CN105064946B - 封孔器及其钻孔取芯工艺 - Google Patents

封孔器及其钻孔取芯工艺 Download PDF

Info

Publication number
CN105064946B
CN105064946B CN201510435929.1A CN201510435929A CN105064946B CN 105064946 B CN105064946 B CN 105064946B CN 201510435929 A CN201510435929 A CN 201510435929A CN 105064946 B CN105064946 B CN 105064946B
Authority
CN
China
Prior art keywords
capsule
core pipe
shackle member
hole packer
swivel nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510435929.1A
Other languages
English (en)
Other versions
CN105064946A (zh
Inventor
翟华
齐文国
李振
欧立懂
张业明
朱建安
黄建忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GAOCHENG MINE OF ZHENGZHOU COAL & ELECTRIC CO., LTD.
Jiangsu Zhongmei Mining Equipment Co., Ltd.
Henan University of Technology
Original Assignee
JIANGSU ZHONGMEI MINING EQUIPMENT CO Ltd
GAOCHENG MINE OF ZHENGZHOU COAL & ELECTRIC Co Ltd
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGMEI MINING EQUIPMENT CO Ltd, GAOCHENG MINE OF ZHENGZHOU COAL & ELECTRIC Co Ltd, Henan University of Technology filed Critical JIANGSU ZHONGMEI MINING EQUIPMENT CO Ltd
Priority to CN201510435929.1A priority Critical patent/CN105064946B/zh
Publication of CN105064946A publication Critical patent/CN105064946A/zh
Application granted granted Critical
Publication of CN105064946B publication Critical patent/CN105064946B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明涉及一种封孔器及其钻孔取芯工艺,所述封孔器包含有芯管(1),所述芯管(1)外套装有胶囊(2),所述胶囊(2)两端分别连接有左卡接件(4)和右卡接件(5),所述左卡接件(4)滑动套装于芯管(1)上,所述右卡接件(5)经定位螺圈(3)固定于芯管(1)上,所述右卡接件(5)上设置有进水通道,所述定位螺圈(3)上设置有螺圈进水通道(3.1),所述胶囊(2)的内腔经右卡接件(5)的进水通道、定位螺圈(3)的螺圈进水通道(3.1)和胶囊进水管(6)后连通至胶囊进水接头(7)。本发明涉及一种封孔器及其钻孔取芯工艺,结构简单、使用方便且能对岩层状况进行直观探测。

Description

封孔器及其钻孔取芯工艺
技术领域
本发明涉及一种封孔器及其钻孔取芯工艺,属于矿用设备技术领域。
背景技术
封孔器,是煤层气抽放和煤层注水钻孔孔口的密封装置;采用封孔器可降低粉尘80% 以上,改善工人作业环境,杜绝粉尘爆炸事故,湿润煤体,预防煤体自燃发火;
现有的煤层封孔器不仅注水水道结构复杂、成本高,最主要的是封孔后内部的水流流动不畅;通过水压从钻杆导出的岩层为碎片结构,不但容易堵塞钻杆,而且无法有效的通过其对岩层端面进行识别和判断,因此亟需一种能够克服上述问题的全新封孔器。
发明内容
本发明的目的在于克服上述不足,提供一种结构简单、使用方便且能对岩层状况进行直观探测的封孔器及其钻孔取芯工艺。
本发明的目的是这样实现的:
一种封孔器,所述封孔器包含有芯管,所述芯管外套装有胶囊,所述胶囊两端分别连接有左卡接件和右卡接件,所述左卡接件滑动套装于芯管上,所述右卡接件经定位螺圈固定于芯管上,所述右卡接件上设置有进水通道,所述定位螺圈上设置有螺圈进水通道,所述胶囊的内腔经右卡接件的进水通道、定位螺圈的螺圈进水通道和胶囊进水管后连通至胶囊进水接头。
本发明一种封孔器,所述左卡接件包含有滑动套装于芯管上的左侧内螺套,所述左侧内螺套上旋置有左侧外螺套,且胶囊的左端卡置于左侧内螺套和左侧外螺套之间;
定位螺圈固定套装于芯管上,所述右卡接件包含有套装于芯管上的右侧内螺套,且右侧内螺套与定位螺圈相连接,所述右侧内螺套上旋置有右侧外螺套,所述右侧内螺套上设置有内螺套进水通道;
所述胶囊进水管固定于芯管的外管壁上,且胶囊进水接头位于胶囊进水管上,所述胶囊的内腔经内螺套进水通道、进水通道和胶囊进水管后连通至胶囊进水接头。
本发明一种封孔器,所述胶囊进水管上套装有导向套;该导向套为一锥形结构,该锥形结构的小头端靠近胶囊。
本发明一种封孔器,所述芯管的右端面连接有密封装置,所述密封装置包含有与芯管相连接的壳体,所述壳体上设置有打钻进水接头,所述壳体内设置有一内套筒,该内套筒的内筒壁上设置有卡环,所述卡环的左侧设置有左定位块,所述内套筒的左端面卡置有左封盖,且左封盖与左定位块相紧密贴合,所述卡环的右侧设置有安装座,所述安装座的内壁上设置有多个Y型密封圈,所述安装座的右端面抵置有右定位块,所述内套筒的右端面卡置有右封盖,且右封盖与右定位块相紧密贴合,所述壳体的右端面上设置有挡环,且右封盖贴合在挡环上;所述壳体上穿接有定位螺栓,且定位螺栓压紧于内套筒的外筒壁上。
本发明一种封孔器,所述左封盖与壳体之间设置有O形密封圈。
本发明一种钻孔取芯工艺,将钻杆插入封孔器中,钻杆头部连接取芯钻头;通过胶囊进水接头将高压水导入胶囊中,从而使得封孔器固定于钻孔内;启动钻杆旋转,此时通过打钻进水接头导入高压水,此时高压水经钻杆与芯管内管壁之间的通道进入钻孔;当需要取芯时,停止钻杆,此时高压水经钻头流入钻杆,将钻杆中的柱状结构的岩芯整体压出;通过整体结构的岩芯,可对岩层的地质状况进行判断。
与现有技术相比,本发明的有益效果是:
本发明结构简单、使用方便,且钻孔结束后能够将柱状结构的岩芯整体压出,便于对岩层结构进行观测;同时,在整个工作过程中,持续导入的高压水还可以递交降温的作用,防止钻头、钻杆因摩擦产生的高温损坏。
附图说明
图1为本发明封孔器的结构示意图。
图2为本发明封孔器的图1的Ⅰ的局部放大图。
图3为本发明封孔器的图1的Ⅱ的局部放大图。
图4为本发明封孔器的密封装置的结构示意图。
图5为本发明封孔器的钻孔取芯时的状态示意图。
其中:
芯管1、胶囊2、定位螺圈3、左卡接件4、右卡接件5、胶囊进水管6、胶囊进水接头7、导向套8、拉杆封9、防护套10;
壳体101、打钻进水接头102、内套筒103、卡环104、左定位块105、左封盖106、安装座107、Y型密封圈108、右定位块109、右封盖110、定位螺栓111、挡环112;
螺圈进水通道3.1;
左侧内螺套4.1、左侧外螺套4.2;
右侧内螺套5.1、右侧外螺套5.2、内螺套进水通道5.3。
具体实施方式
参见图1~5,本发明涉及的一种封孔器,所述封孔器包含有芯管1,所述芯管1外套装有胶囊2,所述胶囊2两端分别连接有左卡接件4和右卡接件5,所述左卡接件4滑动套装于芯管1上,所述右卡接件5经定位螺圈3固定于芯管1上,所述右卡接件5上设置有进水通道,所述定位螺圈3上设置有螺圈进水通道3.1,所述胶囊2的内腔经右卡接件5的进水通道、定位螺圈3的螺圈进水通道3.1和胶囊进水管6后连通至胶囊进水接头7;
具体的讲,所述左卡接件4包含有滑动套装于芯管1上的左侧内螺套4.1,所述左侧内螺套4.1上旋置有左侧外螺套4.2,且胶囊2的左端卡置于左侧内螺套4.1和左侧外螺套4.2之间;
定位螺圈3固定套装于芯管1上,所述右卡接件5包含有套装于芯管1上的右侧内螺套5.1,且右侧内螺套5.1与定位螺圈3相连接,且右侧内螺套5.1和定位螺圈3之间设置有O形密封圈,所述右侧内螺套5.1上旋置有右侧外螺套5.2,所述右侧内螺套5.1上设置有内螺套进水通道5.3;
所述胶囊进水管6固定于芯管1的外管壁上,且胶囊进水接头7位于胶囊进水管6上,所述胶囊2的内腔经内螺套进水通道5.3、进水通道3.1和胶囊进水管6后连通至胶囊进水接头7;
注水后,胶囊2膨胀,此时右卡接件5不动,左卡接件4向右移动,从而使得膨胀后的胶囊2顶住孔壁;并且,所述左卡接件4的左侧端面设置有拉杆封9,保证左卡接件4移动时水不会发生泄漏;所述芯管1的左端面连接有防护套10,用于防止拆装过程中因碰撞造成胶囊2移动端(左卡接件4)的损坏;
所述胶囊进水管6上套装有导向套8;该导向套8为一锥形结构,该锥形结构的小头端靠近胶囊2;从而使得插入钻孔工作时能够对封孔器起到固定作用,防止其晃动;
所述芯管1的右端面连接有密封装置,具体的讲,所述密封装置包含有与芯管1相连接的壳体101,所述壳体101上设置有打钻进水接头102,所述壳体101内设置有一内套筒103,该内套筒103的内筒壁上设置有卡环104,所述卡环104的左侧设置有左定位块105,所述内套筒103的左端面卡置有左封盖106,且左封盖106与左定位块105相紧密贴合,所述卡环104的右侧设置有安装座107,所述安装座107的内壁上设置有多个Y型密封圈108,所述安装座107的右端面抵置有右定位块109,所述内套筒103的右端面卡置有右封盖110,且右封盖110与右定位块109相紧密贴合,所述壳体101的右端面上设置有挡环112,且右封盖110贴合在挡环112上;所述壳体101上穿接有定位螺栓111,且定位螺栓111压紧于内套筒103的外筒壁上;进一步的,所述左封盖106与壳体101之间设置有O形密封圈,保证工作时的密封性能;
通过密封装置的设置,使得钻杆在工作时,安装座能够跟随钻杆适当偏移,且通过Y型密封圈保证工作过程中的密封性能;
一种钻孔取芯工艺,将钻杆插入封孔器中,钻杆头部连接取芯钻头;通过胶囊进水接头7将高压水导入胶囊2中,从而使得封孔器固定于钻孔上;启动钻杆旋转,此时通过打钻进水接头102导入高压水,此时高压水经钻杆与芯管1内管壁之间的通道进入钻孔;当需要取芯时,停止钻杆,此时高压水经钻头流入钻杆,将钻杆中的柱状结构的岩芯整体压出;通过整体结构的岩芯,可对岩层的地质状况进行判断;
另外:需要注意的是,上述具体实施方式仅为本专利的一个优化方案,本领域的技术人员根据上述构思所做的任何改动或改进,均在本专利的保护范围之内。

Claims (4)

1.一种封孔器,其特征在于:所述封孔器包含有芯管(1),所述芯管(1)外套装有胶囊(2),所述胶囊(2)两端分别连接有左卡接件(4)和右卡接件(5),所述左卡接件(4)滑动套装于芯管(1)上,所述右卡接件(5)经定位螺圈(3)固定于芯管(1)上,所述右卡接件(5)上设置有进水通道,所述定位螺圈(3)上设置有螺圈进水通道(3.1),所述胶囊(2)的内腔经右卡接件(5)的进水通道、定位螺圈(3)的螺圈进水通道(3.1)和胶囊进水管(6)后连通至胶囊进水接头(7);
所述胶囊进水管(6)上套装有导向套(8);该导向套(8)为一锥形结构,该锥形结构的小头端靠近胶囊(2);
所述芯管(1)的右端面连接有密封装置,所述密封装置包含有与芯管(1)相连接的壳体(101),所述壳体(101)上设置有打钻进水接头(102),所述壳体(101)内设置有一内套筒(103),该内套筒(103)的内筒壁上设置有卡环(104),所述卡环(104)的左侧设置有左定位块(105),所述内套筒(103)的左端面卡置有左封盖(106),且左封盖(106)与左定位块(105)相紧密贴合,所述卡环(104)的右侧设置有安装座(107),所述安装座(107)的内壁上设置有多个Y型密封圈(108),所述安装座(107)的右端面抵置有右定位块(109),所述内套筒(103)的右端面卡置有右封盖(110),且右封盖(110)与右定位块(109)相紧密贴合,所述壳体(101)的右端面上设置有挡环(112),且右封盖(110)贴合在挡环(112)上;所述壳体(101)上穿接有定位螺栓(111),且定位螺栓(111)压紧于内套筒(103)的外筒壁上。
2.如权利要求1所述一种封孔器,其特征在于:所述左卡接件(4)包含有滑动套装于芯管(1)上的左侧内螺套(4.1),所述左侧内螺套(4.1)上旋置有左侧外螺套(4.2),且胶囊(2)的左端卡置于左侧内螺套(4.1)和左侧外螺套(4.2)之间;
定位螺圈(3)固定套装于芯管(1)上,所述右卡接件(5)包含有套装于芯管(1)上的右侧内螺套(5.1),且右侧内螺套(5.1)与定位螺圈(3)相连接,所述右侧内螺套(5.1)上旋置有右侧外螺套(5.2),所述右侧内螺套(5.1)上设置有内螺套进水通道(5.3);
所述胶囊进水管(6)固定于芯管(1)的外管壁上,且胶囊进水接头(7)位于胶囊进水管(6)上,所述胶囊(2)的内腔经内螺套进水通道(5.3)、进水通道(3.1)和胶囊进水管(6)后连通至胶囊进水接头(7)。
3.如权利要求1所述一种封孔器,其特征在于:所述左封盖(106)与壳体(101)之间设置有O形密封圈。
4.一种钻孔取芯工艺,其特征在于:所述工艺采用如权利要求1所述一种封孔器实现,将钻杆插入封孔器中,钻杆头部连接取芯钻头;通过胶囊进水接头(7)将高压水导入胶囊(2)中,从而使得封孔器固定于钻孔内;启动钻杆旋转,此时通过打钻进水接头(102)导入高压水,此时高压水经钻杆与芯管(1)内管壁之间的通道进入钻孔;当需要取芯时,停止钻杆,此时高压水经钻头流入钻杆,将钻杆中的柱状结构的岩芯整体压出;通过整体结构的岩芯,可对岩层的地质状况进行判断。
CN201510435929.1A 2015-07-23 2015-07-23 封孔器及其钻孔取芯工艺 Expired - Fee Related CN105064946B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510435929.1A CN105064946B (zh) 2015-07-23 2015-07-23 封孔器及其钻孔取芯工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510435929.1A CN105064946B (zh) 2015-07-23 2015-07-23 封孔器及其钻孔取芯工艺

Publications (2)

Publication Number Publication Date
CN105064946A CN105064946A (zh) 2015-11-18
CN105064946B true CN105064946B (zh) 2017-12-29

Family

ID=54494426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510435929.1A Expired - Fee Related CN105064946B (zh) 2015-07-23 2015-07-23 封孔器及其钻孔取芯工艺

Country Status (1)

Country Link
CN (1) CN105064946B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715230B (zh) * 2016-04-08 2018-04-03 河南理工大学 中部渗浆式单囊袋注浆封孔装置及其封孔方法
CN106223886A (zh) * 2016-09-08 2016-12-14 华北科技学院 一种充水保压冷却钻进取煤芯的装置及方法
CN106593335B (zh) * 2017-01-16 2019-02-15 中国地质大学(北京) 煤层取芯密封装置及其密封取芯方法
CN112177558B (zh) * 2020-10-13 2021-06-25 中国矿业大学 一种新型地下煤气化开采过程泄露封堵装置
CN112832779B (zh) * 2021-01-29 2021-12-21 中国科学院武汉岩土力学研究所 一种co2微爆联合tbm破岩装置

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB558659A (en) * 1941-06-24 1944-01-14 Shell Dev Improvements in or relating to well drilling
CN2193428Y (zh) * 1994-04-22 1995-03-29 河南省煤炭科学研究所 矿井下抽放瓦斯充气式胶囊封孔器
US5488876A (en) * 1992-09-30 1996-02-06 Precision Sampling Incorporated Soil sampling system with sample container ridgidly coupled to drive casing
US6644423B2 (en) * 2000-07-27 2003-11-11 Applied Research Associates, Inc. Wireline system for multiple direct push tool usage
CN102155251A (zh) * 2011-02-28 2011-08-17 河南理工大学 一种水力封孔器
CN102383826A (zh) * 2011-06-30 2012-03-21 河南理工大学 一种封孔器及通过其实现的封孔工艺
CN203403856U (zh) * 2013-08-06 2014-01-22 河南理工大学 外注式瓦斯抽放及煤层注水封孔器
CN203769840U (zh) * 2014-04-04 2014-08-13 郑州远见矿用设备有限公司 煤矿用瓦斯抽放封孔器
CN204804755U (zh) * 2015-07-23 2015-11-25 江苏中煤矿山设备有限公司 封孔器

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB558659A (en) * 1941-06-24 1944-01-14 Shell Dev Improvements in or relating to well drilling
US5488876A (en) * 1992-09-30 1996-02-06 Precision Sampling Incorporated Soil sampling system with sample container ridgidly coupled to drive casing
CN2193428Y (zh) * 1994-04-22 1995-03-29 河南省煤炭科学研究所 矿井下抽放瓦斯充气式胶囊封孔器
US6644423B2 (en) * 2000-07-27 2003-11-11 Applied Research Associates, Inc. Wireline system for multiple direct push tool usage
CN102155251A (zh) * 2011-02-28 2011-08-17 河南理工大学 一种水力封孔器
CN102383826A (zh) * 2011-06-30 2012-03-21 河南理工大学 一种封孔器及通过其实现的封孔工艺
CN203403856U (zh) * 2013-08-06 2014-01-22 河南理工大学 外注式瓦斯抽放及煤层注水封孔器
CN203769840U (zh) * 2014-04-04 2014-08-13 郑州远见矿用设备有限公司 煤矿用瓦斯抽放封孔器
CN204804755U (zh) * 2015-07-23 2015-11-25 江苏中煤矿山设备有限公司 封孔器

Also Published As

Publication number Publication date
CN105064946A (zh) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105064946B (zh) 封孔器及其钻孔取芯工艺
WO2019210657A1 (zh) 一种井下深孔松动爆破注水一体化封孔装置
CN105863556A (zh) 一种煤矿瓦斯抽采钻孔带压注浆快速封孔器及其使用方法
CN206693997U (zh) 一种油田隔采工艺管柱
CN104612640B (zh) 一种煤矿井下钻孔注热及封孔一体化方法
CN103306657B (zh) 一种煤层割缝卸压增透和缝槽保持装置及方法
CN104295263A (zh) 一种用于煤层瓦斯抽排的钻孔径向封孔器
CN104405434A (zh) 一种低渗煤层区井筒气相压裂快速揭煤的方法及其装置
CN104533336A (zh) 一种预注胶体密封松软煤层抽采钻孔的工艺与装置
CN205063914U (zh) 一种射孔、防砂、丢枪一体化完井管柱
CN104213888A (zh) 一种稠油热采井井下注汽管柱
CN105003224B (zh) 两段式封孔器及其钻孔取芯工艺
CN201811862U (zh) 一种井下卸压密闭煤芯取样器
CN103195470B (zh) 钻孔施工瓦斯涌出收集装置
CN202544799U (zh) 一种煤层安全钻进防喷装置
CN103939075B (zh) 一种提高煤矿瓦斯抽采效果的压裂方法及装置
CN207315289U (zh) 双管热采井口装置
CN205805503U (zh) 煤矿瓦斯抽采钻孔带压注浆快速封孔器
CN104373093A (zh) 带压力监测功能的井下造氮气诱喷完井管柱
CN204804755U (zh) 封孔器
CN204571904U (zh) 易维修热采套管头和易维修井口热采装置
CN203856443U (zh) 可伸缩式热采套管头装置
CN101173605A (zh) 分层定量注汽装置
CN203308392U (zh) 一种高压注气管柱密封插头
CN203851203U (zh) 一种油井井下摄像装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Di Hua

Inventor after: Qi Wenguo

Inventor after: Li Zhen

Inventor after: Ou Lidong

Inventor after: Zhang Yeming

Inventor after: Zhu Jianan

Inventor after: Huang Jianzhong

Inventor before: Huang Jianzhong

Inventor before: Huang Wentao

Inventor before: Hua Li

Inventor before: Liu Yi

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160113

Address after: Gaocheng Shuang Miao Cun town Dengfeng city Henan province 450000

Applicant after: GAOCHENG MINE OF ZHENGZHOU COAL & ELECTRIC CO., LTD.

Applicant after: Henan Polytechnic University

Applicant after: Jiangsu Zhongmei Mining Equipment Co., Ltd.

Address before: 214443 Jiangsu city of Wuxi province Jiangyin Shengang sub package Road No. 158

Applicant before: Jiangsu Zhongmei Mining Equipment Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20180723

CF01 Termination of patent right due to non-payment of annual fee