CN105064765B - A kind of transmission line of electricity hydraulic pressure repairing device - Google Patents

A kind of transmission line of electricity hydraulic pressure repairing device Download PDF

Info

Publication number
CN105064765B
CN105064765B CN201510470144.8A CN201510470144A CN105064765B CN 105064765 B CN105064765 B CN 105064765B CN 201510470144 A CN201510470144 A CN 201510470144A CN 105064765 B CN105064765 B CN 105064765B
Authority
CN
China
Prior art keywords
steel
tower
leg
hydraulic
tower leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510470144.8A
Other languages
Chinese (zh)
Other versions
CN105064765A (en
Inventor
沈黎明
王子琦
苏高峰
王忠强
范砚学
周海
李明超
王新铭
郭玉良
王宏伟
赵雨
郭保林
王彪
刘春雷
严燕
贾伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU KAITONG SICHUANG TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Xinxiang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
ZHENGZHOU KAITONG SICHUANG TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Xinxiang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU KAITONG SICHUANG TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, Xinxiang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical ZHENGZHOU KAITONG SICHUANG TECHNOLOGY Co Ltd
Priority to CN201510470144.8A priority Critical patent/CN105064765B/en
Publication of CN105064765A publication Critical patent/CN105064765A/en
Application granted granted Critical
Publication of CN105064765B publication Critical patent/CN105064765B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a kind of transmission line of electricity hydraulic pressure repairing device, clamping device including being arranged on steel tower tower leg, hydraulic cylinder is set between the fixed seat of the clamping device and steel tower, and the hydraulic cylinder is connected by oil pipe with hydraulic power unit, and the hydraulic power unit is connected with programmable controller.The not another Li Xinta of the present invention, emergency repair time is short, avoid have a power failure for a long time economic loss brought, circuit reliability service.

Description

A kind of transmission line of electricity hydraulic pressure repairing device
Technical field
The present invention relates to iron tower of power transmission line rush repair equipment technical field, more particularly to a kind of electric power transmission line steel tower Inclined hydraulic repairing device.
Background technology
High pressure overhead power line is generally by basis, steel tower, the part such as insulator, gold utensil, wire, ground wire and earthing or grounding means Composition, and be connected with transformer station or power plant, power network or power system are constituted, to convey electric energy.Steel tower is built on stilts defeated The important component of electric line, his effect is to support to lead, ground wire and wire is kept certain peace over the ground and between wire Full distance.Therefore, the safety and the degree of reliability of line steel tower are only improved, continuous power supply is just can guarantee that.
But, because high pressure overhead power line is directly exposed in large natural environment, frequently suffer from artificial and natural External force is destroyed.People under steel tower in order that carrying out earthwork evacuation or carrying out construction heavy-duty machinery shock steel tower and people Steel tower is damaged for revenge, tower material is stolen and destroys resistance to overturning of steel tower etc.;Natural factor is landslide mud-rock flow Foundation instability etc. caused by caused subgrade reaction reduction, natural cause.
For near iron tower of power transmission line bottom due to excavate or other reasons cause steel tower occur in various degree it is inclined Problem, phenomenon generally existing among national transmission line of electricity production run, and original solution is to look for a ground in addition Fang Chongxin excavation foundations, set up a base steel tower, leading on the steel tower of run-off the straight, ground wire are displaced on newly vertical steel tower.This The method of kind is not only time-consuming, laborious, expensive, and basis is done in the uncertain place that can find of environment around steel tower;Have a power failure application Also it is pretty troublesome.
The content of the invention
It is an object of the invention to provide a kind of not another Li Xinta, emergency repair time is short, avoid having a power failure for a long time the economy brought Loss, the transmission line of electricity hydraulic pressure repairing device of circuit reliability service.
The purpose is achieved by the following scheme:A kind of transmission line of electricity hydraulic pressure repairing device, including it is arranged on steel tower Hydraulic cylinder is set between the clamping device of tower leg, the fixed seat of the clamping device and steel tower, the hydraulic cylinder by oil pipe with Hydraulic power unit is connected, and the hydraulic power unit is connected with programmable controller, provided with interim fixed between the tower leg and fixed seat Mechanism.
Reinforcement is provided between the steel tower tower leg.
The temporary securing mechanism includes the steel wire rope through tower leg and pre-embedded steel slab, and the steel wire rope two ends pass through wire clamp It is fixed together.
The clamping device includes the angle steel for being vertically mounted on steel tower tower leg, the two ends downside of the angle steel and consolidating for steel tower Connected between reservation by two hydraulic cylinders.
The angle steel is fixed with steel tower tower leg by the bolt through tower leg and angle steel.
The hydraulic cylinder is provided with proportional flow control valve.
The method of iron tower of power transmission line inclined hydraulic repairing, comprises the following steps:
1)Angle steel is vertically fixed on two tower legs of Iron tower incline side, put at least two crossbeams of steel tower It is equipped with level meter;
2)Two strong points A, B are selected on the downside of the two ends of angle steel, make A points to distance and B point the hanging down to tower leg of tower leg It is straight apart from identical, two hydraulic cylinders, which are fixed on, makes the upper end of two hydraulic cylinders face A points, B respectively in the fixed seat of steel tower Point;
3)First the fixing bolt of a tower leg of Iron tower incline side is dismantled, by the fixing hole of steel wire penetrating tower leg and Pre-embedded steel slab in fixed seat, steel wire rope two ends are fixed on together with wire clamp;Now by another tower leg of Iron tower incline side Fixing bolt dismantle, by the pre-embedded steel slab on the fixing hole and fixed seat of steel wire penetrating tower leg, steel wire rope two ends wire clamp It is fixed on together;
4)After hydraulic cylinder is connected with hydraulic power unit by high pressure consistent lubricant pipe, by observing level meter, hydraulic cylinder work is adjusted Make, until steel tower crossbeam is horizontal;
5)First the steel wire rope of a tower leg of Iron tower incline side is dismantled, steel plate one end is welded on tower leg, it is another End is welded on pre-embedded steel slab, then the steel wire rope of another tower leg of Iron tower incline side is dismantled, and steel plate one end is welded on On tower leg, the other end is welded on pre-embedded steel slab.
The level meter uses electrolevel, and electrolevel is connected with voice announcer and alarm, voice broadcast The level angle of device real-time broadcasting steel tower, when steel tower angle exceedes setting value, alarm work reminds operating personnel.
The steel plate uses the welding steel of special corrosion-resistant good welding performance, the chemical composition quality of the welding steel Percentage is:C:0.16~0.17%, Si:1.16~1.18%, Mn:2.90~3.20%, P≤0.012%, S≤ 0.012%th, Ti:0.01~0.02%, Cr:7.5~8.5%, Re:0.02~0.08%, surplus Fe and inevitable impurity.
Beneficial effects of the present invention:
1st, rush to repair when without another Li Xinta, tear old tower open.
Hydraulic test is used when the 2nd, rushing to repair, loading procedure is steady, safe and reliable, no impact load.
3rd, angle steel deck is loaded convenience, operation flexibly, it is adaptable to a variety of steel towers.
The adjustable of synchronization lifting and lifting speed can be realized during repairing;Rationally the structure of design angle steel card, prevents Only in repairing, iron tower main material is deformed;In the event of fortuitous event during repairing, emergent stopping, unexpected feelings to be solved can be achieved Quick recoverable works after condition.
Brief description of the drawings
The present invention is made below in conjunction with the accompanying drawings and being further illustrated:
Fig. 1 is the structural representation of the present invention.
Embodiment
Embodiment one:
As shown in figure 1, a kind of transmission line of electricity hydraulic pressure repairing device, including the clamping device of steel tower tower leg 2 is arranged on, it is described Hydraulic cylinder 3 is set between the fixed seat 9 of clamping device and steel tower, and the hydraulic cylinder 3 is connected by oil pipe with hydraulic power unit 6, institute State hydraulic power unit 6 and be connected with the device of PLC technology 10.
The clamping device includes on the downside of the angle steel 4 for being vertically mounted on steel tower tower leg 3, the two ends of the angle steel 4 and steel tower Fixed seat 9 between connected by two hydraulic cylinders 3.
The angle steel 4 is fixed with steel tower tower leg 2 by the bolt through tower leg and angle steel.
The hydraulic cylinder 3 is provided with proportional flow control valve.
Temporary securing mechanism is provided between the tower leg and fixed seat.
The temporary securing mechanism includes the steel wire rope through tower leg and pre-embedded steel slab, and the steel wire rope two ends pass through wire clamp It is fixed together.
Several reinforcements are provided between the steel tower tower leg, the reinforcement is welded on steel tower, can prevent steel tower Steel tower is deformed during by jack-up.
The method of iron tower of power transmission line inclined hydraulic repairing, comprises the following steps:
1)Angle steel is vertically fixed on two tower legs of Iron tower incline side, at least two crossbeams 1 of steel tower Level meter is placed with, two level meters can be compared, more accurately;
2)Two strong points A, B are selected on the downside of the two ends of angle steel 4, make A points to distance and the B point of tower leg 2 to tower leg 2 Vertical range is identical, and two hydraulic cylinders 3, which are fixed in the fixed seat 9 of steel tower, makes the upper end of two hydraulic cylinders 3 face A respectively Point, B points, make angle steel uniform force;
3)First the fixing bolt of a tower leg 2 of Iron tower incline side is dismantled, by the fixing hole of steel wire penetrating tower leg With the pre-embedded steel slab in fixed seat, steel wire rope two ends are fixed on together with wire clamp;Now by another tower of Iron tower incline side The fixing bolt of leg 5 is dismantled, and by the pre-embedded steel slab 8 on the fixing hole 7 and fixed seat of steel wire penetrating tower leg, steel wire rope two ends are used Wire clamp is fixed on together, and collapse of iron tower can be prevented by playing interim fixation;
4)After hydraulic cylinder is connected with hydraulic power unit by high pressure consistent lubricant pipe, by observing level meter, hydraulic cylinder work is adjusted Make, until steel tower crossbeam 1 is horizontal;
5)First the steel wire rope of a tower leg of Iron tower incline side is dismantled, steel plate one end is welded on tower leg, it is another End is welded on pre-embedded steel slab, then the steel wire rope of another tower leg of Iron tower incline side is dismantled, and steel plate one end is welded on On tower leg, the other end is welded on pre-embedded steel slab, steel wire rope of dismantling successively, safe and reliable.
The steel plate uses the welding steel of special corrosion-resistant good welding performance, the chemical composition quality of the welding steel Percentage is:C:0.16%th, Si:1.16%th, Mn:2.90%th, P≤0.012%, S≤0.012%, Ti:0.01%th, Cr: 7.5%th, Re:0.02%, surplus Fe and inevitable impurity.
Embodiment two:
As shown in figure 1, a kind of transmission line of electricity hydraulic pressure repairing device, including the clamping device of steel tower tower leg is arranged on, it is described Hydraulic cylinder is set between clamping device and the fixed seat of steel tower, and the hydraulic cylinder is connected by oil pipe with hydraulic power unit, the liquid Press pump station is connected with programmable controller.
The clamping device includes the angle steel for being vertically mounted on steel tower tower leg, the two ends downside of the angle steel and consolidating for steel tower Connected between reservation by two hydraulic cylinders.
The angle steel is fixed with steel tower tower leg by the bolt through tower leg and angle steel.
The hydraulic cylinder is provided with proportional flow control valve.
The temporary securing mechanism includes the steel wire rope through tower leg and pre-embedded steel slab, and the steel wire rope two ends pass through wire clamp It is fixed together.
Several reinforcements are provided between the steel tower tower leg, the reinforcement is welded on steel tower, can prevent steel tower Steel tower is deformed during by jack-up.
The method of iron tower of power transmission line inclined hydraulic repairing, comprises the following steps:
1)Angle steel is vertically fixed on two tower legs of Iron tower incline side, put at least two crossbeams of steel tower It is equipped with level meter;
2)Two strong points A, B are selected on the downside of the two ends of angle steel, make A points to distance and B point the hanging down to tower leg of tower leg It is straight apart from identical, two hydraulic cylinders, which are fixed on, makes the upper end of two hydraulic cylinders face A points, B respectively in the fixed seat of steel tower Point;
3)First the fixing bolt of a tower leg of Iron tower incline side is dismantled, by the fixing hole of steel wire penetrating tower leg and Pre-embedded steel slab in fixed seat, steel wire rope two ends are fixed on together with wire clamp;Now by another tower leg of Iron tower incline side Fixing bolt dismantle, by the pre-embedded steel slab on the fixing hole and fixed seat of steel wire penetrating tower leg, steel wire rope two ends wire clamp It is fixed on together;
4)After hydraulic cylinder is connected with hydraulic power unit by high pressure consistent lubricant pipe, by observing level meter, hydraulic cylinder work is adjusted Make, until steel tower crossbeam is horizontal;
5)First the steel wire rope of a tower leg of Iron tower incline side is dismantled, steel plate one end is welded on tower leg, it is another End is welded on pre-embedded steel slab, then the steel wire rope of another tower leg of Iron tower incline side is dismantled, and steel plate one end is welded on On tower leg, the other end is welded on pre-embedded steel slab.
The steel plate uses the welding steel of special corrosion-resistant good welding performance, the chemical composition quality of the welding steel Percentage is:C:0.17%th, Si:1.18%th, Mn:3.20%th, P≤0.012%, S≤0.012%, Ti:0.02%th, Cr: 8.5%th, Re:0.08%, surplus Fe and inevitable impurity.
Embodiment three:
As shown in figure 1, a kind of transmission line of electricity hydraulic pressure repairing device, including the clamping device of steel tower tower leg is arranged on, it is described Hydraulic cylinder is set between clamping device and the fixed seat of steel tower, and the hydraulic cylinder is connected by oil pipe with hydraulic power unit, the liquid Press pump station is connected with programmable controller.
The clamping device includes the angle steel for being vertically mounted on steel tower tower leg, the two ends downside of the angle steel and consolidating for steel tower Connected between reservation by two hydraulic cylinders.
The angle steel is fixed with steel tower tower leg by the bolt through tower leg and angle steel.
The hydraulic cylinder is provided with proportional flow control valve.
The temporary securing mechanism includes the steel wire rope through tower leg and pre-embedded steel slab, and the steel wire rope two ends pass through wire clamp It is fixed together.
Several reinforcements are provided between the steel tower tower leg, the reinforcement is welded on steel tower, can prevent steel tower Steel tower is deformed during by jack-up.
The method of iron tower of power transmission line inclined hydraulic repairing, comprises the following steps:
1)Angle steel is vertically fixed on two tower legs of Iron tower incline side, put at least two crossbeams of steel tower It is equipped with level meter;
2)Two strong points A, B are selected on the downside of the two ends of angle steel, make A points to distance and B point the hanging down to tower leg of tower leg It is straight apart from identical, two hydraulic cylinders, which are fixed on, makes the upper end of two hydraulic cylinders face A points, B respectively in the fixed seat of steel tower Point;
3)First the fixing bolt of a tower leg of Iron tower incline side is dismantled, by the fixing hole of steel wire penetrating tower leg and Pre-embedded steel slab in fixed seat, steel wire rope two ends are fixed on together with wire clamp;Now by another tower leg of Iron tower incline side Fixing bolt dismantle, by the pre-embedded steel slab on the fixing hole and fixed seat of steel wire penetrating tower leg, steel wire rope two ends wire clamp It is fixed on together;The fixing bolt of surplus tower leg can be loosened, be fastened after having rushed to repair, then by fixing bolt;
4)After hydraulic cylinder is connected with hydraulic power unit by high pressure consistent lubricant pipe, by observing level meter, hydraulic cylinder work is adjusted Make, until steel tower crossbeam is horizontal;
5)First the steel wire rope of a tower leg of Iron tower incline side is dismantled, steel plate one end is welded on tower leg, it is another End is welded on pre-embedded steel slab, then the steel wire rope of another tower leg of Iron tower incline side is dismantled, and steel plate one end is welded on On tower leg, the other end is welded on pre-embedded steel slab.
The steel plate uses the welding steel of special corrosion-resistant good welding performance, the chemical composition quality of the welding steel Percentage is:C:0.165%th, Si:1.17%th, Mn:3.00%th, P≤0.012%, S≤0.012%, Ti:0.02%th, Cr: 8.0%th, Re:0.05%, surplus Fe and inevitable impurity.
It is provided with two direct-acting overflow valves, eight hydraulic control one-way valves, four hydraulic cylinders and is respectively mounted in hydraulic system Four proportional flow control valves, to control hydraulic fluid flow rate.Pressed on the guidance panel of programmable controller provided with six selections Button, can control the select button that four hydraulic cylinder synchronous rise or fall, and single branch hydraulic cylinder is can control again and individually rises, decline Speed adjusting knob, and the anxious tight stop button of hydraulic system, to ensure four hydraulic cylinder synchronous liftings, and are realized single or complete The regulation of the four hydraulic cylinder lifting speeds in portion.
In order to ensure during iron tower main material angle steel jacking not by shearing force, torsion, indeformable, in lifting bracket and steel tower In the connected mode of main material angle steel, angle steel deck connection method is employed.The contact area that is loaded is big, pressure is small, uniform force, subtracts The small tendency of iron tower main material angle steel stress deformation.
Provided with an emergency stop push button on the guidance panel of programmable controller, when there is emergency episode, it can press This lower button, makes hydraulic system stop supplying pressure oil to hydraulic cylinder, hydraulic cylinder is stopped, and inclined steel tower is in halted state, Treat after the completion of accident treatment, scram button is rotated in the direction of arrows and is allowed to reset, hydraulic system is again started up work, is rushed to repair Work.
The check valve valve core of the present invention keeps the position being pressed in vertically downward on valve seat, in order to avoid valve core jam;Commutation should be made Guiding valve keeps axis level orientation, in case causing from hanging down for valve core, electromagnet part is commutated and resetted not normal.Flow divider-combiner Valve core should be axis horizontal orientation, in order to avoid reduce its synchronization accuracy.
The oil circuit board of the hydraulic power unit of the present invention, in order to reduce the hole number on oil circuit board, shortens drilling depth, can take Following measures: 1)Make to have in hydraulic system that associated control element is adjacent to be laid as far as possible.If 2) certain two control element has Hydraulic fluid port is communicated, then should make two communicate hydraulic fluid port line and oil circuit board certain-side is parallel, to reduce the number of cross-drilled hole on oil circuit board.Valve 1 A holes will be communicated with the B holes of valve 2, and the arrangement of two valves makes A holes identical with coordinate dimension in the X-axis in B holes, and boring two straight holes can Connect A, B holes.If conversely, the X-axis coordinate dimension in two holes it is different it is necessary to increasing-individual cross-drilled hole, when what is disposed on oil circuit board When number of elements is more, to avoid the duct that should not be connected from communicating, drilling should be layered, still, layering drilling increases oil circuit board Thickness and weight.Close to Hydraulic Elements ground drill with ferrule the-layer hole, do draining and and control oil passage, their diameter compared with It is small;Second layer hole is the cross-drilled hole of logical pressure oil;Third layer hole is oil return hole path.To prevent oil pressure effect from puncturing adjacency channel, Wall thickness between Kong Yukong-as cannot be less than 5mm.In order to improve the functional reliability of oil circuit board, pressure oilhole is calculated or checked Between minimum wall thickness (MINI W.), it is met intensity requirement.When number of elements is less, two layers of drilling, or only arrangement-layer hole can be divided To link up each element by system requirements and reducing drilling depth ,-a little fabrication hole, last process hole plug screw can be suitably arranged Block, each pressure measurement oilhole of pressure meter switch is circumferentially arranged, and aperture is smaller, distribution is closeer, be difficult on oil circuit board direct cloth Put and use the connection of plate outer pipe type more convenient.
Comparative example 1:The present apparatus being made of stainless steel material disclosed in CN200810100275.7 in the prior art.
Testing Tensile Strength at Elevated Temperature(600 degree) High-temperature yield strength(600 degree) High-temperature oxidation resistance(700 degree, 100h) 0 degree of ballistic work of V-type Eb(mv) Welding performance Use 4 years
Embodiment 1 629 589 0.27 279 362 Flawless after good 4 years Without rust spot
Embodiment 2 639 577 0.28 268 353 Flawless after good 4 years Without rust spot
Embodiment 3 659 599 0.26 298 382 Flawless after good 4 years Without rust spot
Comparative example 1 328 226 0.43 192 126 There is crackle after general 1 year Get rusty serious
Chromium is main element in stainless steel, is that steel obtains rustless property, the important element of corrosion resistance, needs in the prior art Substantial amounts of chromium is added, just can guarantee that steel has good stainless steel corrosion resistance, suitable rhenium is added in the prior art to adjust just Thermoplasticity, the appropriate rhenium of invention addition of the invention, rhenium plays synergy, Neng Gouxian with the chromium in chromium, titanium stainless steel plate The decay resistance of the raising stainless steel of work, what is more important can improve the stability of steel, it is not easy to acid or alkali Property material its reaction, it is ensured that the performance of stainless steel.The titanium wherein added is not in the case where reducing C content and adjustment silicon by adding Plus trace amount of titanium, titanium and rhenium, chromium, silicon, manganese, carbon plays synergy, will not only reduce the yield strength and tensile strength of steel plate, And the welding performance of steel plate is significantly improved, and sees the above table.Mechanics, corrosion resistance and the using effect number of 4 embodiments According to being shown in Table 1.Wherein pitting potential Eb test(ing) medium is 50 DEG C, the 0.5% NaCl aqueous solution;According to GB10125-88 Salt mist experiment is carried out, salt fog the temperature inside the box is 35 ± 2 DEG C, continuous spraying is observed stanniferous ferrite stainless steel surface and become rusty The time t of point.:The high temperature tensile strength of material uses standard GB/T/T 4338-2006《Metal material-drawing by high temperature Test method》;The endurance limit intensity of material uses standard GB/T/T 2039-1997《Metal stretching creep and duration running Method》;The high-temperature oxidation resistance of material uses standard GB/T/T 13303-1991《The antioxygenic property assay method of steel》.

Claims (2)

1. a kind of method that transmission line of electricity hydraulic pressure repairing device is rushed to repair, including transmission line of electricity hydraulic pressure repairing device, it includes It is arranged between the clamping device of steel tower tower leg, the fixed seat of the clamping device and steel tower and hydraulic cylinder, the hydraulic cylinder is set It is connected by oil pipe with hydraulic power unit, the hydraulic power unit is connected with programmable controller, is set between the tower leg and fixed seat There is temporary securing mechanism;The clamping device include being vertically mounted on the downside of the angle steel of steel tower tower leg, the two ends of the angle steel with Connected between the fixed seat of steel tower by two hydraulic cylinders;The angle steel passes through the bolt through tower leg and angle steel with steel tower tower leg It is fixed;The hydraulic cylinder is provided with proportional flow control valve;
Comprise the following steps:
1)Angle steel is vertically fixed on two tower legs of Iron tower incline side, water is placed with least two crossbeams of steel tower Level;
2)On the downside of the two ends of angle steel select two strong points A, B, make A points to tower leg distance and B point to tower leg it is vertical away from From identical, two hydraulic cylinders, which are fixed on, makes the upper end of two hydraulic cylinders face A points, B points respectively in the fixed seat of steel tower;
3)First the fixing bolt of a tower leg of Iron tower incline side is dismantled, by the fixing hole of steel wire penetrating tower leg and fixation Pre-embedded steel slab on seat, steel wire rope two ends are fixed on together with wire clamp;Now consolidating another tower leg of Iron tower incline side Determine bolt to dismantle, by the pre-embedded steel slab on the fixing hole and fixed seat of steel wire penetrating tower leg, steel wire rope two ends are fixed with wire clamp Together;
4)After hydraulic cylinder is connected with hydraulic power unit by high pressure consistent lubricant pipe, by observing level meter, hydraulic cylinder works are adjusted, directly It is horizontal to steel tower crossbeam;
5)First the steel wire rope of a tower leg of Iron tower incline side is dismantled, steel plate one end is welded on tower leg, other end weldering It is connected on pre-embedded steel slab, then the steel wire rope of another tower leg of Iron tower incline side is dismantled, steel plate one end is welded on tower leg On, the other end is welded on pre-embedded steel slab.
2. the method that transmission line of electricity hydraulic pressure repairing device as claimed in claim 1 is rushed to repair, it is characterised in that:The steel plate Using the welding steel of special corrosion-resistant good welding performance, the chemical composition mass percent of the welding steel is:C:0.16 ~0.17%, Si:1.16~1.18%, Mn:2.90~3.20%, P≤0.012%, S≤0.012%, Ti:0.01~ 0.02%th, Cr:7.5~8.5%, Re:0.02~0.08%, surplus Fe and inevitable impurity.
CN201510470144.8A 2015-08-04 2015-08-04 A kind of transmission line of electricity hydraulic pressure repairing device Active CN105064765B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510470144.8A CN105064765B (en) 2015-08-04 2015-08-04 A kind of transmission line of electricity hydraulic pressure repairing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510470144.8A CN105064765B (en) 2015-08-04 2015-08-04 A kind of transmission line of electricity hydraulic pressure repairing device

Publications (2)

Publication Number Publication Date
CN105064765A CN105064765A (en) 2015-11-18
CN105064765B true CN105064765B (en) 2017-09-26

Family

ID=54494249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510470144.8A Active CN105064765B (en) 2015-08-04 2015-08-04 A kind of transmission line of electricity hydraulic pressure repairing device

Country Status (1)

Country Link
CN (1) CN105064765B (en)

Also Published As

Publication number Publication date
CN105064765A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN100580191C (en) High-strength prestressed concrete pipe pile construction method
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN203947771U (en) A kind of Bailey beam pendent form support system
CN104963368A (en) Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof
CN107662881A (en) Integral riser erecting device and its installation method in a kind of high stove pipe well
CN106865414A (en) A kind of combined hanging installation method of Con casting ladle panoramic table
CN205004678U (en) Transmission line iron tower hydraulic pressure is assembled and is dismantled convenient device of salvageing fast
CN108487201A (en) Avoid tail water cooler of underwater operation to overhaul device
CN206127746U (en) Isolation bearing handles accurate location structure of pre -buried steel sheet in back
CN104420694B (en) The general installation method of benzene hydrogenation engineering tower
CN109780330A (en) The fixed bracket of multi-pipeline and its construction method
CN105756380B (en) A kind of multilayer large-span assembled integral space steel lattice box structure construction of hydropower method
CN105064765B (en) A kind of transmission line of electricity hydraulic pressure repairing device
CN209604683U (en) Multi-pipeline fixes bracket
CN105024306B (en) A kind of rapid rush-repair device of iron tower of power transmission line hydraulic pressure assembly convenient disassembly
CN205000726U (en) Device is salvageed to transmission line hydraulic pressure
CN105625754B (en) A kind of HTGR Nuclear Power Plant steam generator partition module
CN107558487A (en) A kind of goaf transmission line foundation bracing means and reinforcement means
CN207935031U (en) A kind of lower bearing bracket assembly tooling
CN103754791A (en) Method for lifting water-tower 1000m<3> water tank by utilizing prestressed strands
CN204828929U (en) Vertical hot and cold water pipeline supporting assembly of high -rise building
CN210505323U (en) Tower crane anchor foot adjustable support
CN210975824U (en) Shaped steel connects combination formula steel support supporting construction that throws to one side
CN208764475U (en) A kind of rapid rescue device
CN206328760U (en) A kind of foundation pit construction structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Inventor after: Shen Liming

Inventor after: Wang Hongwei

Inventor after: Zhao Yu

Inventor after: Guo Baolin

Inventor after: Wang Biao

Inventor after: Liu Chunlei

Inventor after: Yan Yan

Inventor after: Jia Wei

Inventor after: Wang Ziqi

Inventor after: Su Gaofeng

Inventor after: Wang Zhongqiang

Inventor after: Fan Yanxue

Inventor after: Zhou Hai

Inventor after: Li Mingchao

Inventor after: Wang Xinming

Inventor after: Guo Yuliang

Inventor before: Liu Chunlei

Inventor before: Guo Baolin

Inventor before: Wang Biao

Inventor before: Su Pei

CB03 Change of inventor or designer information
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20161222

Address after: 100000 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Power Networks Co

Applicant after: Xinxiang Power Supply Company, State Grid Henan Electric Power Company

Applicant after: ZHENGZHOU KAITONG SICHUANG TECHNOLOGY CO., LTD.

Address before: 453000 Henan City, Xinxiang Province, Hongli Road, No. 168

Applicant before: Xinxiang Power Supply Company, State Grid Henan Electric Power Company

GR01 Patent grant
GR01 Patent grant