CN101592007A - The technology of building doors and windows universal auxiliary frame or the joint filling of general frame one-time pressure injection - Google Patents

The technology of building doors and windows universal auxiliary frame or the joint filling of general frame one-time pressure injection Download PDF

Info

Publication number
CN101592007A
CN101592007A CN 200910106754 CN200910106754A CN101592007A CN 101592007 A CN101592007 A CN 101592007A CN 200910106754 CN200910106754 CN 200910106754 CN 200910106754 A CN200910106754 A CN 200910106754A CN 101592007 A CN101592007 A CN 101592007A
Authority
CN
China
Prior art keywords
frame
joint filling
gang form
template
technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200910106754
Other languages
Chinese (zh)
Other versions
CN101592007B (en
Inventor
蔡贤慈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUCHENG CURTAIN-WALL DECORATION ENGINEERING Co Ltd SHENZHEN CITY
SHENZHEN FUCHENG TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
FUCHENG CURTAIN-WALL DECORATION ENGINEERING Co Ltd SHENZHEN CITY
SHENZHEN FUCHENG TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUCHENG CURTAIN-WALL DECORATION ENGINEERING Co Ltd SHENZHEN CITY, SHENZHEN FUCHENG TECHNOLOGY DEVELOPMENT Co Ltd filed Critical FUCHENG CURTAIN-WALL DECORATION ENGINEERING Co Ltd SHENZHEN CITY
Priority to CN 200910106754 priority Critical patent/CN101592007B/en
Priority to US13/265,494 priority patent/US8516772B2/en
Priority to AU2009344735A priority patent/AU2009344735B2/en
Priority to PCT/CN2009/074100 priority patent/WO2010121461A1/en
Publication of CN101592007A publication Critical patent/CN101592007A/en
Application granted granted Critical
Publication of CN101592007B publication Critical patent/CN101592007B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The technology of a kind of building doors and windows universal auxiliary frame or the joint filling of general frame one-time pressure injection comprises following processing step: at first gang form is installed on the side of attached frame of door and window or frame and hole body of wall; The beginning mechanical pressure is injected packing material in the space between the attached frame of door and window or frame and hole, and finishes the post-processed of sealing; Behind material cured to be filled or the semi-solid preparation, remove gang form.The present invention adopts above-mentioned job practices, can improve the compactness of joint filling, the phenomenon that prevents manual joint filling compactness difference takes place, thermal insulation and construction quality have been improved, also improved operating efficiency, simultaneously, guaranteed the quality and the safety that are connected between attached frame of building doors and windows or frame and body of wall to solve the problems such as oozing, leak that attached frame of door and window or side frame of buildings density difference are caused.

Description

The technology of building doors and windows universal auxiliary frame or the joint filling of general frame one-time pressure injection
Technical field
The present invention relates to job practices, particularly be used for the construction technology that fill in the slit between attached frame of building doors and windows or frame and the reservation hole.
Background technology
At present, all leave the slit of regulation between attached frame of building doors and windows or frame and the reservation hole, the position of being convenient to the installation of attached frame of door and window or frame is accurate, for above-mentioned slit, after the attached frame of door and window or frame install and fix, adopt the artificial means of filling and criticize retaining to finish the joint filling and the surfacing work in later stage then, for bigger slit, the constructor generally adopts impurity such as inserting earlier brickbat inside, and then manual joint filling and batch method of retaining on the surface, it is slow that this job practices exists construction speed, the phenomenon of compactness difference and poor reliability is filled in the slit, joint filling compactness difference and poor reliability also become percolating water, the root of insulation difference and heat insulation difference, and, because the manual compactness of squeegeeing is poor, and impurity such as brickbat are arranged in inside, the bonding fastness is poor between impurity such as these brickbats and the cement mortar, the impurity such as brickbat of filling also cause jamb distortion or the like easily, had a strong impact on construction quality, and influenced the safety and the application life of building doors and windows, also bring hidden danger for the building doors and windows peripheral structure.
Summary of the invention
The invention provides the job practices of a kind of building doors and windows universal auxiliary frame or the joint filling of frame one-time pressure injection, in joint filling, adopt template to add the mode of mechanization pressure injection, particularly at the smaller jamb of width, not only increase work efficiency, and, also improve the compactness that fill in the slit, improve construction quality, solve the not high problem of construction quality in the existing door and window filling technology.
The construction technology of building doors and windows universal auxiliary frame that the present invention provides for solving the problems of the technologies described above or the joint filling of frame one-time pressure injection comprises following processing step:
A. at first gang form is installed on the side of attached frame of door and window or frame and hole body of wall;
B. make the edge of a side template in the gang form be against body of wall and reserve on the medial surface at hole, and make that the medial surface of template is attached on the outer surface of attached frame or frame in the gang form;
C. the beginning mechanical pressure is injected packing material in the space between the attached frame of door and window or frame and hole, and finishes the post-processed of sealing;
D. behind material cured to be filled or the semi-solid preparation, remove gang form.
Also be divided into step by step following among the step B:
B1. after in steps A, gang form being installed in the sealing place at the attached frame of door and window or frame and hole, adjust the intermediate connecting rod of relative both sides gang form, adjust two relative edges' gang form earlier, making a lateral edges of template in the gang form be against body of wall reserves on the medial surface at hole, and carry out locking measure, the template that to desire sealed sides then compresses, and makes it be adjacent to the side of attached frame of door and window or frame;
B2. behind the completing steps B1, the mode of B1 is then finished other two relative edges' template adjustment set by step, and the template on four limits seals the latasuture crack around the door and window fully.
In step B1 and the step 2, connect on the intermediate connecting rod on relative both sides and add the length of connecting rod guiding mechanism, in order to adjust the length of this connecting rod, to adapt to the needs at different size hole, this intermediate connecting rod is the rigidity connecting rod of two-part, and an end of two sections connecting rods connects gang form respectively, and other a section of two sections connecting rods is respectively equipped with the opposite screw thread of rotation direction, described length of connecting rod guiding mechanism is that two ends are respectively equipped with the opposite internal thread of rotation direction, and the centre is the connecting rod of hollow.
Gang form described in the steps A comprises fork-shaped fastener and template, and the one side of described fork-shaped fastener is provided with guiding mechanism, can make template compress jamb.Perhaps gang form described in the steps A is that one side is material templates such as the wood on plane or steel at least.
Packing material described in the step C is cement mortar or other joint filling waterproofing materialss.
Attached frame material described in the present invention comprises metal attached frames, moulds steel frame, the attached frame of the attached frame of aluminium alloys and other composite materials, and described frame comprises the frame of metal edge frame, plastic-steel frame, aluminum alloy frame and other composite materials.
The present invention adopts above-mentioned job practices, can improve the compactness of joint filling, the phenomenon that prevents manual joint filling compactness difference takes place, construction quality and efficient have been improved, quality, safety and the application life of building doors and windows have been guaranteed, improved the safety of door and window peripheral structure and stable, this scheme is applicable to joint filling construction between curtain wall frame that situation is similar and the body of wall too.
Description of drawings
Fig. 1 is the joint filling structural representation that adopts this technology construction.
Fig. 2 is the schematic diagram of gang form of the present invention.
The specific embodiment
In conjunction with above-mentioned description of drawings specific embodiments of the invention.
By among Fig. 1 as can be known, the construction technology of this building doors and windows universal auxiliary frame or the joint filling of frame one-time pressure injection comprises following processing step:
A. at first gang form is installed on the side of attached frame of door and window or frame and hole body of wall;
B. make the edge of a side template in the gang form be against body of wall and reserve on the medial surface at hole, and make that the medial surface of template is attached on the outer surface of attached frame or frame in the gang form;
C. the beginning mechanical pressure is injected packing material in the space between the attached frame of door and window or frame and hole, and finishes the post-processed of sealing;
D. behind material cured to be filled or the semi-solid preparation, remove gang form.
Seal the slit of the attached frame of door and window or frame and hole one side among the present invention by gang form, in the slit, pour into packing material by pressure injection machinery again, owing to be pressure injection, all, the compactness height of packing material, avoid artificial batch of retaining unavoidable space of institute and void to fill out phenomenon fully, not only can increase work efficiency greatly, also improved construction quality simultaneously.
Also be divided into step by step following among the step B:
B1. after in steps A, gang form being installed in the sealing place at the attached frame of door and window or frame and hole, adjust the intermediate connecting rod of relative both sides gang form, adjust two relative edges' gang form earlier, making a lateral edges of template in the gang form be against body of wall reserves on the body of wall side at hole, and carry out locking measure, the template that to desire sealed sides then compresses, and makes it be adjacent to the side of attached frame of door and window or frame;
B2. behind the completing steps B1, the mode of B1 is then finished other two relative edges' template adjustment set by step, and the template on four limits is with the sealing of the latasuture crack around the door and window.
In step B1 and the step 2, connect on the intermediate connecting rod on relative both sides and add the length of connecting rod guiding mechanism, in order to adjust the length of this connecting rod, to adapt to the needs at different size hole.Described intermediate connecting rod is the rigidity connecting rod of two-part, one end of two sections connecting rods connects gang form respectively, and other a section of two sections connecting rods is respectively equipped with the opposite screw thread of rotation direction, and described length of connecting rod guiding mechanism is that two ends are respectively equipped with the opposite internal thread of rotation direction, and the centre is the connecting rod of hollow.
Gang form described in the steps A comprises fork-shaped fastener and template, and the one side of described fork-shaped fastener is provided with guiding mechanism, can make template compress the side (as shown in Figure 2) of attached frame of door and window or frame.Perhaps gang form described in the steps A is that one side is material templates (as shown in fig. 1) such as the wood on plane or steel at least.
Packing material described in the step C is cement mortar or joint filling waterproofing materials.
Above content be in conjunction with concrete preferred implementation to further describing that the present invention did, can not assert that concrete enforcement of the present invention is confined to these explanations.For the general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to protection scope of the present invention.

Claims (9)

1. the technology of a building doors and windows universal auxiliary frame or the joint filling of general frame one-time pressure injection, it is characterized in that: this technology comprises following processing step:
A. at first gang form is installed on the side of attached frame of door and window or frame and hole body of wall;
B. make the edge of a side template in the gang form be against body of wall and reserve on the medial surface at hole, and make that the medial surface of template is attached on the outer surface of attached frame or frame in the gang form;
C. the beginning mechanical pressure is injected packing material in the space between the attached frame of door and window or frame and hole, and finishes the post-processed of sealing;
D. behind material cured to be filled or the semi-solid preparation, remove gang form.
2. according to the technology of described building doors and windows universal auxiliary frame of claim 1 or the joint filling of general frame one-time pressure injection, it is characterized in that: also be divided into step by step following among the step B:
B1. after in steps A, gang form being installed in the sealing place at the attached frame of door and window or frame and hole, adjust the intermediate connecting rod of relative both sides gang form, adjust two relative edges' gang form earlier, making a lateral edges of template in the gang form be against body of wall reserves on the medial surface at hole, and carry out locking measure, the template that to desire sealed sides then compresses, and makes it be adjacent to the side of attached frame of door and window or frame;
B2. behind the completing steps B1, the mode of B1 is then finished other two relative edges' template adjustment set by step, and the template on four limits is with the sealing of the latasuture crack around the door and window.
3. according to the technology of described building doors and windows universal auxiliary frame of claim 2 or the joint filling of general frame one-time pressure injection, it is characterized in that: in step B1 and the step 2, connect on the intermediate connecting rod on relative both sides and add the length of connecting rod guiding mechanism, in order to adjust the length of this connecting rod, to adapt to the needs at different size hole.
4. according to the technology of described building doors and windows universal auxiliary frame of claim 2 or the joint filling of general frame one-time pressure injection, it is characterized in that: described intermediate connecting rod is the rigidity connecting rod of two-part, one end of two sections connecting rods connects gang form respectively, and other a section of two sections connecting rods is respectively equipped with the opposite screw thread of rotation direction, described length of connecting rod guiding mechanism is that two ends are respectively equipped with the opposite internal thread of rotation direction, and the centre is the connecting rod of hollow.
5. according to the technology of each described building doors and windows universal auxiliary frame in the claim 1 to 4 or the joint filling of general frame one-time pressure injection, it is characterized in that: gang form described in the steps A comprises fork-shaped fastener and template, the one side of described fork-shaped fastener is provided with guiding mechanism, makes template compress the side of attached frame of door and window or frame.
6. according to the technology of each described building doors and windows universal auxiliary frame in the claim 1 to 4 or the joint filling of general frame one-time pressure injection, it is characterized in that: gang form described in the steps A is at least simultaneously being the template on plane.
7. according to the technology of described building doors and windows universal auxiliary frame of claim 6 or the joint filling of general frame one-time pressure injection, it is characterized in that: template described in the steps A is wooden or the steel template.
8. according to the technology of each described building doors and windows universal auxiliary frame in the claim 1 to 4 or the joint filling of general frame one-time pressure injection, it is characterized in that: the packing material described in the step C is a cement mortar.
9. according to the technology of each described building doors and windows universal auxiliary frame in the claim 1 to 4 or the joint filling of general frame one-time pressure injection, it is characterized in that: the packing material described in the step C is the joint filling waterproofing materials.
CN 200910106754 2009-04-21 2009-04-21 Process for filling clearances of general auxiliary frames or general frames of construction windows and doors through one-time pressure injection Expired - Fee Related CN101592007B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN 200910106754 CN101592007B (en) 2009-04-21 2009-04-21 Process for filling clearances of general auxiliary frames or general frames of construction windows and doors through one-time pressure injection
US13/265,494 US8516772B2 (en) 2009-04-21 2009-09-22 Pressure injecting caulking construction technique for gaps between building door/window hole and common additional frame or side frame
AU2009344735A AU2009344735B2 (en) 2009-04-21 2009-09-22 Pressure injecting caulking construction technique for gaps between building door /window hole and common additional frame or side frame
PCT/CN2009/074100 WO2010121461A1 (en) 2009-04-21 2009-09-22 Pressure injecting caulking construction technique for gaps between building door /window hole and common additional frame or side frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910106754 CN101592007B (en) 2009-04-21 2009-04-21 Process for filling clearances of general auxiliary frames or general frames of construction windows and doors through one-time pressure injection

Publications (2)

Publication Number Publication Date
CN101592007A true CN101592007A (en) 2009-12-02
CN101592007B CN101592007B (en) 2013-02-13

Family

ID=41406867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910106754 Expired - Fee Related CN101592007B (en) 2009-04-21 2009-04-21 Process for filling clearances of general auxiliary frames or general frames of construction windows and doors through one-time pressure injection

Country Status (1)

Country Link
CN (1) CN101592007B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103145380A (en) * 2013-02-27 2013-06-12 同济大学 Cement-based shrinkage-free joint filling sealing mortar for doors and windows and preparation method and construction method thereof
CN105041115A (en) * 2015-08-11 2015-11-11 山东明达建筑科技有限公司 Window frame installation reinforcement device
CN105040972A (en) * 2015-08-29 2015-11-11 陈连娣 Construction tool for window frame fixing pile
CN105133837A (en) * 2015-08-29 2015-12-09 陈连娣 Wall window frame fixing pile construction method
CN106111474A (en) * 2016-08-30 2016-11-16 北京燕化天钲建筑工程有限责任公司 A kind of glue injection machine
CN110331920A (en) * 2019-07-02 2019-10-15 宁波建工建乐工程有限公司 Aluminum window grouting material stuff up a crack technique and plain-water slurry coating unit

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103145380A (en) * 2013-02-27 2013-06-12 同济大学 Cement-based shrinkage-free joint filling sealing mortar for doors and windows and preparation method and construction method thereof
CN103145380B (en) * 2013-02-27 2014-12-10 同济大学 Cement-based shrinkage-free joint filling sealing mortar for doors and windows and preparation method and construction method thereof
CN105041115A (en) * 2015-08-11 2015-11-11 山东明达建筑科技有限公司 Window frame installation reinforcement device
CN105040972A (en) * 2015-08-29 2015-11-11 陈连娣 Construction tool for window frame fixing pile
CN105133837A (en) * 2015-08-29 2015-12-09 陈连娣 Wall window frame fixing pile construction method
CN105133837B (en) * 2015-08-29 2017-03-29 陈连娣 The construction method of wall window frame spud pile
CN106111474A (en) * 2016-08-30 2016-11-16 北京燕化天钲建筑工程有限责任公司 A kind of glue injection machine
CN106111474B (en) * 2016-08-30 2018-11-16 北京燕化天钲建筑工程有限责任公司 A kind of glue injection machine
CN110331920A (en) * 2019-07-02 2019-10-15 宁波建工建乐工程有限公司 Aluminum window grouting material stuff up a crack technique and plain-water slurry coating unit

Also Published As

Publication number Publication date
CN101592007B (en) 2013-02-13

Similar Documents

Publication Publication Date Title
CN101592007B (en) Process for filling clearances of general auxiliary frames or general frames of construction windows and doors through one-time pressure injection
CN101525968B (en) Construction process for filling joints between door and window and universal auxiliary frame and side frame of buildings by pressure injection
CN106522406A (en) Assembly type cast-in-place concrete exterior thermal insulation wall steel skeleton framework system and connecting piece
CN205713845U (en) Aluminium alloy window edge frame Hermetical connecting structure
CN107143250A (en) A kind of door and window fixed connection structure and its production installation method
CN109826442A (en) Prefabricated buildings exempt from plastering construction method of construction
WO2010121461A1 (en) Pressure injecting caulking construction technique for gaps between building door /window hole and common additional frame or side frame
CN207332616U (en) A kind of firmly easy-to-dismount window fixed seat
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN203613682U (en) Cast-in-situ template for wall compound insulation system
CN201416348Y (en) One-time pressure injection caulking Mounting structure for general auxiliary frame or border of building door/window
CN208363636U (en) Envelope storehouse tool for assembled architecture conversion layer sleeve grouting exterior wall
CN101560859B (en) Construction process of pressure injection seam filling for opening of window and door in building and universal auxiliary frame or side frame
CN206457996U (en) Reinforcing bar is with half grout sleeve joint
CN214738791U (en) Embedded assembled side fascia connected node
CN212582954U (en) Concrete split mortise-tenon joint structure
CN109610866A (en) A kind of joint filling method that auxiliary frame is connect with wall hole
CN210317010U (en) Window body structure that waterproof performance and compressive property are good
CN203834795U (en) Prefabricated panel capable of effectively preventing cracking
CN208668831U (en) Assembled architecture outer wall integrated plate for heat insulation window edge sealing fixing piece
CN109838173A (en) A kind of assembled window arrangement and construction method
CN206957461U (en) Aluminium alloy door's window hole one-step shaping system
CN221322139U (en) Assembled building wall body keeps warm integration door and window entrance to a cave bridge cut-off heat insulation structure
CN109750943A (en) A kind of novel building window frame and its installation method
CN103806791B (en) Waft window bay window embedded installing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20210421

CF01 Termination of patent right due to non-payment of annual fee