CN105016669B - A kind of pre-fabricated electric cables ditch and preparation method thereof - Google Patents

A kind of pre-fabricated electric cables ditch and preparation method thereof Download PDF

Info

Publication number
CN105016669B
CN105016669B CN201410173302.9A CN201410173302A CN105016669B CN 105016669 B CN105016669 B CN 105016669B CN 201410173302 A CN201410173302 A CN 201410173302A CN 105016669 B CN105016669 B CN 105016669B
Authority
CN
China
Prior art keywords
parts
side wall
base plate
average grain
electric cables
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410173302.9A
Other languages
Chinese (zh)
Other versions
CN105016669A (en
Inventor
黄贺明
刘福财
盛山青
王鸣珂
李斌
周思晴
孙俊阳
郭宗林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410173302.9A priority Critical patent/CN105016669B/en
Publication of CN105016669A publication Critical patent/CN105016669A/en
Application granted granted Critical
Publication of CN105016669B publication Critical patent/CN105016669B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The present invention discloses a kind of pre-fabricated electric cables ditch and preparation method thereof, and using fluidised form very-high performance inorganic powder concreting, described fluidised form very-high performance inorganic powder concrete includes each raw material components of following weight parts composition:500 ~ 650 parts of low alkali portland cement or Portland cement;85 ~ 120 parts of silicon ash;II grade of 115 ~ 145 parts of flyash;175 ~ 215 parts of slag powders;1050 ~ 1250 parts of river sand;26 ~ 32 parts of high efficiency water reducing agent;130 ~ 145 parts of water;Straight 100 ~ 140 parts of copper facing steel fibre.The present invention is apparent attractive in appearance, and pressure-proof and snap-resistent intensity is big, lightweight, is the weight 1/3 ~ 1/5 that normal concrete builds ditch or concreting ditch by laying bricks or stones.

Description

A kind of pre-fabricated electric cables ditch and preparation method thereof
Technical field
The present invention relates to building material field, more particularly to a kind of pre-fabricated electric cables ditch and preparation method thereof.
Background technology
The prefabricated ditch China of electric power has been used up to be traditional brick masonry or uses on-site concrete, this start within several years into Row explores research and development pre-fabricated electric cables ditch, is particularly Jiangsu, zhejiang and other places, and main cause is poor geological conditions, drift sand mud geology More, excavation construction difficulty is larger, large-scale flourishing city domestic in recent years due to maintenance, transformation etc. reason, for reduce traffic and Other influences, accelerating construction progress also begins to exploration and begins to use, and is successively proposed by the exploration and research and development of more than ten years various The prefabricated ditch of form, such as large-scale monolithic concrete pours cable duct, cable duct that various organic resins are made etc., real to throw Enter usage amount and few, very want reason to be, concreting pre-fabricated electric cables groove, well deadweight are excessive, to basic treatment and hold Carry pressure requirements higher, foundation settlement dislocation etc. occurs during use, construction in addition needs Large-scale Hoisting equipment, spells The more difficult implementation of dress movement, and the cable trench being made using organic resin is easily received in backfilling process and during later stage use Compressive strain, therefore the high-strength light durability how developed and be effectively applicable to engineering is explored in many cities domestic always in trial The good pre-fabricated electric cables ditch of energy.
The Chinese patent of Application No. 200910060802.0《A kind of low cost active powder concrete and its preparation side Method》A kind of RPC is disclosed, is 0.52 ~ 0.58: 0.16 ~ 0.18: 0.10 ~ 0.16: 0.13 ~ 0.16 by mass ratio : 0.012 ~ 0.018: 0.9 ~ 1.1: 0.14 ~ 0.18: 0.156 ~ 0.234 portland cement, steel-making slag powder, flyash, silicon ash, height Effect water reducer, river sand, mixing water and steel fibre are obtained.The patent adds slag as a kind of mineral admixture, in concrete morning The resistance of concrete to chloride ion penetration of phase is less than straight cement concrete, and the resistance of concrete to chloride ion penetration in later stage is higher than straight cement concrete, But in the case of identical volume, the performance of slag is not as good as flyash and slag, additionally, a small amount of CaO is in a free form in slag In the presence of f-CaO aquations generation Ca (OH)2, volume increase 1.98 times, cause steel slag stability bad.
The Chinese patent of Application No. 200810019337.1《Slag mixed active powder concrete》Disclose one kind and mix ore deposit Slag RPC, its each component is with respect to the part by weight of portland cement:Portland cement:1;Slag:0.40~ 0.60;Silica flour:0.20~0.35;Silica flour:0.20~0.35;River sand:1.20~1.60;Water:0.20~0.28;Water reducer:0.02~ 0.03.RPC disclosed in the patent has pumpability poor, and impermeability is poor, impact resistance difference the shortcomings of.
The Chinese patent of Application No. 200710055438.X《High-durability high-activity powder concrete electrical pole》It is open It is thin for 12 ~ 15mm that a kind of composition of raw materials of high-durability high-activity powder concrete electrical pole is a diameter of 0.22mm length 100 ~ 140 parts of the copper-plated steel fibre of circular surface, 690 ~ 720 parts of Portland cement, average grain diameter is 0.31 μm of silica flour 160 ~ 200 parts, 21 ~ 25 parts of un-naphthalene water reducing agent, 170 ~ 190 parts of water, particle diameter for 0.16 ~ 1.25mm fine quartz sand 1110 ~ 1190 parts.The invention is relatively costly, and cement content and silicon ash content are higher, and it is very strong that itself sticks poly- property, it is impossible to form dispersion gravity flow Level state, surface easily forms stomata, and quartz sand is 4 ~ 5 times of river sand relatively, and economic performance has been difficult product promotion and has been worth.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of heavy and light matter, high-strength, easy construction and apparent U.S. The pre-fabricated electric cables ditch of sight.
Above-mentioned purpose of the invention is achieved by following technical solution:
A kind of pre-fabricated electric cables ditch, using fluidised form very-high performance inorganic powder concreting, described fluidised form very-high performance Inorganic powder concrete includes each raw material components of following weight parts composition:
500 ~ 650 parts of the low alkali portland cement or Portland cement of 30 ~ 60 μm of average grain diameter;
0.18 μm of average grain diameter, 85 ~ 120 parts of the silicon ash of SiO2 content >=85%;
115 ~ 145 parts of II grade of flyash of 20 ~ 40 μm of average grain diameter;
175 ~ 215 parts of the S95 grades of above slag powders that 10 ~ 30 μm of average grain diameter;
Particle diameter is 1050 ~ 1250 parts of the river sand of 0.16 ~ 4.75mm, clay content less than 0.5%;
High efficiency water reducing agent 26 ~ 32 part of the water-reducing rate more than 30%;
130 ~ 145 parts of water;
A diameter of 0.18 ~ 0.25mm, length are 100 ~ 140 parts of the copper facing steel fibre of 10 ~ 15mm.
Further, described fluidised form very-high performance inorganic powder concrete includes each raw material group of following weight parts composition Point:
575 parts of the low alkali portland cement or Portland cement of 30 ~ 60 μm of average grain diameter;
0.18 μm of average grain diameter, 105 parts of the silicon ash of SiO2 content >=85%;
130 parts of II grade of flyash of 20 ~ 40 μm of average grain diameter;
195 parts of the S95 grades of above slag powders that 10 ~ 30 μm of average grain diameter;
Particle diameter is 1150 parts of the river sand of 0.16 ~ 4.75mm, clay content less than 0.5%;
High efficiency water reducing agent 29 part of the water-reducing rate more than 30%;
136 parts of water;
A diameter of 0.18 ~ 0.25mm, length are 120 parts of the copper facing steel fibre of 10 ~ 15mm.
Replace cement by using slag and flyash, the glutinous poly- property of reduction proportioning is low, enables its self-leveling good, divergence Greatly, air content is low, and economic cost performance is high, and satisfaction exempts from vibration moulding demand.
Further, a kind of pre-fabricated electric cables ditch, including U-lag, the U-lag includes base plate, side wall and bears down on one, using stream State very-high performance inorganic powder concreting, the base plate is provided with the first attachment structure for being connected with another base plate, institute State side wall and be provided with the second attachment structure for being connected with opposite side wall.
The present invention uses precast assembly, is realized by the first and second attachment structures.The simple structure, easily construction, can Quick accelerating construction progress, reduces construction site management difficulty.
Further, first attachment structure is provided with the concavo-convex backplane interface being mutually twisted for base plate both sides.Institute Stating backplane interface includes first interface and second interface, and the second interface of the first interface correspondence occlusion adjacent bottom plates is described The first interface of the adjacent another base plate of second interface correspondence occlusion.
Second attachment structure be side wall before and after be provided with the concavo-convex side wall interface being mutually twisted.The side wall interface Including the 3rd interface and the 4th interface, the 4th interface of the 3rd interface correspondence occlusion adjacent wall, the 4th interface pair The 3rd interface of adjacent opposite side wall should be engaged.
Post hydro-expansive rubber bar, the side wall and opposite side wall in the gap that the base plate is mutually twisted with another base plate Post hydro-expansive rubber bar in the gap being mutually twisted.The hydro-expansive rubber bar plays sealing function.
Further, the base plate is provided with first time extended corner and second time extended corner, and the side wall is provided with first Extended corner on extended corner and second, it is described bear down on one be integrated with side wall it is stepped.First, second time extended corner and First, extended corner plays a part of to increase anti-folding, the resistance to compression degree of cable duct on two, and first, second extended corner that rains can also have drainage The effect of water.
The side wall is provided with multiple preformed holes, and the base plate is provided with drainage trough and inlet.The preformed hole is used to install Support, uppermost preformed hole is used to install expansion bolt.
First time extended corner and the second time lower edge line base plate of extended corner to gutter channel outer are respectively equipped with first row The gradient of water slope and the second weathering, first weathering and the second weathering is 1 ~ 3%.The design of weathering can make rainwater Quickly drain, make cable duct relatively dry, do not accumulate rainwater.
The steel mesh protective layer for 10 ~ 15mm with thickness is provided with the pre-fabricated electric cables ditch, the steel mesh protective layer is many The crisscross composition of bar steel bar.The steel mesh protective layer can strengthen high-strength durable of the invention.
The pre-fabricated electric cables ditch thickness is 3cm ~ 10cm.Cable duct is poured using fluidised form very-high performance inorganic powder concrete Build, its thickness is the 1/3 ~ 1/5 of traditional cable ditch.
The preparation method of the pre-fabricated electric cables ditch, it is characterised in that comprise the following steps:
S1. the copper facing steel fibre and river sand that restriction will be formulated add mixer stirring to be uniformly dispersed for 2 ~ 3 minutes;
S2. again to the low alkali portland cement or Portland cement, silicon ash and ore deposit for adding formula to limit in mixer Ground-slag continues to stir 1 ~ 2 minute to uniform;
S3. continues to stir 3 ~ 4 minutes to being uniformly dispersed to high efficiency water reducing agent and water is sequentially added in the material obtained by S2, Obtain fluidised form very-high performance inorganic powder concrete;
Described water is suitably finely tuned according to actual slump 26cm ~ 30cm, divergence for 60cm ~ 70cm;
S4. by the concrete prepared by S3 by the uniform cloth of distribution device in cable duct mould, during fabric thickness Carry out pouring cloth again after spreading steel mesh protective layer during away from mold box 10 ~ 15mm of surface layer, the slight vibration of passing through of going forward side by side is smooth, bottom surface Enter natural curing 12 ~ 14 hours after press polish, subsequently into infrared high-temperature maintenance, temperature is 90+5 DEG C, constant temperature 12 hours;
The steel mesh protective layer is the crisscross composition of a plurality of steel bar.
Compared with prior art, the present invention has the advantages that:
(1)Fluidised form very-high performance inorganic powder concrete is employed, thickness is the 1/3 ~ 1/5 of traditional product, is significantly subtracted Light weight, the mechanical index performance and durability performance that improve product, its compression strength is up to 110 ~ 150 MPas, anti-folding 14 ~ 20 MPas of intensity, with corrosion-resistant, life cycle management it is good the features such as;
(2)Product increased the flexibility of site operation by assembling process realization, construction work be greatly reduced strong Degree, reduces the complex management degree of job site;Principle is simple, installation operation is easy, can fast and effectively solve to construct Cheng Zhiliang is difficult to control to, and the problems such as construction speed are influenceed by weather;
(3)Can large area reduce construction and excavation amount, reduce live labor management and environmental pollution, it is quick increase construct into Degree, reduces comprehensive making;
(4)Steel mesh protective layer is provided with, strengthens high-strength durable of the invention;
Figure of description
Fig. 1 is structure front view of the invention;Wherein, 1, base plate;2nd, furrow bank;3rd, bear down on one;4th, first time extended corner;5th, Two times extended corners;6th, extended corner on first;7th, extended corner on second;8th, the 3rd interface;9th, the 4th interface;10th, first interface; 11st, second interface;12nd, the first weathering;13rd, the second weathering;14th, drainage trough;15th, inlet;16th, preformed hole;
Fig. 2 is structure left view of the invention;
Fig. 3 is structure top view of the invention;
Fig. 4 is preformed hole schematic diagram of the present invention.
Specific embodiment
The present invention is made with reference to Figure of description and specific embodiment further being elaborated, but embodiment is simultaneously The present invention is not limited in any form.
Embodiment 1
A kind of pre-fabricated electric cables ditch, it is characterised in that described fluidised form very-high performance inorganic powder concrete includes following heavy Each raw material components of amount part composition:
575 parts of the low alkali portland cement of 30 ~ 60 μm of average grain diameter;
0.18 μm of average grain diameter, 105 parts of the silicon ash of SiO2 content >=85%;
130 parts of II grade of flyash of 20 ~ 40 μm of average grain diameter;
195 parts of the S95 grades of above slag powders that 10 ~ 30 μm of average grain diameter;
Particle diameter is 1150 parts of the river sand of 0.16 ~ 4.75mm, clay content less than 0.5%;
High efficiency water reducing agent 29 part of the water-reducing rate more than 30%;
136 parts of water;
A diameter of 0.18 ~ 0.25mm, length are 120 parts of the copper facing steel fibre of 10 ~ 15mm.
As shown in Fig. 1,2,3 and 4, a kind of pre-fabricated electric cables ditch, including U-lag, the U-lag includes base plate 1, the and of side wall 2 Bear down on one 3, using fluidised form very-high performance inorganic powder concreting, the base plate be provided with for be connected with another base plate first Attachment structure, the side wall is provided with the second attachment structure for being connected with opposite side wall.
First attachment structure is provided with the concavo-convex backplane interface being mutually twisted for base plate both sides.The backplane interface Including first interface 10 and second interface 11, the second interface 11 of the correspondence occlusion adjacent bottom plates of the first interface 10, described the The first interface 10 of the adjacent another base plate of the correspondence occlusion of two interface 11.
Second attachment structure be side wall before and after be provided with the concavo-convex side wall interface being mutually twisted.The side wall interface Including the 3rd interface 8 and the 4th interface 9, the 4th interface 9 of the correspondence of the 3rd interface 8 occlusion adjacent wall, the described 4th connects 3rd interfaces 8 of the adjacent opposite side wall of the correspondence occlusion of mouth 9.
The base plate is provided with first time extended corner 4 and second time extended corner 5, and the side wall is provided with the He of extended corner 6 on first Extended corner 7 on second, it is described bear down on one 3 be integrated with side wall 2 it is stepped.
Post hydro-expansive rubber bar, the side wall and opposite side wall in the gap that the base plate is mutually twisted with another base plate Post hydro-expansive rubber bar in the gap being mutually twisted.
The side wall is provided with multiple preformed holes 16, and the base plate is provided with drainage trough 14 and inlet 15.First time expansion Exhibition angle 4 and second time lower edge line base plate of extended corner 5 to the outer of drainage trough 14 are respectively equipped with the first weathering 12 and the second draining Slope 13, the gradient of the weathering 13 of first weathering 12 and second is 3%.
The steel mesh protective layer for 12mm with thickness is additionally provided with, the steel mesh protective layer is crisscross group of a plurality of steel bar Into.The pre-fabricated electric cables ditch thickness is 7cm.
The preparation method of the pre-fabricated electric cables ditch, it is characterised in that comprise the following steps:
S1. the copper facing steel fibre and river sand that restriction will be formulated add mixer stirring to be uniformly dispersed for 2 ~ 3 minutes;
S2. again to the low alkali portland cement or Portland cement, silicon ash and ore deposit for adding formula to limit in mixer Ground-slag continues to stir 1 ~ 2 minute to uniform;
S3. continues to stir 3 ~ 4 minutes to being uniformly dispersed to high efficiency water reducing agent and water is sequentially added in the material obtained by S2, Obtain fluidised form very-high performance inorganic powder concrete;
Described water is suitably finely tuned according to actual slump 26cm, divergence for 60cm;
S4. by the concrete prepared by S3 by the uniform cloth of distribution device in cable duct mould, during fabric thickness Carry out pouring cloth again after spreading steel mesh protective layer during away from mold box surface layer 10mm, the slight vibration of passing through of going forward side by side is smooth, bottom surface pressure Enter natural curing 12 ~ 14 hours after light, subsequently into infrared high-temperature maintenance, temperature is 90+5 DEG C, constant temperature 12 hours;
The steel mesh protective layer is the crisscross composition of a plurality of steel bar.
Embodiment 2
In addition to the weight portion difference of described fluidised form very-high performance each raw material components of inorganic powder concrete, other Part is with embodiment 1;
Described fluidised form very-high performance inorganic powder concrete includes each raw material components of following weight parts composition:
500 parts of the low alkali portland cement or Portland cement of 30 ~ 60 μm of average grain diameter;
0.18 μm of average grain diameter, 85 parts of the silicon ash of SiO2 content >=85%;
115 parts of II grade of flyash of 20 ~ 40 μm of average grain diameter;
175 parts of the S95 grades of above slag powders that 10 ~ 30 μm of average grain diameter;
Particle diameter is 1050 parts of the river sand of 0.16 ~ 4.75mm, clay content less than 0.5%;
High efficiency water reducing agent 26 part of the water-reducing rate more than 30%;
130 parts of water;
A diameter of 0.18 ~ 0.25mm, length are 100 parts of the copper facing steel fibre of 10 ~ 15mm.
Embodiment 3
In addition to the weight portion difference of described fluidised form very-high performance each raw material components of inorganic powder concrete, other Part is with embodiment 1;
Described fluidised form very-high performance inorganic powder concrete includes each raw material components of following weight parts composition:
650 parts of the low alkali portland cement or Portland cement of 30 ~ 60 μm of average grain diameter;
0.18 μm of average grain diameter, 120 parts of the silicon ash of SiO2 content >=85%;
145 parts of II grade of flyash of 20 ~ 40 μm of average grain diameter;
215 parts of the S95 grades of above slag powders that 10 ~ 30 μm of average grain diameter;
Particle diameter is 1250 parts of the river sand of 0.16 ~ 4.75mm, clay content less than 0.5%;
High efficiency water reducing agent 32 part of the water-reducing rate more than 30%;
145 parts of water;
A diameter of 0.18 ~ 0.25mm, length are 140 parts of the copper facing steel fibre of 10 ~ 15mm.
Comparative example 1
In addition to described concrete is normal concrete, other conditions are with embodiment 1;
The normal concrete includes each raw material components of following weight parts composition:
450 parts of 42.5 cement of normal silicate;
River sand, grain composition is 700 parts of middle sand;
5 ~ 15 millimeters of 1150 parts of stones;
170 parts of water;
High efficiency water reducing agent 6 part of the water-reducing rate more than 20%;
Comparative example 2
In addition to saving silicon ash in described ultra-high performance concrete raw material components, other conditions are with embodiment 1;
Comparative example 3
In addition to saving flyash in described ultra-high performance concrete raw material components, other conditions are with embodiment 1;
Comparative example 4
In addition to saving slag powders in described ultra-high performance concrete raw material components, other conditions are with embodiment 1;
Comparative example 5
Except in the ultra-high performance concrete silicon ash, flyash it is different with the weight portion of slag powders in addition to, other conditions With embodiment 1;
The weight portion of silicon ash, flyash and slag powders is as follows in the ultra-high performance concrete:
84 parts of silicon ash
114 parts of flyash
174 parts of slag powders;
Comparative example 6
Except in the ultra-high performance concrete silicon ash, flyash it is different with the weight portion of slag powders in addition to, other conditions With embodiment 1;
The weight portion of silicon ash, flyash and slag powders is as follows in the ultra-high performance concrete:
121 parts of silicon ash
146 parts of flyash
216 parts of slag powders;
Pre-fabricated electric cables ditch of the 1200*1400*800 cable ducts according to obtained by prepared by embodiment 1 ~ 3 and comparative example 1 ~ 6, its property Can be such as following table:
Thickness (cm) Deadweight (kg) Bearing capacity KN Standard requirement KN
Embodiment 1 7 630 290 224
Embodiment 2 6 540 240 224
Embodiment 3 8 700 310 224
Comparative example 1 24 2300 280 224
Comparative example 2 7 640 210 224
Comparative example 3 7 630 240 (surface holes are more) 224
Comparative example 4 7 630 240 224
Comparative example 5 7 630 235 224
Comparative example 6 7 630 250 224
Contrasted by comparative example 1 and embodiment 1 ~ 3, intuitively find out that the deadweight of pre-fabricated electric cables ditch of the invention is significantly less than Using the cable duct of normal concrete, also superior to the cable bearer of common concrete material in terms of bearing capacity;By comparative example 2 ~ 4 with the contrast of embodiment 1, obvious embodiment 1 is more excellent in terms of bearing capacity, and the cable duct surface holes of the preparation of comparative example 3 are more, From data, the combination of silicon ash, flyash and slag powders and proportioning can make best performance of the invention;By comparative example 5,6 Contrasted with embodiment 1 ~ 3, the bearing capacity ratio embodiment 1 ~ 3 of comparative example 5 is all low, although comparative example 6 is omited than the bearing capacity of embodiment 2 Greatly, it is but higher on cost, it is seen that inventive formulation number range is optimal.

Claims (6)

1. a kind of pre-fabricated electric cables ditch, it is characterised in that use fluidised form very-high performance inorganic powder concreting, described fluidised form Very-high performance inorganic powder concrete is made up of each raw material components that following weight parts are constituted:
500 ~ 650 parts of the low alkali portland cement or Portland cement of 30 ~ 60 μm of average grain diameter;
0.18 μm of average grain diameter, SiO285 ~ 120 parts of the silicon ash of content >=85%;
115 ~ 145 parts of II grade of flyash of 20 ~ 40 μm of average grain diameter;
175 ~ 215 parts of the S95 grades of above slag powders that 10 ~ 30 μm of average grain diameter;
Particle diameter is 1050 ~ 1250 parts of the river sand of 0.16 ~ 4.75mm, clay content less than 0.5%;
High efficiency water reducing agent 26 ~ 32 part of the water-reducing rate more than 30%;
130 ~ 145 parts of water;
A diameter of 0.18 ~ 0.25mm, length are 100 ~ 140 parts of the copper facing steel fibre of 10 ~ 15mm;
The pre-fabricated electric cables ditch includes U-lag, and the U-lag includes base plate, side wall and bears down on one, inorganic using fluidised form very-high performance Powder concrete is poured, and the base plate is provided with the first attachment structure for being connected with another base plate, the side wall be provided with for The second attachment structure being connected with opposite side wall;
First attachment structure is provided with the concavo-convex backplane interface being mutually twisted for base plate both sides;Second attachment structure To be provided with the concavo-convex side wall interface being mutually twisted before and after the wall of side;
The base plate is provided with first time extended corner and second time extended corner, and the side wall is provided with first on extended corner and second and expands Exhibition angle, it is described bear down on one be integrated with side wall it is stepped.
2. a kind of pre-fabricated electric cables ditch according to claim 1, it is characterised in that described fluidised form very-high performance inorganic powder Concrete is made up of each raw material components that following weight parts are constituted:
575 parts of the low alkali portland cement or Portland cement of 30 ~ 60 μm of average grain diameter;
0.18 μm of average grain diameter, SiO2105 parts of the silicon ash of content >=85%;
130 parts of II grade of flyash of 20 ~ 40 μm of average grain diameter;
195 parts of the S95 grades of above slag powders that 10 ~ 30 μm of average grain diameter;
Particle diameter is 1150 parts of the river sand of 0.16 ~ 4.75mm, clay content less than 0.5%;
High efficiency water reducing agent 29 part of the water-reducing rate more than 30%;
136 parts of water;
A diameter of 0.18 ~ 0.25mm, length are 120 parts of the copper facing steel fibre of 10 ~ 15mm.
3. a kind of pre-fabricated electric cables ditch according to claim 1, it is characterised in that the base plate is mutually twisted with another base plate Hydro-expansive rubber bar is posted in gap, and the side wall posts hydro-expansive rubber bar with the gap that opposite side wall is mutually twisted.
4. a kind of pre-fabricated electric cables ditch according to claim 1, it is characterised in that the side wall is provided with multiple preformed holes, described Base plate is provided with drainage trough and inlet.
5. a kind of pre-fabricated electric cables ditch according to claim 1, it is characterised in that extended on extended corner and second on described first The lower edge at angle to drainage trough outer is respectively equipped with the first weathering and the second weathering, first weathering and the second weathering The gradient be 1 ~ 3%.
6. according to claim 1 ~ 5 Arbitrary Term pre-fabricated electric cables ditch preparation method, it is characterised in that comprise the following steps:
S1. the copper facing steel fibre and river sand that restriction will be formulated add mixer stirring to be uniformly dispersed for 2 ~ 3 minutes;
S2. again to the low alkali portland cement or Portland cement, silicon ash and slag powders for adding formula to limit in mixer Continue to stir 1 ~ 2 minute to uniform;
S3. continue to stir 3 ~ 4 minutes to being uniformly dispersed to sequentially adding high efficiency water reducing agent and water in the material obtained by S2, flowed State very-high performance inorganic powder concrete;
Described water is suitably finely tuned according to actual slump 26cm ~ 30cm, divergence for 60cm ~ 70cm;
S4. by the concrete prepared by S3 by the uniform cloth of distribution device in cable duct mould, during fabric thickness away from mould Carry out pouring cloth again after paving steel mesh protective layer during tool box 10 ~ 15mm of surface layer, the slight vibration of passing through of going forward side by side is smooth, bottom surface press polish Enter natural curing 12 ~ 14 hours afterwards, subsequently into infrared high-temperature maintenance, temperature is 90 ± 5 DEG C, constant temperature 12 hours;
The steel mesh protective layer is the crisscross composition of a plurality of steel bar.
CN201410173302.9A 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof Active CN105016669B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410173302.9A CN105016669B (en) 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410173302.9A CN105016669B (en) 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105016669A CN105016669A (en) 2015-11-04
CN105016669B true CN105016669B (en) 2017-07-04

Family

ID=54407040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410173302.9A Active CN105016669B (en) 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105016669B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105367012A (en) * 2015-11-18 2016-03-02 国网浙江平湖市供电公司 Masonry type cable operation well
CN105236896A (en) * 2015-11-18 2016-01-13 黄贺明 Light high-performance powder concrete and preparation method thereof
CN105470824A (en) * 2015-12-30 2016-04-06 华润电力(贺州)有限公司 Anti-condensation apparatus for switch cabinet in limestone powder station section
CN106495580B (en) * 2016-10-21 2019-05-28 长江宜昌航道工程局 A kind of steel fiber reinforced concrete structure water-permeable frame method for prefabricating
CN107276002B (en) * 2017-07-25 2018-11-13 宁夏众力管廊科技有限公司 A kind of cable duct groove body component
CN112374826A (en) * 2020-11-16 2021-02-19 宁波市电力设计院有限公司 High-performance cement-based material for prefabricated cable trench

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1066239A (en) * 1996-08-13 1998-03-06 Adachi Concrete Kogyo:Kk Cable trough
JP2002199532A (en) * 2000-12-27 2002-07-12 Ageo:Kk End station method for branch cable in concrete cable trough and its device
JP3936864B2 (en) * 2001-12-28 2007-06-27 川田建設株式会社 Cable storage duct device
CN2547047Y (en) * 2002-07-02 2003-04-23 远山产业(烟台)有限公司 Cable trough
CN201388032Y (en) * 2009-04-07 2010-01-20 湖北省输变电工程公司 Cable trench convenient for draining
CN101820156B (en) * 2010-03-26 2012-05-23 黄贺明 Combined cable trench
CN202840440U (en) * 2012-07-13 2013-03-27 康冰 Ground prefabricated cable trench
CN103224358B (en) * 2013-02-07 2015-02-25 黄贺明 Environment-friendly ground fine river sand powder concrete
CN103224357B (en) * 2013-02-07 2015-02-25 黄贺明 Green environmentally-friendly broken stone active powder concrete

Also Published As

Publication number Publication date
CN105016669A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN105016669B (en) A kind of pre-fabricated electric cables ditch and preparation method thereof
CN101560084B (en) Environmental-friendly waterproof polymer mortar
CN103979901B (en) A kind of cement based shrinking-free grouting material and using method being mixed with phosphorus slag powder
WO2016145548A1 (en) Self-compacting concrete prepared from industrial solid waste and preparation method therefor
CN103979891B (en) Assembly-type enclosure wall and preparation method thereof
CN108675699A (en) A kind of corrosion-resistant geopolymer filling concrete pile material and preparation method thereof and construction technology
CN103086668A (en) Design method for mixing ratio of C60-grade pumping self-compacting steel tube recycled concrete
CN101285330A (en) Environment protection type structure thermal insulation concrete block, masonry and method for anti-knock domestic architecture
CN110004975B (en) Concrete self-waterproof structure of underground engineering of residential building and construction method thereof
CN108049521B (en) A kind of assembled wall structure of the assembled light raw-soil and bionical soil RPC material
CN107805018B (en) Self-compacting road backfill material produced by stone saw mud and construction method thereof
CN110387904A (en) A kind of compound retaining wall structure of ecology and its construction method
CN205576857U (en) Be suitable for hydraulic and hydroelectric engineering's super high enrockment dam structure
CN101666117A (en) Gypsum-concrete mixed structure energy-conserving residential building and manufacture method
CN201224941Y (en) Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building
CN103408266A (en) Design method for mixing ratio of C40-grade pumping self-compacting steel tube recycled concrete
CN113565143A (en) Basement roof settlement post-cast strip construction method
CN103304190B (en) A kind of roof waterproof layer cast high impervious cracking resistance protective layer and manufacture craft thereof
CN105484284B (en) A kind of outdoor switch case well head basis and preparation method thereof
CN105330211A (en) High-strength self-compacting concrete
CN108071173A (en) A kind of construction method of mass concrete
CN103896539A (en) Prefabticated silicon-aluminum-based environment-friendly cement concrete two-way hole hollow template and manufacturing method thereof
CN209227358U (en) A kind of sand concrete transom pier cap beam
CN107663058B (en) Iron tailing heat-preservation dry-mixed plastering mortar and preparation method thereof
CN105780737A (en) Super-high rockfill dam structure suitable for water conservancy and hydropower engineering and construction method of dam structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant