CN104989117A - Layout structure and method of protective sheds for precast beam installation and construction - Google Patents

Layout structure and method of protective sheds for precast beam installation and construction Download PDF

Info

Publication number
CN104989117A
CN104989117A CN201510411342.7A CN201510411342A CN104989117A CN 104989117 A CN104989117 A CN 104989117A CN 201510411342 A CN201510411342 A CN 201510411342A CN 104989117 A CN104989117 A CN 104989117A
Authority
CN
China
Prior art keywords
precast beam
web
protection canopy
angle steel
protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510411342.7A
Other languages
Chinese (zh)
Inventor
孙晓伟
潘焕辉
张勇
王鑫
刘奖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201510411342.7A priority Critical patent/CN104989117A/en
Publication of CN104989117A publication Critical patent/CN104989117A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to the technical field of bridge construction, in particular to a layout structure and method of protective sheds for precast beam installation and construction. The layout structure comprises the protective sheds and precast beams arranged between two rows of piers. Each precast beam comprises a top plate and webs located on the two sides of the precast beam, wherein the top plate is located on the top of the precast beam. Inter-beam gaps are formed between the top plates of the precast beams located between the two rows of piers. The protective sheds are located between the opposite webs of the adjacent precast beams and located below the Inter-beam gaps. The protective sheds are fixed to the lower portions of the webs. A supporting structure attached to the precast beams is used as a bearing structure for erection of a protective platform, and reliable protection is provided for the lower side of a construction area; besides, complicated management and safety risk caused by land construction is eliminated, and the forming speed of the protective platform is increased.

Description

The protection canopy arrangement of precast beam install construction and method for arranging thereof
Technical field
The present invention relates to technical field of bridge construction, be specifically related to protection canopy arrangement and the method for arranging thereof of the construction of a kind of precast beam install.
Background technology
In bridge construction field, engineering superstructure often adopts precast beam structure, after precast beam lifting puts in place, generally needs the construction carrying out seam between Liang Yuliang.When agent structure crosses over the region of the totally-enclosed covered protection of the needs such as existing line or existing building, between precast beam, seam construction needs to transfer in working face to set up protection canopy, plays the protective effect to lower zone.Traditional protection canopy adopts the form of structure of " steel pipe support+steel ceiling ", needs to take construction area for a long time setting up in process, affects greatly, and there is larger potential safety hazard to social environment (as be open to traffic, pedestrian etc.).
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of protection reliable, setting up protection canopy arrangement and the method for arranging thereof of precast beam install construction easily.
The protection canopy arrangement of a kind of precast beam install construction of the present invention, its technical scheme is: comprise protection canopy and be arranged in the precast beam between two row's bridge piers, described precast beam comprises the top board being positioned at precast beam top and the web being positioned at precast beam both sides, gap between beam is formed between the described precast beam top board be arranged between two row's bridge piers, described protection canopy is arranged between the relative web of precast beam, be positioned between beam below gap, described protection canopy is fixed on web bottom.
Further, the braced structures that described protection canopy comprises protection face board and evenly arranges along precast beam length direction, described braced structures is fixedly connected with the web plate face of both sides, and described protection face board is arranged in braced structures, and protection face board upper surface is corresponding with gap between beam.
Further, described braced structures comprises left and right braced structures monomer, and described braced structures monomer comprises embedded sleeve barrel, angle steel and standing screw, and described embedded sleeve barrel is arranged in web, and described angle steel side is threaded with embedded sleeve barrel by standing screw.
Further, described braced structures monomer also comprises correcting wedge, described correcting wedge clamping is arranged between angle steel and web, and the lozenges of described correcting wedge is corresponding with web, and described standing screw is threaded with embedded sleeve barrel through angle steel, correcting wedge.
Further, described protection face board comprises the wooden a tree, used in making timber for boats be installed in braced structures and the plank be installed on wooden a tree, used in making timber for boats.
Further, described plank upper surface is equipped with fireprotection layer.
The protection canopy method for arranging of a kind of precast beam install construction of the present invention, its technical scheme is: precast beam produce time in web pre-buried embedded sleeve barrel, after precast beam install puts in place, protection canopy both sides are threaded with embedded sleeve barrel by standing screw, to be fixed on by protection canopy between beam below gap.
Further, the protection face board of described protection canopy is supported by the angle steel of both sides, after described precast beam install puts in place, by standing screw, angle steel is arranged on web plate basifacial, and correcting wedge is encased inside between angle steel and web, make the lozenges of correcting wedge corresponding with web plate face, by the gap between correcting wedge adjustment angle steel and web.
Further, after angle steel is in place, angle steel is installed wooden a tree, used in making timber for boats, then on wooden a tree, used in making timber for boats timber boarding.
Further, described plank lays fireprotection layer fire prevention in upper surface after being in place.
Beneficial effect of the present invention: the present invention sets up protective platform by the braced structures be attached on precast beam body as load-carrying members, to providing reliable protection below construction area, eliminating complex management and security risk that land construction brings simultaneously, accelerating protective platform and form speed.To set up defences on plank upper berth fire bed, can prevent electric welding Mars in work progress from directly dropping on plank and cause fire.
Accompanying drawing explanation
Fig. 1 is front view of the present invention;
Fig. 2 is Fig. 1 longitudinal sectional view;
Fig. 3 is Fig. 1 partial enlarged drawing;
In figure: 1-precast beam, 2-top board, 3-web, gap between 4-beam, 5-protection canopy, 6-angle steel, 7-embedded sleeve barrel, 8-correcting wedge, 9-standing screw, 10-wooden a tree, used in making timber for boats, 11-plank, 12-fireprotection layer.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail:
As Figure 1-3, the present invention includes protection canopy 5 and be arranged in the precast beam 1 between two row's bridge piers, precast beam 1 comprises the top board 2 being positioned at precast beam top and the web 3 being positioned at precast beam both sides, forms gap 4 between beam between the top board 2 being arranged in the precast beam 1 between two row's bridge piers.Protection canopy 5 is arranged between the relative web of precast beam 1, to be positioned between beam below gap 4.
The braced structures that protection canopy 5 comprises protection face board and evenly arranges along precast beam length direction.Braced structures comprises left and right braced structures monomer, and braced structures monomer comprises embedded sleeve barrel 7, angle steel 6, correcting wedge 8 and standing screw 9.Protection face board comprises wooden a tree, used in making timber for boats 10, plank 11 and fireprotection layer 12.Embedded sleeve barrel 7 is arranged in web 3, and angle steel 6 is the steel bar that 90 ° of angles extend along bridge length direction, comprises side and end face, and its side is threaded with embedded sleeve barrel 7 by standing screw 9.Correcting wedge 8 is fixed between the side of angle steel 6 and web 3 plate face by standing screw 9, and its lozenges is corresponding with web 3 plate face, for adjusting the gap between angle steel 6 to web 3 plate face.Wood a tree, used in making timber for boats 10 and plank 11 are fixed on the upper surface of angle steel 6 successively, and fireprotection layer 12 is laid on the upper surface of plank 11.Wherein, fireprotection layer 12 is fire-proof asbestos, causes fire for preventing electric welding Mars in work progress from directly dropping on plank.
The arrangement of this protection canopy arrangement is as follows:
(1) precast beam 1 is when precasting yard is produced, the pre-buried embedded sleeve barrel 7 in relevant position bottom web 3 plate face;
(2) precast beam 1 is in place;
(3) angle steel 6 is arranged on bottom web 3 plate face, correcting wedge 8 is set between angle steel 6 side and web, make the lozenges of correcting wedge 8 corresponding with web 3 plate face, by standing screw 9, angle steel 6 and correcting wedge 8 are fixed on embedded sleeve barrel 7, adjust the gap between angle steel 6 and web 3 by correcting wedge 8, make angle steel fixation;
(4), after angle steel 6 fixes, angle steel 6 is installed wooden a tree, used in making timber for boats 10;
(5) after wooden a tree, used in making timber for boats 10 installs, timber boarding 11 on wooden a tree, used in making timber for boats 10;
(6), after plank 11 installs, fire-proof asbestos is established on plank 11 upper berth.
The above, be only the specific embodiment of the present invention, it should be pointed out that any those of ordinary skill in the art are in the technical scope disclosed by the present invention, the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention.

Claims (10)

1. the protection canopy arrangement of a precast beam install construction, comprise protection canopy (5) and be arranged in the precast beam (1) between two row's bridge piers, described precast beam (1) comprises the top board (2) being positioned at precast beam (1) top and the web (3) being positioned at precast beam both sides, gap between beam (4) is formed between precast beam (1) top board (2) between described two row's bridge piers, it is characterized in that: described protection canopy (5) is arranged between the relative web (3) of precast beam (1), be positioned at below, gap between beam (4), described protection canopy (5) is fixed on web (3) bottom.
2. the protection canopy arrangement of precast beam install construction as claimed in claim 1, it is characterized in that: the braced structures that described protection canopy (5) comprises protection face board and evenly arranges along precast beam length direction, described braced structures is fixedly connected with web (3) the plate face of both sides, described protection face board is arranged in braced structures, and protection face board upper surface is corresponding with gap between beam (4).
3. the protection canopy arrangement of precast beam install construction as claimed in claim 2, it is characterized in that: described braced structures comprises left and right braced structures monomer, described braced structures monomer comprises embedded sleeve barrel (7), angle steel (6) and standing screw (9), described embedded sleeve barrel (7) is arranged in web (3), and described angle steel (6) side is threaded with embedded sleeve barrel (7) by standing screw (9).
4. the protection canopy arrangement of precast beam install construction as claimed in claim 3, it is characterized in that: described braced structures monomer also comprises correcting wedge (8), described correcting wedge (8) clamping is arranged between angle steel (6) and web (3), the lozenges of described correcting wedge (8) is corresponding with web (3), and described standing screw (9) is threaded with embedded sleeve barrel (7) through angle steel (6), correcting wedge (8).
5. the protection canopy arrangement of precast beam install construction as claimed in claim 2, is characterized in that: described protection face board comprises the wooden a tree, used in making timber for boats (10) be installed in braced structures and the plank (11) be installed on wooden a tree, used in making timber for boats (10).
6. the protection canopy arrangement of precast beam install construction as claimed in claim 5, is characterized in that: described plank (11) upper surface is equipped with fireprotection layer (12).
7. the method for arranging of the protection canopy arrangement of a kind of precast beam install construction as described in claim 1-6, it is characterized in that: described precast beam (1) produce time in web (3) pre-buried embedded sleeve barrel (7), after precast beam (1) is in place, protection canopy (5) both sides are threaded with embedded sleeve barrel (7) by standing screw (9), protection canopy (5) are fixed on below, gap between beam (4).
8. the method for arranging of the protection canopy arrangement of a kind of precast beam install construction as claimed in claim 7, it is characterized in that: the protection face board of described protection canopy (5) is supported by the angle steel (6) of both sides, after described precast beam (1) is in place, by standing screw (9), angle steel (6) is arranged on web (3) plate basifacial, and correcting wedge (8) is encased inside between angle steel (6) and web (3), make the lozenges of correcting wedge (8) corresponding with web (3) plate face, by the gap between correcting wedge (8) adjustment angle steel (6) and web (3).
9. the method for arranging of the protection canopy arrangement of a kind of precast beam install construction as claimed in claim 8, it is characterized in that: after angle steel (6) is in place, at angle steel (6) the wooden a tree, used in making timber for boats of upper installation (10), then at the upper timber boarding (11) of wooden a tree, used in making timber for boats (10).
10. the method for arranging of the protection canopy arrangement of a kind of precast beam install construction as claimed in claim 9, is characterized in that: lay fireprotection layer (12) fire prevention in upper surface after described plank (11) is in place.
CN201510411342.7A 2015-07-14 2015-07-14 Layout structure and method of protective sheds for precast beam installation and construction Pending CN104989117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510411342.7A CN104989117A (en) 2015-07-14 2015-07-14 Layout structure and method of protective sheds for precast beam installation and construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510411342.7A CN104989117A (en) 2015-07-14 2015-07-14 Layout structure and method of protective sheds for precast beam installation and construction

Publications (1)

Publication Number Publication Date
CN104989117A true CN104989117A (en) 2015-10-21

Family

ID=54300998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510411342.7A Pending CN104989117A (en) 2015-07-14 2015-07-14 Layout structure and method of protective sheds for precast beam installation and construction

Country Status (1)

Country Link
CN (1) CN104989117A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806009A (en) * 2017-10-27 2018-03-16 中铁五局集团有限公司 A kind of across the Existing Railway Line contact net protection canopy of highway and its construction method
CN108824826A (en) * 2018-08-15 2018-11-16 中铁六局集团广州工程有限公司 Across railway protective canopy, across railway box beam bridge and the construction method across railway protective canopy

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101624024A (en) * 2009-08-12 2010-01-13 株洲柒星实业有限责任公司 Manufacture method of electricity-resistant isolating shed by precast beam of electric railroad-crossing contact net
KR101099396B1 (en) * 2003-09-18 2011-12-27 호리 가부시키가이샤 Suspended scaffold, protective shelf for suspended scaffold and their construction method
CN102425116A (en) * 2011-12-19 2012-04-25 中煤建安第七工程有限公司 Method for connecting trough-type base of steel trestle with embedded bolt in concrete bracket
CN204826701U (en) * 2015-07-14 2015-12-02 中交第二航务工程局有限公司 Precast beam construction and installation's protection canopy arrangement structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101099396B1 (en) * 2003-09-18 2011-12-27 호리 가부시키가이샤 Suspended scaffold, protective shelf for suspended scaffold and their construction method
CN101624024A (en) * 2009-08-12 2010-01-13 株洲柒星实业有限责任公司 Manufacture method of electricity-resistant isolating shed by precast beam of electric railroad-crossing contact net
CN102425116A (en) * 2011-12-19 2012-04-25 中煤建安第七工程有限公司 Method for connecting trough-type base of steel trestle with embedded bolt in concrete bracket
CN204826701U (en) * 2015-07-14 2015-12-02 中交第二航务工程局有限公司 Precast beam construction and installation's protection canopy arrangement structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐昊毅: "《预制梁上跨既有铁路线轻型防护棚架的应用》", 《低碳世界》 *
甘晓东: "《某公跨铁立交桥无防护棚架跨线架梁施工技术》", 《浙江建筑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806009A (en) * 2017-10-27 2018-03-16 中铁五局集团有限公司 A kind of across the Existing Railway Line contact net protection canopy of highway and its construction method
CN108824826A (en) * 2018-08-15 2018-11-16 中铁六局集团广州工程有限公司 Across railway protective canopy, across railway box beam bridge and the construction method across railway protective canopy
CN108824826B (en) * 2018-08-15 2019-04-23 中铁六局集团广州工程有限公司 Across railway box beam bridge and construction method across railway protective canopy

Similar Documents

Publication Publication Date Title
CN102108676B (en) Arch bridge construction method for combined beam-steel arch combined system
CN101914897B (en) Construction method of single main cable inclined-suspender earth anchored suspension bridge
CN205024907U (en) Vary joint construction of wide flange I -beam roof beam of prestressing force hollow floor and edge of a wing
CN105064511A (en) Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof
CN105970836A (en) Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN105696469A (en) Ejection installation and construction method for long-span bidirectional longitudinal slope steel box girder of specially long span bridge
CN105155428B (en) Across railway in operation large-scale prefabricated PC concrete continuous T beam construction method
CN104060542B (en) Compound beam cable stayed bridge direction across bridge prestress application device and applying method thereof
CN103711323A (en) Construction method of sprung roof plates by use of movable type pipe truss platform
CN106522997A (en) Construction trolley for lagging jack in tunnel and underground construction and construction method
CN106930181A (en) A kind of simple-supported thencontinuous steel reinforced concrete combined bridge hogging moment area structure
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN104100037A (en) Combined flat beam
CN105544396A (en) Steel arc distributive girder structure of rod type bracket for cast-in-place arch bridge and construction method
CN104989117A (en) Layout structure and method of protective sheds for precast beam installation and construction
CN106567548B (en) Rectangular raw coal bucket is segmented installation method
CN107740352A (en) The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
RU2495184C1 (en) Method to disassemble bridge span and device for realisation of this method
CN204826701U (en) Precast beam construction and installation's protection canopy arrangement structure
CN107620317A (en) Piping lane construction foundation pit supporting supporting device
CN204455810U (en) A kind of trestle bridge floor deformation joint syndeton
CN110904753A (en) Rapid Assembly formula cantilever structure mountain area temporary road
CN103016008B (en) Mining stopping method for downwards mined underlying seams of coal seam group
CN114525846B (en) Mounting method of unequal-elevation steel truss structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021

RJ01 Rejection of invention patent application after publication