CN105242031B - 一种碳酸盐岩块石碾压密实度测量方法 - Google Patents
一种碳酸盐岩块石碾压密实度测量方法 Download PDFInfo
- Publication number
- CN105242031B CN105242031B CN201510638471.XA CN201510638471A CN105242031B CN 105242031 B CN105242031 B CN 105242031B CN 201510638471 A CN201510638471 A CN 201510638471A CN 105242031 B CN105242031 B CN 105242031B
- Authority
- CN
- China
- Prior art keywords
- carbonate
- packing
- rock
- measuring method
- fill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种碳酸盐岩块石碾压密实度测量方法,包括步骤一,建立砂石填料(2)密实度、块石填料(1)密实度与碾压遍数之间的关系曲线;步骤二,碾压施工时检测砂石填料密实度数据;步骤三,根据步骤二中的砂石填料(2)密实度数据,对比步骤一中的关系曲线得出块石填料(1)的密实度。本发明实现方便,可以更为便捷和快速地得到在施工过程中块石密实度的检测结果。
Description
技术领域
本发明涉及一种密实度检测方法,特别是碳酸盐岩块石碾压密实度测量方法。
背景技术
随着建筑用地日趋紧张,开山填沟造地的人工填方地基将成为解决建设用地的重要途径。对于使用大块石填筑的大面积、高填方、疏松、且不均匀的堆填场地,如何使地基稳定、变形、强度均满足建设要求尤为重要。
在西南地区开山填方材料的成分中,碳酸盐岩大块石是很主要的一类。处理碳酸盐岩块石填方地基确定其质量控制指标是不可回避的问题,其中对密实程度的检测是判定填筑地基加固效果的主要手段。通过碾压法获得密实度数据是一种方法。对于块石填料,其最大粒径超过现有规范的规定,现在所用的块石填料粒径往往在300~800mm之间,现在通常是采用缩尺的方式来进行块石填料的测试。每次碾压后都进行取样测试,过程较为复杂,因此急需提出一种较为便捷的检测方法,降低检测费用和缩短检测时间。
发明内容
本发明要解决的技术问题:提供一种碳酸盐岩块石碾压密实度测量方法,通过与砂石密实度的关系便捷地获得碳酸盐岩块石的密实度,降低检测费用和缩短检测时间。
简单的说,本发明的实现方式是:在碾压施工前将砂石填料埋入块石填料中,碾压过程中检测块石与砂石的密实度,并做出密实度是与碾压遍数的关系图表;正式施工时只检测砂石密度,通过上述关系图表获得块石的密实度。
本发明的技术方案包括以下步骤:
步骤一,建立砂石填料密实度、块石填料密实度与碾压遍数之间的关系曲线;
步骤二,碾压施工时检测砂石填料密实度数据;
步骤三,根据步骤二中的砂石填料密实度数据,对比步骤一中的关系曲线得出块石填料的密实度。
步骤一中,需选取和划分试验段,在试验段待碾压块石填料中选取试验点,施工前将砂石填料装袋后埋入试验点块石填料层厚的2/3深度处,且砂石填料厚度约为块石填料层厚度的1/3。
所述试验段长30~50m,试验段每5米为一个检测点,检测点个数为3~5个。
所述块石填料为粒径在300~500mm的自然级配碳酸盐岩填料,砂石填料为粒径不大于50mm的自然级配填料。
所述块石填料最大粒径不大于碾压层厚度的2/3。
所述碾压施工为振动碾压,即采用25~30t振动压路机,振动频率20~30Hz,施工时行驶速度在2~4km/h。
需要注意的是,试验段采用的块石填料和砂石填料各属性必须与正式施工时的一致,以确保试验段获取的曲线关系能够适用在正式施工上。
具体来说,建立砂石填料、块石填料密实度与碾压遍数之间的关系时的具体过程为如下:
首先,在待碾压块石填料中选取3~5个试验点,施工前将砂石装袋后埋入试验点块石层厚的2/3深处。使用振动压路机每碾压一遍就对块石及砂石进行取样测试,直至碾压施工完成。在多次碾压后利用每次碾压多个试验点处的检测密实度的平均值,以碾压遍数为横坐标,以密实度为纵坐标,绘制出砂石、块石密实度与碾压遍数之间的关系曲线图。
接着,待上述关系曲线建立后,振动压路机对块石振动压实过程中,只对砂石填料进行密实度检测,每次检测完成后将取样的砂石填料回填,等待下一次检测。通过对比得到的密实度与碾压遍数之间的关系曲线图表,查得对应的块石填料的密实度。
然后,若得到的块石密实度若满足设计要求,则无需进行碾压,若得到的密实度不满足设计要求,则继续碾压。
最后,在完成碾压后的填筑体的基础上,不断重复上述过程,直至填筑到填方体设计标高。
本发明通过与砂石密实度的关系便捷地获得碳酸盐岩块石的密实度,降低了检测费用,缩短了检测时间。
附图说明
图1是本发明的方法流程图;
图2是本发明获取试验段关系曲线时的设计示意图。
具体实施方式
一种碳酸盐岩块石碾压密实度测量方法,具体步骤如下:在现场铺设场地选取30~50m试验段分层铺设块石填料1,块石填料1最大粒径不大于碾压层厚度的2/3。选取试验段每5米为一个检测点,检测样点个数在3~5个,将不大于50mm的自然级配的砂石填料2装袋后埋入试验段2/3层厚深处,砂石填料2厚度控制在块石填料层厚度的1/3。采用25t振动压路机3,振动频率为20~30Hz,施工时行驶速度控制在2~4km/h,对铺设段进行碾压。每次碾压一遍后对试验段块石填料1中部取大样进行填料测试密实度,并对砂石填料2取部分进行密实度测试。测试完毕后重新填入填料(这里的填料是指将取回的样品进行回填)进行再次碾压,直至沉降观测无沉降为止。去除异常数据将每次测试数据取平均值,以碾压遍数为横坐标,密实度为纵坐标,使用计算机中的Excel软件绘制出两者之间的关系曲线图,得到砂石密实度、块石密实度与碾压遍数之间的线性关系。正式施工时,振动压路机对填筑体进行振动碾压后,对砂石进行取样进行密实度检测,通过对比上述建立起的密实度与碾压遍数之间的关系图表,查阅得到块石密实度对应的密实度与碾压遍数,以控制块石压实质量,确定是否继续碾压。在完成碾压后的填筑体的基础上,重复上述步骤,直至填筑到填方体设计标高。
Claims (6)
1.一种碳酸盐岩块石碾压密实度测量方法,其特征在于,包括以下步骤:
步骤一,建立砂石填料(2)密实度、块石填料(1)密实度与碾压遍数之间的关系曲线;
步骤二,碾压施工时检测砂石填料密实度数据;
步骤三,根据步骤二中的砂石填料(2)密实度数据,对比步骤一中的关系曲线得出块石填料(1)的密实度。
2.根据权利要求1所述的一种碳酸盐岩块石碾压密实度测量方法,其特征在于:选择试验段,在试验段待碾压块石填料(1)中选取试验点,施工前将砂石填料(2)装袋后埋入试验点块石填料层厚的2/3深度处,且砂石填料(2)厚度约为块石填料(1)层厚度的1/3。
3.根据权利要求2所述的一种碳酸盐岩块石碾压密实度测量方法,其特征在于:所述试验段长30~50m,试验段每5米为一个检测点,检测点个数为3~5个。
4.根据权利要求1所述的一种碳酸盐岩块石碾压密实度测量方法,其特征在于:块石填料(1)为粒径在300~500mm的自然级配碳酸盐岩填料,砂石填料(2)为粒径不大于50mm的自然级配填料。
5.根据权利要求1所述的一种碳酸盐岩块石碾压密实度测量方法,其特征在于:块石填料(1)最大粒径不大于碾压层厚度的2/3。
6.根据权利要求1所述的一种碳酸盐岩块石碾压密实度测量方法,其特征在于:所述碾压施工为振动碾压,即采用25~30t振动压路机(3),振动频率20~30Hz,施工时行驶速度在2~4km/h。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510638471.XA CN105242031B (zh) | 2015-09-30 | 2015-09-30 | 一种碳酸盐岩块石碾压密实度测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510638471.XA CN105242031B (zh) | 2015-09-30 | 2015-09-30 | 一种碳酸盐岩块石碾压密实度测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105242031A CN105242031A (zh) | 2016-01-13 |
CN105242031B true CN105242031B (zh) | 2017-06-13 |
Family
ID=55039752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510638471.XA Active CN105242031B (zh) | 2015-09-30 | 2015-09-30 | 一种碳酸盐岩块石碾压密实度测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105242031B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101122128A (zh) * | 2007-08-31 | 2008-02-13 | 中铁八局集团有限公司 | 一种冲击碾压施工方法 |
WO2011061662A1 (en) * | 2009-11-23 | 2011-05-26 | Schlumberger Canada Limited | Methods for optimizing petroleum reservoir analysis |
CN102619208A (zh) * | 2012-04-18 | 2012-08-01 | 贵州正业工程技术投资有限公司 | 一种碳酸盐岩大块石填料原位试验方法 |
CN103134906A (zh) * | 2013-01-24 | 2013-06-05 | 河海大学 | 一种基于分形理论的粗粒料缩尺方法 |
CN104458494A (zh) * | 2014-09-28 | 2015-03-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 堆石混凝土密实度的测定方法及装置 |
CN104792679A (zh) * | 2015-04-08 | 2015-07-22 | 东华大学 | 一种中空微球复合材料孔隙率检测标块及其制备方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7567079B2 (en) * | 2007-06-08 | 2009-07-28 | University Of New Brunswick | Methods suitable for measuring capillary pressure and relative permeability curves of porous rocks |
-
2015
- 2015-09-30 CN CN201510638471.XA patent/CN105242031B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101122128A (zh) * | 2007-08-31 | 2008-02-13 | 中铁八局集团有限公司 | 一种冲击碾压施工方法 |
WO2011061662A1 (en) * | 2009-11-23 | 2011-05-26 | Schlumberger Canada Limited | Methods for optimizing petroleum reservoir analysis |
CN102619208A (zh) * | 2012-04-18 | 2012-08-01 | 贵州正业工程技术投资有限公司 | 一种碳酸盐岩大块石填料原位试验方法 |
CN103134906A (zh) * | 2013-01-24 | 2013-06-05 | 河海大学 | 一种基于分形理论的粗粒料缩尺方法 |
CN104458494A (zh) * | 2014-09-28 | 2015-03-25 | 中国电建集团贵阳勘测设计研究院有限公司 | 堆石混凝土密实度的测定方法及装置 |
CN104792679A (zh) * | 2015-04-08 | 2015-07-22 | 东华大学 | 一种中空微球复合材料孔隙率检测标块及其制备方法 |
Non-Patent Citations (4)
Title |
---|
冲击压实技术在路基压实中的应用试验分析;王传文;《江苏建筑》;20071231(第1期);全文 * |
水泥稳定碎石基层压实度影响因素的试验研究;唐建亚,夏得亮,刘运兰;《公 路 工 程》;20131231;第 38 卷(第 6 期);全文 * |
碎石土路基施工质量管理及检测方法;李敏;《山西建筑》;20150630;第 41 卷(第 18 期);全文 * |
碎石土路基施工质量管理及检测方法的研究;刘广信 等;《森林工程》;19960331;第12 卷(第1期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN105242031A (zh) | 2016-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Han et al. | Pressures on the lining of a large shield tunnel with a small overburden: a case study | |
Saowapakpiboon et al. | Measured and predicted performance of prefabricated vertical drains (PVDs) with and without vacuum preloading | |
Saowapakpiboon et al. | PVD improvement combined with surcharge and vacuum preloading including simulations | |
Sun et al. | Effects of cyclic confining pressure on the deformation characteristics of natural soft clay | |
CN105021418B (zh) | 适用于土工离心模型试验的盾构开挖面模型及模拟方法 | |
Duong et al. | Physical model for studying the migration of fine particles in the railway substructure | |
Igwe et al. | The effect of relative density and confining stress on shear properties of sands with varying grading | |
Ayala et al. | Cone penetration testing on silty tailings using a new small calibration chamber | |
CN105242028A (zh) | 一种由高层建筑荷载和地下水抽灌引起土体分层沉降模型试验装置及试验方法 | |
CN105239551B (zh) | 一种振动碾压质量控制方法 | |
CN207003424U (zh) | 一种软土层中钢筋笼带套的旋挖钻孔灌注桩 | |
CN108169093A (zh) | 一种煤矿地下水库储水系数测定方法 | |
CN106908349B (zh) | 确定筑坝原级配砂砾料最大干密度的方法 | |
CN111305006A (zh) | 一种填土路基的填筑施工方法 | |
Qi et al. | Soil deformations during casing jacking and extraction of expanded-shoe piles, using model tests | |
CN102619208B (zh) | 一种碳酸盐岩大块石填料原位试验方法 | |
CN101787689B (zh) | 昔格达土高边坡填方的强夯施工方法 | |
CN105257318B (zh) | 一种衬砌局部渗漏引起隧道结构变形的安全保护方法 | |
CN105242031B (zh) | 一种碳酸盐岩块石碾压密实度测量方法 | |
CN102373718B (zh) | 基于圆形自由紊动射流理论的高压旋喷桩直径确定方法 | |
Ngo et al. | Full scale consolidation test on ultra-soft soil improved by prefabricated vertical drains in MAE MOH mine, Thailand | |
CN203745110U (zh) | 岩土压力传感器埋设装置 | |
CN105887791A (zh) | 一种考虑边载效应的公路刚性桩复合地基沉降计算方法 | |
Lin et al. | Three-dimensional numerical modelling of soft ground improved by prefabricated vertical drains | |
CN110029652A (zh) | 一种减少湿陷性黄土工后沉降的施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Shen Zhiping Inventor after: Liu Xiaoxing Inventor after: Wu Bin Inventor after: Cai Cong Inventor after: Wang Hong Inventor before: Shen Zhiping Inventor before: Chen Demao Inventor before: Wu Bin Inventor before: Cai Cong Inventor before: Wang Hong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |