Pipeline closing or blocking monitoring method and system for fire water supply system Download PDF

Info

Publication number
CN105178392B
CN105178392B CN201510574193.6A CN201510574193A CN105178392B CN 105178392 B CN105178392 B CN 105178392B CN 201510574193 A CN201510574193 A CN 201510574193A CN 105178392 B CN105178392 B CN 105178392B
Authority
CN
China
Prior art keywords
real
valve
fire
time
normal pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510574193.6A
Other languages
Chinese (zh)
Other versions
CN105178392A (en
Inventor
徐培龙
陈睿迪
周鹏飞
刘巧和
袁靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Hehang Technology Co.,Ltd.
Original Assignee
Chongqing Hehang Internet Of Things Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Hehang Internet Of Things Technology Research Institute Co Ltd filed Critical Chongqing Hehang Internet Of Things Technology Research Institute Co Ltd
Priority to CN201510574193.6A priority Critical patent/CN105178392B/en
Publication of CN105178392A publication Critical patent/CN105178392A/en
Application granted granted Critical
Publication of CN105178392B publication Critical patent/CN105178392B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The invention discloses a pipeline closing or blocking monitoring method and system for a fire water supply system. The method comprises the steps that a standard pressure ratio is determined, a real-time pressure ratio is acquired, and the real-time pressure ratio is compared with the standard pressure ratio to judge whether a pipeline between detection points is blocked or a valve is located in a closed state, or judge whether a pipeline of a fire water tank leading to a fire pipe network is blocked or the pressure of a fire water tank is low. According to the method, the states of the fire pipe network itself and the fire water tank are determined by adopting the method of comparing the real-time pressure ratio between the detection points with the standard pressure ratio; the method is simple and accurate, whether the condition that the fire pipeline network is blocked or the valve is closed and the state that the water pressure of the fire water tank is reduced to a threshold value exist in the fire pipe network can be detected in real time, therefore, it is guaranteed that the whole fire pipe network ( including an automatic sprinkler system and a fire hydrant system) can be quickly used, and the loss caused by a fire disaster is reduced.

Description

Fire supply system closedown of pipeline or blocking monitoring method and system
Technical field
The present invention relates to a kind of monitoring field of the fire_fighting pipe network based on pressure detection, special type is related to a kind of fire water-supply system System closedown of pipeline or blocking monitoring method and system.
Background technology
With the fast development of China's economy, day built by urban track traffic, skyscraper, hotel, hotel, office building etc. Benefit increases, and the complicated building of these functions once occurs fire will bring heavy losses to people's safety of life and property, Bring very big negative effect and financial burden also to country and social unit simultaneously.And in actual production life, fire-fighting water resource Scarcity, water facilities are unsound, regular maintenance management is not in place is the main cause leading to small fire to lead to big fire.
For the problems referred to above, employing automatic sprinkler system more in prior art, hydrant system normal The dynamic effect that all can guarantee that fire gives full play to fire-fighting fire extinguishing when occurring.But in real security against fire supervision, for saving due to letting out Leaking the fire water leading to run off it may appear that artificially closing fire valve, once occurring fire it is impossible to fast reaction, causing larger Loss;Or, it is used for other without being supplemented because of fire protection pipeline infiltration or by the fire water in fire water box, fire occurs When fire-fighting water supply two cause greater loss not in time.
For avoiding the problems referred to above, have in prior art and the water level in fire water box is carried out with automatic detection and is automatically replenished Linked system, but this system does not have Monitoring Data, cannot form linkage after fault, and for the blocking of pipeline, valve The closing of door then cannot be carried out monitoring.
Accordingly, it would be desirable to the method and system that a kind of working condition to fire_fighting pipe network is monitored, can real-time detection arrive Whether there is blocking or the situation of valve closing in fire_fighting pipe network and whether the hydraulic pressure of fire water box be reduced to threshold values state, To ensure to occur the quick use of whole fire_fighting pipe network (including automatic sprinkler system, hydrant system) during fire, thus Reduce the loss causing due to fire.
Content of the invention
In view of this, it is an object of the invention to provide a kind of fire supply system closedown of pipeline or blocking monitoring method and be System, can real-time detection in fire_fighting pipe network with the presence or absence of blocking or the situation of valve closing and the hydraulic pressure of fire water box be No it is reduced to threshold values state, to ensure to occur whole fire_fighting pipe network during fire (to include automatic sprinkler system, fire hydrant system System) quick use, thus reducing the loss that causes due to fire.
The fire supply system closedown of pipeline of the present invention or blocking monitoring method, comprise the following steps:
A. set valve after test point before the valve of fire_fighting pipe network valve and respectively, in valve opening and elevated tank hydraulic pressure just Normal pressure value after normal pressure value and valve before valve is obtained, by normal pressure value after valve than normal pressure value before valve on the premise of often Ratio as normal pressure ratio;
B. using real-time pressure after pressure values real-time before the valve of test point real-time detection fire_fighting pipe network valve of step a and valve Value, using pressure values real-time after valve than pressure values real-time before valve ratio as real-time pressure ratio;
C. the standard pressure ratio value of the real-time pressure ratio of step b and step a is contrasted, when real-time pressure ratio is less than Normal pressure ratio, then judge that the line clogging between test point or valve are closed;When real-time pressure ratio is more than Normal pressure ratio, then judge that fire water box is low towards the line clogging of fire_fighting pipe network or fire water box pressure.
Further, in step c, when real-time pressure ratio is less than normal pressure ratio more than a set point, then judge Line clogging between test point or valve are closed;When real-time pressure ratio sets more than one more than normal pressure ratio When determining scope, then judge that fire water box is low towards the line clogging of fire_fighting pipe network or fire water box pressure;
Further, in step a, also will be poor as normal pressure for the difference of normal pressure value before normal pressure value after valve and valve Value;In step b, also using the difference of pressure values real-time before pressure values real-time after valve and valve as real-time pressure difference;In step c, When real-time pressure ratio is less than normal pressure ratio, and when pressure difference is again smaller than normal pressure difference in real time, then judge detection Line clogging between point or valve are closed;When real-time pressure ratio is more than normal pressure ratio, and real-time pressure When difference is not changed in respect to normal pressure difference, then judge that fire water box leads to line clogging or the fire water of fire_fighting pipe network Case pressure is low;
Further, in step c, when real-time pressure ratio is less than normal pressure ratio, and real-time pressure difference is again smaller than mark During quasi- pressure difference, and the numerical value that real-time pressure ratio is less than normal pressure ratio is poor less than normal pressure with real-time pressure difference Value has corresponding relation, then judge that the line clogging between test point or valve are closed;
Further, described test point includes test point after least favorable point test point and valve before high-order and valve.
The invention also discloses a kind of fire supply system closedown of pipeline or blocking monitoring system, comprising:
Pressure detector unit, including being distributed in fire_fighting pipe network pressure transducer, for obtaining disappearing of fire_fighting pipe network set point Waterproof pressure;
CPU, stores the normal pressure ratio between set point, transmits for receiving pressure detector unit Fire_fighting pipe network set point fire fighting hydraulic pressure hard real time data, set point is obtained according to the fire fighting hydraulic pressure hard real time data of set point Between real-time pressure ratio, contrast real-time pressure ratio and normal pressure ratio.
Further, described CPU also stores the normal pressure difference between set point, for receiving pressure The fire fighting hydraulic pressure hard real time data of the fire_fighting pipe network set point that detector unit transmits, according to the fire fighting hydraulic pressure hard real time number of set point According to the real-time pressure difference obtaining between set point, contrast real-time pressure difference and normal pressure difference;
Further, also include output unit, for CPU is contrasted real-time pressure ratio and normal pressure ratio The result of the result of value and the real-time pressure difference of contrast and normal pressure difference and judged result output;
Further, remote monitoring center and network transmitting unit are also included, network transmitting unit is used for for central authorities processing list The judged result of unit is delivered to remote monitoring center;
Further, also include sending alarm signal for the order receiving CPU or/and remote monitoring center Alarm unit.
Beneficial effects of the present invention: the fire supply system closedown of pipeline of the present invention or blocking monitoring method and system, by The test point pressure that each sets in fire_fighting pipe network should be constant, should be with normal pressure using pressure ratio real-time between test point The method that ratio compares, determines the state of fire_fighting pipe network itself and fire water box, and method is simply accurate, being capable of real-time detection Whether there is blocking or the situation of valve closing in fire_fighting pipe network and whether the hydraulic pressure of fire water box is reduced to threshold values shape State, to ensure to occur the quick use of whole fire_fighting pipe network (including automatic sprinkler system, hydrant system) during fire, from And reduce the loss causing due to fire.
Brief description
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is method of the present invention flow chart;
Fig. 2 is present system theory diagram.
Specific embodiment
Fig. 1 is method of the present invention flow chart, as shown in the figure: the fire supply system closedown of pipeline of the present embodiment or stifled Plug monitoring method, comprises the following steps:
A. set valve after test point before the valve of fire_fighting pipe network valve and respectively, in valve opening and elevated tank hydraulic pressure just Normal pressure value after normal pressure value and valve before valve is obtained, by normal pressure value after valve than normal pressure value before valve on the premise of often Ratio as normal pressure ratio;Before valve, test point is typically chosen the test point before fire_fighting pipe network valve, and disappears with this The least favorable point that anti-pipe network is located at a high position is corresponding, and after valve, test point should be multiple, after being in the valve of all controlled valves of pipe network, And, generally, normal pressure ratio be also after each valve the normal pressure value of test point with positioned at high-order least favorable Ratio between the normal pressure value of point (before valve) test point, now it is believed that point on the basis of least favorable point (before valve) test point; Of course, it is possible to using different datum marks, all enable goal of the invention;
B. using real-time pressure after pressure values real-time before the valve of test point real-time detection fire_fighting pipe network valve of step a and valve Value, using pressure values real-time after valve than pressure values real-time before valve ratio as real-time pressure ratio;The calculating of pressure ratio in real time Selection with datum mark should be consistent with the selection of the calculating of the normal pressure ratio in step a and datum mark, and here is no longer superfluous State;
C. the standard pressure ratio value of the real-time pressure ratio of step b and step a is contrasted, when real-time pressure ratio is less than Normal pressure ratio, then judge that the line clogging between test point or valve are closed;I.e. due to line clogging or Valve closing, after valve, test point pressure values taper into, and (before at least one valve, test point is as base thus to can determine that test point Line clogging between on schedule) or valve are closed;When real-time pressure ratio is more than normal pressure ratio, then judge to disappear Caisson is low towards the line clogging of fire_fighting pipe network or fire water box pressure, that is, because tank pressure declines, examines before valve and after valve Measuring point all deducts identical pressure value, then after valve before the real-time pressure values of test point and valve the real-time pressure values of test point ratio Become larger, thus can determine whether out that fire water box is low towards the line clogging of fire_fighting pipe network or fire water box pressure.
Certainly, with preceding method contrary calculation may also be employed, detect after the pressure values of test point and valve before valve The ratio of the pressure values of point, as pressure values ratio, judges also contrary accordingly, also can reach goal of the invention, here is no longer superfluous State.
In the present embodiment, in step c, when real-time pressure ratio is less than normal pressure ratio more than a set point, then Judge that the line clogging between test point or valve are closed;When real-time pressure ratio exceedes more than normal pressure ratio During one set point, then judge that fire water box is low towards the line clogging of fire_fighting pipe network or fire water box pressure;Become using scope Change and judged, environmental fluctuating interference can be excluded, and reduce unnecessary warning and in-situ processing.
In the present embodiment, in step a, also using the difference of normal pressure value before normal pressure value after valve and valve as standard pressure Strong difference;In step b, also using the difference of pressure values real-time before pressure values real-time after valve and valve as real-time pressure difference;Step c In, when real-time pressure ratio is less than normal pressure ratio, and when pressure difference is again smaller than normal pressure difference in real time, then judge inspection Line clogging between measuring point or valve are closed, if now pressure difference is equal to normal pressure difference in real time, Valve and pipeline should belong to normal, should find the problem of other presence, and such as tank pressure is excessively high;When real-time pressure ratio is big In normal pressure ratio, and when real-time pressure difference is not changed in respect to normal pressure difference, then judge that fire water box leads to The line clogging of fire_fighting pipe network or fire water box pressure are low, if now pressure difference is more than normal pressure difference in real time, should Belong to detecting system fault, such as Sensor Problem etc., water tank can be excluded abnormal;Assist the determination methods of ratio using difference, More accurate can must be judged, be excluded external interference.
In the present embodiment, select two test point a (before valve), b (after valve);Least favorable point (before valve) detection positioned at high point Normal pressure value p of pointA marks=ρ ghA marks, real-time pressure values pA is real=ρ ghA is real, normal pressure value p of test point after valveB marks=ρ ghB marks, Pressure values p in real timeB is real=ρ ghB is real;ρ is fire-fighting water density, and g is acceleration of gravity, hB is real=hB is realFor test point after valve with respect to water The height of case liquid level, hA marks=hA is realFor test point after valve with respect to water tank level height;
When real-time pressure ratio is less than normal pressure ratio, and when pressure difference is again smaller than normal pressure difference in real time: kFullsized =pB is real/pA is real, kMark ratio=pB marks/pA marks, kFullsized-kMark ratio< 0;pB is real-pA is real=kReal poor, pB marks-pA marks=kMark is poor, kReal poor-kMark is poor< 0;Now judge Blocking or valve closing between two test point a (before valve), b (after valve);
When real-time pressure ratio is more than normal pressure ratio, and when real-time pressure difference is equal to normal pressure difference: kFullsized- kMark ratio> 0;kReal poor-kMark is poor=0;Now judge that fire water box is low towards the line clogging of fire_fighting pipe network or fire water box pressure;
Certainly, in the present embodiment, b (after valve) test point only chooses one, can be the valve of multiple valves when actually used Test point afterwards, needs to select different datum mark a (being generally located at the least favorable point of high point) according to different, here is no longer superfluous State.
During use, according to fire_fighting pipe network be automatic sprinkler system pipe network and fire hydrant linkage pipe network can set difference Test point, such as, automatic sprinkler system pipe network set test point a, test point b and test point c, wherein test point a position In a high position and before switch valve valve, after test point b is located at switch valve valve and before alarm valve valve, test point c is located at warning After valve valve, will not be described here;And fire hydrant linkage pipe network is additionally provided with air relief valve, should add when air relief valve calculates after and before the valve and subtract The decompression valve parameter of pressure valve, will not be described here.
In the present embodiment, in step c, when real-time pressure ratio is less than normal pressure ratio, and real-time pressure difference is also little When normal pressure difference, and real-time pressure ratio is less than the numerical value of normal pressure ratio and real-time pressure difference is less than standard pressure Strong difference has corresponding relation, then judge that the line clogging between test point or valve are closed;Corresponding relation refers to It is that line clogging or valve are closed down, when real-time pressure ratio is reduced to the numerical value determining, then real-time pressure difference The numerical value reducing is to determine, the two has corresponding relation, according to formula kFullsized=pB is real/pA is real, pB is real-pA is real=kReal poorCan be seen that, Will not be described here.
In this enforcement, described test point includes test point after least favorable point test point and valve before high-order and valve;Tool There is the detection reference of standard, conveniently contrast and calculate.
The invention also discloses a kind of fire supply system closedown of pipeline or blocking monitoring system, comprising:
Pressure detector unit, including being distributed in fire_fighting pipe network pressure transducer, for obtaining disappearing of fire_fighting pipe network set point Waterproof pressure;According to the needs of preceding method, set test point and pressure transducer is installed;
CPU, stores the normal pressure ratio between set point, transmits for receiving pressure detector unit Fire_fighting pipe network set point fire fighting hydraulic pressure hard real time data, set point is obtained according to the fire fighting hydraulic pressure hard real time data of set point Between real-time pressure ratio, contrast real-time pressure ratio and normal pressure ratio.
In the present embodiment, described CPU also stores the normal pressure difference between set point, for receiving The fire fighting hydraulic pressure hard real time data of the fire_fighting pipe network set point that pressure detector unit transmits, real according to the fire water pressure of set point When data obtain real-time pressure difference between set point, contrast real-time pressure difference and normal pressure difference.
In the present embodiment, also include output unit, for CPU is contrasted real-time pressure ratio and standard pressure The result of the result of strong ratio and the real-time pressure difference of contrast and normal pressure difference and judged result output;According to aforementioned side Method, judges that the line clogging between test point or valve are closed;Or, judge that fire water box leads to fire_fighting pipe network Line clogging or fire water box pressure are low;Will not be described here.
In the present embodiment, also include remote monitoring center and network transmitting unit, network transmitting unit is used for centre The judged result of reason unit is delivered to remote monitoring center;Described remote monitoring center generally comprises remote central processing unit, For receiving the relevant parameter that premise central processing unit is transmitted by network transmitting unit, and believed according to this parameter output data Number, control command etc.;Network transmitting unit is the Internet, mobile network etc., will not be described here;Certainly possesses necessary communication Module, communication module and remote monitoring center interactive correspondence, are monitored by long-range, realize effectively supervising, it is to avoid occur because disappearing Fire-fighting accident in anti-system problem.
In the present embodiment, also include sending warning for the order receiving CPU or/and remote monitoring center The alarm unit of signal.
Finally illustrate, above example only in order to technical scheme to be described and unrestricted, although with reference to relatively Good embodiment has been described in detail to the present invention, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent, the objective without deviating from technical solution of the present invention and scope, and it all should be covered at this In the middle of the right of invention.

Claims (4)

1. a kind of fire supply system closedown of pipeline or blocking monitoring method it is characterised in that: comprise the following steps:
A. set valve after test point before the valve of fire_fighting pipe network valve and respectively, in valve opening and elevated tank hydraulic pressure is normal Under the premise of obtain normal pressure value after normal pressure value and valve before valve, by normal pressure value after valve than the ratio of normal pressure value before valve It is worth as normal pressure ratio, using the difference of normal pressure value before normal pressure value after valve and valve as normal pressure difference;
B. using real-time pressure values after pressure values real-time before the valve of test point real-time detection fire_fighting pipe network valve of step a and valve, Using pressure values real-time after valve than pressure values real-time before valve ratio as real-time pressure ratio, by before pressure values real-time after valve and valve The difference of pressure values is as real-time pressure difference in real time;
C. by the normal pressure ratio of the real-time pressure ratio of step b and real-time pressure difference and step a and normal pressure difference Contrasted, when real-time pressure ratio is less than normal pressure ratio, and when pressure difference is again smaller than normal pressure difference in real time, then Judge that the line clogging between test point or valve are closed;When real-time pressure ratio is more than normal pressure ratio, and When pressure difference is not changed in respect to normal pressure difference in real time, then judge that fire water box leads to the line clogging of fire_fighting pipe network Or fire water box pressure is low.
2. fire supply system closedown of pipeline according to claim 1 or blocking monitoring method it is characterised in that: step c In, when real-time pressure ratio is less than normal pressure ratio more than a set point, then judge the line clogging between test point Or valve is closed;When real-time pressure ratio is more than normal pressure ratio more than a set point, then judge fire-fighting Water tank is low towards the line clogging of fire_fighting pipe network or fire water box pressure.
3. fire supply system closedown of pipeline according to claim 1 or blocking monitoring method it is characterised in that: step c In, when real-time pressure ratio is less than normal pressure ratio, and when pressure difference is again smaller than normal pressure difference in real time, and press in real time Strong ratio is less than the numerical value of normal pressure ratio and real-time pressure difference has corresponding relation less than the numerical value of normal pressure difference, Then judge that the line clogging between test point or valve are closed.
4. fire supply system closedown of pipeline according to claim 1 or blocking monitoring method it is characterised in that: described inspection Measuring point includes test point after least favorable point test point and valve before high-order and valve.
CN201510574193.6A 2015-09-10 2015-09-10 Pipeline closing or blocking monitoring method and system for fire water supply system Active CN105178392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510574193.6A CN105178392B (en) 2015-09-10 2015-09-10 Pipeline closing or blocking monitoring method and system for fire water supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510574193.6A CN105178392B (en) 2015-09-10 2015-09-10 Pipeline closing or blocking monitoring method and system for fire water supply system

Publications (2)

Publication Number Publication Date
CN105178392A CN105178392A (en) 2015-12-23
CN105178392B true CN105178392B (en) 2017-02-01

Family

ID=54900779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510574193.6A Active CN105178392B (en) 2015-09-10 2015-09-10 Pipeline closing or blocking monitoring method and system for fire water supply system

Country Status (1)

Country Link
CN (1) CN105178392B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106020034A (en) * 2016-06-23 2016-10-12 合肥工业大学 Method for automatically detecting municipal sewage pipeline siltation
CN106128024B (en) * 2016-08-19 2018-12-14 中铁第六勘察设计院集团有限公司 It grows up fire extinguisher canvas hose pipeline exploding early warning device in Underwater Traffic Tunnel
CN111219208A (en) * 2020-01-15 2020-06-02 安徽蓝海之光科技有限公司 Intelligent pipeline ponding alarm device in pit
CN112129339B (en) * 2020-09-14 2022-02-15 深圳供电局有限公司 Pipeline blockage detection device
CN113244563A (en) * 2021-03-25 2021-08-13 杭州智缤科技有限公司 Fire hydrant front end control valve closes valve monitoring feedback system
CN115046678A (en) * 2022-08-15 2022-09-13 山东金宇信息科技集团有限公司 Method and device for monitoring pressure of fire fighting pipeline in tunnel and storage medium

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1484012A (en) * 2003-08-04 2004-03-24 伍华本 Sensor system for pressure difference type detecting filter blocking state
DE102004016378A1 (en) * 2004-04-02 2005-11-03 Stefan Windisch Method and arrangement for active monitoring of pipelines
KR100860613B1 (en) * 2008-02-21 2008-09-29 주식회사 삼진정밀 Supervisory remote control system for rate of water supply
CN201964145U (en) * 2010-12-31 2011-09-07 浙江师范大学 Detecting device for pipeline blocking
CN102692931B (en) * 2012-06-06 2015-08-19 李茂华 Tunnel fire-fighting head-tank level monitoring system and method for supervising
GB2506837B (en) * 2012-08-07 2017-08-09 Atmos Wave Ltd A method of identifying leaks in a fluid carrying conduit
CN103272359B (en) * 2013-06-08 2016-03-30 公安部沈阳消防研究所 A kind of real-time monitoring system for structural fire protection water supply system and method
CN103994331A (en) * 2014-06-13 2014-08-20 上海市城市建设设计研究总院 Device for monitoring and slowing down blocking of sludge pipe
CN204477701U (en) * 2014-10-16 2015-07-15 中南大学 There is the intelligent feedwater piping of blocking self-inspection and locating function

Also Published As

Publication number Publication date
CN105178392A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN105178392B (en) Pipeline closing or blocking monitoring method and system for fire water supply system
CN203169888U (en) Monitoring system for fire-fighting equipment
CN116246407A (en) Agriculture and forestry area fire early warning supervisory systems based on artificial intelligence
CN110159929B (en) Intelligent control big data processing method for underground drainage pipe network
Bakker et al. Heuristic burst detection method using flow and pressure measurements
CN109189011A (en) A kind of security monitoring management system based on Internet of Things
CN111659067B (en) Intelligent fire hydrant system and water pressure control method thereof
CN102913276A (en) System and method for generating urgent danger prevention dynamic route
CN101696627A (en) Accident monitoring method in welldrilling process
CN105381565B (en) Fire supply system intelligent inspection system and method
CN105184386A (en) Method for establishing abnormal event early warning system based on expert experience and historical data
CN104790499B (en) Inspection well lid device for urban waterlogging analysis
CN103272359B (en) A kind of real-time monitoring system for structural fire protection water supply system and method
CN115620477A (en) Fire engineering construction is with real-time fire prevention monitoring data transmission system
CN204485168U (en) A kind of fire-fighting automatic inspection device
CN105484801A (en) Underground flood alarm method based on image and water inflow monitoring
CN205948256U (en) Internet of things -based fire control supervisory system
CN106345092A (en) Intelligent high-rise building fire-protection monitoring system
CN112150752A (en) Fire-fighting water monitoring system and method
CN112445166A (en) Construction method of hydraulic engineering gate pump remote measurement and control system
CN204522094U (en) Structural fire protection is to water monitoring system
JP2011120717A (en) Hydrant device inspection system
CN114264333A (en) Automatic monitoring method, system and device for well control equipment
CN105477820A (en) Fire fighting system water supply tail end monitoring system
CN206239946U (en) Safety management system is monitored based on Internet of Things fire water-supply

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180802

Address after: 400039 3, floor K, standard workshop 52, four Garden Street, Kowloon Po, Chongqing.

Patentee after: Chongqing Hehang Technology Co.,Ltd.

Address before: 401336 63, 5 floor, Rong Ying building, science and technology innovation center, 8 Yuwang Road, Nan'an District, Chongqing.

Patentee before: CHONGQING HEHANG INTERNET OF THINGS TECHNOLOGY RESEARCH INSTITUTE CO., LTD.