CN105016669A - Prefabricated cable channel and preparation method thereof - Google Patents

Prefabricated cable channel and preparation method thereof Download PDF

Info

Publication number
CN105016669A
CN105016669A CN201410173302.9A CN201410173302A CN105016669A CN 105016669 A CN105016669 A CN 105016669A CN 201410173302 A CN201410173302 A CN 201410173302A CN 105016669 A CN105016669 A CN 105016669A
Authority
CN
China
Prior art keywords
parts
sidewall
electric cables
base plate
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410173302.9A
Other languages
Chinese (zh)
Other versions
CN105016669B (en
Inventor
黄贺明
刘福财
盛山青
王鸣珂
李斌
周思晴
孙俊阳
郭宗林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410173302.9A priority Critical patent/CN105016669B/en
Publication of CN105016669A publication Critical patent/CN105016669A/en
Application granted granted Critical
Publication of CN105016669B publication Critical patent/CN105016669B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention discloses a prefabricated cable channel and a preparation method thereof. The prefabricated cable channel is poured by flow-state ultrahigh-performance inorganic powder concrete, and the flow-state ultrahigh-performance inorganic powder concrete is prepared from the following raw material components in parts by weight: 500-650 parts of low-alkaline portland cement or portland cement, 85-120 parts of silica fume, 115-145 parts of II-level fly ash, 175-215 parts of slag powder, 1050-1250 parts of river sand, 26-32 parts of high-efficiency water reducing agent, 130-145 parts of water, and 100-140 parts of straight copper-plated steel fiber. The prefabricated cable channel is attractive in appearance, high in crush resistance and breaking strength and light in weight, and the weight of the prefabricated cable channel is one third to one fifth of the weight of a channel poured by common concrete or concrete.

Description

A kind of pre-fabricated electric cables ditch and preparation method thereof
Technical field
The present invention relates to building material field, particularly relate to a kind of pre-fabricated electric cables ditch and preparation method thereof.
Background technology
It is traditional brick masonry or employing on-site concrete that electric power prefabricated ditch China adopts always, this starts to carry out exploration research and development pre-fabricated electric cables ditch for several years, particularly Jiangsu, zhejiang and other places, main cause is that geologic condition is poor, drift sand mud geology is more, excavation construction difficulty is larger, domestic large-scale flourishing city was due to maintenance in recent years, the reasons such as transformation, for reducing traffic and other influences, accelerating construction progress also starts exploration and brings into use, successively various forms of prefabricated ditch is proposed through the exploration of more than ten years and research and development, such as large-scale monolithic concrete builds cable trench, the cable trench etc. that various organic resin is made, really the amount of coming into operation is also few, reason is really wanted to be, concrete placement pre-fabricated electric cables groove, well deadweight is excessive, require higher to the process on basis and bearing pressure, foundation settlement dislocation etc. is there will be in use procedure, construction needs Large-scale Hoisting equipment in addition, the more difficult enforcement of assembled movement, and the cable trough using organic resin to make easily compressive deformation in backfilling process and in later stage use procedure, therefore domestic a lot of city is attempting exploring the pre-fabricated electric cables ditch how developing the high-strength light excellent in durability being effectively applicable to engineering always.
Application number be 200910060802.0 Chinese patent " a kind of low cost active powder concrete and preparation method thereof " disclose a kind of RPC, the silicate cement, steel-making slag powder, flyash, silicon ash, high efficiency water reducing agent, river sand, mixing water and the steel fiber that are 0.52 ~ 0.58: 0.16 ~ 0.18: 0.10 ~ 0.16: 0.13 ~ 0.16: 0.012 ~ 0.018: 0.9 ~ 1.1: 0.14 ~ 0.18: 0.156 ~ 0.234 by mass ratio obtain.This patent adds slag as a kind of mineral admixture, at the early stage the resistance of concrete to chloride ion penetration of concrete lower than straight cement concrete, the resistance of concrete to chloride ion penetration in later stage is higher than straight cement concrete, but when identical volume, the performance of slag is not as good as flyash and slag, in addition, in slag, a small amount of CaO exists in a free form, and f-CaO aquation generates Ca (OH) 2, volume increases 1.98 times, causes steel slag stability bad.
Application number be 200810019337.1 Chinese patent " slag mixed active powder concrete " disclose a kind of slag mixed active powder concrete, the part by weight of the relative silicate cement of its each component is: silicate cement: 1; Slag: 0.40 ~ 0.60; Silica flour: 0.20 ~ 0.35; Silica powder: 0.20 ~ 0.35; River sand: 1.20 ~ 1.60; Water: 0.20 ~ 0.28; Water reducer: 0.02 ~ 0.03.The shortcomings such as disclosed in this patent, RPC has pumpability difference, and impermeability is poor, impact resistance difference.
The copper-plated steel fiber of thin circular surface 100 ~ 140 parts of application number is composition of raw materials that the Chinese patent " high-durability high-activity powder concrete electrical pole " of 200710055438.X discloses a kind of high-durability high-activity powder concrete electrical pole be diameter to be 0.22mm length be 12 ~ 15mm, ordinary Portland cement 690 ~ 720 parts, median size is 0.31 μm of silica flour 160 ~ 200 parts, un-naphthalene water reducing agent 21 ~ 25 parts, 170 ~ 190 parts, water, particle diameter is the fine quartz sand 1110 ~ 1190 parts of 0.16 ~ 1.25mm.This invention cost is higher, cement content and silicon ash content higher, self glutinous poly-property is very strong, and can not form dispersion Self-leveling state, surface easily forms pore, and quartz sand is 4 ~ 5 times of river sand relatively, and economic performance has been difficult to product promotion and has been worth.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of heavy and light matter, high-strength, easy construction and apparent pre-fabricated electric cables ditch attractive in appearance are provided.
Above-mentioned purpose of the present invention is achieved by following technical solution:
A kind of pre-fabricated electric cables ditch, adopt the concrete placement of fluidised form very-high performance inorganic powder, described fluidised form very-high performance inorganic powder concrete comprises each feed composition of following weight parts composition:
The low alkali portland cement of median size 30 ~ 60 μm or ordinary Portland cement 500 ~ 650 parts;
The silicon ash of median size 0.18 μm, SiO2 content >=85% 85 ~ 120 parts;
115 ~ 145 parts, II grade of flyash of median size 20 ~ 40 μm;
The above slag powders of S95 level 175 ~ 215 parts of median size 10 ~ 30 μm;
1050 ~ 1250 parts, the river sand that particle diameter is 0.16 ~ 4.75mm, silt content is less than 0.5%;
The high efficiency water reducing agent 26 ~ 32 parts that water-reducing rate is greater than 30%;
130 ~ 145 parts, water;
The copper plated steel fiber 100 ~ 140 parts that diameter is 0.18 ~ 0.25mm, length is 10 ~ 15mm.
Further, described fluidised form very-high performance inorganic powder concrete comprises each feed composition of following weight parts composition:
The low alkali portland cement of median size 30 ~ 60 μm or ordinary Portland cement 575 parts;
The silicon ash 105 parts of median size 0.18 μm, SiO2 content >=85%;
130 parts, II grade of flyash of median size 20 ~ 40 μm;
The above slag powders of S95 level 195 parts of median size 10 ~ 30 μm;
1150 parts, the river sand that particle diameter is 0.16 ~ 4.75mm, silt content is less than 0.5%;
The high efficiency water reducing agent 29 parts that water-reducing rate is greater than 30%;
136 parts, water;
The copper plated steel fiber 120 parts that diameter is 0.18 ~ 0.25mm, length is 10 ~ 15mm.
By adopting slag and flyash to replace cement, reduce the glutinous poly-property of proportioning low, make its Self-leveling performance good, divergence is large, and air content is low, and economic cost performance is high, meets and exempts from vibratory compaction demand.
Further, a kind of pre-fabricated electric cables ditch, comprise U-lag, described U-lag comprises base plate, sidewall and bears down on one, adopt the concrete placement of fluidised form very-high performance inorganic powder, described base plate is provided with the first syndeton for being connected with another base plate, and described sidewall is provided with the second syndeton for being connected with another sidewall.
The utility model adopts precast assembly, is realized by the first and second syndetons.This structure is simple, easily constructs, can accelerating construction progress fast, reduction construction site management difficulty.
Further, described first syndeton is the concavo-convex backplane interface that base plate both sides are provided with occlusion mutually.Described backplane interface comprises first interface and the second interface, the second interface of described first interface correspondence occlusion adjacent bottom plates, the first interface of described second interface correspondence occlusion another base plate adjacent.
Described second syndeton is the concavo-convex sidewall interface being provided with occlusion mutually before and after sidewall.Described sidewall interface comprises the 3rd interface and the 4th interface, the 4th interface of described 3rd interface correspondence occlusion adjacent wall, the 3rd interface of described 4th interface correspondence occlusion another sidewall adjacent.
Hydro-expansive rubber bar is posted in the gap that described base plate and another base plate are engaged mutually, and hydro-expansive rubber bar is posted in the gap that described sidewall and another sidewall are engaged mutually.Described hydro-expansive rubber bar plays sealing function.
Further, described base plate is provided with first time extended corner and second time extended corner, and described sidewall to be provided with on first extended corner on extended corner and second, described in bear down on one be integrated with sidewall stepped.First, second lower extended corner described and first and second upper extended corner play and increase the anti-folding of cable trench, the effect of resistance to compression degree, and first, second lower extended corner can also have the effect of drainage rainwater.
Described sidewall is provided with multiple pre-opened hole, and described base plate is provided with drainage trough and inlet.Described pre-opened hole is used for mounting bracket, and uppermost pre-opened hole uses for installing expansion bolt.
Lower edge line base plate to the gutter channel outer of described first time extended corner and second time extended corner is respectively equipped with the first weathering and the second weathering, and the gradient of described first weathering and the second weathering is 1 ~ 3%.The design of weathering can make rainwater drain quickly, makes cable trench relatively dry, does not accumulate rainwater.
Be provided with in described pre-fabricated electric cables ditch and have the steel mesh protective layer that thickness is 10 ~ 15mm, described steel mesh protective layer is many crisscross compositions of steel bar.Described steel mesh protective layer can strengthen high-strength durable of the present utility model.
Described pre-fabricated electric cables ditch thickness is 3cm ~ 10cm.Cable trench adopts the concrete placement of fluidised form very-high performance inorganic powder, and its thickness is 1/3 ~ 1/5 of traditional cable ditch.
The preparation method of described pre-fabricated electric cables ditch, is characterized in that, comprise the steps:
S1. the copper plated steel fiber limited by formula and river sand add stirrer stirring and are uniformly dispersed for 2 ~ 3 minutes;
S2. in stirrer, add low alkali portland cement that formula limits or ordinary Portland cement, silicon ash and slag powders again continue stirring 1 ~ 2 minute to evenly;
S3.. in the material of S2 gained, adding high efficiency water reducing agent and water successively continuing stirring 3 ~ 4 minutes to being uniformly dispersed, obtain fluidised form very-high performance inorganic powder concrete;
Described water is according to actual slump 26cm ~ 30cm, and divergence is that 60cm ~ 70cm suitably finely tunes;
S4. the concrete prepared by S3 is passed through the even cloth of distribution device in cable trench mould; in process, fabric thickness carries out building cloth after paving steel mesh protective layer apart from during mold box surface layer 10 ~ 15mm again; the slight vibration of passing through of going forward side by side is smooth; natural curing is entered 12 ~ 14 hours after the press polish of bottom surface; then enter infrared high-temperature maintenance, temperature is 90 +5 DEG C, constant temperature 12 hours;
Described steel mesh protective layer is for being many crisscross compositions of steel bar.
Compared with prior art, the present invention has following beneficial effect:
(1) have employed fluidised form very-high performance inorganic powder concrete, thickness is 1/3 ~ 1/5 of traditional product, significantly alleviate weight, improve the mechanical index performance of product and durability performance, its ultimate compression strength can reach 110 ~ 150 MPas, folding strength 14 ~ 20 MPa, has the features such as corrosion-resistant, life cycle management is good;
(2) product is realized by assembling process, adds the handiness of site operation, significantly alleviates construction labour intensity, reduces the complex management degree of working-yard; Principle is simple, installation processing ease, can solve construction process difficult quality fast and effectively and control, by difficult problems such as weather effect construction speeds;
(3) big area can reduce construction and excavation amount, reduce on-the-spot labor management and environmental pollution, increase construction speed fast, reduce and comprehensively make;
(4) be provided with steel mesh protective layer, strengthen high-strength durable of the present invention;
figure of description
Fig. 1 is structure front view of the present invention; Wherein, 1, base plate; 2, furrow bank; 3, bear down on one; 4, first time extended corner; 5, second time extended corner; 6, extended corner on first; 7, extended corner on second; 8, the 3rd interface; 9, the 4th interface; 10, first interface; 11, the second interface; 12, the first weathering; 13, the second weathering; 14, drainage trough; 15, inlet; 16, pre-opened hole;
Fig. 2 is structure left view of the present invention;
Fig. 3 is structure vertical view of the present invention;
Fig. 4 is pre-opened hole schematic diagram of the present invention.
Embodiment
Below in conjunction with Figure of description and specific embodiment the present invention made and elaborating further, but embodiment does not limit in any form the present invention.
Embodiment 1
A kind of pre-fabricated electric cables ditch, is characterized in that, described fluidised form very-high performance inorganic powder concrete comprises each feed composition of following weight parts composition:
The low alkali portland cement of median size 30 ~ 60 μm 575 parts;
The silicon ash 105 parts of median size 0.18 μm, SiO2 content >=85%;
130 parts, II grade of flyash of median size 20 ~ 40 μm;
The above slag powders of S95 level 195 parts of median size 10 ~ 30 μm;
1150 parts, the river sand that particle diameter is 0.16 ~ 4.75mm, silt content is less than 0.5%;
The high efficiency water reducing agent 29 parts that water-reducing rate is greater than 30%;
136 parts, water;
The copper plated steel fiber 120 parts that diameter is 0.18 ~ 0.25mm, length is 10 ~ 15mm.
As Fig. 1,2, shown in 3 and 4, a kind of pre-fabricated electric cables ditch, comprise U-lag, described U-lag comprises base plate 1, sidewall 2 and bears down on one 3, adopt the concrete placement of fluidised form very-high performance inorganic powder, described base plate is provided with the first syndeton for being connected with another base plate, and described sidewall is provided with the second syndeton for being connected with another sidewall.
Described first syndeton is the concavo-convex backplane interface that base plate both sides are provided with occlusion mutually.Described backplane interface comprises first interface 10 and the second interface 11, the second interface 11 of described first interface 10 correspondence occlusion adjacent bottom plates, the first interface 10 of described second interface 11 correspondence occlusion another base plate adjacent.
Described second syndeton is the concavo-convex sidewall interface being provided with occlusion mutually before and after sidewall.Described sidewall interface comprises the 3rd interface 8 and the 4th interface 9, the 4th interface 9 of described 3rd interface 8 correspondence occlusion adjacent wall, the 3rd interface 8 of described 4th interface 9 correspondence occlusion another sidewall adjacent.
Described base plate is provided with first time extended corner 4 and second time extended corner 5, and described sidewall to be provided with on first extended corner 7 on extended corner 6 and second, described in bear down on one and 3 be integrated stepped with sidewall 2.
Hydro-expansive rubber bar is posted in the gap that described base plate and another base plate are engaged mutually, and hydro-expansive rubber bar is posted in the gap that described sidewall and another sidewall are engaged mutually.
Described sidewall is provided with multiple pre-opened hole 16, and described base plate is provided with drainage trough 14 and inlet 15.Lower edge line base plate to drainage trough 14 outer of described first time extended corner 4 and second time extended corner 5 is respectively equipped with the first weathering 12 and the second weathering 13, and the gradient of described first weathering 12 and the second weathering 13 is 3%.
Also be provided with and have the steel mesh protective layer that thickness is 12mm, described steel mesh protective layer is many crisscross compositions of steel bar.Described pre-fabricated electric cables ditch thickness is 7cm.
The preparation method of described pre-fabricated electric cables ditch, is characterized in that, comprise the steps:
S1. the copper plated steel fiber limited by formula and river sand add stirrer stirring and are uniformly dispersed for 2 ~ 3 minutes;
S2. in stirrer, add low alkali portland cement that formula limits or ordinary Portland cement, silicon ash and slag powders again continue stirring 1 ~ 2 minute to evenly;
S3.. in the material of S2 gained, adding high efficiency water reducing agent and water successively continuing stirring 3 ~ 4 minutes to being uniformly dispersed, obtain fluidised form very-high performance inorganic powder concrete;
Described water is according to actual slump 26cm, and divergence is that 60cm suitably finely tunes;
S4. the concrete prepared by S3 is passed through the even cloth of distribution device in cable trench mould; in process, fabric thickness carries out building cloth after paving steel mesh protective layer apart from during mold box surface layer 10mm again; the slight vibration of passing through of going forward side by side is smooth; natural curing is entered 12 ~ 14 hours after the press polish of bottom surface; then enter infrared high-temperature maintenance, temperature is 90 +5 DEG C, constant temperature 12 hours;
Described steel mesh protective layer is for being many crisscross compositions of steel bar.
Embodiment 2
Except the weight part difference of the described each feed composition of fluidised form very-high performance inorganic powder concrete, other conditions are with embodiment 1;
Described fluidised form very-high performance inorganic powder concrete comprises each feed composition of following weight parts composition:
The low alkali portland cement of median size 30 ~ 60 μm or ordinary Portland cement 500 parts;
The silicon ash 85 parts of median size 0.18 μm, SiO2 content >=85%;
115 parts, II grade of flyash of median size 20 ~ 40 μm;
The above slag powders of S95 level 175 parts of median size 10 ~ 30 μm;
1050 parts, the river sand that particle diameter is 0.16 ~ 4.75mm, silt content is less than 0.5%;
The high efficiency water reducing agent 26 parts that water-reducing rate is greater than 30%;
130 parts, water;
The copper plated steel fiber 100 parts that diameter is 0.18 ~ 0.25mm, length is 10 ~ 15mm.
Embodiment 3
Except the weight part difference of the described each feed composition of fluidised form very-high performance inorganic powder concrete, other conditions are with embodiment 1;
Described fluidised form very-high performance inorganic powder concrete comprises each feed composition of following weight parts composition:
The low alkali portland cement of median size 30 ~ 60 μm or ordinary Portland cement 650 parts;
The silicon ash 120 parts of median size 0.18 μm, SiO2 content >=85%;
145 parts, II grade of flyash of median size 20 ~ 40 μm;
The above slag powders of S95 level 215 parts of median size 10 ~ 30 μm;
1250 parts, the river sand that particle diameter is 0.16 ~ 4.75mm, silt content is less than 0.5%;
The high efficiency water reducing agent 32 parts that water-reducing rate is greater than 30%;
145 parts, water;
The copper plated steel fiber 140 parts that diameter is 0.18 ~ 0.25mm, length is 10 ~ 15mm.
Comparative example 1
Except described concrete is normal concrete, other conditions are with embodiment 1;
Described normal concrete comprises each feed composition of following weight parts composition:
Normal silicate 42.5 cement 450 parts;
River sand, grain composition is medium sand 700 parts;
1150 parts, 5 ~ 15 millimeters of stones;
170 parts, water;
The high efficiency water reducing agent 6 parts that water-reducing rate is greater than 20%;
Comparative example 2
Except saving except silicon ash in described ultra-high performance concrete feed composition, other conditions are with embodiment 1;
Comparative example 3
Except saving except flyash in described ultra-high performance concrete feed composition, other conditions are with embodiment 1;
Comparative example 4
Except saving except slag powders in described ultra-high performance concrete feed composition, other conditions are with embodiment 1;
Comparative example 5
Except in described ultra-high performance concrete silicon ash, flyash different with the weight part of slag powders except, other conditions are with embodiment 1;
In described ultra-high performance concrete, the weight part of silicon ash, flyash and slag powders is as follows:
Silicon ash 84 parts
114 parts, flyash
Slag powders 174 parts;
Comparative example 6
Except in described ultra-high performance concrete silicon ash, flyash different with the weight part of slag powders except, other conditions are with embodiment 1;
In described ultra-high performance concrete, the weight part of silicon ash, flyash and slag powders is as follows:
Silicon ash 121 parts
146 parts, flyash
Slag powders 216 parts;
1200*1400*800 cable trench prepares the pre-fabricated electric cables ditch of gained according to embodiment 1 ~ 3 and comparative example 1 ~ 6, and its performance is as following table:
Thickness (cm) Deadweight (kg) Bearing capacity KN Standard-required KN
Embodiment 1 7 630 290 224
Embodiment 2 6 540 240 224
Embodiment 3 8 700 310 224
Comparative example 1 24 2300 280 224
Comparative example 2 7 640 210 224
Comparative example 3 7 630 240 (surface holes is many) 224
Comparative example 4 7 630 240 224
Comparative example 5 7 630 235 224
Comparative example 6 7 630 250 224
Contrasted by comparative example 1 and embodiment 1 ~ 3, find out that the deadweight of pre-fabricated electric cables ditch of the present invention is significantly less than the cable trench adopting normal concrete intuitively, in bearing capacity, be also better than the cable bearer of common concrete material; By the contrast of comparative example 2 ~ 4 with embodiment 1, in bearing capacity, obvious embodiment 1 is more excellent, and cable trench surface holes prepared by comparative example 3 is many, and from data, combination and the proportioning of silicon ash, flyash and slag powders can make best performance of the present invention; By comparative example 5,6 contrast with embodiment 1 ~ 3, and the bearing capacity ratio embodiment 1 ~ 3 of comparative example 5 is all low, although comparative example 6 is more bigger than embodiment 2 bearing capacity, higher on cost, and visible the present invention fills a prescription numerical range optimum.

Claims (10)

1. a pre-fabricated electric cables ditch, is characterized in that, adopt the concrete placement of fluidised form very-high performance inorganic powder, described fluidised form very-high performance inorganic powder concrete comprises each feed composition of following weight parts composition:
The low alkali portland cement of median size 30 ~ 60 μm or ordinary Portland cement 500 ~ 650 parts;
The silicon ash of median size 0.18 μm, SiO2 content >=85% 85 ~ 120 parts;
115 ~ 145 parts, II grade of flyash of median size 20 ~ 40 μm;
The above slag powders of S95 level 175 ~ 215 parts of median size 10 ~ 30 μm;
1050 ~ 1250 parts, the river sand that particle diameter is 0.16 ~ 4.75mm, silt content is less than 0.5%;
The high efficiency water reducing agent 26 ~ 32 parts that water-reducing rate is greater than 30%;
130 ~ 145 parts, water;
The copper plated steel fiber 100 ~ 140 parts that diameter is 0.18 ~ 0.25mm, length is 10 ~ 15mm.
2. a kind of pre-fabricated electric cables ditch according to claim 1, is characterized in that, described fluidised form very-high performance inorganic powder concrete comprises each feed composition of following weight parts composition:
The low alkali portland cement of median size 30 ~ 60 μm or ordinary Portland cement 575 parts;
The silicon ash 105 parts of median size 0.18 μm, SiO2 content >=85%;
130 parts, II grade of flyash of median size 20 ~ 40 μm;
The above slag powders of S95 level 195 parts of median size 10 ~ 30 μm;
1150 parts, the river sand that particle diameter is 0.16 ~ 4.75mm, silt content is less than 0.5%;
The high efficiency water reducing agent 29 parts that water-reducing rate is greater than 30%;
136 parts, water;
The copper plated steel fiber 120 parts that diameter is 0.18 ~ 0.25mm, length is 10 ~ 15mm.
3. a kind of pre-fabricated electric cables ditch according to claim 1, it is characterized in that, comprise U-lag, described U-lag comprises base plate, sidewall and bears down on one, adopt the concrete placement of fluidised form very-high performance inorganic powder, described base plate is provided with the first syndeton for being connected with another base plate, and described sidewall is provided with the second syndeton for being connected with another sidewall.
4. a kind of pre-fabricated electric cables ditch according to claim 3, is characterized in that, stating the first syndeton is the concavo-convex backplane interface that base plate both sides are provided with occlusion mutually; Described second syndeton is the concavo-convex sidewall interface being provided with occlusion mutually before and after sidewall.
5. a kind of pre-fabricated electric cables ditch according to claim 4, it is characterized in that, hydro-expansive rubber bar is posted in the gap that described base plate and another base plate are engaged mutually, and hydro-expansive rubber bar is posted in the gap that described sidewall and another sidewall are engaged mutually.
6. a kind of pre-fabricated electric cables ditch according to claim 3, it is characterized in that, described base plate is provided with first time extended corner and second time extended corner, and described sidewall to be provided with on first extended corner on extended corner and second, described in bear down on one be integrated with sidewall stepped.
7. a kind of pre-fabricated electric cables ditch according to claim 3, it is characterized in that, described sidewall is provided with multiple pre-opened hole, and described base plate is provided with drainage trough and inlet.
8. a kind of pre-fabricated electric cables ditch according to claim 3, it is characterized in that, on described first, on extended corner and second, lower edge line base plate to the gutter channel outer of extended corner is respectively equipped with the first weathering and the second weathering, and the gradient of described first weathering and the second weathering is 1 ~ 3%.
9. a kind of pre-fabricated electric cables ditch according to claim 3, is characterized in that, be provided with and have the steel mesh protective layer that thickness is 10 ~ 15mm; Described pre-fabricated electric cables ditch thickness is 3cm ~ 10cm.
10. the preparation method of pre-fabricated electric cables ditch according to claim 1 ~ 9 Arbitrary Term, is characterized in that, comprise the steps:
S1. the copper plated steel fiber limited by formula and river sand add stirrer stirring and are uniformly dispersed for 2 ~ 3 minutes;
S2. in stirrer, add low alkali portland cement that formula limits or ordinary Portland cement, silicon ash and slag powders again continue stirring 1 ~ 2 minute to evenly;
S3. in the material of S2 gained, adding high efficiency water reducing agent and water successively continuing stirring 3 ~ 4 minutes to being uniformly dispersed, obtain fluidised form very-high performance inorganic powder concrete;
Described water is according to actual slump 26cm ~ 30cm, and divergence is that 60cm ~ 70cm suitably finely tunes;
S4. by the concrete prepared by S3 by the even cloth of distribution device in the cable trench mould having steel mesh framework, steel mesh protective layer 8 ~ 15mm, the slight vibration of passing through of going forward side by side is smooth; bottom surface press polish; enter natural curing 12 ~ 14 hours, then enter infrared high-temperature maintenance, temperature is 90 +5 DEG C, constant temperature 12 hours;
Described steel mesh protective layer is for being many crisscross compositions of steel bar.
CN201410173302.9A 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof Active CN105016669B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410173302.9A CN105016669B (en) 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410173302.9A CN105016669B (en) 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105016669A true CN105016669A (en) 2015-11-04
CN105016669B CN105016669B (en) 2017-07-04

Family

ID=54407040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410173302.9A Active CN105016669B (en) 2014-04-28 2014-04-28 A kind of pre-fabricated electric cables ditch and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105016669B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105236896A (en) * 2015-11-18 2016-01-13 黄贺明 Light high-performance powder concrete and preparation method thereof
CN105367012A (en) * 2015-11-18 2016-03-02 国网浙江平湖市供电公司 Masonry type cable operation well
CN105470824A (en) * 2015-12-30 2016-04-06 华润电力(贺州)有限公司 Anti-condensation apparatus for switch cabinet in limestone powder station section
CN106495580A (en) * 2016-10-21 2017-03-15 长江宜昌航道工程局 A kind of steel fiber reinforced concrete structure water-permeable frame method for prefabricating
CN107276002A (en) * 2017-07-25 2017-10-20 宁夏众力管廊科技有限公司 A kind of cable duct cell body component
CN112374826A (en) * 2020-11-16 2021-02-19 宁波市电力设计院有限公司 High-performance cement-based material for prefabricated cable trench

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1066239A (en) * 1996-08-13 1998-03-06 Adachi Concrete Kogyo:Kk Cable trough
JP2002199532A (en) * 2000-12-27 2002-07-12 Ageo:Kk End station method for branch cable in concrete cable trough and its device
CN2547047Y (en) * 2002-07-02 2003-04-23 远山产业(烟台)有限公司 Cable trough
JP2003199224A (en) * 2001-12-28 2003-07-11 Kawada Construction Co Ltd Duct for storing cable and fixing method therefor
CN201388032Y (en) * 2009-04-07 2010-01-20 湖北省输变电工程公司 Cable trench convenient for draining
CN101820156A (en) * 2010-03-26 2010-09-01 黄贺明 Combined cable trench
CN202840440U (en) * 2012-07-13 2013-03-27 康冰 Ground prefabricated cable trench
CN103224357A (en) * 2013-02-07 2013-07-31 黄贺明 Green environmentally-friendly broken stone active powder concrete
CN103224358A (en) * 2013-02-07 2013-07-31 黄贺明 Environment-friendly ground fine river sand powder concrete

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1066239A (en) * 1996-08-13 1998-03-06 Adachi Concrete Kogyo:Kk Cable trough
JP2002199532A (en) * 2000-12-27 2002-07-12 Ageo:Kk End station method for branch cable in concrete cable trough and its device
JP2003199224A (en) * 2001-12-28 2003-07-11 Kawada Construction Co Ltd Duct for storing cable and fixing method therefor
CN2547047Y (en) * 2002-07-02 2003-04-23 远山产业(烟台)有限公司 Cable trough
CN201388032Y (en) * 2009-04-07 2010-01-20 湖北省输变电工程公司 Cable trench convenient for draining
CN101820156A (en) * 2010-03-26 2010-09-01 黄贺明 Combined cable trench
CN202840440U (en) * 2012-07-13 2013-03-27 康冰 Ground prefabricated cable trench
CN103224357A (en) * 2013-02-07 2013-07-31 黄贺明 Green environmentally-friendly broken stone active powder concrete
CN103224358A (en) * 2013-02-07 2013-07-31 黄贺明 Environment-friendly ground fine river sand powder concrete

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓钫印: "《建筑材料实用手册》", 31 May 2007 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105236896A (en) * 2015-11-18 2016-01-13 黄贺明 Light high-performance powder concrete and preparation method thereof
CN105367012A (en) * 2015-11-18 2016-03-02 国网浙江平湖市供电公司 Masonry type cable operation well
CN105470824A (en) * 2015-12-30 2016-04-06 华润电力(贺州)有限公司 Anti-condensation apparatus for switch cabinet in limestone powder station section
CN106495580A (en) * 2016-10-21 2017-03-15 长江宜昌航道工程局 A kind of steel fiber reinforced concrete structure water-permeable frame method for prefabricating
CN106495580B (en) * 2016-10-21 2019-05-28 长江宜昌航道工程局 A kind of steel fiber reinforced concrete structure water-permeable frame method for prefabricating
CN107276002A (en) * 2017-07-25 2017-10-20 宁夏众力管廊科技有限公司 A kind of cable duct cell body component
CN107276002B (en) * 2017-07-25 2018-11-13 宁夏众力管廊科技有限公司 A kind of cable duct groove body component
CN112374826A (en) * 2020-11-16 2021-02-19 宁波市电力设计院有限公司 High-performance cement-based material for prefabricated cable trench

Also Published As

Publication number Publication date
CN105016669B (en) 2017-07-04

Similar Documents

Publication Publication Date Title
CN105016669A (en) Prefabricated cable channel and preparation method thereof
CN103319121B (en) Fluidic backfill material produced by building garbage fines and construction method
CN103979891B (en) Assembly-type enclosure wall and preparation method thereof
CN101143774A (en) Environmental protection energy-saving concrete brick
CN103086668A (en) Design method for mixing ratio of C60-grade pumping self-compacting steel tube recycled concrete
CN104529333A (en) Waste sintered brick recycled C30 concrete and preparation method thereof
CN106517978A (en) Light-weight thermal mortar taking ardealite hydraulic compound gel material as principal material
CN104556905A (en) Waste sintered brick recycled C25 concrete and preparation method thereof
CN107902997A (en) A kind of pumpable weight concrete
CN107805018B (en) Self-compacting road backfill material produced by stone saw mud and construction method thereof
CN205576857U (en) Be suitable for hydraulic and hydroelectric engineering's super high enrockment dam structure
CN101666117A (en) Gypsum-concrete mixed structure energy-conserving residential building and manufacture method
CN103408266A (en) Design method for mixing ratio of C40-grade pumping self-compacting steel tube recycled concrete
CN102887678A (en) Recycled-aggregate heat-preservation building block material
CN103304190B (en) A kind of roof waterproof layer cast high impervious cracking resistance protective layer and manufacture craft thereof
CN105484284B (en) A kind of outdoor switch case well head basis and preparation method thereof
CN104675013A (en) Prefabricated steel fiber recycled brick concrete wall based on T-slot connection and construction method thereof
CN203891072U (en) Assembled cable pit
CN107663058B (en) Iron tailing heat-preservation dry-mixed plastering mortar and preparation method thereof
CN111039619A (en) Prefabricated staircase of assembled recycled aggregate lightweight concrete
CN105780737A (en) Super-high rockfill dam structure suitable for water conservancy and hydropower engineering and construction method of dam structure
CN113603504B (en) Silt foam concrete and preparation method thereof
CN109133743A (en) A kind of machine-made sand concrete premixing mortar
CN103539381B (en) Admixture for pea gravel concrete
CN105649102B (en) A kind of distribution box foundation and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant