CN105259334B - A kind of multi-functional large scale physical model pours load testing machine - Google Patents

A kind of multi-functional large scale physical model pours load testing machine Download PDF

Info

Publication number
CN105259334B
CN105259334B CN201510854759.0A CN201510854759A CN105259334B CN 105259334 B CN105259334 B CN 105259334B CN 201510854759 A CN201510854759 A CN 201510854759A CN 105259334 B CN105259334 B CN 105259334B
Authority
CN
China
Prior art keywords
backplate
steel construction
combination formula
formula steel
positive combination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510854759.0A
Other languages
Chinese (zh)
Other versions
CN105259334A (en
Inventor
刘滨
肖龙鸽
雷广峰
苏守
苏守一
周哲
王俊涛
彭星新
张静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201510854759.0A priority Critical patent/CN105259334B/en
Publication of CN105259334A publication Critical patent/CN105259334A/en
Application granted granted Critical
Publication of CN105259334B publication Critical patent/CN105259334B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of multi-functional large scale physical model pours load test stand, first positive combination formula steel construction backplate is respectively with second, 3rd, 5th positive combination formula steel construction backplate and first side backplate are connected, 4th positive combination formula steel construction backplate respectively with the second positive combination formula steel construction backplate, 3rd positive combination formula steel construction backplate, 5th positive combination formula steel construction backplate, second side load plate is connected, second positive combination formula steel construction backplate respectively with first side backplate, 4th positive combination formula steel construction backplate, second side load plate is connected, high-strength lucite backplate is respectively with first, second positive combination formula steel construction backplate, 3rd, 4th, 5th positive combination formula steel construction backplate, first side backplate and second side load plate are connected.Structure simple it is achieved that intuitively monitoring record in real time to model test overall process.Largely facilitate the research of Rock soil similar material physical experiments.

Description

A kind of multi-functional large scale physical model pours load testing machine
Technical field
The present invention relates to Rock soil similar material physical model pour, maintenance, load test technical field, be more particularly to one Kind of multi-functional large scale analog material physical model pours load test stand it is adaptable to various intensity Rock soil similar material physics In model test whole process, the pouring of large scale rock-soil material model, maintenance, excavation, loading and monitoring.
Background technology
With the development of China's economic society, the quickening of urbanization process, increasing permanent resident population pours in limited City space.Increase the contradiction nervous with land used for solving urban population, increasing city starts with the underground space and sends out Exhibition underground traffic.The excavation of subterranean tunnel cavern will necessarily cause disturbance to protolith, causes surrouding rock stress redistribution, and then affects The safety and stablization of surface buildingses.When particularly carrying out tunnel excavation in the relatively low broken formation of Surrounding Rock Strength, early stage is led to Cross the physical mechanicses character that analog material physical experiments carry out weak surrounding rock during construction simulation, and then pass through model test Counter push away construction parameter, this under complex geological condition it is ensured that the safety and stablization of engineering are significant.Subterranean tunnel In construction process, different cavern excavation orders, different construction method, different impacts will necessarily be produced to country rock. Find the problem that a kind of quick, economic, safe and efficient working procedure is industry more concern in recent years.With construction Technological level and mechanical development, underground engineering tunnel excavated section is increasing, the construction that surface buildingses are caused Disturbance is also increasing.In order to ensure the safety and stablization of engineering, all can strengthen to above ground structure and hole in work progress The displacement deformation monitoring of room country rock.The frequency that in urban construction, large cross-section tunnel engineering occurs gets more and more, and that brings therewith is all Many problems also become increasingly complex.Therefore, large cross-section tunnel excavation has become important and unavoidable in current underground engineering and has asked Topic.
At present, during research weak broken formation tunnel excavation construction, the Main Means of coffer mechanics behavior mostly are numerical value Analysis and model test, large scale, the construction method of large cross-section tunnel and adjoining rock stability Journal of Sex Research are the major subjects of the direction. Although numerical analysis method has the advantages that simple and easy to do when studying complex construction problem, mathematical calculation model is past Past quite different with Practical Project geological conditions.Therefore, almost all of Important Project, all can adopt the similar of certain likelihood ratio Material model test carrys out construction simulation operating mode, and some engineerings even adopt 1:1 prototype test.Weak-fracture zone excavates , because Surrounding Rock Strength is relatively low, easily there is the phenomenons such as collapse in cavern, country rock ruptures, therefore in this kind of Surrounding Rock Strength bar in cavern con struction Under part, similarity material test becomes indispensable operation.
During carrying out similarity material test, choose the similar material mixture meeting Test in Situ mechanics parameter It is the key of the method.This requires to carry out substantial amounts of proportioning test:Choose different material mixture ratios, make standard specimen, lead to Cross uniaxial compressive test, direct shear test etc. to determine final proportioning.Simultaneously low-intensity large-scale model pouring, maintenance, excavation, Supporting test-bed equipment is needed during loading etc..In recent years, lot of domestic and international scholar is also constantly advancing and is developing this Class model test method and technology.Existing many scholars have carried out substantial amounts of work in terms of geomechanical model test, obtain Many beneficial achievements and conclusion.
In place of existing testing equipment comes with some shortcomings at present:1. existing mould make standard specimen when, due to Analog material low intensity, the demoulding that mostly occurs failure, test specimen is damaged, causes waste of material, affects test progress;2. model loads examination Test stand pattern and fix it is impossible to the excavation under meeting different condition requires, existing most of test-beds cannot be realized " plus enclosing The operating condition of test of pressure ";3. low-intensity analog material strain brick makes that mould is poorly efficient, consumptive material, success rate are low.According to the present invention many Function large scale Rock soil similar material model test stand device, disclosure satisfy that large-scale model body pour, maintenance, excavation, plus The requirement carrying and monitoring, by pre-buried monitoring element in model body, binding tests stand itself, during realizing to excavating Surrouding rock stress, the real-time monitoring record of change in displacement rule.
Content of the invention
The purpose of the present invention is to there are provided one kind to disclosure satisfy that simulation each intensity Similar Material of Rockmass physical model examination The assay device tested, structure simple and flexible, model test stand front is bolted burst assembled backplate, inside backplate Using special high intensity lucite backplate, and model test stand side is configured with hydraulic loaded equipment.This testing stand Construction work when frame can simulate each intensity rock excavation, under the conditions of different caverns section, different excavation sequence, different confined pressure Condition is it is achieved that in real time intuitively monitoring record to model test overall process.Largely facilitate Rock soil similar material physics mould The research of type test.
The purpose of the present invention is achieved through the following technical solutions:
A kind of multi-functional large scale physical model pours load testing machine, and it includes:First positive combination formula steel construction Backplate, the second positive combination formula steel construction backplate, the 3rd positive combination formula steel construction backplate, the 4th positive combination formula steel construction shield Plate, the 5th positive combination formula steel construction backplate, high-strength transparent organic glass backplate, first side backplate, second side load plate, Electronic separated type hydraulic jack, Stress control table, ground fixing bolt, rolling bearing, assembled bolt it is characterised in that:The One positive combination formula steel construction backplate is protected with the second positive combination formula steel construction backplate, the 3rd positive combination formula steel construction respectively Plate, the 5th positive combination formula steel construction backplate and first side backplate be connected, the 4th positive combination formula steel construction backplate respectively with Second positive combination formula steel construction backplate, the 3rd positive combination formula steel construction backplate, the 5th positive combination formula steel construction backplate, Two side faces load plate be connected, the second positive combination formula steel construction backplate respectively with first side backplate, the 4th positive combination formula steel Structure backplate, second side load plate are connected, high-strength lucite backplate respectively with the first positive combination formula steel construction backplate, the Two positive combination formula steel construction backplates, the 3rd positive combination formula steel construction backplate, the 4th positive combination formula steel construction backplate, the 5th Positive combination formula steel construction backplate, first side backplate and second side load plate are connected, and rolling bearing is separated with electronic respectively Formula hydraulic jack is connected with second side load plate, by the first positive combination formula steel construction backplate, the second positive combination formula steel Structure backplate, the 3rd positive combination formula steel construction backplate, the 4th positive combination formula steel construction backplate, the 5th positive combination formula steel knot Structure backplate is integrally attached on test-bed, and multi-functional large scale physical model pours load test stand the first positive combination Formula steel construction backplate, the second positive combination formula steel construction backplate, the 3rd positive combination formula steel construction backplate, the 4th positive combination formula Steel construction backplate, the 5th positive combination formula steel construction backplate connect into arrangement by assembled bolt burst, are conducive to carrying out flexibly Dismounting, can meet the requirement of different cavern excavation section configurations and position during construction;Supporting high-strength in model test stand front Lucite backplate intensity is high, and can intuitively observe the progressive evolution of country rock rupture in model digging process.Examination Test the supporting electronic separated type hydraulic jack in stand side, jack is loaded to model body by side loaded plate, can Excavating condition under the conditions of simulation high confining pressure;The overall flexible topology layout of model test stand, is easy in model body embedded Measuring cell, arranges monitoring instrument equipment.This model test stand disclosure satisfy that large-scale model body pour, maintenance, excavation, plus The requirement carrying and monitoring, by pre-buried monitoring element in model body, binding tests stand itself, during realizing to excavating Surrouding rock stress, the real-time monitoring record of change in displacement rule.
The present invention has the following advantages that and effect:
1. to pour load test stand yardstick itself larger for model, can meet large scale likelihood ratio physical experiments Require;2. test-bed front steel construction backplate with bolts, can as needed, and flexible Controlling model body excavates The shape of section and position;3. the supporting electronic separated type hydraulic jack in test-bed side is directly connected with side loaded plate Connect, model body can be loaded, the excavating condition under the conditions of high confining pressure can be simulated;4. test-bed front steel construction shield It is high-strength lucite backplate inside plate, the boundary condition that can meet model test frame requires, and model body can be excavated again Cheng Zhong, rock masses fracturing progressive evolution Real Time Observation is monitored.
Brief description
Fig. 1 pours load testing machine schematic diagram for a kind of multi-functional large scale physical model.
Fig. 2 is this model test stand positive combination formula steel construction backplate schematic diagram.
Fig. 3 is a kind of transparent high-strength lucite backplate schematic diagram.
Fig. 4 is this model test stand side loaded plate schematic diagram.
Fig. 5 is that when this model test stand model excavates, displacement changes over curve.
Wherein:First positive combination formula steel construction backplate 1A, the second positive combination formula steel construction backplate 1B, the 3rd front group Box-like steel construction backplate 1C, the 4th positive combination formula steel construction backplate 1D, the 5th positive combination formula steel construction backplate 1E, transparent height Strong lucite backplate 2, first side backplate 3A, second side load plate 3B, electronic separated type hydraulic jack 4(Model DQF-200), Stress control table 5(Model DQF-200), ground fixing bolt 6, rolling bearing 7, assembled bolt 8.
Specific embodiment
The present invention is further detailed explanation below in conjunction with the accompanying drawings:
A kind of multi-functional large scale physical model pours load testing machine(Stand), it is tied by the first positive combination formula steel Structure backplate 1A, the second positive combination formula steel construction backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 4th positive combination formula Steel construction backplate 1D, the 5th positive combination formula steel construction backplate 1E, transparent high-strength lucite backplate 2, first side backplate 3A, Second side load plate 3B, electronic separated type hydraulic jack 4(Model DQF-200), Stress control table 5(Model DQF-200)、 Ground fixing bolt 6, rolling bearing 7, assembled bolt 8 form it is characterised in that:First positive combination formula steel construction backplate 1A divides Not with the second positive combination formula steel construction backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 5th positive combination formula steel knot Structure backplate 1E and first side backplate 3A be connected, the 4th positive combination formula steel construction backplate 1D respectively with the second positive combination formula steel Structure backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 5th positive combination formula steel construction backplate 1E, second side load Plate 3B be connected, the second positive combination formula steel construction backplate 1B respectively with first side backplate 3A, the 4th positive combination formula steel construction Backplate 1D, second side load plate 3B be connected, high-strength lucite backplate 2 respectively with the first positive combination formula steel construction backplate 1A, the second positive combination formula steel construction backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 4th positive combination formula steel construction Backplate 1D, the 5th positive combination formula steel construction backplate 1E, first side backplate 3A and second side load plate 3B are connected, the axis of rolling Hold 7 to be connected with electronic separated type hydraulic jack 4, second side load plate 3B respectively, the first positive combination formula steel construction is protected Plate 1A, the second positive combination formula steel construction backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 4th positive combination formula steel knot Structure backplate 1D, the 5th positive combination formula steel construction backplate 1E are integrally attached on test-bed, multi-functional large scale physical model Pour load test stand the first positive combination formula steel construction backplate 1A, the second positive combination formula steel construction backplate 1B, the 3rd Positive combination formula steel construction backplate 1C, the 4th positive combination formula steel construction backplate 1D, the 5th positive combination formula steel construction backplate 1E Arrangement is connected into by assembled bolt 8 burst, is conducive to flexibly being dismounted, and then meet disconnected to excavating under different construction conditions Face shape and the requirement of position.Model test stand the first positive combination formula steel construction backplate 1A, the second positive combination formula steel knot Structure backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 4th positive combination formula steel construction backplate 1D, the 5th positive combination formula Inside steel construction backplate 1E equipped with(Supporting)Transparent high-strength lucite backplate 2, it can meet the requirement of intensity, and can be straight The progressive process observing country rock rupture in model body digging process seen.The supporting electronic separate type liquid in test-bed side Pressure jack 4(Model DQF-200), directly act on side second side load plate 3B, and then confined pressure is applied to model body, the Two side faces load plate 3B is connected with test-bed by rolling bearing 7, and electronic separating jack 4 fixes spiral shell self by ground Bolt 6 is fixed on experiment room floor, this excavating condition being designed to simulate under the conditions of high confining pressure;The overall spirit of model test stand The topology layout lived, is easy to bury measuring cell in model body, arranges monitoring instrument equipment.
When being embodied as, the work process that a kind of multi-functional large scale physical model pours load test stand is as follows:? After the proportioning of each component of model test early stage analog material determines, model body is carried out with placement layer by layer, vibrated, press by proportioning Real.Before pouring, need to be according to shown in Fig. 1, by the first positive combination formula steel construction backplate 1A, the second positive combination formula steel construction Backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 4th positive combination formula steel construction backplate 1D, the 5th positive combination formula steel Structure backplate 1E is integrally attached on test-bed, simultaneously will be fixing for transparent high-strength lucite backplate 2, electronic separation type hydraulic Jack 4 and second side load plate 3B are in original state.After everything in readiness, carry out placement layer by layer, vibrate, be compacted, Maintenance work.Model test stand front uses the first positive combination formula steel construction backplate 1A, the second positive combination formula steel Structure backplate 1B, the 3rd positive combination formula steel construction backplate 1C, the 4th positive combination formula steel construction backplate 1D, the 5th positive combination Formula steel construction backplate 1E, after the completion of model body makes maintenance, can select not by the assembled bolt 8 in front according to test needs Same burst backplate carries out assembling combination, and then meets different excavated section shapes and the requirement of position.Work as model test stand First positive combination formula steel construction backplate 1A, the second positive combination formula steel construction backplate 1B, the 3rd positive combination formula steel construction shield When plate 1C, the 4th positive combination formula steel construction backplate 1D, the 5th positive combination formula steel construction backplate 1E all remove, model body is just Face is only subject to constraining of high-strength lucite backplate 2, and now, model body front all intuitively appears, and is easy to observation country rock body and breaks The progressive evolution damaged.When not needing actively to add confined pressure when field condition decision model body excavates, can by second side plus Support plate 3B fixes, and if desired actively adds confined pressure, then can be by electronic separated type hydraulic jack 4 and second side load plate 3B pair Model body carries out confined pressure loading, and during loading, jack 4 directly acts on second side load plate 3B, second side load plate 3B Moved inward by rolling bearing 7, evenly load is applied to model body.Confined pressure size is controlled by Stress control table 6.

Claims (1)

1. a kind of multi-functional large scale physical model pours load testing machine, and it includes the first positive combination formula steel construction backplate (1A), the second positive combination formula steel construction backplate (1B), the 3rd positive combination formula steel construction backplate (1C), the 4th positive combination formula Steel construction backplate (1D), the 5th positive combination formula steel construction backplate (1E), transparent high-strength lucite backplate (2), first side Backplate (3A), second side load plate (3B), electronic separated type hydraulic jack (4), rolling bearing (7), assembled bolt (8), It is characterized in that:First positive combination formula steel construction backplate (1A) respectively with the second positive combination formula steel construction backplate (1B), Three positive combination formula steel construction backplate (1C), the 5th positive combination formula steel construction backplate (1E) and first side backplate (3A) phase Even, the 4th positive combination formula steel construction backplate (1D) respectively with the second positive combination formula steel construction backplate (1B), the 3rd front group Box-like steel construction backplate (1C), the 5th positive combination formula steel construction backplate (1E), second side load plate (3B) are connected, and second just Face combined steel structure backplate (1B) respectively with first side backplate (3A), the 4th positive combination formula steel construction backplate (1D), Two side faces load plate (3B) is connected, high-strength lucite backplate (2) respectively with the first positive combination formula steel construction backplate (1A), the Two positive combination formula steel construction backplate (1B), the 3rd positive combination formula steel construction backplate (1C), the 4th positive combination formula steel construction Backplate (1D), the 5th positive combination formula steel construction backplate (1E), first side backplate (3A) and second side load plate (3B) phase Even, rolling bearing (7) is connected with electronic separated type hydraulic jack (4), second side load plate (3B) respectively, by the first front Combined steel structure backplate (1A), the second positive combination formula steel construction backplate (1B), the 3rd positive combination formula steel construction backplate (1C), the 4th positive combination formula steel construction backplate (1D), the 5th positive combination formula steel construction backplate (1E) are integrally attached to test On stand;First positive combination formula steel construction backplate (1A), the second positive combination formula steel construction backplate (1B), the 3rd positive combination In formula steel construction backplate (1C), the 4th positive combination formula steel construction backplate (1D), the 5th positive combination formula steel construction backplate (1E) Side is equipped with transparent high-strength lucite backplate (2);Second side load plate (3B) passes through rolling bearing (7) and test-bed phase Even, electronic separating jack (4) is fixed on ground by ground fixing bolt (6).
CN201510854759.0A 2015-11-28 2015-11-28 A kind of multi-functional large scale physical model pours load testing machine Expired - Fee Related CN105259334B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510854759.0A CN105259334B (en) 2015-11-28 2015-11-28 A kind of multi-functional large scale physical model pours load testing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510854759.0A CN105259334B (en) 2015-11-28 2015-11-28 A kind of multi-functional large scale physical model pours load testing machine

Publications (2)

Publication Number Publication Date
CN105259334A CN105259334A (en) 2016-01-20
CN105259334B true CN105259334B (en) 2017-03-08

Family

ID=55099101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510854759.0A Expired - Fee Related CN105259334B (en) 2015-11-28 2015-11-28 A kind of multi-functional large scale physical model pours load testing machine

Country Status (1)

Country Link
CN (1) CN105259334B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106526134A (en) * 2016-12-13 2017-03-22 华北科技学院 Multifunctional testing tank device for geotechnical engineering
CN108020464B (en) * 2017-10-24 2020-04-21 河北工程大学 Method for calibrating uniformity degree of similar materials by using strain bricks
CN109377849A (en) * 2018-12-11 2019-02-22 山东大学 A kind of true three-dimensional physical model pilot system of the prominent discharge disaster in simulation deep cavern
CN110736820B (en) * 2019-10-29 2022-07-19 中国石油大学(华东) Model test device of landslide area pipeline security
CN111811938B (en) * 2020-07-21 2022-09-20 重庆大学 Strain brick and preparation method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477097B (en) * 2009-01-19 2012-06-27 西安科技大学 Horizontal and vertical combined loading analogue simulation experiment frame
CN201368828Y (en) * 2009-03-25 2009-12-23 西安科技大学 Analog simulation experiment shelf loading equipment
KR101057990B1 (en) * 2009-05-21 2011-08-19 한국과학기술원 Rock excavation simulation apparatus using ultra high pressure waterjet
CN101738331B (en) * 2009-12-28 2011-08-17 北京交通大学 Tunnel construction simulation plane strain model test device
CN103604703A (en) * 2013-11-26 2014-02-26 李宏亮 Loading device of analog simulation experiment rack
CN205139138U (en) * 2015-11-28 2016-04-06 中国科学院武汉岩土力学研究所 Multi -functional large scale physical model pours loading test device

Also Published As

Publication number Publication date
CN105259334A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN105259334B (en) A kind of multi-functional large scale physical model pours load testing machine
CN105675840B (en) Workings subject to dy namic pressure supporting physical model test device and method
CN207198149U (en) One kind is based on numerical simulation study close-in seamses group's water-retaining production experimental provision
Jia et al. Numerical study on failure mechanism of tunnel in jointed rock mass
Sainoki et al. Time-dependent tunnel deformations in homogeneous and heterogeneous weak rock formations
CN105137048B (en) Stratum grouting simulation system
CN105974056B (en) Tunnel water bursting disaster precursor information monitoring model pilot system and test method
CN103398861B (en) A kind of true triaxial rockburst physical simulation experiment system for deep-lying tunnel
CN107796646A (en) Simulate the experimental rig and test method of deep-lying tunnel Blasting Excavation off-load
CN107807051A (en) Simulate the experimental rig and test method of Blasting Excavation off-load under three-dimensional loading environment
Yang et al. Stress redistribution of longwall mining stope and gas control of multi-layer coal seams
CN104713738B (en) Intelligent two-way multi-angle overturn model test device and test method
CN106226112A (en) A kind of multi-functional reduced scale tunnel structure force model response characteristic laboratory test system and method
CN103398902A (en) Test apparatus for flexible loading and instantaneously unloading of high geostress, and test method
CN105865820A (en) Laboratory test device for simulating deep roadway excavation and method
CN103471796B (en) Tunnel Cast-in-place concrete lining anti-seismic performance test methods
Chen et al. Effects of rock pillar width on the excavation behavior of parallel tunnels
Zhao et al. A large-scale synchronous grouting test for a quasi-rectangular shield tunnel: Observation, analysis and interpretation
Mandal et al. Underpinning-based simultaneous extraction of contiguous sections of a thick coal seam under weak and laminated parting
He et al. Failure modes of highway tunnel with voids behind the lining roof
Wang et al. Numerical study on the formation of pressure arch in bolted gravel plate
Zhang et al. Full-scale experimental study on failure characteristics of the key segment in shield tunnel with super-large cross-section
Tian et al. Experimental study of deformations and failures of the coal wall in a longwall working face
CN206115855U (en) Tunnel is supporting construction experimental model case in advance
Guo et al. Progressive failure analysis of shallow circular tunnel based on the functional catastrophe theory considering strain softening of surrounding rock mass

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308