CN105220878B - Construction method for jointly decorating maintenance storehouses and installing pipelines by aid of movable scaffolds - Google Patents
Construction method for jointly decorating maintenance storehouses and installing pipelines by aid of movable scaffolds Download PDFInfo
- Publication number
- CN105220878B CN105220878B CN201510518883.XA CN201510518883A CN105220878B CN 105220878 B CN105220878 B CN 105220878B CN 201510518883 A CN201510518883 A CN 201510518883A CN 105220878 B CN105220878 B CN 105220878B
- Authority
- CN
- China
- Prior art keywords
- scaffold
- construction
- pipeline
- engineering
- carries out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a construction method for jointly decorating maintenance storehouses and installing pipelines by the aid of movable scaffolds. The method includes constructing first and second inspection pits in the built storehouses; filling the peripheries of the first and second inspection pits with earth in the storehouses; laying two guide rails on the backfilled earth on two sides of each of the first and second inspection pits, sequentially erecting the first, second, third and fourth scaffolds on the guide rail on the outer side of an end of each of the first and second inspection pits, carrying out ceiling plastering, putty applying and paint coating on the scaffolds, and installing the various pipelines, lamps, the firefighting pipelines and electrical equipment on the scaffolds until complete decorating and pipeline installing and constructing procedures are completed in the storehouses. Rollers are respectively installed at the bottoms of the first, second, third and fourth scaffolds. The method has the advantages that indoor ground structural engineering and overhead pipeline and equipment installation engineering such as ceiling decoration engineering, electrical installation engineering, water supply and drainage engineering, firefighting engineering, heating and ventilation engineering can be sequentially constructed in an assembly line manner, accordingly, various construction tasks in profession can be quickly completed, the construction periods can be greatly shortened, and effects of yielding twice the result with half the effort can be realized.
Description
Technical field
The invention belongs to Subway Facilities construction technique field, more particularly to one kind carry out joint inspection using movable Scaffold
Repair the construction method that storehouse finishing and pipeline are installed.
Background technology
At present, joint being must be provided with subway engineering construction and overhauling storehouse, the storeroom structure form in joint maintenance storehouse is more
For monolayer reinforced concrete frame structure, a plurality of locomotive inspection hole in storehouse, is provided with, its effect is to sail in storehouse to carry out for locomotive
Maintenance activity.Now normal sequence of construction is that the wall building construction → interior inspection of constructing → fill of main body frame beam plate post is cheated and applied
Work → interior room heart backfill → ground concrete cushion construction → indoor canopy and wall surfacing → indoor water supply and drainage, heating,
Ventilation, fire-fighting, electric pipeline and lamp installation → ground surface construction etc..Due to there is substantial amounts of locomotive inspection in joint maintenance storehouse
Hole being looked into, and hole being checked along storehouse longitudinally elongated parallel setting, traditional way is again in room after complete inspection hole construction is finished
Inside setting up full hall steel pipe scaffold carries out ceiling plastering, Puttying, swabbing and various pipelines, light fixture and fire main, electrically
The installation of equipment, if but the duration it is very tight, if after complete inspection hole construction is finished carrying out storehouse interior decoration again and being inherently delayed building
If the duration,
The content of the invention
In order to solve the above problems, it is an object of the invention to provide one kind carries out joint maintenance storehouse using movable Scaffold
The construction method that finishing and pipeline are installed.
In order to achieve the above object, the utilization movable Scaffold that the present invention is provided carries out joint maintenance storehouse finishing and pipeline peace
The construction method of dress includes the following steps for carrying out in order:
1) carry out the construction in first and second road inspection hole first in built storehouse, then carry out remaining inspection successively
The construction in hole;
2) carry out interior around first and second built road inspection hole to banket;
3) a leading track is respectively laid in the backfill of first and second road inspection hole both sides, and in first and second road inspection
The first scaffold that bottom is provided with roller is set up on leading track on the outside of the one end of hole, then by workmen in the scaffold
On carry out Puttying, the brushing paint operation of square ceiling thereon, after the completion of the first scaffold is moved to into next work along leading track
Make face, proceed ceiling finish construction, until it reaches the other end in first and second road inspection hole;
4) the second scaffold that bottom is provided with roller is set up at the original place of setting up of the first scaffold, then by workmen
Cable conduct, wire through pipe, cable testing bridge, cable laying, the electric peace of light fixture under square ceiling thereon is carried out on the scaffold
Pretend industry, after the completion of the second scaffold is moved to into subsequent work face along leading track, proceed above-mentioned electric installation exercise, directly
To the other end for reaching first and second road inspection hole;
5) the 3rd scaffold that bottom is provided with roller is set up at the original place of setting up of the first scaffold, then by workmen
The installation exercise of square fire protection pipeline thereon is carried out on the scaffold, after the completion of the 3rd scaffold is moved to along leading track it is next
Work surface, proceeds above-mentioned fire protection pipeline installation exercise, until it reaches the other end in first and second road inspection hole;
6) the 4th scaffold that bottom is provided with roller is set up at the original place of setting up of the first scaffold A, then by constructor
Member carries out the installation exercise of square caliduct thereon on the scaffold, after the completion of the 4th scaffold is moved to down along leading track
One work surface, proceeds above-mentioned caliduct installation exercise, until it reaches the other end in first and second road inspection hole;
7), after the construction and surrounding for often completing two road inspection holes is banketed, repeat step is 3) to step 6), until completing in storehouse
All fit up and pipeline installation process.
The height of the first described scaffold is 13.86m, and length is 10.5m, and width is 12.6m.
The height of the second described scaffold is 13.86m, and length is 6m, and width is 12.6m.
The height of the 3rd described scaffold is 11.86m, and length is 4.5m, and width is 12.6m.
The height of the 4th described scaffold is 9.86m, and length is 3m, and width is 12.6m.
The utilization movable Scaffold that the present invention is provided carries out the construction method that joint maintenance storehouse is fitted up and pipeline is installed to be had
Following beneficial effect:
(1) scaffold building and dismounting are easily quick, with very strong mobility, can meet large-scale job requirements.
(2) set up that pattern is more flexible, differing heights, Different Plane size, the scaffold of different facade patterns can be set up.
(3) scaffold bottom is provided with roller, moves can whole support body.
(4) support body intensity, rigidity, stability can guarantee that construction safety completely Jing after load design checking computations.
(5) more conventional construction method can reduce construction cost in a large number:
As this engineering construction area is big, and height is higher, in the past construction convention be interior decoration engineering and supporting water,
Warm, fire-fighting, electrical engineering are set up full hall and implement formula steel pipe scaffold.Accordingly even when considering scaffold lease time and turnover
Number of times, but still need to scaffold that all peace is torn open once in the range of the great Ku, labour cost is very high.Will according to the movable Scaffold
Ceiling finish and the cross construction molding successively of various aerial pipelines, only need to spend minimal amount of scaffold rental charge and installing/dismounting
Labour cost, can greatly save engineering expenditure, and Jing measuring and calculating saves labour cost up to 90%.
(6) more conventional construction method can greatly speed up construction speed:
In the past construction convention for first construct it is indoor on the ground or underground infrastructures (such as checking hole or equipment Foundations etc.) again by
Ground concrete bed course is carried out, and is then carried out ceiling, metope, ground surface finishing, is finally installed various pipelines, equipment etc..According to
This construction method, can be by flooring Structural Engineering and ceiling finish engineering, electrical installation project, water supply and sewage work, fire-fighting
The aerial pipelines such as engineering, heating and ventilation engineering and equipment installation project form cross construction successively.Even can by taking this engineering as an example
So that locomotive inspection hole to be constructed with the engineering such as ceiling finish and wind, water, warm, electricity simultaneously, it does not interfere with each other up and down, is co-stretched work
Face, can quickly complete the construction task in each specialty, substantially reduce the duration, serve the effect got twice the result with half the effort.
Description of the drawings
Fig. 1-Figure 18 for the present invention provides the present invention provide utilization movable Scaffold carry out joint maintenance storehouse fit up and
The construction method work progress schematic diagram that pipeline is installed.
Specific embodiment
Carry out joint maintenance storehouse dress below in conjunction with the accompanying drawings with specific embodiment to the utilization movable Scaffold that the present invention is provided
Repair and the construction method of pipeline installation is described in detail.
As shown in Fig. 1-Figure 18, the utilization movable Scaffold that the present invention is provided carries out joint maintenance storehouse finishing and pipeline peace
The construction method of dress includes the following steps for carrying out in order:
1) carry out the construction in first and second road inspection hole 2 first in built storehouse 1, then carry out remaining inspection successively
Look into the construction in hole 2;
2) carry out interior around first and second built road inspection hole 2 to banket;
3) cheat in first and second road inspection and respectively lay in the backfill of 2 both sides a leading track 3, and examine in first and second road
The first scaffold A that bottom is provided with roller is set up on the leading track 3 looked on the outside of 2 one end of hole, described the first scaffold A's
It is highly 13.86m, length is 10.5m, and width is 12.6m, square ceiling thereon is carried out on the scaffold by workmen then
Puttying, brushing paint operation, after the completion of the first scaffold A is moved to into subsequent work face along leading track 3, proceed top
Canopy decoration construction, until it reaches the other end in first and second road inspection hole 2;
4) the second scaffold B that bottom is provided with roller, described crus secunda are set up at the original place of setting up of the first scaffold A
The height of hand cradle B is 13.86m, and length is 6m, and width is 12.6m, and side thereon is carried out on the scaffold by workmen then
The electric installation exercise of cable conduct, wire through pipe, cable testing bridge, cable laying, light fixture under ceiling, after the completion of by crus secunda handss
Frame B moves to subsequent work face along leading track 3, proceeds above-mentioned electric installation exercise, until it reaches first and second road inspection hole
2 other end;
5) the 3rd scaffold C that bottom is provided with roller is set up at the original place of setting up of the first scaffold A, then by constructor
Member carries out the installation exercise of square fire protection pipeline thereon on the scaffold, as fire protection pipeline designed elevation will be less than ceiling 2m,
It is main to arrange along frame column both sides, and mounting process is simpler, operating surface need not be excessive, therefore the height of the 3rd scaffold C is
11.86m, length are 4.5m, and width is 12.6m, after the completion of the 3rd scaffold C is moved to into subsequent work face along leading track 3, after
It is continuous to carry out above-mentioned fire protection pipeline installation exercise, until it reaches the other end in first and second road inspection hole 2;
6) the 4th scaffold D that bottom is provided with roller is set up at the original place of setting up of the first scaffold A, then by constructor
Member carries out the installation exercise of square caliduct thereon on the scaffold, as caliduct designed elevation will be less than ceiling 4m,
And mounting process is simpler, operating surface is without the need for excessive, therefore the height of the 4th scaffold D is 9.86m, and length is 3m, and width is
12.6m, after the completion of the 4th scaffold D is moved to into subsequent work face along leading track 3, proceed above-mentioned caliduct and install to make
Industry, until it reaches the other end in first and second road inspection hole 2;
7), after the construction and surrounding for often completing two road inspection holes 2 is banketed, repeat step is 3) to step 6), until completing in storehouse
All fit up and pipeline installation process.
Claims (5)
1. a kind of utilization movable Scaffold carries out combining the construction method that maintenance storehouse finishing and pipeline are installed, it is characterised in that:Its
Including the following steps for carrying out in order:
1) carry out the construction in first and second road inspection hole (2) first in built storehouse (1), then carry out remaining inspection successively
Look into the construction of hole (2);
2) carry out interior around first and second built road inspection hole (2) to banket;
3) a leading track (3) is respectively laid in the backfill of first and second road inspection hole (2) both sides, and examine in first and second road
The first scaffold (A) that bottom is provided with roller is set up on the leading track (3) looked on the outside of hole (2) one end, then by constructor
Member carries out the Puttying of square ceiling thereon, brushing paint operation on the scaffold, after the completion of by the first scaffold (A) along leading
Track (3) moves to subsequent work face, proceeds ceiling finish construction, until it reaches the another of (2) is cheated in first and second road inspection
End;
4) the second scaffold (B) that bottom is provided with roller is set up at the original place of setting up of the first scaffold (A), then by constructor
Member carry out on the scaffold cable conduct under square ceiling thereon, wire through pipe, cable testing bridge, cable laying, light fixture it is electric
Installation exercise, after the completion of the second scaffold (B) is moved to into subsequent work face along leading track (3), proceed above-mentioned electric peace
Pretend industry, until it reaches the other end in first and second road inspection hole (2);
5) the 3rd scaffold (C) that bottom is provided with roller is set up at the original place of setting up of the first scaffold (A), then by constructor
Member carries out the installation exercise of square fire protection pipeline thereon on the scaffold, after the completion of by the 3rd scaffold (C) along leading track (3)
Subsequent work face is moved to, proceeds above-mentioned fire protection pipeline installation exercise, until it reaches the another of (2) is cheated in first and second road inspection
End;
6) the 4th scaffold (D) that bottom is provided with roller is set up at the original place of setting up of the first scaffold (A), then by constructor
Member carries out the installation exercise of square caliduct thereon on the scaffold, after the completion of by the 4th scaffold (D) along leading track (3)
Subsequent work face is moved to, proceeds above-mentioned caliduct installation exercise, until it reaches the another of (2) is cheated in first and second road inspection
End;
7), after the construction and surrounding for often completing two roads inspection hole (2) is banketed, repeat step is 3) to step 6), until completing complete in storehouse
Fit up and pipeline installation process in portion.
2. utilization movable Scaffold according to claim 1 carries out combining the construction party that maintenance storehouse finishing and pipeline are installed
Method, it is characterised in that:The height of described the first scaffold (A) is 13.86m, and length is 10.5m, and width is 12.6m.
3. utilization movable Scaffold according to claim 1 carries out combining the construction party that maintenance storehouse finishing and pipeline are installed
Method, it is characterised in that:The height of described the second scaffold (B) is 13.86m, and length is 6m, and width is 12.6m.
4. utilization movable Scaffold according to claim 1 carries out combining the construction party that maintenance storehouse finishing and pipeline are installed
Method, it is characterised in that:The height of the 3rd described scaffold (C) is 11.86m, and length is 4.5m, and width is 12.6m.
5. utilization movable Scaffold according to claim 1 carries out combining the construction party that maintenance storehouse finishing and pipeline are installed
Method, it is characterised in that:The height of the 4th described scaffold (D) is 9.86m, and length is 3m, and width is 12.6m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510518883.XA CN105220878B (en) | 2015-08-20 | 2015-08-20 | Construction method for jointly decorating maintenance storehouses and installing pipelines by aid of movable scaffolds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510518883.XA CN105220878B (en) | 2015-08-20 | 2015-08-20 | Construction method for jointly decorating maintenance storehouses and installing pipelines by aid of movable scaffolds |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105220878A CN105220878A (en) | 2016-01-06 |
CN105220878B true CN105220878B (en) | 2017-04-19 |
Family
ID=54990109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510518883.XA Active CN105220878B (en) | 2015-08-20 | 2015-08-20 | Construction method for jointly decorating maintenance storehouses and installing pipelines by aid of movable scaffolds |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105220878B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105625721B (en) * | 2016-03-10 | 2017-08-01 | 四川华西安装工程有限公司 | The boring and coring method and its servicing unit in concrete lamp hole |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004038786B3 (en) * | 2004-08-09 | 2006-01-19 | Db Regio Ag | Side working pit for rail vehicle repair has profiled rails for mobile access staging having locking brake to hold in place |
CN1939785A (en) * | 2006-09-25 | 2007-04-04 | 王树生 | Wagon body repairing technology |
CN201154712Y (en) * | 2007-12-14 | 2008-11-26 | 中铁工程设计院有限公司 | Stereo operation platform of motor train set inspecting garage |
CN201265254Y (en) * | 2008-12-29 | 2009-07-01 | 中铁建工集团有限公司 | Movable operating platform system |
CN203797592U (en) * | 2014-05-09 | 2014-08-27 | 中建七局(上海)有限公司 | Movable assembled type engineering lighting table |
CN204139569U (en) * | 2014-08-28 | 2015-02-04 | 江苏南通二建集团有限公司 | Sliding scaffold |
CN104727538A (en) * | 2015-03-30 | 2015-06-24 | 山东双得利建设科技有限公司 | Scaffold device for plant roof reinforcement and maintenance and scaffold erecting method |
-
2015
- 2015-08-20 CN CN201510518883.XA patent/CN105220878B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004038786B3 (en) * | 2004-08-09 | 2006-01-19 | Db Regio Ag | Side working pit for rail vehicle repair has profiled rails for mobile access staging having locking brake to hold in place |
CN1939785A (en) * | 2006-09-25 | 2007-04-04 | 王树生 | Wagon body repairing technology |
CN201154712Y (en) * | 2007-12-14 | 2008-11-26 | 中铁工程设计院有限公司 | Stereo operation platform of motor train set inspecting garage |
CN201265254Y (en) * | 2008-12-29 | 2009-07-01 | 中铁建工集团有限公司 | Movable operating platform system |
CN203797592U (en) * | 2014-05-09 | 2014-08-27 | 中建七局(上海)有限公司 | Movable assembled type engineering lighting table |
CN204139569U (en) * | 2014-08-28 | 2015-02-04 | 江苏南通二建集团有限公司 | Sliding scaffold |
CN104727538A (en) * | 2015-03-30 | 2015-06-24 | 山东双得利建设科技有限公司 | Scaffold device for plant roof reinforcement and maintenance and scaffold erecting method |
Also Published As
Publication number | Publication date |
---|---|
CN105220878A (en) | 2016-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109614723B (en) | Comprehensive construction method based on BIM technology | |
CN103291076B (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN103711323B (en) | Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing | |
ITFI20100096A1 (en) | "A COMPLEX OF PREFABRICATED ELEMENTS TO FORM A PREFABRICATED BUILDING AT AT LEAST TWO PLANS AND RELATED BUILDING AND INSTALLATION PROCEDURE" | |
CN105569358A (en) | Construction method of special-shaped curved surface roof with large span and multiple curvatures | |
CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
CN104818787A (en) | Installation and construction method for large suspension glass curtain walls | |
CN106149863B (en) | A kind of house 3D printing method | |
CN202324576U (en) | Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall | |
CN106760529A (en) | Roof system steel truss slipping and assembling operation platform and installation method | |
CN106150079A (en) | Make building machine in the air | |
CN205063331U (en) | Slipform architecture | |
CN106703262B (en) | Curtain wall interlayer fireproof blocking structure based on raised floor design and construction method thereof | |
CN106115417A (en) | The attachment structure that in lowering or hoisting gear, elevator is basic with attachment | |
CN105220878B (en) | Construction method for jointly decorating maintenance storehouses and installing pipelines by aid of movable scaffolds | |
CN103216108A (en) | Hydraulic pushing curve sliding installation method of five tracks of long span spatial composite roof truss | |
CN204728554U (en) | The integral structure of channel and double-deck operation platform | |
CN201635377U (en) | Rigid suspended type scaffold provided with large-span steel roof equipment pipeline | |
CN202865996U (en) | Room modular structure for nuclear power plant | |
CN204311622U (en) | A kind of shape of a saddle prestressed cable net | |
CN112127529A (en) | Half unit assembled stone curtain wall structure | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN103276840B (en) | Nuclear power plant composite floor slab module and construction method thereof | |
CN211817210U (en) | Steel partition wall structure | |
CN104060838A (en) | Grouping and air-pairing installation method for corridor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |