CN105220794A - 一种预制装配式剪力墙竖向主筋快速连接方法 - Google Patents
一种预制装配式剪力墙竖向主筋快速连接方法 Download PDFInfo
- Publication number
- CN105220794A CN105220794A CN201510696264.XA CN201510696264A CN105220794A CN 105220794 A CN105220794 A CN 105220794A CN 201510696264 A CN201510696264 A CN 201510696264A CN 105220794 A CN105220794 A CN 105220794A
- Authority
- CN
- China
- Prior art keywords
- shear wall
- wire rope
- end ring
- bar
- rope end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 210000003205 muscle Anatomy 0.000 title claims abstract description 12
- 238000004873 anchoring Methods 0.000 claims abstract description 4
- 238000005452 bending Methods 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 abstract description 9
- 238000009954 braiding Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 18
- 239000010959 steel Substances 0.000 description 18
- 238000009417 prefabrication Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 229910001208 Crucible steel Inorganic materials 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000035800 maturation Effects 0.000 description 3
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000009941 weaving Methods 0.000 description 1
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明公开了一种预制装配式剪力墙竖向主筋快速连接方法,将若干根两头编织端环的钢丝绳浇入剪力墙板砼内实现锚固,从而在每块剪力墙板的顶部和底部均预留有多个对应的钢丝绳端环;将两块剪力墙板的钢丝绳端环进行上下对应,分别用两个短钢筋从剪力墙板两端的钢丝绳端环穿入;将短钢筋在钢丝绳端环内旋转绷直,并与相邻位置的短钢筋绑扎以消除回转。本发明以钢丝绳取代形状僵硬的直钢筋,以钢丝绳端环作为连接形式,以短钢筋作为受力连接件和绷直构件,并通过与相邻位置的短钢筋绑扎实现了抵消回转,安装简单,安全可靠。
Description
技术领域
本发明涉及建筑工程领域,具体是一种预制装配式剪力墙竖向主筋快速连接方法。
背景技术
预制装配式剪力墙住宅结构体系是住宅产业化的重点发展方向,目前,该体系的设计规程、技术措施以及施工工艺都已趋完善,为了保证上下两块预制剪力墙板能形成等同现浇的整体强度,首先必须将这两块剪力墙的纵向预留钢筋可靠连接,为此,国内外有二种已经进入实际应用的成熟方法以及国内有一种尚在试验阶段的方法:
成熟方法之一是,采用套筒灌浆工艺,即:在上块剪力墙的底部预置钢筋连接铸钢套筒,该套筒预埋在预制剪力墙板中的上半段采用螺纹丝扣方式与墙内纵向主筋连接,下半段为套筒预留孔与下块剪力墙顶部预留钢筋对位承插,在规定的时间内将特制的灌浆料压入套筒与钢筋的间隙内,固化时间结束后,上下两块剪力墙的纵向主筋就完成了连接并通过后浇砼形成整体;
成熟方法之二是,采用浆锚搭接工艺,即:在上块剪力墙的底部预留波纹管孔洞,安装时将其上块剪力墙底部的波纹管孔洞对准下块剪力墙顶部预留钢筋并落坐插入孔洞内,在规定的时间内将特制的灌浆料压入孔洞与钢筋的间隙内,固化时间结束后,上下两块剪力墙的纵向主筋就间接通过灌浆孔洞完成了连接并通过后浇砼形成整体。
国内仍在试验阶段的方法是,采用钢套筒压接工艺,即:上、下两块剪力墙的顶面和底面均预留出一定长度的钢筋,安装时将上、下两块剪力墙对准落坐并使上、下墙体的预留钢筋进入连接钢套筒内,采用液压钳将钢套筒与二根钢筋压接为一体。
上述三种钢筋连接方式在实际使用中存在许多问题,直接影响到工程应用:
套筒灌浆工艺,剪力墙的纵向主筋分布在二个表面内;一般纵向主筋的横向间距不超过200,因此,每块预制剪力墙内的铸钢套筒多达数十个,这不仅大幅增加了成本而且预制过程中对铸钢套筒的安装精度要求很高增加了预制生产的难度。
此外,剪力墙板块的顶部预留钢筋在运输、吊装过程中稍有碰撞偏位便无法对准套筒承插孔,现场矫正又受条件所限,因此,现场施工极为不便。
浆锚搭接工艺,每块剪力墙的顶部外露长度超过一米的两排预留钢筋,且在预制生产、运输及现场吊装过程中须避免这些钢筋受到磕碰错位,这既增加了上述工序中的施工难度又使构件的运输出现了超高超宽的麻烦。
此外,现场灌浆量大,质量难以掌控且缺乏对密实度的检查方法。
钢套筒压接工艺,对预留钢筋的定位要求很高,剪力墙板块在运输、吊装过程中对预留钢筋的保护非常困难,如果一旦发生碰撞,钢筋发生偏位则矫正十分困难,此外由于操作空间狭小,液压机具难以工作。
发明内容
本发明的目的在于提供一种设计简单、施工方便且连接可靠的预制装配式剪力墙竖向主筋快速连接方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种预制装配式剪力墙竖向主筋快速连接方法,具体连接步骤如下:
(1)将多根两头编织端环的钢丝绳浇入剪力墙板砼内实现锚固,从而在每块剪力墙板的顶部和底部均预留有多个对应的钢丝绳端环;
(2)将两块剪力墙板的钢丝绳端环进行上下对应,分别用两个短钢筋从剪力墙板两端的钢丝绳端环穿入;
(3)将短钢筋在钢丝绳端环内旋转绷直,并与相邻位置的短钢筋绑扎以消除回转。
作为本发明进一步的方案:所述步骤(2)中使用的短钢筋的一端折弯,以防止绷紧后的端环滑出。
与现有技术相比,本发明的有益效果是:
(1)以钢丝绳取代形状僵硬的直钢筋,以钢丝绳端环作为连接形式,以短钢筋作为受力连接件和绷直构件,并通过与相邻位置的短钢筋绑扎实现了抵消回转;
(2)简单,无论是预制生产、构件运输和现场安装均非常简单,既不需要任何工具器械;又可以在非常狭小的空间内灵活自如地施工;
(3)可靠,钢丝绳的端环以编织形式且浇捣在剪力墙板砼内,两个端环以钢筋穿接方式连为一体,传力直接,安全可靠;
(4)快速,上、下二块剪力墙之间放置砼垫块;将剪力墙两端角部的钢丝绳端环连接经旋转、绷紧、固定后即可不依靠塔吊,大幅提高塔吊的工作效率。
附图说明
图1为两块剪力墙板的连接示意图。
图2为两个钢丝绳端环中穿入短钢筋旋转绷直的示意图。
图3为两个相邻位置的短钢筋绑扎的示意图。
图中:1-剪力墙板;2-钢丝绳端环;3-短钢。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1~3,本发明实施例中,一种预制装配式剪力墙竖向主筋快速连接方法,具体连接步骤如下:
(1)将同一根钢丝绳环绕并编织浇入剪力墙板砼内实现锚固,从而在每块剪力墙板的顶部和底部均预留有多个对应的钢丝绳端环;
(2)将两块剪力墙板的钢丝绳端环进行上下对应,分别用两个短钢筋从剪力墙板两端的钢丝绳端环穿入,短钢筋的一端折弯,且折弯角度接近直角;
(3)将短钢筋在钢丝绳端环内旋转绷直,并与相邻位置的短钢筋绑扎以消除回转,既满足了主筋可靠连接,又防止钢丝绳回转而放松绷直状态。
本方法以柔性钢丝绳为剪力墙主筋,在每块剪力墙板的顶部和底部以一定长度的钢丝绳端环方式预留,不仅预制生产中精度要求低,而且在运输、吊装过程中对钢丝绳端环无须进行任何保护,剪力墙板块上、下连接时,在对应的两个端环中穿入短钢筋旋转绷直钢丝绳并与相邻的已经旋转过的短钢筋绑扎即可抵消回转,从而完成上、下两块剪力墙受力主筋的可靠连接。
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此凡在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。
Claims (2)
1.一种预制装配式剪力墙竖向主筋快速连接方法,其特征在于,具体连接步骤如下:
(1)将多根两头编织端环的钢丝绳浇入剪力墙板砼内实现锚固,从而在每块剪力墙板的顶部和底部均预留有多个对应的钢丝绳端环;
(2)将两块剪力墙板的钢丝绳端环进行上下对应,分别用两个短钢筋从剪力墙板两端的钢丝绳端环穿入;
(3)将短钢筋在钢丝绳端环内旋转绷直,并与相邻位置的短钢筋绑扎以消除回转。
2.根据权利要求1所述的预制装配式剪力墙竖向主筋快速连接方法,其特征在于,所述步骤(2)中使用的短钢筋的一端折弯,以防止绷紧后的端环滑出。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510696264.XA CN105220794A (zh) | 2015-10-23 | 2015-10-23 | 一种预制装配式剪力墙竖向主筋快速连接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510696264.XA CN105220794A (zh) | 2015-10-23 | 2015-10-23 | 一种预制装配式剪力墙竖向主筋快速连接方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105220794A true CN105220794A (zh) | 2016-01-06 |
Family
ID=54990026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510696264.XA Pending CN105220794A (zh) | 2015-10-23 | 2015-10-23 | 一种预制装配式剪力墙竖向主筋快速连接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105220794A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677536A (zh) * | 2017-03-02 | 2017-05-17 | 河北晶通建筑科技股份有限公司 | 一种预制屋顶板节点连接结构的制作方法 |
CN117286952A (zh) * | 2023-11-24 | 2023-12-26 | 内蒙古工业大学 | 用于装配式建筑结构的节点连接装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20319471U1 (de) * | 2003-12-16 | 2005-01-20 | Pfeifer Holding Gmbh & Co. Kg | Verbindungsfuge für den Kraftschluß von Betonfertigteilen |
CN102912861A (zh) * | 2012-10-25 | 2013-02-06 | 长沙远大住宅工业有限公司 | 全预制装配式结构体系 |
CN203097017U (zh) * | 2013-03-14 | 2013-07-31 | 沈阳建筑大学建筑设计研究院 | 一种预制填充墙与预制柱或预制剪力墙的连接结构 |
CN103556749A (zh) * | 2013-10-10 | 2014-02-05 | 南京工业大学 | 一种预制混凝土填充墙悬挂式柔性连接 |
CN103620130A (zh) * | 2011-06-20 | 2014-03-05 | 佩克集团有限公司 | 用于连接相邻的预制混凝土部的连接装置及用于连接第一与第二预制混凝土部的方法 |
CN204491914U (zh) * | 2015-01-16 | 2015-07-22 | 肖宁海 | 一种承重墙t型连接结构 |
-
2015
- 2015-10-23 CN CN201510696264.XA patent/CN105220794A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20319471U1 (de) * | 2003-12-16 | 2005-01-20 | Pfeifer Holding Gmbh & Co. Kg | Verbindungsfuge für den Kraftschluß von Betonfertigteilen |
CN103620130A (zh) * | 2011-06-20 | 2014-03-05 | 佩克集团有限公司 | 用于连接相邻的预制混凝土部的连接装置及用于连接第一与第二预制混凝土部的方法 |
CN102912861A (zh) * | 2012-10-25 | 2013-02-06 | 长沙远大住宅工业有限公司 | 全预制装配式结构体系 |
CN203097017U (zh) * | 2013-03-14 | 2013-07-31 | 沈阳建筑大学建筑设计研究院 | 一种预制填充墙与预制柱或预制剪力墙的连接结构 |
CN103556749A (zh) * | 2013-10-10 | 2014-02-05 | 南京工业大学 | 一种预制混凝土填充墙悬挂式柔性连接 |
CN204491914U (zh) * | 2015-01-16 | 2015-07-22 | 肖宁海 | 一种承重墙t型连接结构 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677536A (zh) * | 2017-03-02 | 2017-05-17 | 河北晶通建筑科技股份有限公司 | 一种预制屋顶板节点连接结构的制作方法 |
CN117286952A (zh) * | 2023-11-24 | 2023-12-26 | 内蒙古工业大学 | 用于装配式建筑结构的节点连接装置 |
CN117286952B (zh) * | 2023-11-24 | 2024-02-20 | 内蒙古工业大学 | 用于装配式建筑结构的节点连接装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110700420A (zh) | 一种装配式建筑的预制墙体和装配结构及其施工方法 | |
CN105862538B (zh) | 装配式斜向缓粘结预应力混凝土路面结构 | |
CN202391019U (zh) | 钢筋端部加粗灌浆接头 | |
CN203113627U (zh) | 一种用于纵向钢筋连接的球墨铸铁灌浆套筒 | |
CN104963461A (zh) | 一种采用钢纤维砂浆灌浆套筒的预制构件间钢筋连接方式 | |
CN110318498A (zh) | 一种装配式建筑组合式连接系统及其施工方法 | |
CN105220794A (zh) | 一种预制装配式剪力墙竖向主筋快速连接方法 | |
CN204475327U (zh) | 一种带钢筋骨架的新型装配式锚杆 | |
CN208792505U (zh) | 一种装配式建筑的预制墙体和装配结构 | |
CN106149874B (zh) | 预制装配式混凝土结构钢筋连接方法 | |
CN200992812Y (zh) | 一种化学灌浆用孔口灌浆止浆塞 | |
CN210857596U (zh) | 一种预制装配式无筋混凝土剪力墙 | |
CN110424573B (zh) | 一种预制装配式无筋混凝土剪力墙及其施工方法 | |
CN106958203A (zh) | 装配式桥梁用大尺寸高强度半灌浆连接型套筒 | |
CN203081460U (zh) | 隧道二衬端头施工缝施工用组合定位夹具 | |
CN102912928A (zh) | 使用钢筋两端约束灌浆锚固连接的构件及连接方法 | |
CN201738454U (zh) | 用于梁板与墙体连接的单元式连接件 | |
CN110644447A (zh) | 一种水工隧洞环向预应力混凝土衬砌锚具槽填充的施工装置及施工方法 | |
CN207032308U (zh) | 新型预制板拼接式检查井 | |
CN210163889U (zh) | 抗腐蚀桩体接头连接构造 | |
CN109667388A (zh) | 钢筋连接器及预制混凝土构件间钢筋连接结构 | |
CN201250516Y (zh) | 一种单侧墙体模板支架加固装置 | |
CN209907800U (zh) | 一种钢筋砼构件 | |
CN110318463A (zh) | 一种基于磷镁材料的预制柱与梁的连接结构及施工方法 | |
CN207512606U (zh) | 装配式桥梁用大尺寸高强度半灌浆连接型套筒 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160517 Address after: 518000 New Times Square, No. 1 Taizi Road, Shekou, Guangdong, Shenzhen, Nanshan District Applicant after: CHINA MERCHANTS SHEKOU INDUSTRIAL ZONE HOLDINGS CO.,LTD. Address before: Xinghua Road 518000 Guangdong city of Shenzhen province Nanshan District Shekou No. 6 Building No. 3 Library of the South China Sea Applicant before: CHINA MERCHANTS REAL ESTATE HOLDING Co.,Ltd. |
|
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160106 |