CN105013663B - Point gum machine - Google Patents

Point gum machine Download PDF

Info

Publication number
CN105013663B
CN105013663B CN201510469479.8A CN201510469479A CN105013663B CN 105013663 B CN105013663 B CN 105013663B CN 201510469479 A CN201510469479 A CN 201510469479A CN 105013663 B CN105013663 B CN 105013663B
Authority
CN
China
Prior art keywords
screw rod
motor
axis motor
frame
glue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510469479.8A
Other languages
Chinese (zh)
Other versions
CN105013663A (en
Inventor
温玉桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Jiahe Electronic Technology Co., Ltd.
Original Assignee
温玉桂
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 温玉桂 filed Critical 温玉桂
Priority to CN201510469479.8A priority Critical patent/CN105013663B/en
Publication of CN105013663A publication Critical patent/CN105013663A/en
Application granted granted Critical
Publication of CN105013663B publication Critical patent/CN105013663B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of point gum machine, including:Frame, the glue applying mechanism in frame and rotating disk mechanism and the discharging frame set close to frame;Glue spraying head is driven to be moved in three dimensions by the X-axis motor in glue applying mechanism, y-axis motor and Z axis motor.Discharging frame includes:Support, binder roller, compressing rod, the first motor, front charging tray and back material stopping disk;First motor is on the support, and front charging tray and back material stopping disk parallel interval are set, and are fixedly arranged in the drive shaft of the first motor, and compressing rod is rotated on support, and binder roller is rotated on compressing rod, and setting of aliging with front charging tray and back material stopping disk.Above-mentioned point gum machine realizes that automatically dropping glue is operated by glue applying mechanism, and will be wound in glue stick therein or adhesive tape feeding glue applying mechanism by discharging frame, reduces manpower intervention degree, realizes that adhesive tape or glue stick smoothly send into glue applying mechanism.

Description

Point gum machine
Technical field
The present invention relates to dispensing technology field, more particularly to a kind of point gum machine.
Background technology
, it is necessary to by PUR drop or be coated on product in the production process of some products, realize other zero Part is firmly pasted together with the product by PUR.Point gum machine of the prior art needs special staff by glue Melted in band or glue stick feeding point gum machine, and check whether adhesive tape or glue stick distort or knot at any time, to smooth out with the fingers along rear suitable In profit feeding point gum machine, not only production efficiency is substantially reduced, and adds cost of labor.
The content of the invention
Based on this, it is necessary to reduce manpower intervention degree there is provided one kind for problems of the prior art, realize glue Band or glue stick smoothly send into point gum machine therein.
A kind of point gum machine, including:Frame, the glue applying mechanism in frame and rotating disk mechanism and putting close to frame setting Bin;
Glue applying mechanism includes:Glue spraying head, installed part, X-axis motor, y-axis motor, Z axis motor, first in frame are led Rail chair, the second track base, the first screw rod, the second screw rod and the 3rd screw rod;
First screw rod is rotated on the first track base, the first sliding block is bolted with the first screw rod, the second track base is fixed In on the first sliding block, X-axis motor drives the first screw rod to rotate on the first track base;
Second screw rod is rotated on the second track base, is bolted with the second sliding block on the second screw rod, and installed part is fixedly arranged on the On two sliding blocks, y-axis motor drives the second screw rod to rotate on the second track base;
Z axis motor drives the 3rd screw rod to rotate on installed part, is bolted with fixture on the 3rd screw rod, glue spraying head It is fixedly arranged on fixture;
Discharging frame includes:Support, binder roller, compressing rod, the first motor, front charging tray and back material stopping disk;
First motor is on support, and front charging tray and back material stopping disk parallel interval are set, and are fixedly arranged on the first motor In drive shaft, compressing rod is rotated on the support, and binder roller is rotated on compressing rod, and with front charging tray and back material stopping disk Alignment is set.
Above-mentioned point gum machine by glue applying mechanism realize automatically dropping glue operate, and by discharging frame will wind glue stick therein or In adhesive tape feeding glue applying mechanism, reduce manpower intervention degree, realize that adhesive tape or glue stick smoothly send into glue applying mechanism.
In one of the embodiments, discharging frame also includes:Bearing block, bearing and rotating shaft;
Bearing block is on support, and bearing is in bearing block, and rotating shaft is rotated with bearing and is connected, and compressing rod is fixed with rotating shaft Connection.
In one of the embodiments, it is respectively provided with a fixed plate, each fixed plate and sets positioned at bearing block both sides on support There is a bumping post, compressing rod is limited between two bumping posts.
In one of the embodiments, a proximity switch is additionally provided with each fixed plate, for sensing by compressing rod During triggering, control the first motor stalling.
In one of the embodiments, guide rail bar is provided with along the length direction of the 3rd screw rod on installed part, fixture is slided It is connected in guide rail bar.
In one of the embodiments, glue applying mechanism also includes support member, and support member is in frame, and the first track base is set In on support member.
Brief description of the drawings
Fig. 1 for one embodiment of the invention point gum machine in part-structure top view;
Fig. 2 is the structural representation of part-structure in point gum machine shown in Fig. 1;
Fig. 3 is the structural representation of glue applying mechanism shown in Fig. 2;
Fig. 4 is the structural representation of discharging frame;
Fig. 5 is the side view of discharging frame in Fig. 4;
Fig. 6 is the structural scheme of mechanism of the first pick-and-place manipulator shown in Fig. 2;
Fig. 7 is another visual angle figure of part-structure in point gum machine shown in Fig. 2;
Fig. 8 is the structural representation of steel ring clamping module in Fig. 7;
Fig. 9 is the structural representation of lifting module in Fig. 7;
Figure 10 is the structural representation of the second pick-and-place manipulator shown in Fig. 2;
Figure 11 is the structural representation of conveying mechanism;
Figure 12 is the side view of conveying mechanism shown in Figure 11.
Embodiment
As shown in figure 1, its top view for part-structure in the point gum machine of one embodiment of the invention, Fig. 2 is shown in Fig. 1 The structural representation of part-structure in point gum machine.
Point gum machine includes:Frame 110, discharging frame 200 (not showing in Fig. 1 and Fig. 2), rotating disk mechanism 300, glue applying mechanism 400, First pick-and-place manipulator 500 and the second pick-and-place manipulator 600.
Glue applying mechanism 400, the first pick-and-place manipulator 500 and the second pick-and-place manipulator 600 are in frame 110, also, point Gluing mechanism 400, the first pick-and-place manipulator 500 and the second pick-and-place manipulator 600 are set around rotating disk mechanism 300.In practical application In, the product 011 of round pie is placed on rotating disk mechanism 300 by the second pick-and-place manipulator 600 by adsorption operations, then, is turned Disc mechanism 300 is moved at glue applying mechanism 400 with product 011, and glue applying mechanism 400 overlays on hot-melt on product 011, enters And, rotating disk mechanism 300 is moved at the first pick-and-place manipulator 500 with the product 011 for being coated with PUR, and first picks and places machinery Circular steel ring 012 is placed on the product 011 for being coated with PUR by hand 500 by adsorption operations, is realized steel ring 012 Firmly it is pasted together with product 011 by PUR.
Also referring to Fig. 3, it is the structural representation of glue applying mechanism 400 shown in Fig. 2.
Glue applying mechanism 400 includes:Glue spraying head 410, installed part 421, X-axis motor 431, y-axis motor 432, Z axis motor 433, The first track base 441, the second track base 442, the first screw rod 451, the second screw rod 452 and the 3rd screw rod in frame 110 453.In the present embodiment, glue applying mechanism 400 also includes support member 470, and support member 470 is in frame 110, the first track base 441 on support member 470.
First screw rod 451 is rotated on the first track base 441, specifically, the two ends of the first screw rod 451 rotate set respectively In the two ends of the first track base 441, in order to improve the smooth degree of the first screw rod 451 rotation, the two ends of the first screw rod 451 lead to respectively Two bearings are crossed to rotate located at the two ends of the first track base 441.The first sliding block 461, the second guide rail are bolted with first screw rod 451 Seat 442 is fixedly arranged on the first sliding block 461.X-axis motor 431 drives the first screw rod 451 to rotate on the first track base 441, Specifically, X-axis motor 431 is located at one end of the first track base 441, the drive shaft of X-axis motor 431 and the one of the first screw rod 451 End is fixedly connected.So, X-axis motor 431 drives the first screw rod 451 to rotate after starting, and then drives the first sliding block 461 along first The length direction movement of screw rod 451, realizes that X-axis motor 431 drives the second track base 442 to move along the x-axis.
Second screw rod 452 is rotated on the second track base 442, specifically, the two ends of the second screw rod 452 rotate set respectively In the two ends of the second track base 442, in order to improve the smooth degree of the second screw rod 452 rotation, the two ends of the second screw rod 452 lead to respectively Two bearings are crossed to rotate located at the two ends of the second track base 442.The second sliding block 462, installed part are bolted with second screw rod 452 421 are fixedly arranged on the second sliding block 462.Y-axis motor 432 drives the second screw rod 452 to rotate on the second track base 442, has Body, y-axis motor 432 is located at one end of the second track base 442, the drive shaft of y-axis motor 432 and one end of the second screw rod 452 It is fixedly connected.So, y-axis motor 432 drives the second screw rod 452 to rotate after starting, and then drives the second sliding block 462 along the second spiral shell The length direction movement of bar 452, realizes that the drive installation part 421 of y-axis motor 432 is moved along Y-axis.
Z axis motor 433 drives the 3rd screw rod 453 to rotate on installed part 421, is bolted with the 3rd screw rod 453 solid Determine part 422, glue spraying head 410 is fixedly arranged on fixture 422.Specifically, the drive shaft of Z axis motor 433 and the one of the 3rd screw rod 453 End is fixedly connected.So, drive the 3rd screw rod 453 to rotate after Z axis motor 433 starts, and then drive fixture 422 along the 3rd spiral shell The length direction movement of bar 453, realizes that the driving glue spraying head 410 of Z axis motor 433 is moved along Z axis.
Stably moved along the 3rd screw rod 453 in order that obtaining fixture 422, along the length of the 3rd screw rod 453 on installed part 421 Spend direction and be provided with guide rail bar 423, fixture 422 is slidably connected in guide rail bar 423.
Above-mentioned glue applying mechanism 400 drives the first screw rod respectively by X-axis motor 431, y-axis motor 432 and Z axis motor 433 451st, the second screw rod 452 and the 3rd screw rod 453, realize and drive glue spraying head 410 to be moved in three dimensions so that glue spraying head 410 Can on the surface of product 011 any part coating hot-melt adhesive, it is to avoid the drawbacks of artificial coating is inaccurate.
As shown in figure 4, it is the structural representation of discharging frame 200.Discharging frame 200 includes:Support 210, binder roller 220th, compressing rod 230, the first motor 240, front charging tray 251 and back material stopping disk 252.
First motor 240 is on support 210, and front charging tray 251 and the parallel interval of back material stopping disk 252 are set, and fixed In in the drive shaft of the first motor 240.In the present embodiment, front charging tray 251 and back material stopping disk 252 are circle, the first motor 240 Drive shaft through the center of front charging tray 251 and back material stopping disk 252, also, front charging tray 251 and back material stopping disk 252 are relative The drive shaft of first motor 240 is fixedly connected.Compressing rod 230 is rotated on support 210, and binder roller 220 is rotated located at pressure Expect on bar 230, and setting of aliging with front charging tray 251 and back material stopping disk 252, that is to say, that binder roller 220 is aligned in front The gap of charging tray 251 and back material stopping disk 252.
In order to illustrate the action principle of discharging frame 200, glue stick 013 is schematically shown with curve in Figure 5 and is wound In gap between front charging tray 251 and back material stopping disk 252.
In actual applications, the free end 0131 of glue stick 013 is gone through from the lower section of binder roller 220, and then sent into In the glue spraying head 410 of glue applying mechanism 400.Discharging frame 200 is rotated by the first motor 240, and control glue stick 013 gradually discharges, real The glue spraying head 410 that glue applying mechanism 400 is continuously sent into the free end 0131 of existing glue stick 013 is melted, it is to avoid glue stick 013 Distortion knots.Binder roller 220 applies lower pressure to glue stick 013, plays a part of stretching glue stick 013.
In order to realize that compressing rod 230 is swimmingly rotated on the bracket 210, discharging frame 200 also includes:Bearing block 261, bearing (not showing in Fig. 4 and Fig. 5) and rotating shaft 262.
Bearing block 261 is on support 210, and bearing is in bearing block 261, and rotating shaft 262 is rotated with bearing and is connected, binder Bar 230 is fixedly connected with rotating shaft 262.
In order to which the amplitude of fluctuation to compressing rod 230 is limited, one is respectively provided with positioned at the both sides of bearing block 261 on support 210 Fixed plate 263, each fixed plate 263 is provided with a bumping post 264, for compressing rod 230 to be limited between two bumping posts 264.
Further, when being contacted to be swung in compressing rod 230 with any one bumping post 264, stop the first motor 240 Turn.It is additionally provided with a proximity switch 265 in each fixed plate 263, proximity switch 265 is used to be triggered by compressing rod 230 sensing When, the first motor 240 of control is stalled.
As shown in fig. 6, it is the structural scheme of mechanism of the first pick-and-place manipulator 500 shown in Fig. 2.First pick-and-place manipulator 500 include:The 3rd track base 510, the first motor 520, the first lift cylinder 530, sucker 540 and company in frame 110 Fitting 550.
3rd track base 510, which is provided with the first guide convex rail 511, the 3rd track base 510, is located at the first guide convex rail 511 Two ends rotate respectively provided with one first tooth form runner 512, two the first tooth form runners 512 pass through the first synchronous cog belt 513 Connection, the first motor 520 is connected with one of them first tooth form runner 512, and connector 550, which is slided, is located at the first guide convex rail On 511, and it is fixedly connected with the first synchronous cog belt 513, the first lift cylinder 530 is on connector 550, the first lifting air The telescopic shaft of cylinder 530 is connected with sucker 540.Dust cover 514 is also covered with 3rd track base 510.For example, the dust cap Plate rotary setting is in the 3rd track base;And for example, if the dust cover includes dry plate dust excluding plate, adjacent two panels dust excluding plate at least portion Divide covering;And for example, if dry plate dust excluding plate Central Symmetry is set.
In the present embodiment, connector 550 includes the 3rd sliding block 551 and the extension plate being fixedly connected with the 3rd sliding block 551 552, the 3rd sliding block 551 is slided on the first guide convex rail 511, and is fixedly connected with the first synchronous cog belt 513, first liter Sending down abnormally ascending cylinder 530 is located on extension plate 552.
For the ease of storing wire and oil pipe, further, the first pick-and-place manipulator 500 also includes drag chain 560, drag chain 560 two ends are fixedly connected with the track base 510 of extension plate 552 and the 3rd respectively.
For the ease of installing sucker 540, the first pick-and-place manipulator 500 also includes expansion board 570, the first lift cylinder 530 Telescopic shaft be connected with expansion board 570, sucker 540 is in the expansion board 570.The quantity of sucker 540 is multiple, multiple suckers 540, in regular polygon distribution, realize and more firmly adsorb steel ring 012.
Fig. 7, Fig. 8 and Fig. 9 are referred in the lump, wherein, Fig. 7 is another visual angle figure of part-structure in point gum machine shown in Fig. 2, Fig. 8 is the structural representation of steel ring clamping module 700 in Fig. 7, and Fig. 9 is the structural representation of lifting module 800 in Fig. 7.In order to It is easy to that steel ring 012 is placed and the first pick-and-place manipulator 500 is to the adsorption operations of steel ring 012, point gum machine is also included close to the 3rd Steel ring clamping module 700 and lifting module 800 that track base 510 is set.
Steel ring clamping module 700 includes shelf 710 and at least three guide rail poles 720 in frame 110, at least three Individual guide rail pole 720 is distributed in regular polygon, and shelf 710 is slided along at least three guide rail poles 720 and set.
It is removably mounted on for the ease of steel ring clamping module 700 in frame 110, steel ring clamping module 700 also includes Bearing table 730, bearing table 730 is removably mounted in frame 110, and at least three guide rail poles 720 are fixed at bearing table 730 On, the steel ring 012 of several stackings is placed on shelf 710, and between at least three guide rail poles 720.So, steel is worked as After all steel rings 012 in circle clamping module 700 have been used, just it can be equipped with by the way that bearing table 730 is disassembled if changing Other steel rings clamping module 700 of the steel ring 012 of dry stacking.
In order to count the first pick-and-place manipulator 500 number of steel ring 012 taken out in module 700, steel ring folder are clamped from steel ring Holding module 700 also includes pole 741, and one end of pole 741 is fixedly connected with bearing table 730, and the other end of pole 741, which is fixed, to be connected Counter 742 is connected to, counter 742 is set close to the one end of guide rail pole 720 away from bearing table 730.So, first machinery is picked and placeed Hand 500 from least three guide rail poles 720 take out steel ring 012 will flip-flop number 742 count, so as to realize to the first pick-and-place machine Tool hand 500 clamps the statistics for the number of steel ring 012 taken out in module 700 from steel ring.
Lifting module 800 includes:The 4th track base 810, the second motor 820, Four-slider 830 in frame 110 The top plate 840 (being shown in Fig. 7) of Four-slider 830 and shelf 710 is connected respectively.
4th track base 810, which is provided with the second guide convex rail 850, the 4th track base 810, is located at the second guide convex rail 850 Two ends rotate respectively provided with one second tooth form runner 860, two the second tooth form runners 860 pass through the second synchronous cog belt 870 Connection, the second motor 820 is connected with one of them second tooth form runner 860, and Four-slider 830, which is slided, is located at the second guide convex rail On 850, and it is fixedly connected with the second synchronous cog belt 870.
As shown in Figure 10, its be Fig. 2 shown in the second pick-and-place manipulator 600 structural representation.
Second pick-and-place manipulator 600 includes:Stand 610, the 5th track base 620 in frame 110, the 3rd motor 630th, the second lift cylinder 640, adsorption piece 650 and connecting portion 660.Adsorption piece 650 is preferably sucker.
5th track base 620, which is provided with the 3rd guide convex rail 621, the 5th track base 620, is located at the 3rd guide convex rail 621 Two ends rotate respectively provided with one the 3rd tooth form runner 671, two the 3rd tooth form runners 671 pass through the 3rd synchronous cog belt 672 Connection, the 3rd motor 630 is connected with one of them the 3rd tooth form runner 671, and connecting portion 860, which is slided, is located at the 3rd guide convex rail On 621, and it is fixedly connected with the 3rd synchronous cog belt 672, the second lift cylinder 640 is on connecting portion 660, the second lifting air The telescopic shaft of cylinder 640 is connected with adsorption piece 650.
For the ease of installing adsorption piece 650, the second pick-and-place manipulator 600 also includes circular discs 680, the second lift cylinder 640 telescopic shaft is connected with circular discs 680, and adsorption piece 650 is in circular discs 680.The quantity of adsorption piece 650 is more to be multiple Individual adsorption piece 650, around distribution, realizes more firmly adsorption production 011 along circular discs 680.
In order to realize that the glue stick 013 that will be wound on discharging frame 200 is smoothly sent into the glue spraying head 410 of glue applying mechanism 400, Avoid because binder roller 220 applies excessive lower pressure to glue stick 013 and by the free end 0131 of glue stick 013 from glue spraying head 410 Disconnect, point gum machine also includes conveying mechanism 900.As is illustrated by figs. 11 and 12, wherein, Figure 11 shows for the structure of conveying mechanism 900 It is intended to, Figure 12 is the side view of conveying mechanism 900 shown in Figure 11.Conveying mechanism 900 includes:Upper roller 910, bottom roller 920, Second motor 930, delivery board 940 and the mounting bracket 950 in frame 110.
Upper roller 910 and bottom roller 920 are rotated on mounting bracket 950, also, upper roller 910 is parallel with bottom roller 920 It is arranged at intervals.Second motor 930 is on mounting bracket 950, also, the synchronous driving upper roller 910 of the second motor 930 and bottom roller 920 are rotated with different direction.Delivery board 940 is on mounting bracket 950, also, delivery board 940 is aligned in the He of upper roller 910 Between bottom roller 920.
In actual applications, the free end 0131 of glue stick 013 is passed through from upper roller 910 and bottom roller 920, the second motor 930 driving upper rollers 910 and bottom roller 920 are rotated, and drive glue stick 013 gradually to be discharged from discharging frame 200, and then send into dispensing The glue spraying head 410 of mechanism 400.Delivery board 940 is used to overlap glue stick 013, it is to avoid the bending because of the gravity of glue stick 013 itself.
Above-mentioned point gum machine by glue applying mechanism realize automatically dropping glue operate, and by discharging frame will wind glue stick therein or In adhesive tape feeding glue applying mechanism, reduce manpower intervention degree, realize that adhesive tape or glue stick smoothly send into glue applying mechanism.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (3)

1. a kind of point gum machine, it is characterised in that including:Frame, the glue applying mechanism in frame and rotating disk mechanism and close machine The discharging frame that frame is set;
Glue applying mechanism includes:Glue spraying head, installed part, X-axis motor, y-axis motor, Z axis motor, the first guide rail in frame Seat, the second track base, the first screw rod, the second screw rod and the 3rd screw rod;
First screw rod is rotated on the first track base, is bolted with the first sliding block on the first screw rod, and the second track base is fixedly arranged on the On one sliding block, X-axis motor is on the first track base, and the drive shaft of X-axis motor is fixedly connected with one end of the first screw rod, and is driven Dynamic first screw rod is rotated;
Second screw rod is rotated on the second track base, the second sliding block is bolted with the second screw rod, installed part is fixedly arranged on the second cunning On block, y-axis motor is on the second track base, and the drive shaft of y-axis motor is fixedly connected with one end of the second screw rod, and driving the Two screw rods are rotated;
Z axis motor is on installed part, and the drive shaft of Z axis motor is fixedly connected with one end of the 3rd screw rod, and drives the 3rd spiral shell Bar is rotated, and is bolted with fixture on the 3rd screw rod, glue spraying head is fixedly arranged on fixture, along the length side of the 3rd screw rod on installed part To provided with guide rail bar, fixture is slidably connected in guide rail bar;
Discharging frame includes:Support, binder roller, compressing rod, the first motor, front charging tray and back material stopping disk;
First motor is on support, and front charging tray and back material stopping disk parallel interval are set, and are fixedly arranged on the driving of the first motor On axle, compressing rod is rotated on support, and binder roller is rotated on compressing rod, and is alignd with front charging tray and back material stopping disk Set;
Discharging frame also includes:Bearing block, bearing and rotating shaft, bearing block is on support, and bearing is in bearing block, rotating shaft and axle Dynamic connection is forwarded, compressing rod is fixedly connected with rotating shaft;
A fixed plate is respectively provided with positioned at bearing block both sides on support, each fixed plate is provided with a bumping post, for compressing rod to be limited Between two bumping posts, a proximity switch is additionally provided with each fixed plate, for sense triggered by compressing rod when, control First motor is stalled.
2. point gum machine according to claim 1, it is characterised in that be provided with and lead along the length direction of the 3rd screw rod on installed part Rail bar, fixture is slidably connected in guide rail bar.
3. point gum machine according to claim 1, it is characterised in that glue applying mechanism also includes support member, support member is located at machine On frame, the first track base is on support member.
CN201510469479.8A 2015-07-30 2015-07-30 Point gum machine Active CN105013663B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510469479.8A CN105013663B (en) 2015-07-30 2015-07-30 Point gum machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510469479.8A CN105013663B (en) 2015-07-30 2015-07-30 Point gum machine

Publications (2)

Publication Number Publication Date
CN105013663A CN105013663A (en) 2015-11-04
CN105013663B true CN105013663B (en) 2017-09-26

Family

ID=54404169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510469479.8A Active CN105013663B (en) 2015-07-30 2015-07-30 Point gum machine

Country Status (1)

Country Link
CN (1) CN105013663B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206549935U (en) * 2017-02-16 2017-10-13 广州市永合祥自动化设备科技有限公司 Battery electrode column automatic dispensing machine

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3285475A (en) * 1965-02-08 1966-11-15 United Shoe Machinery Corp Cement extruders
DE19720705A1 (en) * 1997-05-16 1998-11-19 Basf Ag Method and device for producing pressure sensitive adhesive tapes
CN102059195B (en) * 2011-01-24 2012-12-12 宁波市北仑海能机械设备有限公司 Multi-shaft and multi-head semi-automatic glue dispenser
CN203388356U (en) * 2013-06-21 2014-01-15 东莞市诚锋机械有限公司 Adhesive feeding mechanism for upper making machine and control system
ITMI20131748A1 (en) * 2013-10-18 2015-04-19 Enrico Bianchi THERMOFUSIBLE GLUE DISPENSER DEVICE
CN204195490U (en) * 2014-10-24 2015-03-11 江门市顺宗抛光设备有限公司 The high accuracy polishing machine that three axles slide simultaneously can be realized
CN204448439U (en) * 2014-12-17 2015-07-08 天津光电惠高电子有限公司 A kind of hot melt adhesive injecting machine

Also Published As

Publication number Publication date
CN105013663A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN105013664B (en) Automatically dropping glue feeding device
CN105107688B (en) Automatically dropping glue feeding device
CN104015053B (en) Toy returns Reeb case automatic assembling
CN105217070B (en) Online horizontal ring body winding-packing machine
CN105800337B (en) A kind of round bar conveying mechanism
CN201490021U (en) Automatic rubber coating machine of capacitor
CN105013663B (en) Point gum machine
CN102358040A (en) Automation device for producing medical products
CN209209847U (en) A kind of rolling bearing assemble machine blowout patche automatic feeder
CN202201565U (en) Ring bobbin arranging machine
CN202593893U (en) Automatic shielding-cover packaging device
CN108146756B (en) Automatic wire winding label machine
CN205855189U (en) A kind of automatic material arranging feed rotary table device
CN108423371A (en) A kind of conveying device for smoked sheet sorting
CN205130506U (en) Full -automatic rotary machine
CN208149825U (en) A kind of two-side synchronous label sticking machine with detection double check function
CN206939997U (en) A kind of feeding device of stickers lining machine
CN207566420U (en) A kind of bearing products collecting mechanism
CN110391156A (en) A kind of sorting device that the stability based on chip encapsulation technology is high
CN204413388U (en) Bonding machine
CN206938147U (en) A kind of material collecting device of stickers lining machine
CN108973236A (en) Handbag bag mouth plaster mechanism for card and patch card machine comprising the mechanism
CN209601498U (en) A kind of betel nut orders raisins or fructus lycii material tidying mechanism
CN111099297B (en) Automatic conveying frame for agricultural greenhouse fruit and vegetable planting
CN203900863U (en) Automatic assembly machine for power gearbox of toy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190924

Address after: 244000 1688 north section of Taishan Avenue, Tongling, Anhui (4 floor, C block, Tai Hsiang Technology Pioneer Park)

Patentee after: Tongling Jiahe Electronic Technology Co., Ltd.

Address before: 516000 Guangdong city of Huizhou province Boluo county Luo Yang Zhen Ren Min Road No. 23

Patentee before: Wen Yu Gui

TR01 Transfer of patent right