CN105110138A - 弹性竖向附着承力装置及实施方法 - Google Patents
弹性竖向附着承力装置及实施方法 Download PDFInfo
- Publication number
- CN105110138A CN105110138A CN201510543751.2A CN201510543751A CN105110138A CN 105110138 A CN105110138 A CN 105110138A CN 201510543751 A CN201510543751 A CN 201510543751A CN 105110138 A CN105110138 A CN 105110138A
- Authority
- CN
- China
- Prior art keywords
- spring damping
- guide rail
- supporting traverse
- damping casing
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Vibration Prevention Devices (AREA)
Abstract
本发明提供一种弹性竖向附着承力装置,它包括弹簧阻尼箱体、支撑横梁和转换节,其中弹簧阻尼箱体通过转换节与导轨架中需要卸力的部位连接,并且弹簧阻尼箱体的底部与支撑横梁的一端连接,支撑横梁的另一端固定在建筑物上。通过布置该装置,将导轨架分为数段,从而将各段自重及电梯重量直接传导至建筑物或支点,避免导轨架底部受力过大而导致导轨架立柱壁厚较大的问题;同时,通过设置弹簧阻尼箱体,吸收各段导轨架因温度差产生的变形量,避免导轨架因温差产生额外的应力导致导轨架破坏。
Description
技术领域
本发明涉及施工升降机领域,具体涉及一种弹性竖向附着承力装置及实施方法。
背景技术
随着超高层项目快速发展,作为超高层建筑施工垂直运输的关键设备之一,施工升降机需要架设高度越来越高,已经达到600m,甚至有可能达到1000m。由此而来,施工升降机的导轨架的的高度骤增,其标准节的数量也骤增。以往施工升降机的竖向力均传至导轨架底部基础,上面附着仅传递水平力,导致底部标准节立柱壁厚增大,有的甚至达到12mm;同时由于阳光照射或其他因素,导轨架自身和建筑物附着处有可能存在较大的温度差,可能导致两者竖向变形差异较大,有可能累积量过大,导致导轨架承受额外的应力,甚至导致损坏。
发明内容
本发明要解决的技术问题是:提供一种弹性竖向附着承力装置及实施方法,导轨架中需要卸力的部位设置该装置,使得导轨架该部位以上及在其上的梯笼的荷载通过该装置传递至建筑物或其他支点,同时弹簧阻尼箱体吸收掉该段标准节由于温差产生的变形量。
本发明为解决上述技术问题所采取的技术方案为:一种弹性竖向附着承力装置,其特征在于:它包括弹簧阻尼箱体、支撑横梁和转换节,其中弹簧阻尼箱体通过转换节与导轨架中需要卸力的部位连接,并且弹簧阻尼箱体的底部与支撑横梁的一端连接,支撑横梁的另一端固定在建筑物上。
按上述方案,所述的转换节为设置在导轨架标准节之间的过渡盘。
按上述方案,所述的支撑横梁和建筑物之间连接有斜拉杆。
按上述方案,所述的斜拉杆上设有丝杆调节器。
按上述方案,所述的支撑横梁和建筑物之间连接有下支撑杆。
按上述方案,所述的弹簧阻尼箱体内安装有用于测量弹簧的压缩量的位移传感器,从而得知弹簧阻尼箱体的受力大小。
如上述一种弹性竖向附着承力装置的实施方法,其特征在于:它包括以下步骤:
1)在导轨架中需要卸力的部位安装支撑横梁,并对支撑横梁进行调平,使得支撑横梁水平;
2)将转换节与导轨架标准节进行连接;
3)在转换节与支撑架之间安装弹簧阻尼箱体。
按上述方法,所述1)中,支撑横梁与建筑物之间连接有斜拉杆,通过斜拉杆上的丝杆调节器调整支撑横梁的水平度。
按上述方法,所述的3)弹簧阻尼箱体与转换节和支撑架之间分别采用可拆卸方式安装;
该方法还包括4),当需要拆卸或更换时,将千斤顶设置在转换节与支撑架之间,升高千斤顶使得弹簧阻尼箱体与转换节之间具有间隙,解除弹簧阻尼箱体与支撑架之间的连接,取出弹簧阻尼箱体。
本发明的有益效果为:
1、通过布置该装置,将导轨架分为数段,从而将各段自重及电梯重量直接传导至建筑物或支点,避免导轨架底部受力过大而导致导轨架立柱壁厚较大的问题;同时,通过设置弹簧阻尼箱体,吸收各段导轨架因温度差产生的变形量,避免导轨架因温差产生额外的应力导致导轨架破坏。
2、利用丝杆调节器调整传递至上的荷载的大小以及调整支撑横的水平度以便于减小安装精度控制的难度。
3、弹簧阻尼箱体与转换节和支撑架之间采用可拆卸方式安装,便于拆卸和更换弹簧阻尼箱体。
附图说明
图1为本发明一实施例的结构示意图。
图2为本发明一实施例的拆卸细节图。
图3为过渡盘的结构示意图。
图4为图3的俯视图。
图5为弹簧阻尼箱体的结构示意图。
图6为图5的侧视图。
图中:1-导轨架标准节、2-过渡盘、3-弹簧阻尼箱体、4-斜拉杆、5、支撑横梁、6-下支撑杆、7-丝杆调节器、8(a)-第一千斤顶,8(b)-第二千斤顶、9(a)-第一千斤顶底座,9(b)-第二千斤顶底座,10-建筑物,11-定位螺栓。
具体实施方式
下面结合具体实例和附图对本发明做进一步说明。
图1为本发明一实施例的结构示意图,一种弹性竖向附着承力装置包括弹簧阻尼箱体3、支撑横梁5和转换节,其中弹簧阻尼箱体3通过转换节与导轨架中需要卸力的部位连接,并且弹簧阻尼箱体3的底部与支撑横梁5的一端连接,支撑横梁5的另一端固定在建筑物10(也可以是其它支点)上。
本实施例中,转换节为设置在导轨架标准节1之间的过渡盘2,如图3和图4所示。
为了使得支撑横梁5更好的支撑,提高其承载力,在支撑横梁5和建筑物10之间连接有斜拉杆4。进一步的,斜拉杆4上设有丝杆调节器7,用于更方便的调节支撑横梁5的水平度。当然,为了进一步提高支撑横梁5的承载力,还可以在支撑横梁5的下方增设下支撑杆6,下支撑杆6和斜拉杆4可以二选一,或者二者都用。
另外,还可以在弹簧阻尼箱体3内安装用于测量弹簧的压缩量的位移传感器,从而得知弹簧阻尼箱体的受力大小,在即将超过弹簧阻尼箱体的受力极限时发出报警,便于采取补救措施。
如图5和图6所示,弹簧阻尼箱体包括上盖和下盖,上盖和下盖之间设有高承载力、大变形量的弹簧,和能够耗能的阻尼器,弹簧的承载力、变形量,及阻尼器的耗能量,可以根据导轨架需要卸力的大小而实际考量选取。弹簧阻尼箱体侧向设有定位螺栓11,用于在拆卸时判断弹簧阻尼箱体是否恢复至自然状态。
如上述一种弹性竖向附着承力装置的实施方法,包括以下步骤:
1)在导轨架中需要卸力的部位安装支撑横梁,并对支撑横梁进行调平,使得支撑横梁水平。本实施例中,支撑横梁与建筑物之间连接有斜拉杆,通过斜拉杆上的丝杆调节器调整支撑横梁的水平度。
2)将转换节与导轨架标准节进行连接。
3)在转换节与支撑架之间安装弹簧阻尼箱体。弹簧阻尼箱体与转换节和支撑架之间分别采用可拆卸方式安装。
优选的,该方法还包括4),当需要拆卸或更换时,将千斤顶设置在转换节与支撑架之间,升高千斤顶使得弹簧阻尼箱体与转换节之间具有间隙,解除弹簧阻尼箱体与支撑架之间的连接,取出弹簧阻尼箱体。
本实施例是一种可拆卸式超高层施工电梯分段布置竖向附着装置。其实现竖向附着具体实施步骤如下:
一、地面组装部件:将弹簧阻尼箱体3组装完毕。
二、竖向附着装置施工:吊装带有丝杆调节器的斜拉杆并通过销轴固定于建筑物;吊装支撑横梁5,一端耳板与建筑物销接,另一端耳板与斜拉杆连接,通过丝杆调节器使支撑横梁上表面水平;吊装下支撑杆6,两端分别与建筑物墙体和承力箱梁5连接;吊装弹簧阻尼箱体3,并固定于支撑横梁5的一端;吊装过渡盘2,并与弹簧阻尼箱体3上盖螺栓连接;安装导轨架标准节1。
三、弹簧箱拆卸或更换:吊装千斤顶底座(本实施例包括第一千斤顶底座9(a)和第二千斤顶底座9(b))于支撑横梁5上,分别固定于弹簧阻尼箱体3两侧;吊装千斤顶(本实施例包括第一千斤顶8(a)和第二千斤顶8(b))置于千斤顶底座上。启动千斤顶,顶起过渡盘2,直至弹簧阻尼箱体3上盖还原至定位螺栓10处,并且过渡盘2底部与弹簧阻尼箱体3上盖有一定间隙,即可水平移出弹簧阻尼箱体3。
以上实施例仅用于说明本发明的设计思想和特点,其目的在于使本领域内的技术人员能够了解本发明的内容并据以实施,本发明的保护范围不限于上述实施例。所以,凡依据本发明所揭示的原理、设计思路所作的等同变化或修饰,均在本发明的保护范围之内。
Claims (9)
1.一种弹性竖向附着承力装置,其特征在于:它包括弹簧阻尼箱体、支撑横梁和转换节,其中弹簧阻尼箱体通过转换节与导轨架中需要卸力的部位连接,并且弹簧阻尼箱体的底部与支撑横梁的一端连接,支撑横梁的另一端固定在建筑物上。
2.根据权利要求1所述的一种弹性竖向附着承力装置,其特征在于:所述的转换节为设置在导轨架标准节之间的过渡盘。
3.根据权利要求1所述的一种弹性竖向附着承力装置,其特征在于:所述的支撑横梁和建筑物之间连接有斜拉杆。
4.根据权利要求3所述的一种弹性竖向附着承力装置,其特征在于:所述的斜拉杆上设有丝杆调节器。
5.根据权利要求1所述的一种弹性竖向附着承力装置,其特征在于:所述的支撑横梁和建筑物之间连接有下支撑杆。
6.根据权利要求1所述的一种弹性竖向附着承力装置,其特征在于:所述的弹簧阻尼箱体内安装有用于测量弹簧的压缩量的位移传感器,从而得知弹簧阻尼箱体的受力大小。
7.如权利要求1所述的一种弹性竖向附着承力装置的实施方法,其特征在于:它包括以下步骤:
1)在导轨架中需要卸力的部位安装支撑横梁,并对支撑横梁进行调平,使得支撑横梁水平;
2)将转换节与导轨架标准节进行连接;
3)在转换节与支撑架之间安装弹簧阻尼箱体。
8.根据权利要求7所述的实施方法,其特征在于:所述的1)中,支撑横梁与建筑物之间连接有斜拉杆,通过斜拉杆上的丝杆调节器调整支撑横梁的水平度。
9.根据权利要求7所述的实施方法,其特征在于:所述的3)弹簧阻尼箱体与转换节和支撑架之间分别采用可拆卸方式安装;
该方法还包括4),当需要拆卸或更换时,将千斤顶设置在转换节与支撑架之间,升高千斤顶使得弹簧阻尼箱体与转换节之间具有间隙,解除弹簧阻尼箱体与支撑架之间的连接,取出弹簧阻尼箱体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510543751.2A CN105110138B (zh) | 2015-08-28 | 2015-08-28 | 弹性竖向附着承力装置的实施方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510543751.2A CN105110138B (zh) | 2015-08-28 | 2015-08-28 | 弹性竖向附着承力装置的实施方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105110138A true CN105110138A (zh) | 2015-12-02 |
CN105110138B CN105110138B (zh) | 2018-01-16 |
Family
ID=54658312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510543751.2A Active CN105110138B (zh) | 2015-08-28 | 2015-08-28 | 弹性竖向附着承力装置的实施方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105110138B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105692382A (zh) * | 2016-03-21 | 2016-06-22 | 湖北江汉建筑工程机械有限公司 | 施工升降机的可调节称重支撑装置 |
CN106144832A (zh) * | 2016-08-31 | 2016-11-23 | 中建四局第六建筑工程有限公司 | 一种特制加长型附墙架及其制作方法 |
CN112127369A (zh) * | 2020-08-31 | 2020-12-25 | 中铁第四勘察设计院集团有限公司 | 一种装配式基坑钢支撑结构及其施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4478385A (en) * | 1981-05-02 | 1984-10-23 | Josef Maier | Climbing forms |
CN2388218Y (zh) * | 1999-09-24 | 2000-07-19 | 邢月英 | 单向移动的公路桥梁盆式橡胶支座 |
CN102071798A (zh) * | 2011-01-30 | 2011-05-25 | 中建三局建设工程股份有限公司 | 附壁支撑架液压爬升系统 |
CN102079489A (zh) * | 2011-01-30 | 2011-06-01 | 沈阳建筑大学 | 塔式起重机悬爬式支护系统 |
CN104310234A (zh) * | 2014-08-28 | 2015-01-28 | 沈阳建筑大学 | 外悬爬塔式起重机支护系统 |
CN204152209U (zh) * | 2014-08-06 | 2015-02-11 | 广州市京龙工程机械有限公司 | 一种用于施工升降机的卸力、稳固装置 |
CN104563280A (zh) * | 2015-01-16 | 2015-04-29 | 中建三局集团有限公司 | 一种施工电梯基础转换钢承台及施工电梯基础转换方法 |
-
2015
- 2015-08-28 CN CN201510543751.2A patent/CN105110138B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4478385A (en) * | 1981-05-02 | 1984-10-23 | Josef Maier | Climbing forms |
CN2388218Y (zh) * | 1999-09-24 | 2000-07-19 | 邢月英 | 单向移动的公路桥梁盆式橡胶支座 |
CN102071798A (zh) * | 2011-01-30 | 2011-05-25 | 中建三局建设工程股份有限公司 | 附壁支撑架液压爬升系统 |
CN102079489A (zh) * | 2011-01-30 | 2011-06-01 | 沈阳建筑大学 | 塔式起重机悬爬式支护系统 |
CN204152209U (zh) * | 2014-08-06 | 2015-02-11 | 广州市京龙工程机械有限公司 | 一种用于施工升降机的卸力、稳固装置 |
CN104310234A (zh) * | 2014-08-28 | 2015-01-28 | 沈阳建筑大学 | 外悬爬塔式起重机支护系统 |
CN104563280A (zh) * | 2015-01-16 | 2015-04-29 | 中建三局集团有限公司 | 一种施工电梯基础转换钢承台及施工电梯基础转换方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105692382A (zh) * | 2016-03-21 | 2016-06-22 | 湖北江汉建筑工程机械有限公司 | 施工升降机的可调节称重支撑装置 |
CN105692382B (zh) * | 2016-03-21 | 2017-12-22 | 湖北江汉建筑工程机械有限公司 | 施工升降机的可调节称重支撑装置 |
CN106144832A (zh) * | 2016-08-31 | 2016-11-23 | 中建四局第六建筑工程有限公司 | 一种特制加长型附墙架及其制作方法 |
CN112127369A (zh) * | 2020-08-31 | 2020-12-25 | 中铁第四勘察设计院集团有限公司 | 一种装配式基坑钢支撑结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105110138B (zh) | 2018-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105110138A (zh) | 弹性竖向附着承力装置及实施方法 | |
CN207260360U (zh) | 一种防震建筑结构 | |
CN103362147A (zh) | 一种建筑物多向自复位隔震结构 | |
CN102998168B (zh) | 预应力混凝土梁荷载试验固定装置及测试方法 | |
CN205066897U (zh) | 步进梁缓冲钢卷秤 | |
CN203531027U (zh) | 采用专用千斤顶作为支撑定位的风机基础环精准校平系统 | |
CN203066090U (zh) | 钢板桩围堰施工可拼装支撑结构 | |
CN203385620U (zh) | 一种混凝土桥梁静载试验架 | |
CN102912723A (zh) | 具有限位功能的环形粘弹性阻尼装置 | |
CN202744261U (zh) | 精轧螺纹钢筋立柱组装式连续提升千斤顶 | |
CN112128616B (zh) | 一种适合lng储罐用的隔震支座及其安装方法 | |
CN203546592U (zh) | 桥梁拉索外置式阻尼器 | |
CN102616696B (zh) | 精轧螺纹钢筋立柱组装式连续提升千斤顶 | |
CN101660660B (zh) | 一种煤气柜的安装方法 | |
CN102672460B (zh) | 风电机组整机安装设备 | |
CN102372228A (zh) | 大跨度吊车梁平移安装方法 | |
CN203361019U (zh) | 一种用于公路铁路桥梁施工的t梁抬梁装置 | |
CN205917590U (zh) | 一种大型桥梁用抗震支座 | |
CN106400831A (zh) | 一种预制化设备基础惰性块 | |
CN104176608A (zh) | 一种电梯对重装置 | |
CN111608455B (zh) | 一种三维隔震系统 | |
CN219532698U (zh) | 一种桁架试验装置 | |
CN215053965U (zh) | 一种桁架支座 | |
CN202956308U (zh) | 预应力混凝土梁荷载试验固定装置 | |
CN115262793B (zh) | 一种用于支柱电力设备的摇摆式隔震支座 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |