CN105091611A - 一种煤磨入磨热风管道与发电热风管道并行装置 - Google Patents

一种煤磨入磨热风管道与发电热风管道并行装置 Download PDF

Info

Publication number
CN105091611A
CN105091611A CN201410188134.0A CN201410188134A CN105091611A CN 105091611 A CN105091611 A CN 105091611A CN 201410188134 A CN201410188134 A CN 201410188134A CN 105091611 A CN105091611 A CN 105091611A
Authority
CN
China
Prior art keywords
hot air
air pipe
coal mill
air duct
cyclone separator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410188134.0A
Other languages
English (en)
Inventor
景树鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN XINFENG CEMENT CO Ltd
Original Assignee
WUHAN XINFENG CEMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN XINFENG CEMENT CO Ltd filed Critical WUHAN XINFENG CEMENT CO Ltd
Priority to CN201410188134.0A priority Critical patent/CN105091611A/zh
Publication of CN105091611A publication Critical patent/CN105091611A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Cyclones (AREA)

Abstract

本发明提供一种结构简单、设计新颖的煤磨入磨热风管道与发电热风管道并行装置,包括篦冷机,其特征在于篦冷机通过热风管道A和热风管道B分别与旋风分离器A和旋风分离器B相连,旋风分离器B与煤磨之间通过热风管道B相连,旋风分离器A通过热风管道A与窑头相连,窑头与窑头废气风机之间通过热风管道A相连,煤磨通过热风管道A与煤磨选粉机相连,收尘装置通过热风管道A分别与煤磨选粉机和煤磨系统风机相连,发电系统热风管道和旋风收尘器通风面积扩大,风速降低,粉尘量减少。旋风收尘器磨损得以明显减缓,安全可靠,降低排风机电耗,同时增加发电量,提高煤磨产量;延长旋风收尘器及其热风管道的使用周期;减少煤磨系统爆炸机会。

Description

一种煤磨入磨热风管道与发电热风管道并行装置
技术领域
本发明涉及煤磨机械技术领域,尤其涉及一种煤磨入磨热风管道与发电热风管道并行装置。
背景技术
当煤磨系统和余热发电AQC锅炉在水泥回转窑篦冷机同一侧时,为了便于工艺布置,一般将煤磨入磨热风与发电热风同用一根管道、同一套旋风收尘器。这样布置的结果是:如果余热发电AQC锅炉排风机拉风太小,则窑头会产生正压,影响发电量,同时也影响熟料冷却效果;如果AQC锅炉排风机拉风加大,则煤磨磨头负压会相应增大,造成煤磨系统排风机抽风困难。在这种情况下只能同时加大AQC锅炉排风机和煤磨系统排风机的拉风,而同时增加两台排风机的拉风有以下三个弊端:
一是增加电耗。
二是管道内风速加快,从而携带熟料粉尘浓度变大,热风管道及旋风收尘器磨损严重。AQC锅炉投运仅三个月,旋风收尘器锥部就被磨穿。
三是由于煤磨磨头、磨尾负压变大。负压大漏风量就多,含氧量就多,煤粉爆炸的机会就多。
发明内容
为了解决上述技术问题,本发明提供一种结构简单、设计新颖的煤磨入磨热风管道与发电热风管道并行装置,包括篦冷机,其特征在于所述篦冷机通过热风管道A和热风管道B分别与旋风分离器A和旋风分离器B相连,所述旋风分离器B与煤磨之间通过热风管道B相连,所述旋风分离器A通过热风管道A与窑头相连,所述窑头与窑头废气风机之间通过热风管道A相连,煤磨通过热风管道A与煤磨选粉机相连,收尘装置通过热风管道A分别与煤磨选粉机和煤磨系统风机相连。
本发明的有益效果为:
1、热风管道旁路阀开度由方案实施前的20%降到5%~15%,增加了热回收。
2、煤磨系统风机阀门开度由82%降到70%,收尘出口负压力已由方案实施前的-5150Pa降为-4900Pa,系统风机电流由340A降到270A,每小时可节电55~60Kwh。
3、AQC锅炉不再与煤磨抢风,锅炉出口蒸汽流量由18~20t/h增加到22~24t/h,每小时可增加发电量(23-19)*1000/6=667Kwh每年可增加发电量667*8760*90%=5258628Kwh折合人民币5258628*0.55=289.22(万元)。
4、发电系统热风管道和旋风收尘器通风面积扩大,风速降低,粉尘量减少。旋风收尘器磨损得以明显减缓。耐磨涂料的使用寿命可望延长1~2倍。
5、安全可靠,降低排风机电耗,同时增加发电量,提高煤磨产量;延长旋风收尘器及其热风管道的使用周期;减少煤磨系统爆炸机会。
附图说明
图1为本发明的结构示意图;
其中:1-篦冷机,2-热风管道A,3-旋风分离器A,4-旋风分离器B,5-煤磨,6-热风管道B,7-窑头,8-窑头废气风机,9-煤磨选粉机,10-收尘装置,11-煤磨系统风机。
具体实施方式
下面结合附图对本发明作进一步详细说明;
如图1所示,篦冷机1通过热风管道A2和热风管道B6分别与旋风分离器A3和旋风分离器B4相连,旋风分离器B4与煤磨5之间通过热风管道B6相连,旋风分离器A3通过热风管道A2与窑头7相连,窑头7与窑头废气风机8之间通过热风管道A2相连,煤磨5通过热风管道A2与煤磨选粉机9相连,收尘装置10装置通过热风管道A2分别与煤磨选粉机9和煤磨系统风机11相连。
煤磨5取风口通过热风管道B6直接接入篦冷机1顶部,使之与热风管道A2并行,在煤磨5与篦冷机1连接管路之间增加旋风分离器B4过滤从篦冷机1抽出的粉尘,收集后落入篦冷机1。
热风管道旁路阀开度由方案实施前的20%降到5%~15%,增加了热回收,煤磨系统风机阀门开度由82%降到70%,收尘装置10出口负压力已由方案实施前的-5150Pa降为-4900Pa,系统风机电流由340A降到270A,每小时可节电55~60Kwh,AQC锅炉不再与煤磨5抢风,锅炉出口蒸汽流量由18~20t/h增加到22~24t/h,每小时可增加发电量(23-19)*1000/6=667Kwh每年可增加发电量667*8760*90%=5258628Kwh折合人民币5258628*0.55=289.22(万元),发电系统热风管道和旋风收尘装置器通风面积扩大,风速降低,粉尘量减少。旋风收尘装置器磨损得以明显减缓。耐磨涂料的使用寿命可望延长1~2倍,安全可靠,降低排风机电耗,同时增加发电量,提高煤磨产量;延长旋风收尘装置器及其热风管道的使用周期;减少煤磨系统爆炸机会。

Claims (1)

1.一种煤磨入磨热风管道与发电热风管道并行装置,包括篦冷机(1),其特征在于所述篦冷机(1)通过热风管道A(2)和热风管道B(6)分别与旋风分离器A(3)和旋风分离器B(4)相连,所述旋风分离器B(4)与煤磨(5)之间通过热风管道B(6)相连,所述旋风分离器A(3)通过热风管道A(2)与窑头(7)相连,所述窑头(7)与窑头废气风机(8)之间通过热风管道A(2)相连,煤磨(5)通过热风管道A(2)与煤磨选粉机(9)相连,收尘装置(10)通过热风管道A(2)分别与煤磨选粉机(9)和煤磨系统风机(11)相连。
CN201410188134.0A 2014-05-06 2014-05-06 一种煤磨入磨热风管道与发电热风管道并行装置 Pending CN105091611A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410188134.0A CN105091611A (zh) 2014-05-06 2014-05-06 一种煤磨入磨热风管道与发电热风管道并行装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410188134.0A CN105091611A (zh) 2014-05-06 2014-05-06 一种煤磨入磨热风管道与发电热风管道并行装置

Publications (1)

Publication Number Publication Date
CN105091611A true CN105091611A (zh) 2015-11-25

Family

ID=54572580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410188134.0A Pending CN105091611A (zh) 2014-05-06 2014-05-06 一种煤磨入磨热风管道与发电热风管道并行装置

Country Status (1)

Country Link
CN (1) CN105091611A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107764073A (zh) * 2017-10-23 2018-03-06 铜陵市荣伟水泥有限责任公司 一种煤磨入磨热风管道与发电热风管道并行装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216254A (zh) * 2007-12-29 2008-07-09 中信重工机械股份有限公司 一种提高水泥窑余热发电效率的取热工艺
CN201787820U (zh) * 2010-08-09 2011-04-06 西安思安新能源有限公司 水泥窑窑头能级匹配利用的余热利用系统
CN201819571U (zh) * 2010-09-21 2011-05-04 广东开能环保能源有限公司 水泥余热发电用窑头抽风装置
CN201858903U (zh) * 2010-10-13 2011-06-08 广东开能环保能源有限公司 水泥余热发电用煤磨取风装置
JP2012193909A (ja) * 2011-03-17 2012-10-11 Kawasaki Heavy Ind Ltd 焼結設備用廃熱回収発電プラント

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216254A (zh) * 2007-12-29 2008-07-09 中信重工机械股份有限公司 一种提高水泥窑余热发电效率的取热工艺
CN201787820U (zh) * 2010-08-09 2011-04-06 西安思安新能源有限公司 水泥窑窑头能级匹配利用的余热利用系统
CN201819571U (zh) * 2010-09-21 2011-05-04 广东开能环保能源有限公司 水泥余热发电用窑头抽风装置
CN201858903U (zh) * 2010-10-13 2011-06-08 广东开能环保能源有限公司 水泥余热发电用煤磨取风装置
JP2012193909A (ja) * 2011-03-17 2012-10-11 Kawasaki Heavy Ind Ltd 焼結設備用廃熱回収発電プラント

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107764073A (zh) * 2017-10-23 2018-03-06 铜陵市荣伟水泥有限责任公司 一种煤磨入磨热风管道与发电热风管道并行装置

Similar Documents

Publication Publication Date Title
CN203862359U (zh) 新型矿渣粉磨系统
CN202993866U (zh) 水泥余热发电中提高废气利用的窑头锅炉的旁路系统
CN202361822U (zh) 转底炉烟气处理及余热发电系统
CN201737880U (zh) 一种炭黑生产风送收集装置
CN105091611A (zh) 一种煤磨入磨热风管道与发电热风管道并行装置
CN205174413U (zh) 锅炉烟尘旋风分离回收利用装置
CN205638587U (zh) 一种火力发电厂尾气余热回收利用装置
CN112728952B (zh) 烧结机机尾大罩烟气余热综合利用装置
CN202109774U (zh) 水泥窑头余热发电烟风系统
CN213686896U (zh) 一种用于高水分褐煤煤种的集中制粉系统
CN206008341U (zh) 鼓风炉脱硫除尘系统
CN201032399Y (zh) 氧化铝熟料窑窑尾收尘装置
CN203448299U (zh) 一种用于100mw~1500mw燃煤电厂的新型细粉分离器
CN105013596B (zh) 磨煤机循环负荷中难磨矿物质分选装置及分选工艺
CN203719433U (zh) 石灰窑废气余热回收系统
CN210346364U (zh) 一种水泥生产中提高余热发电量的烟风管装置
CN203771438U (zh) 煤气燃烧加热一次风的高水分褐煤中速磨煤机制粉系统
CN203448201U (zh) 一种用于100mw~1500mw燃煤电厂锅炉仓储式制粉系统的细粉分离器
CN205991721U (zh) 一种余热发电系统
CN204007112U (zh) 气态悬浮焙烧炉的返灰输送装置
CN201482545U (zh) 一种漩流冲击粉碎机
CN205095923U (zh) 一种多联铬铁矿低温烘干磨矿分级收粉装置
CN204555718U (zh) 水泥窑尾废气烘干煤磨脱灰系统
CN103925606A (zh) 煤气燃烧加热一次风的高水分褐煤中速磨煤机制粉系统
CN203448200U (zh) 一种用于100mw~1500mw燃煤电厂的细粉分离器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151125