CN105241596A - 一种热采井注气过程中套管热应力的测试方法及装置 - Google Patents

一种热采井注气过程中套管热应力的测试方法及装置 Download PDF

Info

Publication number
CN105241596A
CN105241596A CN201510609695.8A CN201510609695A CN105241596A CN 105241596 A CN105241596 A CN 105241596A CN 201510609695 A CN201510609695 A CN 201510609695A CN 105241596 A CN105241596 A CN 105241596A
Authority
CN
China
Prior art keywords
temperature
thermal
interior pipe
sleeve
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510609695.8A
Other languages
English (en)
Other versions
CN105241596B (zh
Inventor
邓宽海
林元华
曹震
刘婉颖
王其军
仝闯闯
王锦昌
曾德智
马尚余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201510609695.8A priority Critical patent/CN105241596B/zh
Publication of CN105241596A publication Critical patent/CN105241596A/zh
Application granted granted Critical
Publication of CN105241596B publication Critical patent/CN105241596B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

一种热采井注气过程中套管热应力的测试方法及装置,其特点是:利用高温烘箱给两端用左夹板和右夹板固定的水泥环套管(由外管、水泥环和内管组成,其中外管用于模拟地层或中间套管,内管用于模拟生产套管)加热,采用热电偶和温度采集器记录升温和降低过程的温度及对应的时间,同时采用应变仪记录在升温和降温过程中内管的轴向应变及对应时间,基于测试数据绘制温度与轴向应变的关系曲线,通过计算得到套管的承温极限(套管屈服时对应的温度)及对应的附加轴向热载荷和不同温度下的拉伸残余应力。该装置结构简单,制造成本低,适用于稠油热采井注气过程中套管热应力的测试。

Description

一种热采井注气过程中套管热应力的测试方法及装置
技术领域
本发明涉及稠油热采开发技术领域,具体是一种热采井注气过程中套管热应力的测试方法及装置。
背景技术
注高温蒸汽热采是开采稠油时应用广泛、效益较高的方法之一,辽河、胜利、克拉玛依等油田的许多油井均采用这种开采方式。然而,在稠油井注气开采过程中,套管会承受升温—降温的循环作用,其中升温后套管会受到附加轴向热载荷及热应力,降温后套管会受到拉伸残余应力,无论是附加轴向热载荷还是拉伸残余应力都会降低套管强度(主要包括:抗内压强度、抗挤毁强度和抗拉强度),从而导致许多热采井出现套管损坏,严重影响了热采井的开发效益。
目前针对稠油热采井套管柱热应力的研究主要集中在理论和有限元分析,且多数集中于热应力和结构应力的单独研究,没有同时考虑热应力与结构应力对套管强度的影响。然而,国内外普遍认为注汽井套管、水泥环和地层系统会同时受到热应力与结构应力的共同作用,故仅从某一方面进行研究将导致研究结果与实际工况相差较大。此外,当前关于稠油热采井套管柱热应力计算的理论模型也没有得到试验数据的验证,其准确性和可靠性有待完善。
为了优化热采井完井管柱的设计,完善套管柱热应力研究的理论模型,促进稠油热采井套管柱热应力及热强度研究的发展,迫切需要准确测试并获取热采井注气过程中套管-水泥环-岩层系统升温后套管产生的附加轴向热载荷和降温后产生的残余应力。目前,还没有一种测试方法及装置能够准确获取热采井注气过程中套管产生的热载荷及残余应力。因此,提出一种热采井注气过程中套管热应力的测试方法及装置,可为制定合理的热采井套管损坏预防措施提供了依据。
发明内容
本发明的目的在于提供一种热采井注气过程中套管热应力的测试装置及方法,以解决热采井注气过程中套管-水泥环-岩层系统升温后套管产生的附加轴向热载荷和降温后产生的残余应力难以准确获取的技术难题,并在达到上述目的的同时,简化测试装置的复杂性,降低设备的成本。
为达到上述目的,本发明采用以下技术方案:
本发明采用以下技术方案:一种热采井注气过程中套管热应力的测试方法,其特征是:利用高温烘箱给两端用左、右夹板固定的水泥环套管(由外管、水泥环和内管组成,其中外管用于模拟地层或中间套管,内管用于模拟生产套管)加热,采用热电偶和温度采集器记录升温和降低过程的温度及对应的时间,同时采用应变仪记录在升温和降温过程中内管的轴向应变及对应时间,基于测试数据绘制温度与轴向应变的关系曲线,通过计算得到套管的承温极限(套管屈服对应的温度)及对应的附加轴向热载荷和不同温度下的拉伸残余应力,所述的热采井注气过程中套管热应力的测试方法包括以下步骤:
a.将内管和外管依次焊接在左夹板上,用于限制内管变形并固定内管和外管的位置,然后在内管和外管之间的环空浇注水泥,形成水泥环套管;
b.待水泥环养护成型后,将右夹板焊接在内管和外管上,并在外管中央开一个方形槽;
c.通过方形槽将热电偶和两片高温应变片(一片用于温度补偿,一片用于测量轴向应变)和粘贴在内管外壁上,其中热电偶与温度采集器连接,高温应变片与应变仪连接;
d.将准备好的水泥环套管放进高温烘箱,设定加热温度,同时用应变仪记录轴向应变及对应时间,温度采集器记录温度及对应时间;
e.当温度达到设定温度时,开始降温,直到降为室温,观察室温对应的轴向应变,如果没有残余应变产生,增加加热温度,继续向水泥环套管加热,直到残余应变位置;
f.记录第一次产生残余应变对应的温度及残余应变,利用该温度下的拉伸-应力应变曲线拟合得到内管的本构关系:σ=Aεn(A,n为常数,ε为轴向应变);绘制温度与轴向应变的关系曲线,直接读取内管的承温极限,利用该温度下的本构关系计算得到残余应力和不同温度下对应的附加轴向热载荷,包括弹性变形阶段和塑性变形阶段的热载荷;
g.继续增加温度,用应变仪记录轴向应变及对应时间,温度采集器记录温度及对应时间,当温度达到设定温度时,开始降温,直到降为室温,记录残余应变,重复步骤f得到该温度下的残余应力和不同温度下对应的附加轴向热载荷;
h.重复步骤g可以得到不同加热温度下的残余应力及附加轴向热载荷。
为使用上述方法,本发明提供一种热采井注气过程中套管热应力的测试装置,主要包括:左夹板、右夹板、外管、水泥环、内管、中心孔、高温应变片、方形槽、热电偶、高温导线、高温烘箱、温度采集器、应变仪。内管和外管之间的环空浇注水泥环形成水泥环套管并放入高温烘箱;外管中央开有一方形槽,高温应变片和热电偶通过方形槽被粘贴在内管外壁上;左夹板和右夹板完全相同且其中心孔略小于内管内径,左夹板和右夹板分别被焊接在内管和外管的两端,用于限制内管变形。
本发明具有以下优点:
本发明提供的测试方法及装置可准确测试并获取热采井注气过程中套管-水泥环-岩层系统升温后套管产生的附加轴向热载荷和降温后产生的残余应力,可热采井完井管柱的优化设计及注气工艺参数的优化设计提供有力的指导。
附图说明
图1为测试装置示意图。
图2为水泥环截面的剖视图。
图3为左夹板和右夹板的左视图。
具体实施方式
下面结合附图,对本发明进行详细描述。
本发明利用高温烘箱给两端用左、右夹板固定的水泥环套管(由外管、水泥环和内管组成,其中外管用于模拟地层或中间套管,内管用于模拟生产套管)加热,采用热电偶和温度采集器记录升温和降低过程的温度及对应的时间,同时采用应变仪记录在升温和降温过程中内管的轴向应变及对应时间,基于测试数据绘制温度与轴向应变的关系曲线,通过计算得到套管的承温极限(套管屈服对应的温度)及对应的附加轴向热载荷和不同温度下的拉伸残余应力。
如图1所示,为使用上述方法,本发明提供一种热采井注气过程中套管热应力的测试装置,主要包括:左夹板1、右夹板9、外管2、水泥环3、内管4、中心孔5、高温应变片6、方形槽7、热电偶8、高温导线10、高温烘箱11、温度采集器12、应变仪13。内管4和外管2之间的环空浇注水泥环3形成水泥环套管并放入高温烘箱11;外管2中央开有一方形槽7,高温应变片6和热电偶8通过方形槽7被粘贴在内管4外壁上,其中左夹板1和右夹板9完全相同且其中心孔5略小于内管4内径,左夹板1和右夹板9分别被焊接在内管4和外管2的两端上,用于限制内管4变形。
利用本发明提供的测试方法及装置对热采井注气过程中水泥环套管的热载荷及残余应力进行测试,具体测试过程包括以下步骤:
a.将内管4和外管2依次焊接在左夹板1上,用于限制内管4变形并固定内管4和外管2的位置,然后在内管4和外管2之间的环空浇注水泥,形成水泥环套管;
b.待水泥环3养护成型后,将右夹板9焊接在内管4和外管2上,并在外管2中央开一个方形槽7;
c.通过方形槽7将热电偶8和两片高温应变片6(一片用于温度补偿,一片用于测量轴向应变)和粘贴在内管4外壁上,其中热电偶8与温度采集器12连接,高温应变片6与应变仪13连接;
d.将准备好的水泥环套管放进高温烘箱11,设定加热温度,同时用应变仪13记录轴向应变及对应时间,温度采集器12记录温度及对应时间;
e.当温度达到设定温度时,开始降温,直到降为室温,观察室温对应的轴向应变,如果没有残余应变产生,增加加热温度,继续向水泥环套管加热,直到残余应变位置;
f.记录第一次产生残余应变对应的温度及残余应变,利用该温度下的拉伸-应力应变曲线拟合得到内管4的本构关系:σ=Aεn(A,n为常数,ε为轴向应变);绘制温度与轴向应变的关系曲线,直接读取内管4的承温极限(套管屈服对应的温度),利用该温度下的本构关系计算得到残余应力和不同温度下对应的附加轴向热载荷,包括弹性变形阶段和塑性变形阶段的热载荷;
g.继续增加温度,用应变仪13记录轴向应变及对应时间,温度采集器12记录温度及对应时间,当温度达到设定温度时,开始降温,直到降为室温,记录残余应变,重复步骤f得到该温度下的残余应力和不同温度下对应的附加轴向热载荷;
h.重复步骤g可以得到不同加热温度下的残余应力及附加轴向热载荷。

Claims (2)

1.一种热采井注气过程中套管热应力的测试方法,其特征在于,所述的热采井注气过程中套管热应力的测试方法包括以下步骤:
a.将内管(4)和外管(2)依次焊接在左夹板(1)上,用于限制内管(4)变形并固定内管(4)和外管(2)的位置,然后在内管(4)和外管(2)之间的环空浇注水泥,形成水泥环套管,其中外管(2)用于模拟地层或中间套管,内管(4)用于模拟生产套管;
b.待水泥环养护成型后,将右夹板(9)焊接在内管(4)和外管(2)上,并在外管(1)中央开一个方形槽(7);
c.通过方形槽(7)将热电偶(8)和两片高温应变片(6)粘贴在内管(4)外壁上,其中热电偶(8)与温度采集器(12)连接,高温应变片(6)与应变仪(13)连接;
d.将准备好的水泥环套管放进高温烘箱(11),设定加热温度,同时用应变仪(13)记录轴向应变及对应时间,温度采集器(12)记录温度及对应时间;
e.当温度达到设定温度时,开始降温,直到降为室温,观察室温对应的轴向应变,如果没有残余应变产生,增加加热温度,继续向水泥环套管加热,直到残余应变位置;
f.记录第一次产生残余应变对应的温度及残余应变,利用该温度下的拉伸-应力应变曲线拟合得到内管(4)的本构关系:σ=Aεn(A,n为常数,ε为轴向应变);绘制温度与轴向应变的关系曲线,直接读取内管(4)的承温极限(套管屈服对应的温度),利用该温度下的本构关系计算得到残余应力和不同温度下对应的附加轴向热载荷,包括弹性变形阶段和塑性变形阶段的热载荷;
g.继续增加温度,用应变仪(13)记录轴向应变及对应时间,温度采集器(12)记录温度及对应时间,当温度达到设定温度时,开始降温,直到降为室温,记录残余应变,重复步骤e得到该温度下的残余应力和不同温度下对应的附加轴向热载荷;
h.重复步骤g可以得到不同加热温度下的残余应力及附加轴向热载荷。
2.一种为权利要求1所述的方法使用的热采井注气过程中套管热应力的测试装置,其特征在于:主要包括:左夹板(1)、右夹板(9)、外管(2)、水泥环(3)、内管(4)、中心孔(5)、高温应变片(6)、方形槽(7)、热电偶(8)、高温导线(10)、高温烘箱(11)、温度采集器(12)、应变仪(13),内管(4)和外管(2)之间的环空浇注水泥环(3)形成水泥环套管并放入高温烘箱(11);外管(2)中央开有一方形槽(7),高温应变片(6)和热电偶(8)通过方形槽(7)被粘贴在内管(4)外壁上,左夹板(1)和右夹板(9)完全相同且其中心孔(5)略小于内管(4)内径,左夹板(1)和右夹板(9)分别被焊接在内管(4)和外管(2)的两端,用于限制内管(4)变形。
CN201510609695.8A 2015-09-23 2015-09-23 一种热采井注气过程中套管热应力的测试方法及装置 Expired - Fee Related CN105241596B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510609695.8A CN105241596B (zh) 2015-09-23 2015-09-23 一种热采井注气过程中套管热应力的测试方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510609695.8A CN105241596B (zh) 2015-09-23 2015-09-23 一种热采井注气过程中套管热应力的测试方法及装置

Publications (2)

Publication Number Publication Date
CN105241596A true CN105241596A (zh) 2016-01-13
CN105241596B CN105241596B (zh) 2017-07-21

Family

ID=55039320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510609695.8A Expired - Fee Related CN105241596B (zh) 2015-09-23 2015-09-23 一种热采井注气过程中套管热应力的测试方法及装置

Country Status (1)

Country Link
CN (1) CN105241596B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106989860A (zh) * 2017-05-22 2017-07-28 哈尔滨工业大学 一种基于光热辐射测量的材料内部应力测量系统与方法
CN109211422A (zh) * 2018-10-24 2019-01-15 中国计量大学 基于煤气化炉外壁温度监测模拟实验装置的使用方法
CN109405999A (zh) * 2018-10-24 2019-03-01 中国计量大学 一种对煤气化炉外壁温度变化监测的模拟实验装置
CN109540496A (zh) * 2019-01-10 2019-03-29 西南石油大学 一种用于研究盐穴库输送管道变形强度的实验装置及方法
CN110005906A (zh) * 2019-04-19 2019-07-12 北京豪特耐管道设备有限公司 一种绝热管道及其制造方法
CN110196121A (zh) * 2019-04-12 2019-09-03 中国大唐集团科学技术研究院有限公司火力发电技术研究院 一种调峰机组焊接接头应力测试方法
CN112304788A (zh) * 2020-09-21 2021-02-02 中国石油天然气集团有限公司 一种热采井套管多轮次热循环试验装置及使用方法
CN112782002A (zh) * 2021-03-01 2021-05-11 西南石油大学 一种固井水泥浆侯凝过程中金属套管变形量测试装置
CN114414781A (zh) * 2022-01-21 2022-04-29 西南石油大学 一种交变温度下水泥环轴向应力-变形沿径向分布的测试装置及方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08210595A (ja) * 1995-01-31 1996-08-20 Ishikawajima Harima Heavy Ind Co Ltd 低温液化ガス貯蔵タンクの屋根構造
CN2685563Y (zh) * 2004-02-26 2005-03-16 王作盛 热采井套管保护器
CN102589990A (zh) * 2012-02-20 2012-07-18 中国石油天然气集团公司 一种稠油热采套管测试装置
CN103678927A (zh) * 2013-12-20 2014-03-26 中国石油天然气集团公司 热采井套管柱总应变计算方法
CN104390867A (zh) * 2014-12-12 2015-03-04 中国石油天然气集团公司 稠油热采套管用金属材料热蠕变性能预测试验装置及方法
US20150159956A1 (en) * 2013-12-09 2015-06-11 Balcke-Dürr GmbH Tube Bundle Heat Exchanger Having Straight-Tube Configuration, Process Gas Cooler, Cooler For Gas Turbine Cooling Air, Gas Turbine Or Gas And Steam Turbine Power Plant, And Method For The Cooling Of Cooling Air

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08210595A (ja) * 1995-01-31 1996-08-20 Ishikawajima Harima Heavy Ind Co Ltd 低温液化ガス貯蔵タンクの屋根構造
CN2685563Y (zh) * 2004-02-26 2005-03-16 王作盛 热采井套管保护器
CN102589990A (zh) * 2012-02-20 2012-07-18 中国石油天然气集团公司 一种稠油热采套管测试装置
US20150159956A1 (en) * 2013-12-09 2015-06-11 Balcke-Dürr GmbH Tube Bundle Heat Exchanger Having Straight-Tube Configuration, Process Gas Cooler, Cooler For Gas Turbine Cooling Air, Gas Turbine Or Gas And Steam Turbine Power Plant, And Method For The Cooling Of Cooling Air
CN103678927A (zh) * 2013-12-20 2014-03-26 中国石油天然气集团公司 热采井套管柱总应变计算方法
CN104390867A (zh) * 2014-12-12 2015-03-04 中国石油天然气集团公司 稠油热采套管用金属材料热蠕变性能预测试验装置及方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高连新等: "优质热采井用石油套管的研制", 《上海交通大学学报》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106989860B (zh) * 2017-05-22 2019-01-18 哈尔滨工业大学 一种基于光热辐射测量的材料内部应力测量系统与方法
CN106989860A (zh) * 2017-05-22 2017-07-28 哈尔滨工业大学 一种基于光热辐射测量的材料内部应力测量系统与方法
CN109405999B (zh) * 2018-10-24 2020-11-10 中国计量大学 一种对煤气化炉外壁温度变化监测的模拟实验装置
CN109211422A (zh) * 2018-10-24 2019-01-15 中国计量大学 基于煤气化炉外壁温度监测模拟实验装置的使用方法
CN109405999A (zh) * 2018-10-24 2019-03-01 中国计量大学 一种对煤气化炉外壁温度变化监测的模拟实验装置
CN109540496A (zh) * 2019-01-10 2019-03-29 西南石油大学 一种用于研究盐穴库输送管道变形强度的实验装置及方法
CN109540496B (zh) * 2019-01-10 2023-10-13 西南石油大学 一种用于研究盐穴库输送管道变形强度的实验装置及方法
CN110196121A (zh) * 2019-04-12 2019-09-03 中国大唐集团科学技术研究院有限公司火力发电技术研究院 一种调峰机组焊接接头应力测试方法
CN110005906A (zh) * 2019-04-19 2019-07-12 北京豪特耐管道设备有限公司 一种绝热管道及其制造方法
CN112304788A (zh) * 2020-09-21 2021-02-02 中国石油天然气集团有限公司 一种热采井套管多轮次热循环试验装置及使用方法
CN112782002A (zh) * 2021-03-01 2021-05-11 西南石油大学 一种固井水泥浆侯凝过程中金属套管变形量测试装置
CN114414781A (zh) * 2022-01-21 2022-04-29 西南石油大学 一种交变温度下水泥环轴向应力-变形沿径向分布的测试装置及方法
CN114414781B (zh) * 2022-01-21 2023-06-23 西南石油大学 一种交变温度下水泥环轴向应力-变形沿径向分布的测试装置及方法

Also Published As

Publication number Publication date
CN105241596B (zh) 2017-07-21

Similar Documents

Publication Publication Date Title
CN105241596A (zh) 一种热采井注气过程中套管热应力的测试方法及装置
CN103868801B (zh) 岩石性能的评价装置
CN102590271B (zh) 地源热泵岩土热响应动态测试系统及测试方法
CN104390867B (zh) 稠油热采套管用金属材料热蠕变性能预测试验装置及方法
CN105259041B (zh) 一种模拟注蒸汽井套管热强度的测试方法及装置
CN102331377B (zh) 一种评估t/p92钢的蠕变性能的方法
CN204666542U (zh) 一种线胀系数测量装置
CN104990654A (zh) 大管径集中供热管道应力远程在线监测装置及检测方法
CN110082214A (zh) 一种砂岩油气井套管柱模拟试验装置及其评价方法
CN104316404A (zh) 一种记忆合金恢复力的精确测试方法
CN105089591B (zh) 一种确定注蒸汽井环空气液界面的方法
CN105510148A (zh) 一种高温下封隔器胶筒接触应力测试装置及方法
CN103645129A (zh) 一种高温超低渗透率测量仪
CN204903055U (zh) 大管径集中供热管道应力远程在线监测装置
CN103217454B (zh) 圆筒结构热扩散率的光纤光栅测量方法
CN104330300B (zh) 超高温陶瓷材料热-损伤耦合强度间接测量方法
CN103835709B (zh) 稠油热采储层破裂的模拟实验方法
CN206832724U (zh) 一种快速确定隔热油管隔热性能的试验装置
CN207133138U (zh) 一种用于检测管材蠕变塌陷性能的试验系统
CN104977158A (zh) 一种管内燃烧超高温在线测压液动高温三通球阀试验装置
CN102520004B (zh) 一种热固性树脂固化体积变化的测试方法
CN205352976U (zh) 大体积混凝土细观破裂试验系统
CN101509915A (zh) 混凝土温度裂缝优化控制测试仪
TWI734029B (zh) 地熱井產能預估方法
CN107063993B (zh) 基于应变的高速气流摩阻系数计算方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170721

Termination date: 20180923

CF01 Termination of patent right due to non-payment of annual fee