CN105256769A - Gate bottom board construction method - Google Patents
Gate bottom board construction method Download PDFInfo
- Publication number
- CN105256769A CN105256769A CN201510567587.9A CN201510567587A CN105256769A CN 105256769 A CN105256769 A CN 105256769A CN 201510567587 A CN201510567587 A CN 201510567587A CN 105256769 A CN105256769 A CN 105256769A
- Authority
- CN
- China
- Prior art keywords
- construction
- concrete
- gate
- base plate
- grouting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses a gate bottom board construction method. The gate bottom board construction method includes the steps that the positions where gate bottom boards are about to be spliced to a construction site are determined, and contact grout pipes are pre-buried in the positions; concrete in each gate bottom board is cast in advance; a mounting platform is built on the construction site; the already pre-cast gate bottom boards are conveyed to the construction site, put on the mounting platform and spliced in place; joint grout pipes are buried; back concrete backfill construction of the bottoms is conducted; and finally, the contact grouting construction of the spliced positions of the site and the joint grouting construction among concrete are conducted. According to the gate bottom board construction method, the construction is convenient, the construction quality is easier to guarantee, and the cost is low; it can be guaranteed that no gap exists between the gate bottom boards and the concrete; the grouting work amount is reduced, the grouting quality is easy to guarantee, and the quality problem caused by the fact that the gate bottom boards are mounted firstly and then concreting and grouting are conducted in the prior art is effectively solved.
Description
Technical field
The present invention relates to Construction for Hydroelectric Project technical field, be specially a kind of gate construction of bottom plates method.
Background technology
Generally need gate to be installed for effects such as retaining, flood control, flood discharges in Construction for Hydroelectric Project.General first installation gate base plate in construction in the past, then carry out concrete pouring construction.Adopt the construction method of first installing gate base plate concreting to be again more common, but there is following problem in the method.One, gate base plate bottom surface is uneven, fixing large; Two, concrete pouring quality not easily ensures, although backfill grouting can supply a gap to a certain extent, but there is cavity unavoidably between concrete and gate base plate, external water pressure is produced during current emptying, cause gate bottom deformation, particularly in big-and-middle-sized engineering, high place is required to gate base plate quality; Three, between gate base plate and concrete, grouting amount is large, and cost is higher, and quality is wayward and grouting quality checks difficulty.
Summary of the invention
The object of the present invention is to provide a kind of gate construction of bottom plates method for the problems referred to above, the method effectively can ensure concrete pouring quality, and convenient construction, expense cost is low.Technical scheme is as follows:
A kind of gate construction of bottom plates method, comprising:
A) position that gate base plate will splice with job site is determined, at this position pre-plugged contact grouting pipe;
The concrete of b) precoating in each shoe brake door base plate;
C) mounting platform is built at the construction field (site);
D) be transported to job site be positioned on mounting platform by completing each shoe brake door base plate of precoating, and splicing puts in place;
E) joint grouting pipe is buried underground;
F) the rear fill concrete construction of bottom is carried out;
G) the joint grouting construction between the contact grouting construction of on-the-spot stitching portion and concrete is finally carried out.
Further, the method for building mounting platform described in comprises:
Build two concrete bands at the construction field (site), and the distance of two concrete bands is greater than the wheelspan of haulage vehicle;
At every bar concrete band top pre-embedded steel slab;
Steel plate is fixedly installed i iron platform, and the i iron platform on two concrete bands forms described mounting platform.
Further, also comprise before described step d): in the side wall concrete of both sides at the construction field (site), pre-buried i iron supports; On i iron supports, Chain block is installed, for lifting by crane completing the gate base plate of precoating and be positioned over mounting platform.
Further, during the concrete of precoating in gate base plate, the wing plate of gate base plate is upwards placed, builds to concrete concordant with wing plate, built and be transported to job site again in 7 days later.
The beneficial effect of patent of the present invention is, the present invention is applicable to Hydraulic and Hydro-Power Engineering gate construction of bottom plates, convenient construction, construction quality more easily ensures, expense cost is low, can ensure gate base plate and concrete gapless, reduces grouting works amount, grouting quality easily ensures, efficiently solves and first installs the gate base plate quality problems that cause of concreting and grouting more in the past.
Accompanying drawing explanation
Fig. 1 is that schematic diagram is arranged in the grouting of gate base plate.
Fig. 2 is that schematic diagram buried underground by contact grouting pipe.
Fig. 3 is that schematic diagram buried underground by joint grouting pipe.
Fig. 4 is the concrete band top view of mounting platform.
Fig. 5 is the sectional view of one-sided mounting platform.
Fig. 6 is gate base plate scheme of installation.
In figure: 1-gate base plate; 1a-is positioned at the gate base plate that edge and job site are spliced; 1b-is positioned at middle gate base plate; 2-precoats concrete outside the venue; Seam between 3-gate base plate; Concrete is backfilled after 4-; 5-grout box; 6-contact grouting inlet pipe; 7-contact grouting stack is held concurrently inlet pipe; 8-joint grouting inlet pipe; The double inlet pipe of 9-joint grouting exhaust; 10-concrete band; 11-steel plate; 12-i iron platform; 13-i iron supports; 14-Chain block.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.A kind of gate construction of bottom plates method, first gate base plate inner concrete of precoating outside the venue, concrete 2 of precoating outside the venue as shown in Figure 1, be transported to job site again and carry out the installation of gate base plate, then gate base plate bottom concrete is backfilled, backfill concrete 4 as shown in Figure 1, finally carry out the joint grouting between the contact grouting of on-the-spot stitching portion and concrete, concrete steps are as follows:
1) position that gate base plate will splice with job site is determined, at this position pre-plugged contact grouting pipe.Outside the venue before pre-cast concrete, first gate base plate is turned, then the contact grouting pipe of pre-buried gate base plate stitching portion, as shown in Figure 2, specifically need bury grout box 5, contact grouting inlet pipe 6 and contact grouting stack underground and to hold concurrently inlet pipe 7.
2) concrete of precoating in each shoe brake door base plate.After-pouring gate underplate concrete checked and accepted by grout pipe, builds to concrete concordant with wing plate, is transported to job site again and installs after having built 7 days.
3) mounting platform is built at the construction field (site).Build two concrete bands 10 at the construction field (site), and the distance of two concrete bands 10 is greater than the wheelspan of haulage vehicle (as flat car), as shown in Figure 4; At every bar concrete band 10 top pre-embedded steel slab 11; The i iron platform 12 steel plate 11 is fixedly installed on i iron platform 12, two concrete bands 10 forms mounting platform, as shown in Figure 5.And about platform between distance must ensure that flat car can pass through.When concrete band 10 intensity reaches more than 70%, carry out the transport of gate base plate 1, installation work.
4) in the side wall concrete 15 of both sides at the construction field (site), pre-buried i iron supports 13; Support on 13 at i iron and Chain block 14 is installed, for lifting by crane completing the gate base plate of precoating and be positioned over mounting platform.
5) be transported to job site be positioned over completing each shoe brake door base plate of precoating on mounting platform, and splicing puts in place.Utilize flat car to transport gate base plate to installation site, utilize Chain block 14 by gate base plate lift-off flat car, then flat car is driven away, then gate base plate is hung onto on erecting bed, and firmly support, and carry out scene splicing, as shown in Figure 6.
6) joint grouting pipe is buried underground.As shown in Figure 3, specifically need bury underground: grout box, joint grouting inlet pipe 8 and the double inlet pipe 9 of joint grouting exhaust.
7) the rear fill concrete construction of bottom is carried out.
8) the joint grouting construction between the contact grouting construction of on-the-spot stitching portion and concrete is finally carried out.After rear fill concrete has been constructed 60 days, first carry out contacts baseplate grouting, carry out base plate joint grouting construction after contact grouting completes, grouting construction completes after 28 days and carries out grouting quality inspection.
Claims (4)
1. a gate construction of bottom plates method, is characterized in that, comprising:
A) position that gate base plate will splice with job site is determined, at this position pre-plugged contact grouting pipe;
The concrete of b) precoating in each shoe brake door base plate;
C) mounting platform is built at the construction field (site);
D) be transported to job site be positioned on mounting platform by completing each shoe brake door base plate of precoating, and splicing puts in place;
E) joint grouting pipe is buried underground;
F) the rear fill concrete construction of bottom is carried out;
G) the joint grouting construction between the contact grouting construction of on-the-spot stitching portion and concrete is finally carried out.
2. gate construction of bottom plates method according to claim 1, is characterized in that, described in build mounting platform method comprise:
Build two concrete bands at the construction field (site), and the distance of two concrete bands is greater than the wheelspan of haulage vehicle;
At every bar concrete band top pre-embedded steel slab;
Steel plate is fixedly installed i iron platform, and the i iron platform on two concrete bands forms described mounting platform.
3. gate construction of bottom plates method according to claim 1, is characterized in that, also comprise before described step d): in the side wall concrete of both sides at the construction field (site), pre-buried i iron supports; On i iron supports, Chain block is installed, for lifting by crane completing the gate base plate of precoating and be positioned over mounting platform.
4. gate construction of bottom plates method according to claim 1, is characterized in that, during the concrete of precoating in gate base plate, is upwards placed by the wing plate of gate base plate, builds to concrete concordant with wing plate, built and be transported to job site again in 7 days later.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510567587.9A CN105256769B (en) | 2015-09-08 | 2015-09-08 | Gate bottom board construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510567587.9A CN105256769B (en) | 2015-09-08 | 2015-09-08 | Gate bottom board construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105256769A true CN105256769A (en) | 2016-01-20 |
CN105256769B CN105256769B (en) | 2017-03-22 |
Family
ID=55096685
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510567587.9A Active CN105256769B (en) | 2015-09-08 | 2015-09-08 | Gate bottom board construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105256769B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110144852A (en) * | 2019-04-26 | 2019-08-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of plate-steel liner lower concrete construction method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09279549A (en) * | 1996-04-12 | 1997-10-28 | ▲高▼津 和夫 | Dam construction method |
CN103174095A (en) * | 2013-03-18 | 2013-06-26 | 中国建筑第八工程局有限公司 | Box girder concrete pouring structure with rear-expanding flanges and construction method thereof |
-
2015
- 2015-09-08 CN CN201510567587.9A patent/CN105256769B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09279549A (en) * | 1996-04-12 | 1997-10-28 | ▲高▼津 和夫 | Dam construction method |
CN103174095A (en) * | 2013-03-18 | 2013-06-26 | 中国建筑第八工程局有限公司 | Box girder concrete pouring structure with rear-expanding flanges and construction method thereof |
Non-Patent Citations (2)
Title |
---|
杜雷功等人: "<海河水系平原区大型水闸设计研究>", 31 December 2014 * |
海河水系平原区大型水闸设计研究;杜雷功等人;<海河水系平原区大型水闸设计研究>;20141231;80-85 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110144852A (en) * | 2019-04-26 | 2019-08-20 | 中国电建集团华东勘测设计研究院有限公司 | A kind of plate-steel liner lower concrete construction method |
Also Published As
Publication number | Publication date |
---|---|
CN105256769B (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018436B (en) | Prefabricated box culvert system and its installation method | |
CN103643971B (en) | Tunnel invert sizing end mould rapid constructing method | |
CN107059667A (en) | Door shape assembled armored concrete box culvert and its construction method | |
CN105696622B (en) | A kind of prefabricated city piping lane and its construction method | |
CN202559384U (en) | Prefabricated assembled pipe-jacking working well | |
CN107503382B (en) | End template fixed rubber water stop belt structure and construction method thereof | |
CN100482993C (en) | Lay out method of pipeline and synthetic pipeline with pipe frame component | |
CN105401593A (en) | Assembly type square underground pipe gallery | |
CN112343091A (en) | Subside post-cast strip structure sealed in advance | |
CN103132465B (en) | Underground box culvert constructing method closely attached to pile foundation bearing platform | |
CN104975614A (en) | Structural steel combined unilateral formwork reinforcement construction method | |
JP2016204938A (en) | Ground lowering method for existing tunnel | |
CN104328790A (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN105256769A (en) | Gate bottom board construction method | |
CN206800909U (en) | A kind of assembled terrace in construction site | |
CN103161181B (en) | Underground outer wall construction joint water-stopping structure and construction method thereof | |
KR101673492B1 (en) | Top down construction method using girdir support structure | |
CN206477855U (en) | A kind of counter-force for pushing away stepping for TBM Quick airs provides device | |
CN105275013A (en) | Core tube inverse superimposed underground diaphragm wall and construction method thereof | |
CN109881592B (en) | Trapezoidal drainage ditch construction method adopting single-side formwork | |
CN113463911B (en) | Foundation post-cast strip template and construction method for casting post-cast strip | |
CN102852531B (en) | Construction method for suspended reinforcement of high gas tunnel inverted arch model | |
CN205711786U (en) | Big cross section porous overlength cast-in-place box culvert formwork system | |
CN210459229U (en) | Support assembled in deep basal pit and trade and prop construction frock | |
CN113802670A (en) | Assembly type temporary pipeline comprehensive arrangement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |