CN105200958A - Method for reinforcing river bank by utilizing dredger fill - Google Patents

Method for reinforcing river bank by utilizing dredger fill Download PDF

Info

Publication number
CN105200958A
CN105200958A CN201510539604.8A CN201510539604A CN105200958A CN 105200958 A CN105200958 A CN 105200958A CN 201510539604 A CN201510539604 A CN 201510539604A CN 105200958 A CN105200958 A CN 105200958A
Authority
CN
China
Prior art keywords
river
river levee
fill
days
add
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510539604.8A
Other languages
Chinese (zh)
Other versions
CN105200958B (en
Inventor
雷思宇
张帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Yong
Meng Ziqiang
Ren Fuquan
Song Fubao
Xu Shilei
Yang Bo
Zhao Suyue
Original Assignee
CHANGZHOU SIYU ENVIRONMENTAL PROTECTION MATERIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU SIYU ENVIRONMENTAL PROTECTION MATERIAL TECHNOLOGY Co Ltd filed Critical CHANGZHOU SIYU ENVIRONMENTAL PROTECTION MATERIAL TECHNOLOGY Co Ltd
Priority to CN201510539604.8A priority Critical patent/CN105200958B/en
Publication of CN105200958A publication Critical patent/CN105200958A/en
Application granted granted Critical
Publication of CN105200958B publication Critical patent/CN105200958B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a method for reinforcing a river bank by utilizing dredger fill, belonging to the technical field of foundation treatment. The method provided by the invention comprises the following steps: firstly making a trapezoidal river bank foundation by utilizing steel bars; then respectively mixing dredger fill with cobblestone, quicklime, polymeric organic matters, coarse sand and medium sand, and then sequentially putting in a terrace river bank; and finally, planting vegetations on the reinforced river bank. Embodiments prove that the method reduces the cement content and saves the cost, and the material prepared by the method has an obvious reinforced effect; and by virtue of the design of the trapezoidal river bank, after the river bank is built for 3-5 days, a truck of which the weight is more than 2.5-3.5t can steadily run on the river bank.

Description

A kind of method utilizing barged-in fill to reinforce river levee
Technical field
The present invention relates to a kind of method utilizing barged-in fill to reinforce river levee, belong to foundation treatment technology field.
Background technology
River levee, along rivers, channel, lake, seashore limit or flood-diversion area, encloses and cultivates the water retaining structure that area edge builds.Fill can resist flooding, keeps off damp wave resistance, and the safety of resident and industrial and agricultural production in protection dike is the structural measures of flood control widely adopted the earliest in the world.River levee, Hu Di, sea wall, canal dike and embankment can be divided into according to the position of dike.Levee body is generally built by earth material.At rivers by location, cities and towns, for account for less soil or because of tide, stormy waves too large, also can adopt steel concrete or cemented rock dike, also known as flood protection wall.
Nowadays natural calamity occurs very frequent in China, wherein especially serious with flood, recent two decades comes, the exploitation of natural resource constantly expand, urban and rural economies build develop rapidly, and the frequency that flood occurs and the loss caused thereof also constantly increase, and more do not carry out the place of riverbank reinforce, seriously flood soil, crops of having destroyed by rush of water, house have caved in, the dead domestic animal of people dies, and make us startling.
At present when reinforcing manufacture river levee, the principle larger according to the darker pressure of water, main employing be trapezium structure, in material, importantly add that fine sand mixes by cement, or be laid to dike by sand hill along river course, have in order to save material, directly used the water grains of sand, these river levees be made up of cement material, cost compare is high, and easily ftracture, ground is not solid; The river levee that direct sand hill or the water grains of sand are made, although cost is cheap, only to block weak middle current, run into flood or heavy showers, cannot effectively stop, consequence is hardly imaginable.Therefore, fast, science, effectively carry out riverbank reinforce, make the direction flowing that river specify according to people, to reduce or to avoid river to be a very important thing for the mankind, social injury.
Summary of the invention
The technical problem that the present invention mainly solves: for generally adopting cement and the water grains of sand to be raw material when reinforcing and manufacturing river levee at present, not only cost compare is high, and easily ftracture, cause ground not solid, run into flood or heavy showers, the drawback that cannot effectively stop, provide a kind of method utilizing barged-in fill to reinforce river levee, first the method utilizes reinforcing bar to make a call to a trapezoidal river levee footing, then by barged-in fill respectively with cobble, quicklime, polymerized organics, coarse sand, medium sand mixes respectively, be positioned over successively afterwards in terraced fields river levee, vegetation in finally on the river levee reinforced, not only reduce cement consumption, save cost, and the material reinforced Be very effective that the method is made, add the design of upper trapezoid river levee, the truck of more than 2.5t of making to weigh builds up at river levee and just can firmly travel afterwards for 3 ~ 5 days.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
(1) a bottom width 5 ~ 10m is dug with excavator, high 1.5 ~ the 2m of bank, wide 1 ~ the 1.5m of bank, Kan Po is the river levee of 45 DEG C, and a reinforcing bar is laid every 20 ~ 25cm in bottom terraced fields river levee and slope, both sides, coating a layer thickness after laying is 2 ~ 3cm cement, hangs 3 ~ 4 days, treats its natural air drying;
(2) first from river course, 10 ~ 15kg barged-in fill is taken, add 5 ~ 7kg cobble and 3 ~ 5kg water, clockwise stirring 20 ~ 25min stops in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 35 ~ 45cm,, treat its natural air drying 1 ~ 2 day, make water loss to leather hard;
(3) next from river course, 8 ~ 12kg barged-in fill is taken, add 0.5 ~ 0.8kg polymerized organics, clockwise stirring, add 2 ~ 5kg quicklime in whipping process simultaneously, continue stirring 15 ~ 20min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 25 ~ 38cm, treat its natural air drying 1 ~ 3 day, the PAMC solution of wherein said polymerized organics to be concentration be 0.01 ~ 0.02g/L;
(4) from river course, 5 ~ 18kg barged-in fill is taken again subsequently, add 10 ~ 15kg fine sand, clockwise stirring 15 ~ 20min stops to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 30 ~ 35cm, treats its natural air drying 2 ~ 3 days;
(5) finally from river course, 12 ~ 16kg barged-in fill is taken again, add 8 ~ 14kg coarse sand, clockwise stirring 18 ~ 22min stops in half mud half sand shape, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 20 ~ 40cm, treats its natural air drying 3 ~ 5 days;
(6) after 3 ~ 5 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 12 ~ 15cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 1 ~ 3 day, plant some fast-growing woods sapling and flower seedlings above.
The invention has the beneficial effects as follows:
(1) the material reinforced Be very effective utilizing the method to make, not only effectively can stop the attack of flood or heavy showers, and the truck of more than the 2.5t that makes to weigh builds up at river levee and just can firmly travel afterwards for 3 days;
(2) decrease cement consumption, save cost of production.
Detailed description of the invention
A bottom width 5 ~ 10m is dug, the high 1.5 ~ 2m of bank, the wide 1 ~ 1.5m of bank with excavator, Kan Po is the river levee of 45 DEG C, and a reinforcing bar is laid every 20 ~ 25cm in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 2 ~ 3cm cement, hang 3 ~ 4 days, treat its natural air drying; First from river course, 10 ~ 15kg barged-in fill is taken, add 5 ~ 7kg cobble and 3 ~ 5kg water, clockwise stirring 20 ~ 25min stops in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 35 ~ 45cm,, treat its natural air drying 1 ~ 2 day, make water loss to leather hard; Next from river course, 8 ~ 12kg barged-in fill is taken, add 0.5 ~ 0.8kg polymerized organics, clockwise stirring, add 2 ~ 5kg quicklime in whipping process simultaneously, continue stirring 15 ~ 20min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 25 ~ 38cm, treat its natural air drying 1 ~ 3 day, the PAMC solution of wherein said polymerized organics to be concentration be 0.01 ~ 0.02g/L; 5 ~ 18kg barged-in fill is taken again subsequently from river course, add 10 ~ 15kg fine sand, clockwise stirring 15 ~ 20min stops to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 30 ~ 35cm, treats its natural air drying 2 ~ 3 days; Finally from river course, take 12 ~ 16kg barged-in fill again, add 8 ~ 14kg coarse sand, clockwise stirring 18 ~ 22min stops in half mud half sand shape, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 20 ~ 40cm, treats its natural air drying 3 ~ 5 days; After 3 ~ 5 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 12 ~ 15cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 1 ~ 3 day, plant some fast-growing woods sapling and flower seedlings above.
Dig a bottom width 5m with excavator, bank height 1.5m, bank wide 1m, Kan Po are the river levee of 45 DEG C, and a reinforcing bar is laid every 20cm in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 2cm cement, hangs 3 days, treats its natural air drying; First from river course, take 10kg barged-in fill, add 5kg cobble and 3kg water, stir 20min clockwise and stop in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 35cm, treat its natural air drying 1 day, make water loss to leather hard; Next from river course, 8kg barged-in fill is taken, add 0.5kg polymerized organics, clockwise stirring, add 2kg quicklime in whipping process simultaneously, continue to stir 15min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 25cm, treat its natural air drying 1 day, the PAMC solution of wherein said polymerized organics to be concentration be 0.01g/L; 5kg barged-in fill is taken again subsequently from river course, add 10kg fine sand, stir clockwise 15min and stop to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 30cm, treats its natural air drying 2 days; Finally from river course, take 12kg barged-in fill again, add 8kg coarse sand, stir clockwise 18min in half mud half sand shape only, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 20cm, treats its natural air drying 3 days; After 3 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 12cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 1 day, plant some fast-growing woods sapling and flower seedlings above.
This case method is unique novel, not only reduces cement consumption, has saved cost, and effectively can stop the attack of flood or heavy showers, and the truck of the 2.5t that makes to weigh builds up at river levee and just can firmly travel afterwards for 3 days.
A bottom width 8m is dug, bank height 1.8m, the wide 1.5m of bank with excavator, Kan Po is the river levee of 45 DEG C, and a reinforcing bar is laid every 23m in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 2.5cm cement, hang 3.5 days, treat its natural air drying; First from river course, take 13kg barged-in fill, add 6kg cobble and 4kg water, stir 23min clockwise and stop in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 40cm, treat its natural air drying 1.5 days, make water loss to leather hard; Next from river course, 10kg barged-in fill is taken, add 0.6kg polymerized organics, clockwise stirring, add 3kg quicklime in whipping process simultaneously, continue to stir 18min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 30cm, treat its natural air drying 2 days, the PAMC solution of wherein said polymerized organics to be concentration be 0.015g/L; 12kg barged-in fill is taken again subsequently from river course, add 12kg fine sand, stir clockwise 18min and stop to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 32cm, treats its natural air drying 2.5 days; Finally from river course, take 14kg barged-in fill again, add 12kg coarse sand, stir clockwise 20min in half mud half sand shape only, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 30cm, treats its natural air drying 4 days; After 4 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 13cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 2 days, plant some fast-growing woods sapling and flower seedlings above.
This case method is unique novel, not only reduces cement consumption, has saved cost, and effectively can stop the attack of flood or heavy showers, and the truck of the 3t that makes to weigh builds up at river levee and just can firmly travel afterwards for 3.5 days.
Dig a bottom width 10m with excavator, bank height 2m, bank wide 1.5m, Kan Po are the river levee of 45 DEG C, and a reinforcing bar is laid every 25cm in bottom terraced fields river levee and slope, both sides, and coating a layer thickness after laying is 3cm cement, hangs 4 days, treats its natural air drying; First from river course, take 15kg barged-in fill, add 7kg cobble and 5kg water, stir 25min clockwise and stop in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 45cm, treat its natural air drying 2 days, make water loss to leather hard; Next from river course, 12kg barged-in fill is taken, add 0.8kg polymerized organics, clockwise stirring, add 5kg quicklime in whipping process simultaneously, continue to stir 20min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 38cm, treat its natural air drying 3 days, the PAMC solution of wherein said polymerized organics to be concentration be 0.02g/L; 18kg barged-in fill is taken again subsequently from river course, add 15kg fine sand, stir clockwise 20min and stop to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 35cm, treats its natural air drying 3 days; Finally from river course, take 16kg barged-in fill again, add 14kg coarse sand, stir clockwise 22min in half mud half sand shape only, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 40cm, treats its natural air drying 5 days; After 5 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 15cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 3 days, plant some fast-growing woods sapling and flower seedlings above.
This case method is unique novel, not only reduces cement consumption, has saved cost, and effectively can stop the attack of flood or heavy showers, and the truck of the 3.5t that makes to weigh builds up at river levee and just can firmly travel afterwards for 5 days.

Claims (1)

1. utilize barged-in fill to reinforce a method for river levee, it is characterized in that concrete operation step is:
(1) a bottom width 5 ~ 10m is dug with excavator, high 1.5 ~ the 2m of bank, wide 1 ~ the 1.5m of bank, Kan Po is the river levee of 45 DEG C, and a reinforcing bar is laid every 20 ~ 25cm in bottom terraced fields river levee and slope, both sides, coating a layer thickness after laying is 2 ~ 3cm cement, hangs 3 ~ 4 days, treats its natural air drying;
(2) first from river course, 10 ~ 15kg barged-in fill is taken, add 5 ~ 7kg cobble and 3 ~ 5kg water, clockwise stirring 20 ~ 25min stops in pureed, afterwards by made pureed mixture uniform irrigation bottom above-mentioned dug river levee, thickness is 35 ~ 45cm,, treat its natural air drying 1 ~ 2 day, make water loss to leather hard;
(3) next from river course, 8 ~ 12kg barged-in fill is taken, add 0.5 ~ 0.8kg polymerized organics, clockwise stirring, add 2 ~ 5kg quicklime in whipping process simultaneously, continue stirring 15 ~ 20min to stop in thick, completed on the river levee of bottom above-mentioned by made viscous mixture uniform irrigation afterwards, laying depth is 25 ~ 38cm, treat its natural air drying 1 ~ 3 day, the PAMC solution of wherein said polymerized organics to be concentration be 0.01 ~ 0.02g/L;
(4) from river course, 5 ~ 18kg barged-in fill is taken again subsequently, add 10 ~ 15kg fine sand, clockwise stirring 15 ~ 20min stops to muddy, afterwards by made muddy mixture uniform irrigation on the above-mentioned two-layer river levee completed, laying depth is 30 ~ 35cm, treats its natural air drying 2 ~ 3 days;
(5) finally from river course, 12 ~ 16kg barged-in fill is taken again, add 8 ~ 14kg coarse sand, clockwise stirring 18 ~ 22min stops in half mud half sand shape, afterwards by half made mud half sand mixture uniform irrigation on the above-mentioned river levee having completed three layers, laying depth is 20 ~ 40cm, treats its natural air drying 3 ~ 5 days;
(6) after 3 ~ 5 days, with road roller, terraced fields river levee surface is rolled, and build regular hexagon flower nursery in smooth ground of rolling successively according to the spacing of 12 ~ 15cm, the every length of side 15cm in flower nursery, hexagon all uses rectangle fragment of brick and cement stabilization, after natural coagulation in 1 ~ 3 day, plant some fast-growing woods sapling and flower seedlings above.
CN201510539604.8A 2015-08-30 2015-08-30 Method for reinforcing river bank by utilizing dredger fill Expired - Fee Related CN105200958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510539604.8A CN105200958B (en) 2015-08-30 2015-08-30 Method for reinforcing river bank by utilizing dredger fill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510539604.8A CN105200958B (en) 2015-08-30 2015-08-30 Method for reinforcing river bank by utilizing dredger fill

Publications (2)

Publication Number Publication Date
CN105200958A true CN105200958A (en) 2015-12-30
CN105200958B CN105200958B (en) 2017-01-11

Family

ID=54948891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510539604.8A Expired - Fee Related CN105200958B (en) 2015-08-30 2015-08-30 Method for reinforcing river bank by utilizing dredger fill

Country Status (1)

Country Link
CN (1) CN105200958B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220590A (en) * 2008-01-04 2008-07-16 东南大学 Sullage solidifying method
JP4611402B2 (en) * 2008-06-02 2011-01-12 株式会社ホクコン Composite bottom dam in Tameike dike
CN102173695A (en) * 2011-01-10 2011-09-07 东南大学 Novel composite additive for solidifying material for dredged silt with high water content

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220590A (en) * 2008-01-04 2008-07-16 东南大学 Sullage solidifying method
JP4611402B2 (en) * 2008-06-02 2011-01-12 株式会社ホクコン Composite bottom dam in Tameike dike
CN102173695A (en) * 2011-01-10 2011-09-07 东南大学 Novel composite additive for solidifying material for dredged silt with high water content

Also Published As

Publication number Publication date
CN105200958B (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN105544460B (en) Cast-in-place plant growing type eco-concrete slope protection construction method
CN203411948U (en) Green ecological riverway revetment structure
CN106759104B (en) Ecological slope protection structure and construction method
CN104108905B (en) A kind of early-strength type composite curing agent of high organic mudflat sludge and application thereof
CN103329658A (en) Sectional three-dimensional structure for fast desalting and soil improvement of saline-alkali soil of new tidal marsh reclamation area
CN103086570A (en) Farmland non-point pollution stepped undercurrent dam ecological purification ditch system
CN104594287B (en) Ecological and economic bank protection structure
CN103422511A (en) Reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
CN104404917A (en) Taihu lake ecological dam revetment construction method
CN102870523B (en) Terrain processing method for improving seashore solonchak
CN102953353B (en) Microbial river embankment reinforcement ecological slope protection technology
CN104234007B (en) A kind of river saline-alkali soil levee slope greening method
CN106120652A (en) A kind of method utilizing lichen and Stalactitum to reinforce river levee
CN102234995B (en) Ecological overtopping dam and construction method thereof
CN102144523A (en) Sidewalk-frozen tree planting method for coastal saline-salt soil
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN105133572A (en) Method for reinforcing riverbank by waste oil, enzymolysis glutinous rice starch and rammed dredger fill
CN103205951A (en) Sludge-type soil combined secondary dike-back pressure diking method
CN210840602U (en) Coastal area heavy saline-alkali soil improvement system
CN102369834B (en) Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof
CN101892650A (en) Combined type seawall and construction method thereof
CN218911257U (en) Ecological seawall structure
CN104695379A (en) Ecological river channel revetment structure
CN207092011U (en) A kind of water conservancy ecosystem system
CN105200958B (en) Method for reinforcing river bank by utilizing dredger fill

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wang Yinshan

Inventor after: Zhao Suyue

Inventor after: Li Songtao

Inventor after: Yang Bo

Inventor after: Song Fubao

Inventor after: Liu Hongxing

Inventor after: Ma Xiaolin

Inventor after: Xu Shilei

Inventor after: Lai Xinhe

Inventor after: Zhang Huifeng

Inventor after: Ren Fuquan

Inventor after: Li Yong

Inventor after: Sun Lijuan

Inventor after: Wang Chunsheng

Inventor after: Liu Xinfeng

Inventor after: Meng Ziqiang

Inventor before: Lei Siyu

Inventor before: Zhang Fan

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161101

Address after: 450000 No. 13, building 10, No. 17, weft five road, Jinshui District, Henan, Zhengzhou

Applicant after: Wang Yinshan

Applicant after: Zhao Suyue

Applicant after: Li Songtao

Applicant after: Yang Bo

Applicant after: Song Fubao

Applicant after: Liu Hongxing

Applicant after: Ma Xiaolin

Applicant after: Xu Shilei

Applicant after: Lai Xinhe

Applicant after: Zhang Huifeng

Applicant after: Ren Fuquan

Applicant after: Li Yong

Applicant after: Sun Lijuan

Applicant after: Wang Chunsheng

Applicant after: Liu Xinfeng

Applicant after: Meng Ziqiang

Address before: 213164, C building, Tianhong building, No. 801, science education city, 414 middle Wu Road, Jiangsu, Changzhou

Applicant before: Changzhou Siyu Environmental Protection Material Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20170830