CN105225029A - 预算执行情况在线监测方法、装置以及公司运行监测系统 - Google Patents
预算执行情况在线监测方法、装置以及公司运行监测系统 Download PDFInfo
- Publication number
- CN105225029A CN105225029A CN201510537129.0A CN201510537129A CN105225029A CN 105225029 A CN105225029 A CN 105225029A CN 201510537129 A CN201510537129 A CN 201510537129A CN 105225029 A CN105225029 A CN 105225029A
- Authority
- CN
- China
- Prior art keywords
- money
- amount
- execution
- link
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510537129.0A CN105225029A (zh) | 2015-08-27 | 2015-08-27 | 预算执行情况在线监测方法、装置以及公司运行监测系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510537129.0A CN105225029A (zh) | 2015-08-27 | 2015-08-27 | 预算执行情况在线监测方法、装置以及公司运行监测系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105225029A true CN105225029A (zh) | 2016-01-06 |
Family
ID=54993984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510537129.0A Pending CN105225029A (zh) | 2015-08-27 | 2015-08-27 | 预算执行情况在线监测方法、装置以及公司运行监测系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105225029A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106981022A (zh) * | 2017-04-28 | 2017-07-25 | 珠海聚辉信息科技有限公司 | 一种房地产项目清算的经济指标预警方法及系统 |
CN108154389A (zh) * | 2017-12-19 | 2018-06-12 | 国家电网公司 | 水电工程概算控制系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101916406A (zh) * | 2010-09-01 | 2010-12-15 | 中国建设银行股份有限公司 | 一种用于项目资金预算信息管理的系统以及方法 |
CN103279839A (zh) * | 2013-06-06 | 2013-09-04 | 徐工集团工程机械股份有限公司 | 一种基于活动的战略计划执行与预算分析信息控制系统 |
CN103679373A (zh) * | 2013-04-12 | 2014-03-26 | 国家电网公司 | 生产基建标准成本体系的全链条预算数据处理系统及方法 |
CN104866957A (zh) * | 2015-05-11 | 2015-08-26 | 国家电网公司 | 一种财务业务数据的监控系统 |
-
2015
- 2015-08-27 CN CN201510537129.0A patent/CN105225029A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101916406A (zh) * | 2010-09-01 | 2010-12-15 | 中国建设银行股份有限公司 | 一种用于项目资金预算信息管理的系统以及方法 |
CN103679373A (zh) * | 2013-04-12 | 2014-03-26 | 国家电网公司 | 生产基建标准成本体系的全链条预算数据处理系统及方法 |
CN103279839A (zh) * | 2013-06-06 | 2013-09-04 | 徐工集团工程机械股份有限公司 | 一种基于活动的战略计划执行与预算分析信息控制系统 |
CN104866957A (zh) * | 2015-05-11 | 2015-08-26 | 国家电网公司 | 一种财务业务数据的监控系统 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106981022A (zh) * | 2017-04-28 | 2017-07-25 | 珠海聚辉信息科技有限公司 | 一种房地产项目清算的经济指标预警方法及系统 |
CN108154389A (zh) * | 2017-12-19 | 2018-06-12 | 国家电网公司 | 水电工程概算控制系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107358340B (zh) | 一种基于工程清单的工程项目管理系统 | |
CN104573991A (zh) | 项目流程管理系统 | |
CN109360068A (zh) | 利用区块链的供应链管理方法 | |
Ighravwe et al. | A non-zero integer non-linear programming model for maintenance workforce sizing | |
Sari et al. | Quality accounting information systems with 3 important factors in BUMN Bandung Indonesia | |
CN106570752A (zh) | 一种财务自动管理系统 | |
CN107807953A (zh) | 一种基于区块链的信息云平台管理系统 | |
CN105631612A (zh) | 基于大数据的公职人员个人绩效及能力评估系统及方法 | |
CN105574678A (zh) | 一种基于执行力指数的员工考评数据自动处理系统 | |
CN112581283A (zh) | 商业银行员工交易行为分析及告警的方法及装置 | |
CN107122386A (zh) | 数据的筛选方法及装置 | |
CN102446298A (zh) | 一种采购系统的信息监控和评价装置及其方法 | |
CN105225029A (zh) | 预算执行情况在线监测方法、装置以及公司运行监测系统 | |
US20070239587A1 (en) | System and Method For Dynamically Utilizing and Managing Financial, Operational, and Compliance Data | |
Nurdiani | Case Study: Risk Analysis in Implementation of Istishna Buying on Home Ownership Loans Financing Products at Bank BTN Syariah | |
CN111819592A (zh) | 用于资产分配的候选者的可量化分类的系统和方法 | |
CN110264072A (zh) | 一种企业绩效考核设计方法 | |
CN105809546A (zh) | 一种金融理财分析系统及方法 | |
Manu et al. | Understanding supply chain management from a main contractor's perspective | |
CN104008503A (zh) | 用于检测市场违规的系统和方法 | |
CN103577411A (zh) | 表单签核流程管理方法及系统 | |
US20200134726A1 (en) | Systems and methods for allocating assets to directed and interest-based participants | |
CN111882285A (zh) | 一种药品审计系统、设备及介质 | |
CN105550929A (zh) | 一种商业汇票一体化处理方法及系统 | |
Badillo et al. | A Systems Science/Cybernetics Perspective on Contemporary Management in Supply Chains |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 100070 Times Fortune Tiandi Building, No. 1 Hangfeng Road, Fengtai District, Beijing, 28 Floors Applicant after: BEIJING GUODIANTONG NETWORK TECHNOLOGY Co.,Ltd. Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd. Address before: 100070 Times Fortune Tiandi Building, No. 1 Hangfeng Road, Fengtai District, Beijing, 28 Floors Applicant before: BEIJING GUODIANTONG NETWORK TECHNOLOGY Co.,Ltd. Applicant before: State Grid Corporation of China Applicant before: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190527 Address after: 100033 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd. Applicant after: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd. Address before: 100070 Times Fortune Tiandi Building, No. 1 Hangfeng Road, Fengtai District, Beijing, 28 Floors Applicant before: BEIJING GUODIANTONG NETWORK TECHNOLOGY Co.,Ltd. Applicant before: STATE GRID CORPORATION OF CHINA Applicant before: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160106 |
|
RJ01 | Rejection of invention patent application after publication |