Background technology
River levee, along rivers, channel, lake, seashore limit or flood-diversion area, encloses and cultivates the water retaining structure that area edge builds.Fill can resist flooding, keeps off damp wave resistance, and the safety of resident and industrial and agricultural production in protection dike is the structural measures of flood control widely adopted the earliest in the world.River levee, Hu Di, sea wall, canal dike and embankment can be divided into according to the position of dike.Levee body is generally built by earth material.At rivers by location, cities and towns, for account for less soil or because of tide, stormy waves too large, also can adopt steel concrete or cemented rock dike, also known as flood protection wall.
Nowadays natural calamity occurs very frequent in China, wherein especially serious with flood, recent two decades comes, the exploitation of natural resource constantly expand, urban and rural economies build develop rapidly, and the frequency that flood occurs and the loss caused thereof also constantly increase, and more do not carry out the place of riverbank reinforce, seriously flood soil, crops of having destroyed by rush of water, house have caved in, the dead domestic animal of people dies, and make us startling.
At present when reinforcing manufacture river levee, the principle larger according to the darker pressure of water, main employing be trapezium structure, in material, importantly add that fine sand mixes by cement, or be laid to dike by sand hill along river course, have in order to save material, directly used the water grains of sand, these river levees be made up of cement material, cost compare is high, and easily ftracture, ground is not solid; The river levee that direct sand hill or the water grains of sand are made, although cost is cheap, only to block weak middle current, run into flood or heavy showers, cannot effectively stop, consequence is hardly imaginable.Therefore, fast, science, effectively carry out riverbank reinforce, make the direction flowing that river specify according to people, to reduce or to avoid river to be a very important thing for the mankind, social injury.
Summary of the invention
The technical problem that the present invention mainly solves: for generally adopting cement and the water grains of sand to be raw material when reinforcing and manufacturing river levee at present, not only cost compare is high, and easily ftracture, cause ground not solid, run into flood or heavy showers, the drawback that cannot effectively stop, provide a kind of method utilizing barged-in fill to reinforce river levee, first the method utilizes reinforcing bar to make a call to a trapezoidal river levee footing, then by barged-in fill respectively with cobble, quicklime, polymerized organics, coarse sand, medium sand mixes respectively, be positioned over successively afterwards in terraced fields river levee, vegetation in finally on the river levee reinforced, not only reduce cement consumption, save cost, and the material reinforced Be very effective that the method is made, add the design of upper trapezoid river levee, the truck of more than 2.5t of making to weigh builds up at river levee and just can firmly travel afterwards for 3 ~ 5 days.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
(1) a bottom width 5 ~ 10m is dug with excavator, high 1.5 ~ the 2m of bank, wide 1 ~ the 1.5m of bank, Kan Po is the river levee of 45 DEG C, and a reinforcing bar is laid every 20 ~ 25cm in bottom terraced fields river levee and slope, both sides, coating a layer thickness after laying is 2 ~ 3cm cement, hangs 3 ~ 4 days, treats its natural air drying;
(2) first from river course, 10 ~ 15kg barged-in fill is taken, add 5 ~ 7kg cobble and 3 ~ 5kg water, clockwise stirring 20 ~ 25min stops in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 35 ~ 45cm,, treat its natural air drying 1 ~ 2 day, make water loss to leather hard;
(3) next from river course, 8 ~ 12kg barged-in fill is taken, add 0.5 ~ 0.8kg polymerized organics, clockwise stirring, add 2 ~ 5kg quicklime in whipping process simultaneously, continue stirring 15 ~ 20min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 25 ~ 38cm, treat its natural air drying 1 ~ 3 day, the PAMC solution of wherein said polymerized organics to be concentration be 0.01 ~ 0.02g/L;
(4) from river course, 5 ~ 18kg barged-in fill is taken again subsequently, add 10 ~ 15kg fine sand, clockwise stirring 15 ~ 20min stops to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 30 ~ 35cm, treats its natural air drying 2 ~ 3 days;
(5) finally from river course, 12 ~ 16kg barged-in fill is taken again, add 8 ~ 14kg coarse sand, clockwise stirring 18 ~ 22min stops in half mud half sand shape, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 20 ~ 40cm, treats its natural air drying 3 ~ 5 days;
(6) after 3 ~ 5 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 12 ~ 15cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 1 ~ 3 day, plant some fast-growing woods sapling and flower seedlings above.
The invention has the beneficial effects as follows:
(1) the material reinforced Be very effective utilizing the method to make, not only effectively can stop the attack of flood or heavy showers, and the truck of more than the 2.5t that makes to weigh builds up at river levee and just can firmly travel afterwards for 3 days;
(2) decrease cement consumption, save cost of production.
Detailed description of the invention
A bottom width 5 ~ 10m is dug, the high 1.5 ~ 2m of bank, the wide 1 ~ 1.5m of bank with excavator, Kan Po is the river levee of 45 DEG C, and a reinforcing bar is laid every 20 ~ 25cm in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 2 ~ 3cm cement, hang 3 ~ 4 days, treat its natural air drying; First from river course, 10 ~ 15kg barged-in fill is taken, add 5 ~ 7kg cobble and 3 ~ 5kg water, clockwise stirring 20 ~ 25min stops in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 35 ~ 45cm,, treat its natural air drying 1 ~ 2 day, make water loss to leather hard; Next from river course, 8 ~ 12kg barged-in fill is taken, add 0.5 ~ 0.8kg polymerized organics, clockwise stirring, add 2 ~ 5kg quicklime in whipping process simultaneously, continue stirring 15 ~ 20min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 25 ~ 38cm, treat its natural air drying 1 ~ 3 day, the PAMC solution of wherein said polymerized organics to be concentration be 0.01 ~ 0.02g/L; 5 ~ 18kg barged-in fill is taken again subsequently from river course, add 10 ~ 15kg fine sand, clockwise stirring 15 ~ 20min stops to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 30 ~ 35cm, treats its natural air drying 2 ~ 3 days; Finally from river course, take 12 ~ 16kg barged-in fill again, add 8 ~ 14kg coarse sand, clockwise stirring 18 ~ 22min stops in half mud half sand shape, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 20 ~ 40cm, treats its natural air drying 3 ~ 5 days; After 3 ~ 5 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 12 ~ 15cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 1 ~ 3 day, plant some fast-growing woods sapling and flower seedlings above.
Dig a bottom width 5m with excavator, bank height 1.5m, bank wide 1m, Kan Po are the river levee of 45 DEG C, and a reinforcing bar is laid every 20cm in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 2cm cement, hangs 3 days, treats its natural air drying; First from river course, take 10kg barged-in fill, add 5kg cobble and 3kg water, stir 20min clockwise and stop in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 35cm, treat its natural air drying 1 day, make water loss to leather hard; Next from river course, 8kg barged-in fill is taken, add 0.5kg polymerized organics, clockwise stirring, add 2kg quicklime in whipping process simultaneously, continue to stir 15min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 25cm, treat its natural air drying 1 day, the PAMC solution of wherein said polymerized organics to be concentration be 0.01g/L; 5kg barged-in fill is taken again subsequently from river course, add 10kg fine sand, stir clockwise 15min and stop to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 30cm, treats its natural air drying 2 days; Finally from river course, take 12kg barged-in fill again, add 8kg coarse sand, stir clockwise 18min in half mud half sand shape only, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 20cm, treats its natural air drying 3 days; After 3 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 12cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 1 day, plant some fast-growing woods sapling and flower seedlings above.
This case method is unique novel, not only reduces cement consumption, has saved cost, and effectively can stop the attack of flood or heavy showers, and the truck of the 2.5t that makes to weigh builds up at river levee and just can firmly travel afterwards for 3 days.
A bottom width 8m is dug, bank height 1.8m, the wide 1.5m of bank with excavator, Kan Po is the river levee of 45 DEG C, and a reinforcing bar is laid every 23m in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 2.5cm cement, hang 3.5 days, treat its natural air drying; First from river course, take 13kg barged-in fill, add 6kg cobble and 4kg water, stir 23min clockwise and stop in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 40cm, treat its natural air drying 1.5 days, make water loss to leather hard; Next from river course, 10kg barged-in fill is taken, add 0.6kg polymerized organics, clockwise stirring, add 3kg quicklime in whipping process simultaneously, continue to stir 18min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 30cm, treat its natural air drying 2 days, the PAMC solution of wherein said polymerized organics to be concentration be 0.015g/L; 12kg barged-in fill is taken again subsequently from river course, add 12kg fine sand, stir clockwise 18min and stop to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 32cm, treats its natural air drying 2.5 days; Finally from river course, take 14kg barged-in fill again, add 12kg coarse sand, stir clockwise 20min in half mud half sand shape only, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 30cm, treats its natural air drying 4 days; After 4 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 13cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 2 days, plant some fast-growing woods sapling and flower seedlings above.
This case method is unique novel, not only reduces cement consumption, has saved cost, and effectively can stop the attack of flood or heavy showers, and the truck of the 3t that makes to weigh builds up at river levee and just can firmly travel afterwards for 3.5 days.
Dig a bottom width 10m with excavator, bank height 2m, bank wide 1.5m, Kan Po are the river levee of 45 DEG C, and a reinforcing bar is laid every 25cm in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 3cm cement, hangs 4 days, treats its natural air drying; First from river course, take 15kg barged-in fill, add 7kg cobble and 5kg water, stir 25min clockwise and stop in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 45cm, treat its natural air drying 2 days, make water loss to leather hard; Next from river course, 12kg barged-in fill is taken, add 0.8kg polymerized organics, clockwise stirring, add 5kg quicklime in whipping process simultaneously, continue to stir 20min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 38cm, treat its natural air drying 3 days, the PAMC solution of wherein said polymerized organics to be concentration be 0.02g/L; 18kg barged-in fill is taken again subsequently from river course, add 15kg fine sand, stir clockwise 20min and stop to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 35cm, treats its natural air drying 3 days; Finally from river course, take 16kg barged-in fill again, add 14kg coarse sand, stir clockwise 22min in half mud half sand shape only, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 40cm, treats its natural air drying 5 days; After 5 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 15cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 3 days, plant some fast-growing woods sapling and flower seedlings above.
This case method is unique novel, not only reduces cement consumption, has saved cost, and effectively can stop the attack of flood or heavy showers, and the truck of the 3.5t that makes to weigh builds up at river levee and just can firmly travel afterwards for 5 days.