CN105064359A - Unbonded prestressed construction anchor rod - Google Patents
Unbonded prestressed construction anchor rod Download PDFInfo
- Publication number
- CN105064359A CN105064359A CN201510421814.7A CN201510421814A CN105064359A CN 105064359 A CN105064359 A CN 105064359A CN 201510421814 A CN201510421814 A CN 201510421814A CN 105064359 A CN105064359 A CN 105064359A
- Authority
- CN
- China
- Prior art keywords
- anchor rod
- anchor pole
- construction
- main body
- rod body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses an unbonded prestressed construction anchor rod and belongs to the technical field of civil engineering construction. The unbonded prestressed construction anchor rod comprises a guiding head, an anchor rod outer steel tube, a main anchor rod body, an anchor pad and an anchor part and is characterized in that the main anchor rod body is made of a prestressed steel bar, a rebar or a steel cable, and the anchor rod outer steel tube is flexibly connected with the guiding head and located on the outer side of the main anchor rod body. The unbonded prestressed construction anchor rod has the beneficial effects that as that the main anchor rod body can be made of the prestressed steel bar, the rebar or the steel cable, the stress of the main anchor rod body can be adjusted continuously during construction, and process control can be achieved; the anchor rod outer steel tube is flexibly connected with the guiding head, located on the outer side of the main anchor rod body and used for foundation pit engineering maintenance, and therefore later-period backfill can be recycled in a layered or segmented mode. The unbonded prestressed construction anchor rod is simple in structure and convenient to implement.
Description
Technical field
A kind of Unbonded prestressed anchor pole, belongs to engineering construction technology field.
Background technology
Anchor pole side slope maintenance technology is very extensive in field application such as construction work, bridge highways, and technology maturity is also very high.But conventional anchor construction cost performance is not high, and because soil layer change, bolt deformation etc. are because usually causing the partial failure of anchor pole side slope in work progress, even all lost efficacy, the Engineering Projects causing security incident to occur is a lot.
Summary of the invention
The object of the invention is to realize the process control of constructing.Unbonded prestressed anchor pole can select applicable anchor pole material according to different engineering-environments, the stress of main body anchor pole constantly can be adjusted in work progress, can implementation procedure control, when discovery local, slope deforming is excessive, also can realize the Dynamic dexterity of construction process control.
Object of the present invention is by realizing with under type: a kind of Unbonded prestressed anchor pole, comprise five part compositions such as seeker, anchor pole outer steel pipe, main body anchor pole, anchor pad, anchor, it is characterized in that: described main body anchor pole adopts the materials such as prestressed steel bar, reinforcing bar, cable wire, the outer steel pipe of anchor pole is connected with seeker activity, and is placed in outside main body anchor pole.
The present invention has the following advantages compared with existing prior art: simple structure, and it is convenient to implement, and constantly can adjust the stress of main body anchor pole in work progress, can implementation procedure control; The outer steel pipe of anchor pole is connected with seeker is active, and is placed in outside main body anchor pole, and later stage backfill layering, segmentation can realize the features such as recycling, and cost performance is high.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present invention.
In figure: 1, seeker, 2, the outer steel pipe of anchor pole, 3, main body anchor pole, 4, anchor pad, 5, anchor, 6, side slope sprayed mortar or maintaining pile, 7, plastic bushing.
Detailed description of the invention
As follows with reference to accompanying drawing 1: a kind of Unbonded prestressed anchor pole, comprise seeker 1, anchor pole outer steel pipe 2, main body anchor pole 3, anchor pad 4, anchor 5, it is characterized in that: described main body anchor pole adopts the materials such as prestressed steel bar, reinforcing bar, cable wire, the outer steel pipe of anchor pole is connected with seeker activity, and is placed in outside main body anchor pole.The invention has the beneficial effects as follows that main body anchor pole can select the materials such as prestressed steel bar, reinforcing bar, cable wire, constantly can adjust the stress of main body anchor pole in work progress, can implementation procedure control; The outer steel pipe of anchor pole is connected with seeker activity, and is placed in outside main body anchor pole, safeguards for base pit engineering.
In side slope anchor bolt construction process, seeker 1, main body anchor pole 3 are squeezed in side slope soil layer together with the outer steel pipe 2 of anchor pole, completes the first step of anchor bolt construction; Due to before construction, plastic bushing 7 on the cover of the outside of main body anchor pole in advance, later stage side slope concrete ejection 4, prestressed stretch-draw, anchoring etc., can convenient construction operation.
Claims (3)
1. a Unbonded prestressed anchor pole, comprises five part compositions such as seeker, anchor pole outer steel pipe, main body anchor pole, anchor pad, anchor.
2. main body anchor pole adopts the materials such as prestressed steel bar, reinforcing bar, cable wire, constantly can adjust the stress of main body anchor pole in work progress, can implementation procedure control.
3. the outer steel pipe of anchor pole is connected with seeker activity, and is placed in outside main body anchor pole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510421814.7A CN105064359A (en) | 2015-07-18 | 2015-07-18 | Unbonded prestressed construction anchor rod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510421814.7A CN105064359A (en) | 2015-07-18 | 2015-07-18 | Unbonded prestressed construction anchor rod |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105064359A true CN105064359A (en) | 2015-11-18 |
Family
ID=54493846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510421814.7A Pending CN105064359A (en) | 2015-07-18 | 2015-07-18 | Unbonded prestressed construction anchor rod |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105064359A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107514272A (en) * | 2016-06-16 | 2017-12-26 | 中国矿业大学 | A kind of anchor pole lasso trick for supporting cross-bedding development country rock |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL7508278A (en) * | 1974-07-10 | 1976-01-13 | Mueller Ludwig | DEVICE FOR CONNECTING A POLE IN THE FORM OF A WIDE FLANGE BEAM WITH A DAMWALL. |
CN200961263Y (en) * | 2006-08-29 | 2007-10-17 | 湖北中南岩土工程有限公司 | Fixed valve locking type reclaimable rockbolt |
DE102009016893B4 (en) * | 2009-04-08 | 2011-12-08 | Nordex Energy Gmbh | Anchoring component for a wind turbine tower |
CN102477740A (en) * | 2011-08-24 | 2012-05-30 | 柳州欧维姆机械股份有限公司 | Electric isolation protective anchor cable as well as making and mounting method thereof |
CN203307803U (en) * | 2013-06-04 | 2013-11-27 | 中铁建设集团有限公司 | Pre-stress pressure type anti-floating anchor rod with spiral stirrup |
CN203701092U (en) * | 2014-01-22 | 2014-07-09 | 北京现代金宇工程建设有限公司 | Extrusion lock stress dispersion type high-tonnage anchor cable |
-
2015
- 2015-07-18 CN CN201510421814.7A patent/CN105064359A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL7508278A (en) * | 1974-07-10 | 1976-01-13 | Mueller Ludwig | DEVICE FOR CONNECTING A POLE IN THE FORM OF A WIDE FLANGE BEAM WITH A DAMWALL. |
CN200961263Y (en) * | 2006-08-29 | 2007-10-17 | 湖北中南岩土工程有限公司 | Fixed valve locking type reclaimable rockbolt |
DE102009016893B4 (en) * | 2009-04-08 | 2011-12-08 | Nordex Energy Gmbh | Anchoring component for a wind turbine tower |
CN102477740A (en) * | 2011-08-24 | 2012-05-30 | 柳州欧维姆机械股份有限公司 | Electric isolation protective anchor cable as well as making and mounting method thereof |
CN203307803U (en) * | 2013-06-04 | 2013-11-27 | 中铁建设集团有限公司 | Pre-stress pressure type anti-floating anchor rod with spiral stirrup |
CN203701092U (en) * | 2014-01-22 | 2014-07-09 | 北京现代金宇工程建设有限公司 | Extrusion lock stress dispersion type high-tonnage anchor cable |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107514272A (en) * | 2016-06-16 | 2017-12-26 | 中国矿业大学 | A kind of anchor pole lasso trick for supporting cross-bedding development country rock |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195069B (en) | Pre-stress type double-row pile strong constraint method for supporting deep foundation pit | |
CN104790424A (en) | Reinforcing system and reinforcing method of wind power generation tower foundation ring foundation | |
CN103114585A (en) | Prestressed prefabricated pile tip structure | |
CN203222809U (en) | Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line | |
CN103806451B (en) | A kind of anchorage type foundation ditch strengthening structure and construction method thereof | |
CN105401571B (en) | Prefabricated grouting behind shaft or drift lining abnormal shape root pile and its construction method | |
CN204780979U (en) | Install steel -pipe pile basis of anti horizontal force of iron tower fast | |
CN103790168A (en) | Application method of soil nailing wall in deep foundation pit supporting | |
CN105064359A (en) | Unbonded prestressed construction anchor rod | |
CN204174627U (en) | Side slope supporting structure | |
CN205776194U (en) | A kind of mortar leakage prevention pointed stake | |
CN206646521U (en) | A kind of compound full Grouted bolt supporting construction of campshed | |
CN102561315B (en) | Linkage precast pile type underground diaphragm wall | |
CN202989911U (en) | Post-grouting pile of precast concrete | |
CN204728356U (en) | The hardened system of generation power foundation of wind power cyclic group plinth | |
CN106836324A (en) | A kind of blower foundation reinforcement means for setting up oblique tension reinforcement | |
CN209741864U (en) | Assembled post-tensioned full-prestressed concrete X-shaped beam counter-force structure | |
CN106638733A (en) | Method for reinforcing fan foundation through additionally-arranged horizontal steel bars | |
CN102155015A (en) | Barbed implanted steel pipe anchor rod | |
CN203034790U (en) | Basic prefabricated concrete formwork for basement | |
CN206070558U (en) | A kind of wind power foundation damping energy-dissipating device | |
CN103669901A (en) | Method used for reforming pile in underground space into pillar | |
CN206873684U (en) | The vertical connection structure of prefabricated windows wall | |
CN205259175U (en) | Lower part enlarges compound foundation pile of diameter section | |
CN103195054A (en) | Prefabricated spiral pile head and auxiliary pile sinking construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151118 |