CN105134271A - 综采工作面两端头过超高段液压支护装置 - Google Patents
综采工作面两端头过超高段液压支护装置 Download PDFInfo
- Publication number
- CN105134271A CN105134271A CN201510470025.2A CN201510470025A CN105134271A CN 105134271 A CN105134271 A CN 105134271A CN 201510470025 A CN201510470025 A CN 201510470025A CN 105134271 A CN105134271 A CN 105134271A
- Authority
- CN
- China
- Prior art keywords
- support
- hinged
- oil cylinder
- fixed
- overturn
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明具体为一种综采工作面两端头过超高段液压支护装置,解决了现有过超高段支护需人员高空作业、浪费大量材料的问题。综采工作面两端头过超高段液压支护装置,包括现有支架上利用U型槽钢固定有并排布置的两组液压伸缩支架,液压伸缩支架包括后固定支座、前固定支座,后固定支座前方铰接有翻转油缸,前固定支座上方铰接有翻转梁,翻转油缸前端铰接到翻转梁中部,翻转梁上方固定有升降油缸,升降油缸前端铰接到水平布置的支撑板,翻转梁中部铰接有支撑油缸,支撑油缸端铰接到支撑板。本发明在保证安全高效通过超高段的同时,降低了施工难度、节省了施工成本,且液压支护装置操作简单、易于掌握,还可以重复利用,使用寿命较长。
Description
技术领域
本发明涉及煤矿巷道支护工艺,具体为一种综采工作面两端头过超高段液压支护装置。
背景技术
目前,煤矿综采工作面在回采过程中,进回风两顺槽常遇到超高段,巷道高度达到4米以上,不好维护,一般采用提前在两端头架棚,棚梁上打木垛接顶,综采工作面两端头推进时,使用支架前梁挑住棚梁方法通过超高段,但是要求人员到离地2.5米以上的棚梁上方进行打木垛作业,不但需要大量的木材,而且费时费力。
发明内容
本发明为了解决现有过超高段支护需人员高空作业、浪费大量材料的问题,提供了一种综采工作面两端头过超高段液压支护装置。
本发明是采用如下技术方案实现的:综采工作面两端头过超高段液压支护装置,包括在现有支架上利用U型槽钢固定有并排布置的两组液压伸缩支架,每组液压伸缩支架包括利用U型槽钢固定在支架上的后固定支座,后固定支座前侧设有利用U型槽钢固定在支架上的前固定支座,后固定支座前方铰接有翻转油缸,前固定支座上方铰接有翻转梁,翻转油缸的伸缩杆前端铰接到翻转梁中部,翻转梁上方固定有升降油缸,升降油缸的伸缩杆前端铰接到水平布置的支撑板,翻转梁中部前侧铰接有支撑油缸,支撑油缸的伸缩杆前端铰接到支撑板,具体为支撑板由两组液压伸缩支架并排布置的两个升降油缸和两个支撑油缸支撑。
工作过程中,当掘进至超高段时先将支架降至最低,然后将液压支护装置安装至支架的顶部,液压支护装置通过两边的U型槽钢固定在支架上,U型槽钢通过圆钢固定牢固,并液压支护装置的液压管路连接至工作面配套的泵站,液压支护装置的翻转油缸、支撑油缸和升降油缸对应的液压阀均由设于支架手把附近的电气控制装置控制。液压支护装置收缩时,控制翻转油缸和支撑油缸收缩,翻转梁向后偏转,从而带动支撑板回收靠近支架顶部;液压支护装置展开时,控制翻转油缸和支撑油缸伸长,翻转梁向前偏转至竖直状态,从而带动支撑板伸高。在收缩或者展开状态下,通过调整升降油缸和支撑油缸的伸缩长度,从而保证支撑板水平支撑状态,同时调整升降油缸和支撑油缸的伸缩长度还可以控制液压支护装置在展开状态下支撑板的高度,结合支架的高度调整,从而适应不同高度的超高段支护。当完成超高段支护后,将支架降至最低,将液压支护装置收缩后壳拆除,以供重复安装使用。
本发明的有益效果如下:在支架上另设液压支护装置,利用液压支护装置的伸缩特性实现超高段的支护。本发明避免了架棚施工时人员在2.5米高的棚梁上方打木垛的高强度、高空作业施工,同时节约了打木垛与架棚的木材、架棚成本,在保证安全高效通过超高段的同时,降低了施工难度、节省了施工成本,且液压支护装置操作简单、易于掌握,还可以重复利用,使用寿命较长。
附图说明
图1为本发明结构示意图;
图2为本发明展开状态侧视结构示意图;
图3为本发明展开状态俯视结构示意图;
图4为本发明收缩状态侧视结构示意图;
图5为本发明收缩状态俯视结构示意图;
图6为本发明安装位置布置示意图。
图中:1-支架,2-后固定支座,3-前固定支座,4-翻转油缸,5-翻转梁,6-支撑油缸,7-升降油缸,8-支撑板。
具体实施方式
综采工作面两端头过超高段液压支护装置,包括在现有支架上利用U型槽钢固定有并排布置的两组液压伸缩支架,每组液压伸缩支架包括利用U型槽钢固定在支架1上的后固定支座2,后固定支座2前侧设有利用U型槽钢固定在支架1上的前固定支座3,后固定支座2前方铰接有翻转油缸4,前固定支座3上方铰接有翻转梁5,翻转油缸4的伸缩杆前端铰接到翻转梁5中部,翻转梁5上方固定有升降油缸7,升降油缸7的伸缩杆前端铰接到水平布置的支撑板8,翻转梁5中部前侧铰接有支撑油缸6,支撑油缸6的伸缩杆前端铰接到支撑板8,具体为支撑板8由两组液压伸缩支架并排布置的两个升降油缸7和两个支撑油缸6支撑。
具体实施过程中,支撑板8长度为3.5米,支撑油缸6伸缩杆前端的铰链与升降油缸7伸缩杆前端的铰链之间的间距为0.5米,支撑油缸6伸缩杆前端的铰链距支撑板8最前端距离为1.5米,升降油缸7伸缩杆前端的铰链距支撑板8最后端距离为1.5米。
Claims (1)
1.一种综采工作面两端头过超高段液压支护装置,其特征在于:包括在现有支架(1)上利用U型槽钢固定有并排布置的两组液压伸缩支架,每组液压伸缩支架包括利用U型槽钢固定在支架(1)上的后固定支座(2),后固定支座(2)前侧设有利用U型槽钢固定在支架(1)上的前固定支座(3),后固定支座(2)前方铰接有翻转油缸(4),前固定支座(3)上方铰接有翻转梁(5),翻转油缸(4)的伸缩杆前端铰接到翻转梁(5)中部,翻转梁(5)上方固定有升降油缸(7),升降油缸(7)的伸缩杆前端铰接到水平布置的支撑板(8),翻转梁(5)中部前侧铰接有支撑油缸(6),支撑油缸(6)的伸缩杆前端铰接到支撑板(8),具体为支撑板(8)由两组液压伸缩支架并排布置的两个升降油缸(7)和两个支撑油缸(6)支撑。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510470025.2A CN105134271B (zh) | 2015-08-04 | 2015-08-04 | 综采工作面两端头过超高段液压支护装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510470025.2A CN105134271B (zh) | 2015-08-04 | 2015-08-04 | 综采工作面两端头过超高段液压支护装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105134271A true CN105134271A (zh) | 2015-12-09 |
CN105134271B CN105134271B (zh) | 2017-06-16 |
Family
ID=54719805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510470025.2A Active CN105134271B (zh) | 2015-08-04 | 2015-08-04 | 综采工作面两端头过超高段液压支护装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105134271B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105221173A (zh) * | 2015-10-08 | 2016-01-06 | 山西晋城无烟煤矿业集团有限责任公司 | 综采工作面两端头过超高段支护方法 |
CN105927257A (zh) * | 2016-06-28 | 2016-09-07 | 贵州盘江矿山机械有限公司 | 一种液压支架加长顶梁辅助支撑装置及其操作方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1061071A (en) * | 1964-03-20 | 1967-03-08 | Gullick Ltd | Improvements in or relating to mine roof supports |
DE2406694A1 (de) * | 1974-02-13 | 1975-08-14 | Bochumer Eisen Heintzmann | Schildausbaugestell |
US3932998A (en) * | 1973-02-27 | 1976-01-20 | Becorit Grubenausbau Gmbh | Mine roof support |
GB1487702A (en) * | 1974-01-03 | 1977-10-05 | Gewerk Eisenhuette Westfalia | Shield roof supports |
GB2062737A (en) * | 1979-11-09 | 1981-05-28 | Dobson Park Ind | Cutter and Conveyor Mounting |
GB2101661A (en) * | 1979-11-09 | 1983-01-19 | Dobson Park Ind | Cutter and conveyor mounting |
US20130131318A1 (en) * | 2010-02-12 | 2013-05-23 | Diderik Reinder Kremer | Single unit antibody purification |
WO2013131318A1 (zh) * | 2012-03-07 | 2013-09-12 | 中煤北京煤矿机械有限责任公司 | 中厚煤层两柱掩护式大中心距超高工作阻力液压支架 |
-
2015
- 2015-08-04 CN CN201510470025.2A patent/CN105134271B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1061071A (en) * | 1964-03-20 | 1967-03-08 | Gullick Ltd | Improvements in or relating to mine roof supports |
US3932998A (en) * | 1973-02-27 | 1976-01-20 | Becorit Grubenausbau Gmbh | Mine roof support |
GB1487702A (en) * | 1974-01-03 | 1977-10-05 | Gewerk Eisenhuette Westfalia | Shield roof supports |
DE2406694A1 (de) * | 1974-02-13 | 1975-08-14 | Bochumer Eisen Heintzmann | Schildausbaugestell |
GB2062737A (en) * | 1979-11-09 | 1981-05-28 | Dobson Park Ind | Cutter and Conveyor Mounting |
GB2101661A (en) * | 1979-11-09 | 1983-01-19 | Dobson Park Ind | Cutter and conveyor mounting |
US20130131318A1 (en) * | 2010-02-12 | 2013-05-23 | Diderik Reinder Kremer | Single unit antibody purification |
WO2013131318A1 (zh) * | 2012-03-07 | 2013-09-12 | 中煤北京煤矿机械有限责任公司 | 中厚煤层两柱掩护式大中心距超高工作阻力液压支架 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105221173A (zh) * | 2015-10-08 | 2016-01-06 | 山西晋城无烟煤矿业集团有限责任公司 | 综采工作面两端头过超高段支护方法 |
CN105927257A (zh) * | 2016-06-28 | 2016-09-07 | 贵州盘江矿山机械有限公司 | 一种液压支架加长顶梁辅助支撑装置及其操作方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105134271B (zh) | 2017-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102128040B (zh) | 液压迈步式超前支护装备 | |
CN103452574B (zh) | 循环自移式超前支护辅助移架装置 | |
CN103104267B (zh) | 软岩巷道整体掘护支架 | |
CN109441497B (zh) | 无反复支撑超前支护、搬运成套设备及搬运方法 | |
CN203796302U (zh) | 循环自移式超前支护辅助移架装置 | |
CN201953390U (zh) | 液压迈步式超前支护装备 | |
CN105134271A (zh) | 综采工作面两端头过超高段液压支护装置 | |
CN203362199U (zh) | 综采工作面端头液压支架 | |
CN102229401B (zh) | 井下维修行车支架 | |
CN207632432U (zh) | 一种井下移动液压支架至支护点的装置 | |
CN203905988U (zh) | 一种滑移式临时支护支架 | |
CN212105926U (zh) | 一种迈步自移式超前支护支架组 | |
CN203130112U (zh) | 软岩巷道整体掘护支架 | |
CN107879287A (zh) | 一种井下移动液压支架至支护点的装置 | |
CN110356799B (zh) | 一种支架搬运装置 | |
CN105221173A (zh) | 综采工作面两端头过超高段支护方法 | |
CN107542482B (zh) | 软煤掘进u型棚机械化安装护顶装置 | |
CN202031615U (zh) | 卧式液压自移上梁装置 | |
CN201687503U (zh) | 悬移支架安装架 | |
CN206522146U (zh) | 一种稳定性好的采煤支撑结构 | |
CN201221373Y (zh) | 煤矿巷道用液压支架升梁装置 | |
CN216342324U (zh) | 煤矿综采工作面运输巷道用液压升降回转平台装置 | |
CN216974863U (zh) | 沿空留巷机械化挂模装置 | |
CN204402532U (zh) | 端头液压支架推拉装置 | |
CN212269345U (zh) | 用于井下管路安装的移动升降平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |