation and control vocational work joint-action mechanism;
In conjunction with regional power grid control station actual conditions, carry out monitor staff 10kV feeder line accident treatment, clear stipulaties is without the line tripping of small power station's unit online and non-cable, and monitor can directly try to send, and tries to send unsuccessfully to report dispatch deal again;
Step 4: set up ground point administration automation of transformation substations information classification;
County's dispatched users carries out information classification, work out typical User Interface, during accident treatment, according to the importance of electric network information, by power grid accident, abnormal information by different classes ofly carrying out classifying on alarm window, multi-section display, ensure that dispatcher can pay close attention to main information rapidly, ignore secondary information;
Step 5: the control integrated dispatch automated system of method that distributed foundation ground county power grid regulation is data integrated;
Be that the function that county power grid regulation data integrated method integration dispatch automated system in ground possesses conventional automation system is set up in the distributed power scheduling of platform with OPEN-3000, simultaneously can according to different construction mode, realize the unified maintenance in artwork storehouse, strange land, information sharing, wide-area distribution type data collection, Data disaster and for subsequent use, and the method that scheduling sets up ground county power grid regulation data integrated adjusts the functions such as Combined anti-accident maneuver, wide-area distribution type power scheduling is adopted to set up the data integrated method integration dispatch automated system of ground county power grid regulation, progressively set up power scheduling and set up the data integrated method integral system Technical Standard System of ground county power grid regulation, management standard system, realize power scheduling and set up the data integrated method data dispatching resource of ground county power grid regulation, technical resource, sharing of device resource, effective saving manpower maintenance cost and system Construction cost,
Step 6: realize the dispatching of power netwoks integration of ground county;
Realize the dispatching of power netwoks integration of ground county, first cancel distribution scheduling, regional dispatch and auxiliary tone unite two into one, home zone dispatching office in organizational system, regulation and control class, except bearing the whole responsibility of former scheduling, also bears the 10KV circuit of former distribution scheduling administration and the dispatching management etc. of 10KV Switching Station simultaneously; The management and running business integration adjusted in regulation and control class, county is unified regional power regulation center, personnel depaly is totally 35 people, wherein administrative staff 5 people, director 1 people, deputy director 1 people (being in charge of scheduling, monitoring business respectively), technician, each 1 people of security official, operator on duty 30 people, 4 value 2 runnings are adopted to operate, often be worth 4 people, value is long to be responsible for major network scheduling, distribution scheduling and to monitor work coordination and the commander of tripartite, bears safety supervision management responsibility to all working on duty; Main value dispatcher is responsible for assisting the coordinative command work of the dispatching of power netwoks production of the long regional major network of value on duty and distribution, operation monitoring, exception and accident treatment, works exercise supervision, instruct and train two secondary value dispatchers; Major network pair value dispatcher and distribution pair value dispatcher are responsible for the grid switching operation of master network equipment (distribution net equipment) respectively, under main value dispatcher leader, carry out exception and the accident treatment of master network equipment (distribution net equipment); Power system monitor person is responsible for the supervision of the above equipment run signal of administrative 110KV transformer station, analysis, collection work, is responsible for this value value is long.
2. the method that foundation ground as claimed in claim 1 county power grid regulation is data integrated, it is characterized in that, in described step 5, the method integration dispatch automated system that wide-area distribution type power scheduling sets up ground county power grid regulation data integrated adopts distributed capture mode to carry out Information Monitoring, and embodiment is as follows:
Independently front-collection equipment is put in the allotment of each county, gather local electric network data, deliver in the server of regional dispatch main system and carry out unifying process, and configure unified application service by regional dispatch, maintenance work station is put in county's allotment, dispatching workstations, realize maintenance system, adjusting function, realize distributed capture mode, need to adopt: first: the electric power resource Unified coding technology setting up the data integrated method regulator control system of ground county power grid regulation, second: the distributed proccessing of the large node capacity of regional dispatch system, 3rd: the two-forty of communication network, highly reliable technology,
County under this kind of mode adjusts side system to need to be sent to regional dispatch system after the data acquisition of administrative plant stand arrangement unified, regional dispatch system data acquisition pressure is less, and county's adjusting system can realize whole analytical applications functions of regional dispatch system, county's adjusting system to communicate with the interconnection network of regional dispatch system disconnect time, allow and the front server of tune side, county can be utilized to carry out acquisition process, overall local real time data Monitor and Control function can be realized.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410551985.7A CN104333131A (en) | 2014-10-17 | 2014-10-17 | Method for establishing prefecture and county power grid regulation data integration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410551985.7A CN104333131A (en) | 2014-10-17 | 2014-10-17 | Method for establishing prefecture and county power grid regulation data integration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104333131A true CN104333131A (en) | 2015-02-04 |
Family
ID=52407805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410551985.7A Pending CN104333131A (en) | 2014-10-17 | 2014-10-17 | Method for establishing prefecture and county power grid regulation data integration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104333131A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105260810A (en) * | 2015-07-31 | 2016-01-20 | 国网四川省电力公司 | Method for constructing distribution network standby scheduling and controlling system based on major network scheduling system |
CN105633970A (en) * | 2016-03-15 | 2016-06-01 | 国家电网公司 | Main network dispatching system based building method for standby dispatching control system of distribution network |
CN110689260A (en) * | 2019-09-25 | 2020-01-14 | 云南电网有限责任公司大理供电局 | Intelligent assistant system applied to integration of district and county regulation and control |
CN113747125A (en) * | 2021-09-02 | 2021-12-03 | 北京百度网讯科技有限公司 | Weak current monitoring linkage method, device, system, equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202634491U (en) * | 2012-06-20 | 2012-12-26 | 湖州电力局 | Integral technical support system for city and county regulation and control |
CN103390932A (en) * | 2013-07-09 | 2013-11-13 | 国家电网公司 | Distribution self-governed disaster tolerant standby type prefecture and county integrated system |
CN103715770A (en) * | 2013-12-20 | 2014-04-09 | 国电南瑞科技股份有限公司 | Wide-area-distributed city/county scheduling and monitoring integrated system subarea disconnection/connection operation method |
CN104091232A (en) * | 2014-07-01 | 2014-10-08 | 国家电网公司 | Grid integration state maintenance method |
-
2014
- 2014-10-17 CN CN201410551985.7A patent/CN104333131A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202634491U (en) * | 2012-06-20 | 2012-12-26 | 湖州电力局 | Integral technical support system for city and county regulation and control |
CN103390932A (en) * | 2013-07-09 | 2013-11-13 | 国家电网公司 | Distribution self-governed disaster tolerant standby type prefecture and county integrated system |
CN103715770A (en) * | 2013-12-20 | 2014-04-09 | 国电南瑞科技股份有限公司 | Wide-area-distributed city/county scheduling and monitoring integrated system subarea disconnection/connection operation method |
CN104091232A (en) * | 2014-07-01 | 2014-10-08 | 国家电网公司 | Grid integration state maintenance method |
Non-Patent Citations (3)
Title |
---|
牟军,等: "实施调控一体化培训确保"大运行"体系建设", 《中国电力教育》, 5 June 2014 (2014-06-05), pages 36 - 37 * |
钱栋: "电力调度监控系统的方案设计与实现", 《中国优秀硕士学位论文全文数据库 工程科技II辑》, no. 10, 15 October 2013 (2013-10-15), pages 042 - 176 * |
陈国恩,等: "大运行体系下地县调控一体化的探索与实践", 《中国电力教育》, 20 January 2014 (2014-01-20), pages 230 - 232 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105260810A (en) * | 2015-07-31 | 2016-01-20 | 国网四川省电力公司 | Method for constructing distribution network standby scheduling and controlling system based on major network scheduling system |
CN105260810B (en) * | 2015-07-31 | 2018-11-30 | 国网四川省电力公司 | A kind of distribution back scheduling control system building method based on major network scheduling system |
CN105633970A (en) * | 2016-03-15 | 2016-06-01 | 国家电网公司 | Main network dispatching system based building method for standby dispatching control system of distribution network |
CN105633970B (en) * | 2016-03-15 | 2019-02-12 | 国家电网公司 | Distribution back scheduling control system building method based on major network scheduling system |
CN110689260A (en) * | 2019-09-25 | 2020-01-14 | 云南电网有限责任公司大理供电局 | Intelligent assistant system applied to integration of district and county regulation and control |
CN113747125A (en) * | 2021-09-02 | 2021-12-03 | 北京百度网讯科技有限公司 | Weak current monitoring linkage method, device, system, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109638964B (en) | Multi-element power grid information interaction system and method based on edge computing architecture | |
CN201608541U (en) | Solar-energy photovoltaic intelligent power station based on Ethernet | |
CN106230032B (en) | A kind of wind farm group production scheduling operational system based on power dispatch data network | |
CN106875114A (en) | The SMS platform optimization system and method for distribution repairing maneuvering platform | |
CN102545212B (en) | Electrical energy quality centralized monitoring and auxiliary management decision support system | |
CN106203830A (en) | Promote Distribution Network Failure response and the electric service system of repairing ability | |
CN105305641B (en) | A kind of relay protection information data acquisition and upper delivery method | |
CN104881748A (en) | Power dispatching automation method and power dispatching automation system based on 'cloud computing' dispatching application | |
CN106026405A (en) | Relay protection on-line monitoring and analyzing system based on EMS system | |
CN106251052A (en) | The county's grid power blackout management and control of a kind of ground and analysis decision plateform system | |
CN104333131A (en) | Method for establishing prefecture and county power grid regulation data integration | |
CN206584222U (en) | A kind of supercentral station's centralized monitoring system | |
CN105071376B (en) | Method for implementing integrated framework of main distribution network | |
CN105262227A (en) | Fool-proof lockout system | |
CN103150618A (en) | Generating system and method for working plan of power transmission network | |
CN106154999A (en) | Water supply analysis and Control regulates monitoring and controlling system | |
CN109546747A (en) | A kind of intelligence transmission and distribution network fault pre-alarming management system | |
CN105225168A (en) | Power dispatching managemant system | |
CN105048498B (en) | For how wind farm grid-connected dispatching patcher | |
CN115641070A (en) | Multi-level multi-department linkage handling method and deduction device for power grid emergency | |
CN106789194B (en) | The energy communication service automatic fault diagnosis localization method of multi-disciplinary collaboration | |
CN203644191U (en) | Gas data acquisition and monitoring device based on SCADA (supervisory control and data acquisition) system | |
CN102495615A (en) | Remote monitoring management system of large tonnage box girder transport and erection equipment group safety construction | |
CN104167740A (en) | Automatic control system and method for 35kV capacitor reactance provincial and local collaboration of 500kV transformer substation | |
CN102832708A (en) | Intelligent transformer substation based on integrated multi-stage server framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150204 |