CN105019509A - Construction method for providing water during construction period by utilizing water system of construction site - Google Patents

Construction method for providing water during construction period by utilizing water system of construction site Download PDF

Info

Publication number
CN105019509A
CN105019509A CN201510331683.3A CN201510331683A CN105019509A CN 105019509 A CN105019509 A CN 105019509A CN 201510331683 A CN201510331683 A CN 201510331683A CN 105019509 A CN105019509 A CN 105019509A
Authority
CN
China
Prior art keywords
water
construction
sedimentation basin
gutter
job site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510331683.3A
Other languages
Chinese (zh)
Other versions
CN105019509B (en
Inventor
孙则树
伍艳春
从海虎
李伟烽
程龙祥
余同德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510331683.3A priority Critical patent/CN105019509B/en
Publication of CN105019509A publication Critical patent/CN105019509A/en
Application granted granted Critical
Publication of CN105019509B publication Critical patent/CN105019509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a construction method for providing water during a construction period by utilizing a water system of a construction site. The establishment method comprises following steps of: step 1, site selection and establishment of a collection pond; step 2, establishment of a drainage ditch and elevation; step 3, linkage among a filter pond, a setting pond and a clear water pond; step 4, external isolation of the collection pond; step 5, control of a water supply terminal. The construction method for providing water during the construction period by utilizing the drainage system of the construction site has following advantages: an urban comprehensive drainage system is fully utilized for improving and combining with a drainage system for civilized construction on the construction site so that rainwater can be collected; surface water and grey water are utilized as water for green conservation, car washing, temporary firefighting and concrete curing on the construction site, thereby saving construction water; and a set of basic conditions of infrastructural facilities for green construction and land-saving, water-saving, material-saving and environment-protection data are set up for the purpose of prompting development of green construction in a standardized and modularized way.

Description

A kind of construction process utilizing job site water system to provide construction period water
Technical field
The present invention relates to one construction period way of supplying water, particularly a kind of construction process utilizing job site water system to provide construction period water.
Background technology
China is in the rapid economic development stage, and as a large amount of builing industry consuming the energy and resource, necessary Development of Green Building, changes current high investment, high flow rate, high pollution, inefficient pattern, bear social responsibility and the obligation of sustainable development.Therefore, in construction, efficient, low consumption, environmental protection be pursued, make overall plans, realize the green construction pattern of economic, society, Environmental-protection comprehensive maximizing the benefits.Ensuring the quality of products, under the prerequisite of the basic demand such as safety, by scientific management and technological progress, economize on resources to greatest extent and the construction activities reduced environment negative effect, realize four energy-conservation, save land, economize on water, the target of material-saving and environmental protection.In life and work progress, easily produce surface water and buck, wherein surface water refers to that job site rainwater, engineering construction water are lost to ground, the water recycled after purified treatment after first time uses.Buck to refer to from wash basin and floor drain water out, namely washes one's face at ordinary times, washes one's hands, water after flushing tool vehicle, can be incorporated to on-the-spot drainage system against rain, finally return and flow to community water system; Existing buck harnessing project, can carry out Collection and use to buck, buck utilize exactly buck is collected, after certain facility and chemicals treatment, obtain meeting certain water quality index water recycle process.Be similar to middle water, the buck after process as utilizable water resource can be used for lavatory flushing, afforestation of city, landscape water and other be applicable in water quality standard water quality use water.Job site can be used for service rack carwash, on-the-spot greening, watering and eliminate airborne dust, interim water for fire fighting, concrete curing etc.Therefore buck Collection utilization is the important component part of green construction, and be also the part preferably implemented at the construction field (site), save land, material-saving, Energy Saving get up and relatively want difficult, the space of saving is also little.In prior art, also do not have complete set about buck and work progress standardization and modular method.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide a kind of City complex waterline classifying that utilizes in conjunction with a kind of construction process utilizing job site water system to provide construction period water of job site construction drainage system.
A kind of construction process utilizing job site water system to provide construction period water of the present invention, described building method comprises the steps:
Step one, addressing and collecting pit are built; Sedimentation basin, filtering ponds, clear water reserviors and pump house are built in site inspection addressing; At utmost reduce the surface water of water system and job site drainage system and buck and focus on the resource that sedimentation basin consumes; Described sedimentation basin is connected with rainwater-collecting section by gutter; Described sedimentation basin is connected with buck collecting region by municipal pipeline;
Step 2, gutter is built and absolute altitude; The flat absolute altitudes in field such as when constructing, it is high that the gutter absolute altitude of road side is not less than sedimentation basin top mark, and the gutter absolute altitude of a building surrounding is not less than road gully, building greenbelt are around not less than a building surrounding gutter absolute altitude; Described gutter arranged outside has cover plate;
Step 3, the connection of filtering ponds, sedimentation basin and clear water reserviors; Described filtering ponds are middle transition pond, and filtering ponds both side ends adopts the thick cobble of 500mm to fill, and middle part is gravel mixture, lays permeable non-woven fabrics one deck in end; Fix by adding reinforced mesh outside filtering ponds;
Step 4, collecting pit external isolation; Set up support column and beam suitable for reading inside clear water reserviors, clear water reserviors are suitable for reading is provided with cover plate, described cover plate and clear water reserviors are suitable for reading not exclusively closes;
Step 5, water supply terminal control, according to the multiple objects with water, installs corresponding water pump in clear water reserviors; Described water pump is connected with pressure transmitter, and described pressure transmitter is connected with frequency converter; Described frequency converter is connected to PLC.
Further described rainwater-collecting section is that natural stream networks net in construction area and job site rainwater-collecting net connect and compose.
Between further described municipal pipeline and sedimentation basin, Prefabricated combined septic tank device is installed successively and abandoned stream filter forms.
Adding its aperture of reinforced mesh is further 10 × 10mm.
The invention has the beneficial effects as follows: (1) makes full use of City complex waterline classifying in conjunction with job site civilized construction drainage system, collect rainwater; (2) utilize surface water and buck to do job site virescence maintenance, carwash, interim water for fire fighting and concrete curing water, save construction water; (3) the basic important document of infrastructure construction of a set of green construction can be set up and save land, economize on water, energy-conservation, material-saving and environmental protection data, promote green construction standardization and modularization development.
Detailed description of the invention
A kind of construction process utilizing job site water system to provide construction period water of the present invention, described building method comprises the steps:
Step one, addressing and collecting pit are built; Sedimentation basin, filtering ponds, clear water reserviors and pump house are built in site inspection addressing; At utmost reduce the surface water of water system and job site drainage system and buck and focus on the resource that sedimentation basin consumes; Described sedimentation basin is connected with rainwater-collecting section by gutter; Described sedimentation basin is connected with buck collecting region by municipal pipeline;
Step 2, gutter is built and absolute altitude; The flat absolute altitudes in field such as when constructing, it is high that the gutter absolute altitude of road side is not less than sedimentation basin top mark, and the gutter absolute altitude of a building surrounding is not less than road gully, building greenbelt are around not less than a building surrounding gutter absolute altitude; Described gutter arranged outside has cover plate;
Step 3, the connection of filtering ponds, sedimentation basin and clear water reserviors; Described filtering ponds are middle transition pond, and filtering ponds both side ends adopts the thick cobble of 500mm to fill, and middle part is gravel mixture, lays permeable non-woven fabrics one deck in end; Fix by adding reinforced mesh outside filtering ponds;
Step 4, collecting pit external isolation; Set up support column and beam suitable for reading inside clear water reserviors, clear water reserviors are suitable for reading is provided with cover plate, described cover plate and clear water reserviors are suitable for reading not exclusively closes;
Step 5, water supply terminal control, according to the multiple objects with water, installs corresponding water pump in clear water reserviors; Described water pump is connected with pressure transmitter, and described pressure transmitter is connected with frequency converter; Described frequency converter is connected to PLC.
Further described rainwater-collecting section is that natural stream networks net in construction area and job site rainwater-collecting net connect and compose.
Between further described municipal pipeline and sedimentation basin, Prefabricated combined septic tank device is installed successively and abandoned stream filter forms.
Adding its aperture of reinforced mesh is further 10 × 10mm.
Build reservoir: 20m × 20m × 1.5m; Filtering ponds: 10m × 10m × 1.2m; Clear water reserviors: 20m × 20m × 1.5m; At foul water pump: all Natural Waters, job site rainwater, surface water, buck focus on sedimentation basin by the means such as suction pump, gutter, filtering ponds are set sedimentation basin side 1.0m is high, filtering ponds are gravel filter bag, width is with equaling sedimentation basin width, length 10m, thickness 500mm, arranges clear water reserviors in filtering ponds terminal; When the sedimentation basin water yield reaches a certain amount of, the rainwater of free sedimentation filters through filtering ponds and flows to clear water reserviors, and the water of clear water reserviors can work as construction water, if there is pollution can add chlorine process; During use, by the water pump in clear water reserviors, water is delivered to demand place, as concrete curing, virescence maintenance, interim fire fighting supply, service rack and on-the-spot watering and lowering dust etc.; When sending water, realize electric meter interlocking by PLC and automatically control; 1 frequency converter is adopted to drag the soft start and the speed governing that realize 3 water pumps, economical rationality according to energy saving of system, cost-effectiveness requirement, energy-efficient; Wherein a water pump is for subsequent use, and when water use peak, two water pump operations are to meet hydraulic demand, runs, realize energy-conservation with one pump variable frequency during water ebb.
Embodiment recited above is only be described the preferred embodiment of the present invention; not the spirit and scope of the present invention are limited; under the prerequisite not departing from design concept of the present invention; the various modification that this area ordinary person makes technical scheme of the present invention and improvement; protection scope of the present invention all should be dropped into; the technology contents of request protection of the present invention, all records in detail in the claims.

Claims (4)

1. utilize job site water system to provide a construction process for construction period water, it is characterized in that, described building method comprises the steps:
Step one, addressing and collecting pit are built; Sedimentation basin, filtering ponds, clear water reserviors and pump house are built in site inspection addressing; At utmost reduce the surface water of water system and job site drainage system and buck and focus on the resource that sedimentation basin consumes; Described sedimentation basin is connected with rainwater-collecting section by gutter; Described sedimentation basin is connected with buck collecting region by municipal pipeline;
Step 2, gutter is built and absolute altitude; The flat absolute altitudes in field such as when constructing, it is high that the gutter absolute altitude of road side is not less than sedimentation basin top mark, and the gutter absolute altitude of a building surrounding is not less than road gully, building greenbelt are around not less than a building surrounding gutter absolute altitude; Described gutter arranged outside has cover plate;
Step 3, the connection of filtering ponds, sedimentation basin and clear water reserviors; Described filtering ponds are middle transition pond, and filtering ponds both side ends adopts the thick cobble of 500mm to fill, and middle part is gravel mixture, lays permeable non-woven fabrics one deck in end; Fix by adding reinforced mesh outside filtering ponds;
Step 4, collecting pit external isolation; Set up support column and beam suitable for reading inside clear water reserviors, clear water reserviors are suitable for reading is provided with cover plate, described cover plate and clear water reserviors are suitable for reading not exclusively closes;
Step 5, water supply terminal control, according to the multiple objects with water, installs corresponding water pump in clear water reserviors; Described water pump is connected with pressure transmitter, and described pressure transmitter is connected with frequency converter; Described frequency converter is connected to PLC.
2. a kind of construction process utilizing job site water system to provide construction period water according to claim 1, is characterized in that: described rainwater-collecting section is that natural stream networks net in construction area and job site rainwater-collecting net connect and compose.
3. a kind of construction process utilizing job site water system to provide construction period water according to claim 1, is characterized in that: install Prefabricated combined septic tank device successively between described municipal pipeline and sedimentation basin and abandoned stream filter forms.
4. a kind of construction process utilizing job site water system to provide construction period water according to claim 1, is characterized in that: described in add its aperture of reinforced mesh be 10 × 10mm.
CN201510331683.3A 2015-06-16 2015-06-16 A kind of construction method utilizing job site water system to provide construction period water Active CN105019509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510331683.3A CN105019509B (en) 2015-06-16 2015-06-16 A kind of construction method utilizing job site water system to provide construction period water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510331683.3A CN105019509B (en) 2015-06-16 2015-06-16 A kind of construction method utilizing job site water system to provide construction period water

Publications (2)

Publication Number Publication Date
CN105019509A true CN105019509A (en) 2015-11-04
CN105019509B CN105019509B (en) 2016-10-05

Family

ID=54409779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510331683.3A Active CN105019509B (en) 2015-06-16 2015-06-16 A kind of construction method utilizing job site water system to provide construction period water

Country Status (1)

Country Link
CN (1) CN105019509B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522145A (en) * 2016-12-14 2017-03-22 上海建工二建集团有限公司 Barrier-free full-coverage dust falling system of inverse construction platform and installing method
CN110668651A (en) * 2019-10-26 2020-01-10 马强 Sewage treatment method for building construction site
CN112252403A (en) * 2020-11-10 2021-01-22 鞍山三冶建筑工程有限公司 Piping lane job site water cyclic utilization system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6733663B1 (en) * 2001-08-01 2004-05-11 Material Systems Engineers Waste water treatment washer compactor system
CN102102375A (en) * 2009-12-18 2011-06-22 上海颛桥建筑工程有限公司 Rainwater collection storage utilization process
CN103085775A (en) * 2012-12-05 2013-05-08 朱加林 Intelligent rainwater car washing system
CN103774715A (en) * 2014-01-16 2014-05-07 安徽锋亚环境技术有限公司 Environment-friendly and energy-saving courtyard type rain water collecting, treating and recycling system
CN103953095A (en) * 2014-05-13 2014-07-30 沃清环保科技(上海)有限公司 Integrated rainwater collection and utilization system and method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6733663B1 (en) * 2001-08-01 2004-05-11 Material Systems Engineers Waste water treatment washer compactor system
CN102102375A (en) * 2009-12-18 2011-06-22 上海颛桥建筑工程有限公司 Rainwater collection storage utilization process
CN103085775A (en) * 2012-12-05 2013-05-08 朱加林 Intelligent rainwater car washing system
CN103774715A (en) * 2014-01-16 2014-05-07 安徽锋亚环境技术有限公司 Environment-friendly and energy-saving courtyard type rain water collecting, treating and recycling system
CN103953095A (en) * 2014-05-13 2014-07-30 沃清环保科技(上海)有限公司 Integrated rainwater collection and utilization system and method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522145A (en) * 2016-12-14 2017-03-22 上海建工二建集团有限公司 Barrier-free full-coverage dust falling system of inverse construction platform and installing method
CN106522145B (en) * 2016-12-14 2019-02-01 上海建工二建集团有限公司 A kind of accessible all standing dust falling system of contrary sequence method platform and installation method
CN110668651A (en) * 2019-10-26 2020-01-10 马强 Sewage treatment method for building construction site
CN112252403A (en) * 2020-11-10 2021-01-22 鞍山三冶建筑工程有限公司 Piping lane job site water cyclic utilization system

Also Published As

Publication number Publication date
CN105019509B (en) 2016-10-05

Similar Documents

Publication Publication Date Title
CN104480994B (en) A kind of square, urban green space rainwater-collecting reutilization system
CN203452123U (en) Rainwater collection and treatment system
CN201276718Y (en) Rainwater collecting and recycling system on building roofing
CN202880996U (en) Modularized dismountable constructed wetland
CN105089302A (en) Rainwater garden system for community rainwater flow diversion, peak clipping and ecological purification
CN107130663A (en) Construction site water recycling system and method
CN103015517A (en) Intelligently controlled type concave urban rainwater park capable of resisting shocks
CN204608867U (en) Rainwater collecting and treating system
CN102619272A (en) Comprehensive control method for town water pollution in three gorges reservoir area
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN105019509B (en) A kind of construction method utilizing job site water system to provide construction period water
CN203625966U (en) Comprehensive ecological rainwater collecting and recycling system
CN206428782U (en) Rainwater-collecting reclaiming system
CN201962720U (en) Rainwater utilization system
CN207277487U (en) Water Sproading utilization system for construction site
CN104775500A (en) Building construction rainwater and wastewater recycling system
CN107473505A (en) A kind of sponge-type campus rain sewage recycling method based on low influence exploitation
CN204875929U (en) System of recycling is retrieved to rainwater
CN204768028U (en) Maintenance system is controlled and sprays to raise dust that job site was used
CN205894165U (en) Job site precipitation recovery system
CN203795512U (en) Rainwater recycling device
CN104652526A (en) Town residential area rainwater recovery system
CN211935706U (en) Rainwater wastewater collecting and recycling device
CN111321774A (en) Green energy-saving rainwater recycling method
CN102155036A (en) Engineering rainfall or rainwater recycling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant