CN105040972A - Construction tool for window frame fixing pile - Google Patents

Construction tool for window frame fixing pile Download PDF

Info

Publication number
CN105040972A
CN105040972A CN201510539213.6A CN201510539213A CN105040972A CN 105040972 A CN105040972 A CN 105040972A CN 201510539213 A CN201510539213 A CN 201510539213A CN 105040972 A CN105040972 A CN 105040972A
Authority
CN
China
Prior art keywords
push pedal
baffle plate
baffle
window frame
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510539213.6A
Other languages
Chinese (zh)
Other versions
CN105040972B (en
Inventor
陈连娣
郑舒杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Sanpeng Real Estate Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510539213.6A priority Critical patent/CN105040972B/en
Publication of CN105040972A publication Critical patent/CN105040972A/en
Application granted granted Critical
Publication of CN105040972B publication Critical patent/CN105040972B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a construction tool for a window frame fixing pile. The construction tool comprises a shaping part which is formed by an outer clamping plate, an inner clamping plate and connecting rods. A feeding part communicated with the shaping part is arranged on the outer side of the shaping part and composed of an outer baffle, an inner baffle, a bottom plate, supporting rods and a push plate. The push plate can move back and forth between the supporting rods and the connecting rods. The construction tool has the advantages that a fixing pile pouring space can be obtained without knocking off bricks, reliable fixing pile pouring can be achieved through pouring equipment, and the fixing pile will not be damaged when the tool is disassembled.

Description

The construction tool of window frame spud pile
Technical field
The invention belongs to building machinery technical field, particularly relate to a kind of frock for the construction of building window frame spud pile.
Background technology
Building needs the place of daylighting all to need to arrange window, the window frame of window is fixed on the wall of architectural openings by spud pile, spud pile is generally all adopt the wall first having built opening at present, fixing local knock-off fragment of brick is needed to vacate certain space at window frame, outer wall again in this space, inboard fix external splint, inner clamping plate by connecting rod, then with block cutter and excellent class thing, the mixed earth be stirred are filled this space.This construction method of spud pile comes with some shortcomings part, in order to the wall fragment of brick built is broken into pieces by the space vacateing construction spud pile, waste of manpower, material resources, due to pure manual operation, operating efficiency is lower, and cannot realize mixed earth and fill this space completely, and the fastness of spud pile is affected, when removing external splint, inner clamping plate, connecting rod bonds together with mixed earth in addition, inevitably produces damage when taking connecting rod away to spud pile.
Summary of the invention
For overcoming above-mentioned defect, the technical issues that need to address of the present invention are: provide a kind of space that can obtain cast spud pile without the need to striking brick, realized the reliable cast of spud pile by casting equipment, the construction tool of the window frame spud pile of damage during disassembling fixture, can not be produced spud pile.
For solveing the technical problem, technical scheme of the present invention is: a kind of construction tool of window frame spud pile, comprise external splint, in clamping plate, be connected by connecting rod between external splint with inner clamping plate and form the moulding portion of hollow, reinforced portion is provided with outside the one end in described moulding portion, reinforced portion comprises outer baffle, in baffle plate, base plate, the dual-side that base plate is relative is fixedly connected on the inboard face of outer baffle respectively, in baffle plate lateral surface lower edge on, outer baffle, in be also connected with support bar between baffle plate, outer baffle is parallel with inner baffle plate, outer baffle is connected with external splint, in baffle plate be connected with inner clamping plate, support bar is positioned at reinforced portion away from the one end in moulding portion and is positioned at the upside of base plate, push pedal is provided with between support bar and connecting rod, the lower edge of push pedal is connected on base plate, push pedal is connected on inner baffle plate towards the side of inner baffle plate, the side of push pedal baffle plate is toward the outside connected on outer baffle, push pedal can move around between support bar and connecting rod along base plate, push pedal, outer baffle, in baffle plate, base plate surrounds upper end open, the reinforced portion that side is communicated with moulding portion.The quantity of described connecting rod is four, wherein two connecting rods are positioned at the upside in moulding portion, other two connecting rods are positioned at the downside in moulding portion, the two connecting rod lines be positioned on the upside of moulding portion are parallel with the two connecting rod lines being positioned at moulding subordinate side, and on the upside of moulding portion, the most upper limb of two connecting rods is equal with the width of brick with the distance between the most lower edge of two connecting rods in moulding subordinate side.Like this when building wall, need the position that window frame spud pile is set to replace brick to leave the space that spud pile is set in advance at wall opening four connecting rods of window frame spud pile construction tool, without the need to striking brick afterwards, save human and material resources.The reinforced portion that upper end open is set in the side in moulding portion, be communicated with moulding portion, reinforced portion has the push pedal that can move around between support bar and connecting rod along base plate, so the mixed earth be stirred is added reinforced portion by the opening on the upside of reinforced portion, promote push pedal with the vibrating head that building operations is special to move to direction, moulding portion, under the promotion of vibrating plate, mixed earth can be filled with the space of spud pile completely, makes the spud pile of setting solid, reliable.
As preferably, the quantity of described support bar is two, two support bars are arranged up and down, and a support bar of downside is near the side of base plate away from connecting rod, and a support bar of upside is greater than the horizontal range of a support bar relative to moulding portion of downside relative to the horizontal range in moulding portion.Such push pedal leans against on two support bars can form inclined-plane, makes openend, reinforced portion comparatively large, conveniently adds mixed earth.
As preferably, described push pedal is provided with push rod away from a side in moulding portion, and the outer face of push rod is provided with blind hole.Push rod is arranged on the centre of draft in push pedal pushing course, make vibrating head promote push pedal time without the need to finding the centre of draft at every turn; Blind hole is set in the outer face of push rod, makes the vibrating head origin of force be vibrated can not shake from the centre of draft of push pedal, vibrating head also can be facilitated to control the relative position of push pedal.
As preferably, described push pedal is provided with towards a side in moulding portion the bypass channel upwards extended in the middle part of push pedal, and the bearing of trend of bypass channel is parallel with outer baffle, and the distance of bypass channel and outer baffle equals the distance of bypass channel and inner baffle plate.The mixed earth quantity adding reinforced portion is difficult to accurate control, generally can add, bypass channel be arranged so that unnecessary mixed earth can overflow from bypass channel.Bypass channel is arranged on the centre of outer baffle, inner baffle plate, makes the resistance of push pedal can not deviation.
As preferably, one side in described push pedal moulding portion is dorsad fixedly connected with two pieces of guide pads, wherein one piece of guide pad flushes towards a side of inner baffle plate with the side of push pedal towards inner baffle plate, and a side of another a block guide pad side and push pedal baffle plate toward the outside of baffle plate toward the outside flushes.Arranging of guide pad facilitates the direction of propulsion of push pedal controlled.
As preferably, the diameter of described connecting rod part one end between external splint and inner clamping plate is greater than the diameter of the other end.Connecting rod one end is large, and one end is little, conveniently after spud pile has been built, dismantles connecting rod, guarantees that spud pile sustains damage when extracting connecting rod out less.
As preferably, be socketed with the sleeve pipe matched with connecting rod to the portion perimeter side clearance of described connecting rod between external splint and inner clamping plate.The setting of sleeve pipe, makes mixed earth directly not contact with connecting rod, and when pumping connecting rod like this, spud pile can stand intact.
As preferably, the tube wall of described sleeve pipe is provided with the finedraw of some the equally distributed through tube walls extended along casing length direction.Sleeve pipe is by making the material of deformation, the tube wall of sleeve pipe arranges some the equally distributed finedraws extended along casing length direction, and make sleeve pipe after the support losing connecting rod, easily under the extruding of mixed earth, distortion departs from and takes out comparatively easily, can reuse, cost-saving.
Compared with prior art, the invention has the beneficial effects as follows: due to the outer rim difference in height of two of upper and lower layout groups of connecting rods is arranged to equal with the width of brick, make the moulding portion of the present invention that brick can be replaced to be preset in advance in body of wall, save and strike brick afterwards, use manpower and material resources sparingly; Owing to having reinforced portion in the arranged outside in moulding portion, reinforced portion in reinforced portion has push pedal, making to water mixed earth can use the vibrating head of building special equipment to carry out do mechanization operation, improve operating efficiency, reduce the labour intensity of operating personnel, and substantially increase the quality of window frame spud pile; Because push pedal tiltable is arranged, make openend, reinforced portion comparatively large, reinforced quick and easy; Because connecting rod is tapered, outer circumferential side is socketed with sleeve pipe tube wall being arranged many finedraws with gap, make dismounting frock very convenient, fast, any harmful effect is not had to spud pile.
Accompanying drawing explanation
Fig. 1 is a kind of structural upright schematic diagram of the present invention;
Fig. 2 is that the push pedal in Fig. 1 is in the cross-sectional schematic tilting to treat material state;
Fig. 3 is the cross-sectional schematic that push pedal in Fig. 1 is in vertical thrust state;
Fig. 4 is that the push pedal in Fig. 1 is in the cross-sectional schematic advancing completion status;
Fig. 5 is the H-H cross section enlarged diagram in Fig. 2;
Fig. 6 is the push pedal schematic front view in the present invention;
Fig. 7 is the push pedal schematic top plan view in the present invention;
Fig. 8 is the structural representation of middle sleeve of the present invention.
In figure: external splint 1, connecting rod 2, sleeve pipe 3, inner clamping plate 4, inner baffle plate 5, bypass channel 6, push pedal 7, guide pad 8, support bar 9, base plate 10, push rod 11, outer baffle 12, moulding portion 13, reinforced portion 14, blind hole 15, finedraw 16.
Detailed description of the invention
Below by preferred embodiment, and in conjunction with Figure of description, technical scheme of the present invention is further described in detail:
Embodiment: a kind of construction tool of window frame spud pile, as Fig. 1, Fig. 2, Fig. 3, shown in Fig. 4, comprise external splint 1, in clamping plate 4, be connected by connecting rod 2 between external splint 1 with inner clamping plate 4 and form the moulding portion 13 of hollow, be provided with reinforced portion 14 outside the one end in described moulding portion 13, reinforced portion 14 comprises outer baffle 12, in baffle plate 5, base plate 10, the dual-side that base plate 10 is relative is fixedly connected on the inboard face of outer baffle 12 respectively, in baffle plate 5 lateral surface lower edge on, outer baffle 12, in be also connected with support bar 9 between baffle plate 5, outer baffle 12 is parallel with inner baffle plate 5, outer baffle 12 and external splint 1 are connected as a single entity, in baffle plate 5 be connected as a single entity with inner clamping plate 4, support bar 9 is positioned at reinforced portion 14 away from the one end in moulding portion 13 and is positioned at the upside of base plate 10, push pedal 7 is provided with between support bar 9 and connecting rod 2, the lower edge of push pedal 7 is connected on base plate 10, push pedal 7 is connected on inner baffle plate 5 towards the side of inner baffle plate 5, the side of push pedal 7 baffle plate 12 is toward the outside connected on outer baffle 12, push pedal 7 can move around between support bar 9 and connecting rod 2 along base plate 10, push pedal 7, outer baffle 12, in baffle plate 5, base plate 10 surrounds upper end open, the reinforced portion 14 that side is communicated with moulding portion 13.The quantity of described support bar 9 is two, two support bars about 9 are arranged, a support bar 9 of downside is near the side of base plate 10 away from connecting rod 2, and a support bar 9 of upside is greater than the horizontal range of a support bar 9 relative to moulding portion 13 of downside relative to the horizontal range in moulding portion 13.Described push pedal 7 is fixedly connected with push rod 11 away from a side in moulding portion 13, and the outer face of push rod 11 is provided with blind hole 15.As shown in Figure 6, Figure 7, described push pedal 7 is provided with towards a side in moulding portion 13 bypass channel 6 upwards extended in the middle part of push pedal 7, the bearing of trend of bypass channel 6 is parallel with outer baffle 12, and bypass channel 6 equals the distance of bypass channel 6 and inner baffle plate 5 with the distance of outer baffle 12.One side in described push pedal 7 moulding portion 13 is dorsad fixedly connected with two pieces of guide pads 8, wherein one piece of guide pad 8 flushes towards a side of inner baffle plate 5 with the side of push pedal 7 towards inner baffle plate 5, and a side of another block guide pad 8 side and push pedal 7 baffle plate 12 toward the outside of baffle plate 12 toward the outside flushes.As shown in Figure 5, Figure 8, the diameter of described connecting rod 2 part one end between external splint 1 and inner clamping plate 4 is greater than the diameter of the other end.Be socketed with the sleeve pipe 3 matched with connecting rod 2 to the portion perimeter side clearance of described connecting rod 2 between external splint 1 and inner clamping plate 4.The tube wall of described sleeve pipe 3 is provided with the finedraw 16 of some the equally distributed through tube walls along the extension of sleeve pipe 3 length direction.
Above-described embodiment is a kind of preferred version of the present invention, not does any pro forma restriction to the present invention, also has other variant and remodeling under the prerequisite not exceeding the technical scheme described in claim.
The content be not described in detail in this manual, belongs to the known prior art of those skilled in the art.

Claims (8)

1. the construction tool of a window frame spud pile, comprise external splint, in clamping plate, be connected by connecting rod between external splint with inner clamping plate and form the moulding portion of hollow, it is characterized in that, reinforced portion is provided with outside the one end in described moulding portion, reinforced portion comprises outer baffle, in baffle plate, base plate, the dual-side that base plate is relative is fixedly connected on the inboard face of outer baffle respectively, in baffle plate lateral surface lower edge on, outer baffle, in be also connected with support bar between baffle plate, outer baffle is parallel with inner baffle plate, outer baffle is connected with external splint, in baffle plate be connected with inner clamping plate, support bar is positioned at reinforced portion away from the one end in moulding portion and is positioned at the upside of base plate, push pedal is provided with between support bar and connecting rod, the lower edge of push pedal is connected on base plate, push pedal is connected on inner baffle plate towards the side of inner baffle plate, the side of push pedal baffle plate is toward the outside connected on outer baffle, push pedal can move around between support bar and connecting rod along base plate, push pedal, outer baffle, in baffle plate, base plate surrounds upper end open, the reinforced portion that side is communicated with moulding portion.
2. the construction tool of window frame spud pile according to claim 1, it is characterized in that, the quantity of described support bar is two, two support bars are arranged up and down, a support bar of downside is near the side of base plate away from connecting rod, and a support bar of upside is greater than the horizontal range of a support bar relative to moulding portion of downside relative to the horizontal range in moulding portion.
3. the construction tool of window frame spud pile according to claim 2, is characterized in that, described push pedal is provided with push rod away from a side in moulding portion, and the outer face of push rod is provided with blind hole.
4. the construction tool of window frame spud pile according to claim 3, it is characterized in that, described push pedal is provided with towards a side in moulding portion the bypass channel upwards extended in the middle part of push pedal, the bearing of trend of bypass channel is parallel with outer baffle, and the distance of bypass channel and outer baffle equals the distance of bypass channel and inner baffle plate.
5. the construction tool of the window frame spud pile according to claim 1 or 2 or 3 or 4, it is characterized in that, one side in described push pedal moulding portion is dorsad fixedly connected with two pieces of guide pads, wherein one piece of guide pad flushes towards a side of inner baffle plate with the side of push pedal towards inner baffle plate, and a side of another a block guide pad side and push pedal baffle plate toward the outside of baffle plate toward the outside flushes.
6. the construction tool of the window frame spud pile according to claim 1 or 2 or 3 or 4, is characterized in that, the diameter of described connecting rod part one end between external splint and inner clamping plate is greater than the diameter of the other end.
7. the construction tool of the window frame spud pile according to claim 1 or 2 or 3 or 4, is characterized in that, is socketed with the sleeve pipe matched with connecting rod to the portion perimeter side clearance of described connecting rod between external splint and inner clamping plate.
8. the construction tool of window frame spud pile according to claim 7, is characterized in that, the tube wall of described sleeve pipe is provided with the finedraw of some the equally distributed through tube walls extended along casing length direction.
CN201510539213.6A 2015-08-29 2015-08-29 Construction tool for window frame fixing pile Active CN105040972B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510539213.6A CN105040972B (en) 2015-08-29 2015-08-29 Construction tool for window frame fixing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510539213.6A CN105040972B (en) 2015-08-29 2015-08-29 Construction tool for window frame fixing pile

Publications (2)

Publication Number Publication Date
CN105040972A true CN105040972A (en) 2015-11-11
CN105040972B CN105040972B (en) 2017-03-22

Family

ID=54447913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510539213.6A Active CN105040972B (en) 2015-08-29 2015-08-29 Construction tool for window frame fixing pile

Country Status (1)

Country Link
CN (1) CN105040972B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100491963B1 (en) * 2005-01-31 2005-05-30 주식회사 무이 이엔지 건축사 사무소 Mounting method of aluminium frame of window for building
CN101592007A (en) * 2009-04-21 2009-12-02 深圳市富诚科技发展有限公司 The technology of building doors and windows universal auxiliary frame or the joint filling of general frame one-time pressure injection
CN201704961U (en) * 2010-06-06 2011-01-12 朱翌 Quick mortar layering device
CN202000828U (en) * 2011-02-10 2011-10-05 杭州胜达钢结构制造有限公司 Wall surface windowsill node mechanism for steel structure
CN203669354U (en) * 2013-07-04 2014-06-25 李圣鑫 Environment-friendly and efficient beam formwork ejector for modern buildings
CN204920205U (en) * 2015-08-29 2015-12-30 陈连娣 Construction frock of window frame spud pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100491963B1 (en) * 2005-01-31 2005-05-30 주식회사 무이 이엔지 건축사 사무소 Mounting method of aluminium frame of window for building
CN101592007A (en) * 2009-04-21 2009-12-02 深圳市富诚科技发展有限公司 The technology of building doors and windows universal auxiliary frame or the joint filling of general frame one-time pressure injection
CN201704961U (en) * 2010-06-06 2011-01-12 朱翌 Quick mortar layering device
CN202000828U (en) * 2011-02-10 2011-10-05 杭州胜达钢结构制造有限公司 Wall surface windowsill node mechanism for steel structure
CN203669354U (en) * 2013-07-04 2014-06-25 李圣鑫 Environment-friendly and efficient beam formwork ejector for modern buildings
CN204920205U (en) * 2015-08-29 2015-12-30 陈连娣 Construction frock of window frame spud pile

Also Published As

Publication number Publication date
CN105040972B (en) 2017-03-22

Similar Documents

Publication Publication Date Title
CN203081466U (en) Integrated moving framework for inverted arch of tunnel
CN103195450A (en) Hydraulic tunnel inverted arch operation trolley and inverted arch construction method
CN107327140A (en) A kind of masonry constructional column pours mouth template
CN204920205U (en) Construction frock of window frame spud pile
CN103614998B (en) Inwall pouring concrete based on diaphragm wall is inverse makes method
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN204040043U (en) Adjustable support supporting movable end
CN108638317A (en) A kind of spheroidal graphite cast-iron push pipe is with pouring tooling and its working method
CN105697019A (en) Vertical shaft wall cast-in-place concrete joint and formwork device and construction method of vertical shaft wall cast-in-place concrete joint
CN105040972A (en) Construction tool for window frame fixing pile
CN105133837A (en) Wall window frame fixing pile construction method
CN113718793B (en) Cover-excavation construction fender post structure and construction method
CN107191205B (en) Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN205422720U (en) Vertical wall of a well cast in situ concrete connects stubble and formwork device thereof
CN204899949U (en) Bow -shaped steel pipe back up support
CN104775831B (en) A kind of tunnel double-lining inverted arch exempts from short abutment wall arcing construction method with arch wall joint portion
CN207582627U (en) A kind of two-sided formwork erection for the canal formwork erection that drains off floodwaters in the conveyance system of cigarette shredded tobacco for water pipes road
CN203887222U (en) Ladle device
CN206299390U (en) The lined steel muscle of Super-large-section tunnel vault two performs mechanism
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN207882025U (en) A kind of plug-type concrete test die
CN107778029B (en) Concrete curing method for buried pipe in structure
CN103104099A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN206721937U (en) A kind of support for shuttering for being used to form building post-cast strip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200918

Address after: 221000 south side of Qingba Road, qingshanquan Town, Jiawang District, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Quanxin wool products Co.,Ltd.

Address before: 317300, No. 22, 8 South Gate Village, Chengguan County, Taizhou City, Zhejiang Province, Xianju

Patentee before: Chen Liandi

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231120

Address after: Room 1907, Furong Building, No. 9 Suixi Road, Luyang District, Hefei City, Anhui Province, 230000

Patentee after: Anhui Sanpeng Real Estate Co.,Ltd.

Address before: 221000 south side of Qingba Road, qingshanquan Town, Jiawang District, Xuzhou City, Jiangsu Province

Patentee before: Xuzhou Quanxin wool products Co.,Ltd.