CN208764475U - A kind of rapid rescue device - Google Patents

A kind of rapid rescue device Download PDF

Info

Publication number
CN208764475U
CN208764475U CN201821186672.6U CN201821186672U CN208764475U CN 208764475 U CN208764475 U CN 208764475U CN 201821186672 U CN201821186672 U CN 201821186672U CN 208764475 U CN208764475 U CN 208764475U
Authority
CN
China
Prior art keywords
steel
cushion cap
steel construction
rescue device
rapid rescue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821186672.6U
Other languages
Chinese (zh)
Inventor
潘宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Oda Smart Technology Co Ltd
Original Assignee
Nanjing Oda Smart Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Oda Smart Technology Co Ltd filed Critical Nanjing Oda Smart Technology Co Ltd
Priority to CN201821186672.6U priority Critical patent/CN208764475U/en
Application granted granted Critical
Publication of CN208764475U publication Critical patent/CN208764475U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to mechanical equipment technical fields, in particular a kind of rapid rescue device, including steel construction cushion cap and the multiple lifting apparatus being installed on steel construction cushion cap, the steel construction cushion cap is interconnected to form by four I-shaped steel bars head and the tail, each I-shaped steel bar by upper and lower two apron pieces and the support beam group being installed between two apron pieces at.The utility model by steel structure platform in length and breadth beam rational position top flange be reliably connected distribution beam, pipe-line system on steel structure platform is integrally lifted in the form of " choosing shoulder pole " jack, to reduce the relative deformation of pipe-line system, accident is avoided to generate;The utility model can carry out rapid uplift rectification to steel construction carrying platform.Overall procedure equipment, material are simple and convenient, and small, operation construction is simple is destroyed to original structure, and lifting controllability is high, speed is fast, while can temporarily be handled using this method, and rapid rescue avoids accident.

Description

A kind of rapid rescue device
Technical field
The utility model relates to mechanical equipment technical field, specially a kind of rapid rescue device.
Background technique
In the industries such as the energy, chemical industry, metallurgy, a large amount of pipe-line equipment systems using purposes such as gas supply, energy supply, water supply, Part of pipe-line equipment system of systems is complicated and requires installation accuracy, the strength of materials high.Steel construction is because its lightweight is high By force, it the features such as solderability, frequently as the direct cushion cap of pipeline system, is provided for it and stablizes, flexibly supports.Meanwhile steel construction Carrying platform is also with higher economical.Steel construction carrying platform should be fixed on according to the space layout demand of pipe-line equipment On suitable cushion cap (basis: including valve plate basis or pile foundation etc.).Valve plate basis (cushion cap) can mention for steel structure platform For high-bearing capacity, the bearing of globality.
Due to the fault of survey and design early period, using function change, periphery construction infection or geological activity etc., raft plate base It is relatively conventional accident that plinth (cushion cap), which generates non-uniform sedimentation,.Steel structure platform and pipe-line system can occur therewith on cushion cap The differential settlement of globality is allowed to that relative deformation occurs with raft plate exterior pipe system.And in hyperstatic pipe-line system then Unfavorable internal force can be generated, with the gradually accumulation of sedimentation, leakproofness and the security facing of pipe-line system are seriously threatened.It is such as too late When prevent or reduce pipe-line system relative deformation, then huge economic loss and casualties may occur.Common solution Scheme is to carry out processing lifting raft plate cushion cap to ground using the methods of foundation grouting, and that there are Uplifting amounts is not easily-controllable for such method System, lifting low efficiency and the disadvantages of complicated, the period is long of constructing, are not suitable for the quick processing of dangerous situation.Steel structure platform can also be dug Lower section (raft plate) concrete, placement jack pair steel structure platform are directly jacked.Such method causes centainly raft plate Destruction, and construction be not easy, dig during generate vibration have detrimental effect to pipe-line system.In consideration of it, it is proposed that A kind of rapid rescue device.
Utility model content
The purpose of this utility model is to provide a kind of rapid rescue devices, to solve mentioned above in the background art ask Topic.
To achieve the above object, the utility model provides the following technical solutions:
A kind of rapid rescue device, including steel construction cushion cap and the multiple lifting apparatus being installed on steel construction cushion cap, The steel construction cushion cap is interconnected to form by four I-shaped steel bar head and the tail, and each I-shaped steel bar is by upper and lower two cushion caps Beam and the support beam group being installed between two apron pieces at, the surface of the apron piece of top is equipped with multiple groups threaded hole, under Multiple earth anchors are installed on the apron piece of side, are arranged with internal screw thread steel bushing on each earth anchor;
Each lifting apparatus includes I-steel distribution beam, is mounted in each I-steel distribution beam multiple Bolt, the I-steel distribution beam between bolt and steel construction cushion cap by being fixedly connected, and I-steel distribution beam and steel construction Right angle welding seam is equipped between cushion cap, the bottom surface of each I-steel distribution beam is mounted on hydraulic jack by the position of two close end, The bottom end of each hydraulic jack is mounted on billet.
Preferably, the threaded hole on the apron piece surface is at least provided with two groups, is in matrix there are four every group of threaded hole is all provided with Formula arrangement.
Preferably, the earth anchor is on each steel construction cushion cap at least provided with four.
Preferably, there are four the bolt is all provided in each I-steel distribution beam, and the spiral shell of bolt and apron piece surface It is threadedly coupled between pit.
Preferably, several floors of putting more energy into are equipped between upper and lower two apron pieces, the floor of putting more energy into is at least provided with four It is a.
Preferably, it is threadedly coupled between the internal screw thread steel bushing and earth anchor.
Compared with prior art, the utility model has the beneficial effects that
1, rapid rescue device provided by the utility model passes through the top flange at steel structure platform in length and breadth beam rational position It is reliably connected distribution beam, pipe-line system on steel structure platform is integrally lifted in the form of " choosing shoulder pole " jack, to reduce The relative deformation of pipe-line system, avoids accident from generating.
2, rapid rescue device provided by the utility model can carry out rapid uplift rectification to steel construction carrying platform.It is whole Set method equipment, material are simple and convenient, and small, operation construction is simple is destroyed to original structure, and lifting controllability is high, speed is fast, simultaneously It can temporarily be handled using this method, rapid rescue avoids accident.
Detailed description of the invention
Fig. 1 is the utility model rapid rescue device lifting apparatus site layout project schematic diagram;
Fig. 2 is the utility model rapid rescue device lifting process schematic;
Fig. 3 is that the utility model rapid rescue device cushion cap is lifted effect picture in place;
Fig. 4 is the utility model rapid rescue device lifting apparatus schematic diagram;
Fig. 5 is the front view of Fig. 4 shown device;
Fig. 6 is the fixed structural schematic diagram of the utility model rapid rescue device steel cushion cap.
In figure: 1, lifting apparatus;2, steel construction cushion cap;3, I-steel distribution beam;4, hydraulic jack;5, billet;6, Bolt;7, right angle welding seam;8, steel cushion block;9, apron piece;10, it puts more energy into floor;11, earth anchor;12, internal screw thread steel bushing;13, high-strength Spend grouting material.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", The orientation or positional relationship of the instructions such as " clockwise ", " counterclockwise " be based on the orientation or positional relationship shown in the drawings, be only for Convenient for description the utility model and simplify description, rather than the equipment of indication or suggestion meaning or element must have specifically Orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Fig. 1-6 is please referred to, the utility model provides a kind of technical solution:
A kind of rapid rescue device, including steel construction cushion cap 2 and the multiple lifting apparatus being installed on steel construction cushion cap 2 1, steel construction cushion cap 2 is interconnected to form by four I-shaped steel bar head and the tail, and each I-shaped steel bar is by upper and lower two cushion caps Beam 9 and the support beam group being installed between two apron pieces 9 are at the surface of the apron piece 9 of top is equipped with multiple groups threaded hole, lower section Apron piece 9 on multiple earth anchors 11 are installed, be arranged with internal screw thread steel bushing 12 on each earth anchor 11.
In the present embodiment, the threaded hole on 9 surface of apron piece is equipped with two groups, is in matrix form there are four every group of threaded hole is all provided with Arrangement.
In the present embodiment, there are four earth anchor 11 is all provided on each steel construction cushion cap 2.
In the present embodiment, it is threadedly coupled between internal screw thread steel bushing 12 and earth anchor 11.
Further, earth anchor 11 is L-shaped, and the vertical section surface of earth anchor 11 is equipped with screw thread, the inside of internal screw thread steel bushing 12 Barrel surface is equipped with screw thread, and the screw thread on 12 surface of screw thread and internal screw thread steel bushing on 11 surface of earth anchor is mutually twisted, by this Mode realizes the threaded connection between internal screw thread steel bushing 12 and earth anchor 11.
In the present embodiment, several floors 10 of putting more energy into are equipped between upper and lower two apron pieces 9, there are four floor 10 of putting more energy into is set.
Each lifting apparatus 1 includes I-steel distribution beam 3, is mounted on multiple bolts in each I-steel distribution beam 3 6, I-steel distribution beam 3 between bolt 6 and steel construction cushion cap 2 by being fixedly connected, and I-steel distribution beam 3 and steel construction cushion cap Right angle welding seam 7 is equipped between 2, the bottom surface of each I-steel distribution beam 3 is mounted on hydraulic jack 4 by the position of two close end, The bottom end of each hydraulic jack 4 is mounted on billet 5.
In the present embodiment, there are four bolt 6 is all provided in each I-steel distribution beam 3, and 9 surface of bolt 6 and apron piece Threaded hole between be threadedly coupled.
In the present embodiment, after 2 Uplifting amount of steel construction cushion cap often reaches a certain amount of, filled in 2 gaps underneath of steel construction cushion cap Various sizes of steel cushion block 8 keeps the stabilization of steel cushion block 8 for the scene special bayonet of various situations.
In the present embodiment, after lifting is in place, fixed steel construction cushion cap 2.Then high intensity is utilized in 2 bottom of steel construction cushion cap Grouting material 13 carries out tamping processing.
Utility model works principle: lifting apparatus 1 is installed first on steel construction cushion cap 2, lifting apparatus 1 is by two liquid Jack 4 and i shaped steel distribution beam 3 is pressed to form the form of " choosing shoulder pole ", before lifting, i shaped steel distribution beam 3 is held with steel construction Platform 2 contacts flange plate by 7 connection of bolt 6 and welding, is welded with floor 10 of putting more energy into 9 corresponding position of apron piece, prevents from holding 9 edge of a wing local buckling of platform beam pads the billet 5 of enough size and thickness below hydraulic jack 4, lower concrete is avoided to be pressurized It destroys, and smooth contact surface can be provided for hydraulic jack 4;
Each point lifting apparatus 1 is installed in place, after equipment detection is normal, is pushed up each lifting point in advance, is eliminated equipment room gap, formally Before lifting starts, the earth anchor 11 between steel construction cushion cap 2 and concrete raft plate is released, lifting apparatus 1 is according to being pre-designed at each point Sequence and speed start to be lifted, and after Uplifting amount often reaches a certain amount of, fill in various sizes of steel in 2 gaps underneath of steel construction cushion cap Cushion block 8 keeps the stabilization of steel cushion block 8 for the scene special bayonet of various situations;
After lifting is in place, earth anchor 11, fixed steel construction cushion cap 2, then in apron piece 9 are increased by internal screw thread steel bushing 12 Bottom carries out tamping processing using high strength grout 13, and 13 intensity of high strength grout removes lifting apparatus 1 afterwards enough, quickly Lifting repairing is completed.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Be only the utility model preference, be not intended to limit the utility model, do not departing from the spirit and scope of the utility model Under the premise of, the utility model also has various changes and improvements, these changes and improvements both fall within claimed it is practical In novel range.The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. a kind of rapid rescue device is filled including steel construction cushion cap (2) and the multiple liftings being installed on steel construction cushion cap (2) Set (1), it is characterised in that: the steel construction cushion cap (2) is interconnected to form by four I-shaped steel bar head and the tail, each I-shaped Steel bar is by upper and lower two apron pieces (9) and the support beam group being installed between two apron pieces (9) at the cushion cap of top The surface of beam (9) is equipped with multiple groups threaded hole, is equipped with multiple earth anchors (11) on the apron piece (9) of lower section, it is each describedly Internal screw thread steel bushing (12) are arranged on anchor (11);
Each lifting apparatus (1) includes I-steel distribution beam (3), is respectively mounted on each I-steel distribution beam (3) Have multiple bolts (6), the I-steel distribution beam (3) between bolt (6) and steel construction cushion cap (2) by being fixedly connected, and work Right angle welding seam (7) are equipped between word steel distribution beam (3) and steel construction cushion cap (2), the bottom surface of each I-steel distribution beam (3) is close The position at both ends is mounted on hydraulic jack (4), and the bottom end of each hydraulic jack (4) is mounted on billet (5).
2. rapid rescue device according to claim 1, it is characterised in that: the threaded hole on apron piece (9) surface is extremely It is equipped with two groups, there are four every group of threaded hole is all provided with less, is in matrix arrangement.
3. rapid rescue device according to claim 1, it is characterised in that: the earth anchor (11) is in each steel construction cushion cap (2) at least provided with four on.
4. rapid rescue device according to claim 1, it is characterised in that: the bolt (6) is distributed in each I-steel There are four being all provided on beam (3), and it is threadedly coupled between bolt (6) and the threaded hole on apron piece (9) surface.
5. rapid rescue device according to claim 1, it is characterised in that: set between upper and lower two apron pieces (9) There are several floors of putting more energy into (10), the floor of putting more energy into (10) is at least provided with four.
6. rapid rescue device according to claim 1, it is characterised in that: the internal screw thread steel bushing (12) and earth anchor (11) it is threadedly coupled between.
CN201821186672.6U 2018-07-25 2018-07-25 A kind of rapid rescue device Active CN208764475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821186672.6U CN208764475U (en) 2018-07-25 2018-07-25 A kind of rapid rescue device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821186672.6U CN208764475U (en) 2018-07-25 2018-07-25 A kind of rapid rescue device

Publications (1)

Publication Number Publication Date
CN208764475U true CN208764475U (en) 2019-04-19

Family

ID=66129329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821186672.6U Active CN208764475U (en) 2018-07-25 2018-07-25 A kind of rapid rescue device

Country Status (1)

Country Link
CN (1) CN208764475U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109058597A (en) * 2018-07-25 2018-12-21 南京奥达升智能科技有限公司 A kind of rapid rescue device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109058597A (en) * 2018-07-25 2018-12-21 南京奥达升智能科技有限公司 A kind of rapid rescue device

Similar Documents

Publication Publication Date Title
CN101691815B (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN101892671B (en) Pile anchor rod foundation structure
CN210164286U (en) Support arrangement for high altitude large-span steel structure truss installation usefulness
CN103243961A (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN203867159U (en) Sleeve type cantilever scaffold structure
CN211665759U (en) Guide positioning device for permanent steel casing of large onshore pile foundation
CN202441119U (en) Tool type retaining board foundation pit edge enclosure structure
CN208764475U (en) A kind of rapid rescue device
CN204591306U (en) A kind of combined steel pipe concrete bow member for supporting
CN103669432A (en) Jacking device for deviation rectification of steel pylon in mining area of coal mine
CN212178059U (en) Suspension protection system for existing large-diameter pipeline
CN205577187U (en) Prefabricated steel pipe concrete constructional column rammed earth wall
CN210127861U (en) Tunnel collapse processing device
CN205532716U (en) Block structure of ore bin bottom
CN110273691B (en) Reaction frame of shield tunneling machine
CN204212060U (en) One falls beam steel work pad device
CN109058597A (en) A kind of rapid rescue device
CN110468870A (en) One kind can have enough to meet the need Tower Crane Foundation by Steel Lattice Column structure
US11414880B2 (en) Reinforcing structure of unexpired concrete building floors
CN104294764B (en) Fall beam steel work pad device and utilize it to carry out the beam buttress construction technology that falls
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN210263022U (en) Pile foundation reinforcement cage positioning fixture
CN210152295U (en) Can have enough to meet need reverse construction method steel-pipe column guiding device that hangs down of bolt formula
CN209179519U (en) Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top
CN204059947U (en) A kind of self-stabilization type outer wall formwork of basement support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant