CN104989109A - Method for lifting roof girders and purlines at the same time - Google Patents

Method for lifting roof girders and purlines at the same time Download PDF

Info

Publication number
CN104989109A
CN104989109A CN201510427003.8A CN201510427003A CN104989109A CN 104989109 A CN104989109 A CN 104989109A CN 201510427003 A CN201510427003 A CN 201510427003A CN 104989109 A CN104989109 A CN 104989109A
Authority
CN
China
Prior art keywords
purlin
steel pipe
room
crane
auxiliary steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510427003.8A
Other languages
Chinese (zh)
Other versions
CN104989109B (en
Inventor
张定宏
张曰望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ASIA DAIRY FAB Ltd
Original Assignee
ASIA DAIRY FAB Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ASIA DAIRY FAB Ltd filed Critical ASIA DAIRY FAB Ltd
Priority to CN201510427003.8A priority Critical patent/CN104989109B/en
Publication of CN104989109A publication Critical patent/CN104989109A/en
Application granted granted Critical
Publication of CN104989109B publication Critical patent/CN104989109B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for lifting roof girders and purlines at the same time. According to the method, auxiliary steel pipes serve as supporting pieces, a plurality of purlines or purlines and roof girders are assembled into a whole on the ground, the angle of the position of a crane rope is adjusted, and the overall inclination of the purlines and the roof girders is made to be the same as the roof gradient; then, the purlines and roof girders are lifted to the corresponding position of the rood girders as a whole and mounted in sequence, and the auxiliary steel pipes are removed after mounting is completed. According to the method, three mounting schemes that the two auxiliary steel pipes are used at the same time, one auxiliary steel pipe and one roof girder are used, and one auxiliary steel pipe and two roof girders are used are provided, the angle and lifting schemes are adjusted flexibly according to the construction filed situation, construction can be carried out along with building projects, and engineering advance is promoted; meanwhile, the problems that a traditional mounting process is low in construction speed, poor in quality, high in risk and low in benefit are solved, the construction period is shortened, quality is promoted, and safety guarantee is enhanced.

Description

A kind of method simultaneously lifting room beam purlin
Technical field
The present invention relates to the method for a kind of pasture construction, be specifically related to a kind of method simultaneously lifting room beam purlin when the pasture colony house of lightweight steel construction is built.
Background technology
Although light steel construction cost is higher than general conventional concrete construction, because its construction is fast, the advantages such as energy-saving and emission-reduction, have obtained the accreditation of more and more builing industry, entered fast-developing period, be used widely in all trades and professions in China.
Pasture colony house is applicable to using lightweight steel construction very much, but pasture, particularly cattle farm, and cowshed span is general all very large, due to wide coverage, so in the design of light steel cowshed and construction, just higher to the requirement of room beam and purlin.Installing particularly at purlin, all based on artificial construction at present, because cowshed span is large, highly high, purlin use amount is large, and workman need work high above the ground one by one successively complete installation, not only progress is slow, personal safety has a big risk, and the easy purlin that occurs slants in installation process, the situations such as downslide, last position of installing can be caused to deviate from the purlin installation site designed, be not inconsistent with roof pitch, very difficult during correction, but do not revise and cause roofing unbalance stress, the contingency question of easy generation roofing fracture, safeguard to cowshed and bring follow-up hidden danger.From cost aspect, present cost of labor, all higher than mechanization cost, uses artificial mounting purlines to become in cowshed construction to have to a bulk of cost paid completely.Therefore, no matter from the installation quality of purlin, or installation cost is considered, pasture undertaking of construction is being sought to develop a kind of easy, efficient, economic purlin mounting method all always.
Summary of the invention
For solving above-mentioned item problem, the present invention proposes a kind of method simultaneously lifting room beam purlin, object is to provide a kind of defect overcoming artificial mounting purlines method at present, making full use of machinery and replace manual efficient, easy, economic purlin mounting method, significantly improve the installation quality of room beam purlin when saving the duration.
The method simultaneously lifting room beam purlin provided by the invention, utilize auxiliary steel pipe as support member, several purlin or purlin and room beam are assembled as a whole on the ground, auxiliary steel pipe and room beam are installed 4-8 root crane rope, the crane rope other end is summarized in crane hook, by adjusting position and the angle of crane rope, make purlin identical with roof pitch with the integral inclined degree of room beam, then use crane integral lifting to beam relevant position, room, successively install, install the lower auxiliary steel pipe of recession.
Described auxiliary steel pipe is made up of steel pipe 1, steel ring 2, wire loop 3, suspension ring 4, Heave Here 5, described steel ring 2 is welded on steel pipe 1, steel ring quantity is identical with the quantity of required mounting purlines, distance between steel ring 2 is identical with the distance between room beam purlin holder, described wire loop 3 is enclosed within steel pipe 1 through steel ring 2, described suspension ring 4 are socketed in below wire loop 3, and described Heave Here 5 is with the semicircular structure of reinforcement welding on steel pipe, and quantity is 2-4.
When use two auxiliary steel pipes lift many purlins simultaneously, lifting step is: by the ground by preset space length for purlin 6, adopt two auxiliary steel pipes as support member, every root assists the suspension ring 4 of steel pipe to be connected by latch with the purlin hole of purlin 6 one end respectively, a crane rope 7 is installed in the Heave Here 5 of each auxiliary steel pipe, the other end of crane rope is summarized in crane hook, adjust each bar crane rope length and angle, make the integral inclined degree of purlin identical with roof pitch, start crane to lift, when rising to beam relevant position, room, stablize crane hook, then purlin on an auxiliary steel pipe is first installed in order, another root is installed in order again and assists purlin on steel pipe, crane hook is unclamped again after installation terminates, then the latch of suspension ring 4 and purlin 6 is opened, remove auxiliary steel pipe.
When use auxiliary steel pipe lifts many purlins and a room beam simultaneously, lifting step is: purlin 6 and room beam 8 are assembled according to cowshed general arrangement by preset space length is on the ground, adopt an auxiliary steel pipe as support member, purlin side is fixedly mounted on the relevant position of room beam respectively, the purlin hole of opposite side is connected with the suspension ring 4 of auxiliary steel pipe by latch, a crane rope 7 is installed in the Heave Here 5 of each auxiliary steel pipe, and also respectively a crane rope 7 is installed in relevant position, room beam 8 two ends, crane rope is summarized in crane hook, adjust each bar rope capacity and angle, make purlin identical with roof pitch with the integral inclined degree of room beam, start crane to lift, when rising to beam relevant position, room, stablize crane hook, first room beam is installed, and then mounting purlines in order, crane hook is unclamped again after installation terminates, then the latch of suspension ring 4 and purlin 6 is opened, remove auxiliary steel pipe.
When use auxiliary steel pipe lifts many purlins and two room beams simultaneously, lifting step is: purlin 6 and two room beams 8 are assembled according to cowshed general arrangement by preset space length is on the ground, adopt an auxiliary steel pipe as support member, purlin side is fixedly mounted on the relevant position of room beam respectively, the purlin hole of opposite side is connected with the suspension ring 4 of auxiliary steel pipe by latch, a crane rope 7 is installed in the Heave Here 5 of each auxiliary steel pipe, and also distinguish each installation crane rope 7 in relevant position, two room beam 8 two ends, crane rope is summarized in crane hook, adjust each bar rope capacity and angle, make purlin identical with roof pitch with the integral inclined degree of room beam, start crane to lift, when rising to beam relevant position, room, stablize crane hook, first room beam is installed, and then mounting purlines in order, crane hook is unclamped again after installation terminates, then the latch of suspension ring 4 and purlin 6 is opened, remove auxiliary steel pipe.
Further, described steel ring 2 is that the reinforcing bar that 6mm is thick is made.
Further, described wire loop 3 is that the reinforcing bar that 5mm is thick is made.
Further, a rope made of hemp is fixed respectively at described auxiliary steel pipe or beam two ends, room.
beneficial effect of the present invention is as follows:
1, make full use of crane, construction is simple, safety:existing purlin mounting method by workman below purlin is hung up properly to be placed on relevant position by workman above after pulling on room beam again and to assemble, and difficulty of construction is large, and security risk is high.Utilize hanging method of the present invention, Jiang Wuliang, purlin and assembly thereof assemble on ground, and with crane lifting, then only need carry out successively assembling with two workmans, construction technology is simple, and safety factor is high.
, lifting area can reach more than 200m2, simultaneously keep roof truss stablize:current hoisting, use two to four wire rope, the object that area is little can only be lifted, but cowshed span is large, purlin wide coverage, use existing hoisting, the easy modification of purlin, and method provided by the invention, use auxiliary steel pipe support in hoisting process, use four to eight wire rope liftings simultaneously, auxiliary steel pipe can be kept in hoisting process to be straight line, thus ensure hanging integrated not modification, once lifting area can reach more than 200m2, can also keep the stability of roof truss simultaneously.
, lifting time can ensure that purlin position stability does not slide:assist the Position Design that steel pipe is connected with purlin steel ring, steel ring welding position is identical with room beam purlin holder positional distance, wire loop hangs over to be hung purlin (wire loop on one side joint steel pipe while connect purlin) and ensures not slide when lifting below this position of steel ring, improve installation quality.
, to use crane rope and the rope made of hemp to guarantee in purlin integral hoisting process stable:crane rope rises with crane hook, the rope made of hemp on two bolt of auxiliary steel pipe and room beam, during by pulling different rope made of hemp adjustment purlin integral hoistings, the stressing conditions at four angles, guarantees that purlin arranges stable in hoisting process, and control its position in installation process, facilitate workman to install successively.
, adopt the adjustment of many crane ropes, make purlin overall identical with roof pitch:because there are four to eight crane ropes to connect Heave Here and the beam two ends, room of crane hook and auxiliary steel pipe, can by adjust every root wire rope length adjust purlin entirety angle and position, ensure in hoisting process, purlin is overall identical with the gradient of roofing, and purlin installation end is straight line, facilitates workman to install, improve installation quality.
, according to job site situation flexible angle adjustment and Hoisting Program, can construct with civil works simultaneously, promote engineering progress:pasture colony house design is different, job site situation also varies, in purlin construction in the past, because construction area span is large, large and the length consuming time of difficulty, can not carry out with civil works simultaneously, and often occur that installation question needs are done over again in construction, cause construction delay, and the hanging method of the application of the invention, utilize auxiliary steel pipe, can according to job site situation, flexible choice for use two auxiliary steel pipes, an auxiliary steel pipe and a room beam, the different schemes of an auxiliary steel pipe and two room beams lifts simultaneously, take only to need according to on-the-spot and roof pitch situation during different schemes, Heave Here on auxiliary steel pipe is redefined position to carry out being welded and fixed, convenient and easy, the installation of purlin can be carried out with civil works simultaneously, promote engineering progress, ensure the duration.
Accompanying drawing explanation
Fig. 1 is auxiliary steel tubular structure schematic diagram
Fig. 2 is auxiliary steel pipe and purlin and room beam component schematic diagram when assembling
Fig. 3 is the assembling schematic diagram that use two auxiliary steel pipes lift purlin simultaneously
Fig. 4 is the assembling schematic diagram that use auxiliary steel pipe lifts purlin and a room beam simultaneously
Fig. 5 is the assembling schematic diagram that use auxiliary steel pipe lifts purlin and two room beams simultaneously
In figure, each label lists as follows:
1-assists steel pipe, 2-steel ring, 3-wire loop, 4-suspension ring, 5-Heave Here, 6-purlin, 7-crane rope, 8-room beam.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the present invention are described in further details.
embodiment 1:
Use two auxiliary steel pipes to lift purlin simultaneously, auxiliary steel pipe is made up of steel pipe 1, steel ring 2, wire loop 3, suspension ring 4, Heave Here 5, described steel ring 2 is welded on steel pipe 1, steel ring quantity is identical with the quantity of required mounting purlines, distance between steel ring 2 is identical with the distance between room beam purlin holder, and described wire loop 3 is enclosed within steel pipe 1 through steel ring 2, and described suspension ring 4 are socketed in below wire loop 3, described Heave Here 5 is that quantity is 3 with the semicircular structure of reinforcement welding on steel pipe 1.Described steel ring 2 is that the reinforcing bar that 6mm is thick is made.Described wire loop 3 is that the reinforcing bar that 5mm is thick is made.
During mounting purlines, assemble needing the purlin installed on the ground, adopt two auxiliary steel pipes as support member, every root assists the suspension ring 4 of steel pipe to be connected by latch with the purlin hole of purlin 6 one end respectively, a crane rope 7 is installed in the Heave Here 5 of each auxiliary steel pipe, the other end of crane rope 7 is summarized in crane hook, adjust each bar crane rope length and angle, make the integral inclined degree of purlin identical with roof pitch, start crane to lift, when rising to beam relevant position, room, stablize crane hook, then purlin on an auxiliary steel pipe is first installed in order, another root is installed in order again and assists purlin on steel pipe, crane hook is unclamped again after installation terminates, then the latch of suspension ring and purlin is opened, remove auxiliary steel pipe.
embodiment 2:
Use an auxiliary steel pipe to lift purlin and a room beam simultaneously, auxiliary steel pipe is made up of steel pipe 1, steel ring 2, wire loop 3, suspension ring 4, Heave Here 5, described steel ring 2 is welded on steel pipe 1, steel ring quantity is identical with the quantity of required mounting purlines, distance between steel ring 2 is identical with the distance between room beam purlin holder, described wire loop 3 is enclosed within steel pipe 1 through steel ring 2, described suspension ring 4 are socketed in below wire loop 3, described Heave Here 5 is that quantity is 3 with the semicircular structure of reinforcement welding on steel pipe 1.Described steel ring 2 is that the reinforcing bar that 6mm is thick is made.Described wire loop 3 is that the reinforcing bar that 5mm is thick is made.
During installation, the purlin needing to install and room beam are assembled according to cowshed general arrangement on the ground, adopt an auxiliary steel pipe as support member, the suspension ring 4 of auxiliary steel pipe are connected by latch with the purlin hole of purlin 6 one end respectively, a crane rope 7 is installed in the Heave Here 5 of each auxiliary steel pipe, and then also respectively a crane rope 7 is installed in the relevant position at beam two ends, room, the other end of crane rope 7 is summarized in crane hook, adjust each bar crane rope length and angle, make purlin identical with roof pitch with the integral inclined degree of room beam, start crane to lift, when rising to beam relevant position, room, stablize crane hook, then first room beam is installed, the purlin of opposite side is installed in order again, crane hook is unclamped again after installation terminates, then the latch of suspension ring and purlin is opened, remove auxiliary steel pipe.
embodiment 3:
Use an auxiliary steel pipe to lift purlin and two room beams simultaneously, auxiliary steel pipe is made up of steel pipe 1, steel ring 2, wire loop 3, suspension ring 4, Heave Here 5, described steel ring 2 is welded on steel pipe 1, steel ring quantity is identical with the quantity of required mounting purlines, distance between steel ring 2 is identical with the distance between room beam purlin holder, described wire loop 3 is enclosed within steel pipe 1 through steel ring 2, described suspension ring 4 are socketed in below wire loop 3, described Heave Here 5 is that quantity is 3 with the semicircular structure of reinforcement welding on steel pipe 1.Described steel ring 2 is that the reinforcing bar that 6mm is thick is made.Described wire loop 3 is that the reinforcing bar that 5mm is thick is made.
During installation, the purlin needing to install and room beam are assembled according to cowshed general arrangement on the ground, adopt an auxiliary steel pipe as support member, the suspension ring 4 of auxiliary steel pipe are connected by latch with the purlin hole of purlin 6 one end respectively, a crane rope 7 is installed in the Heave Here 5 of each auxiliary steel pipe, and then in the relevant position at beam two ends, two rooms, crane rope 7 is installed respectively, the other end of crane rope 7 is summarized in crane hook, adjust each bar crane rope length and angle, make purlin identical with roof pitch with the integral inclined degree of room beam, start crane to lift, when rising to beam relevant position, room, stablize crane hook, then first in order room beam is installed, the purlin of opposite side is installed in order again, crane hook is unclamped again after installation terminates, then the latch of suspension ring and purlin is opened, remove auxiliary steel pipe.
The method simultaneously lifting room beam purlin provided by the invention, efficiently solve when room beam purlin is installed and can only lift by crane installation respectively successively, and be easily shifted in installation process, the problems such as modification, utilize the steel pipe of job site, reinforcing bar, the common items such as wire loop, make auxiliary steel pipe as support, make several purlin and room beam can after ground is by designing requirement assembling, be lifted into relevant position again to install simultaneously, solve conventional mounting construction technology slow, of poor quality, risk is high, the problem that benefit is low, shorten the duration, improve quality, add safety guarantee, the entirety not modification of wingceltis bar and room beam in hoisting process can be guaranteed simultaneously.
Above the method simultaneously lifting room beam purlin provided by the present invention is described in detail.Set forth principle of the present invention and embodiment herein by detailed description of the invention, above explanation just understands method of the present invention and core concept thereof for helping.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some improvement and modification to the present invention, these improve and modify and also fall in the protection domain of the claims in the present invention.

Claims (7)

1. one kind lifts the method for room beam purlin simultaneously, it is characterized in that: utilize auxiliary steel pipe as support member, several purlin or purlin and room beam are assembled as a whole on the ground, auxiliary steel pipe and room beam are installed 4-8 root crane rope, the crane rope other end is summarized in crane hook, by adjusting position and the angle of crane rope, make purlin identical with roof pitch with the integral inclined degree of room beam, then use crane integral lifting to beam relevant position, room, successively install, install the lower auxiliary steel pipe of recession; Wherein said auxiliary steel pipe is made up of steel pipe (1), steel ring (2), wire loop (3), suspension ring (4), Heave Here (5), described steel ring (2) is welded on steel pipe (1), steel ring quantity is identical with the quantity of required mounting purlines, distance between steel ring (2) is identical with the distance between room beam purlin holder, described wire loop (3) is enclosed within steel pipe (1) through steel ring (2), described suspension ring (4) are socketed in wire loop (3) below, described Heave Here (5) is with the semicircular structure of reinforcement welding on steel pipe, and quantity is 2-4.
2. lift the method for room beam purlin according to claim 1 simultaneously, it is characterized in that, when use two auxiliary steel pipes lift many purlins simultaneously, lifting step is: by the ground by preset space length for purlin (6), adopt two auxiliary steel pipes as support member, every root assists the suspension ring of steel pipe (4) to be connected by latch with the purlin hole of purlin (6) one end respectively, upper installation crane rope (7) in Heave Here (5) of each auxiliary steel pipe, the other end of crane rope is summarized in crane hook, adjust each bar crane rope length and angle, make the integral inclined degree of purlin identical with roof pitch, start crane to lift, when rising to beam relevant position, room, stablize crane hook, then purlin on an auxiliary steel pipe is first installed in order, another root is installed in order again and assists purlin on steel pipe, crane hook is unclamped again after installation terminates, then the latch of suspension ring (4) and purlin (6) is opened, remove auxiliary steel pipe.
3. lift the method for room beam purlin according to claim 1 simultaneously, it is characterized in that, when use auxiliary steel pipe lifts many purlins and a room beam simultaneously, lifting step is: assembled according to cowshed general arrangement by preset space length is on the ground by purlin (6) He Wuliang (8), adopt an auxiliary steel pipe as support member, purlin side is fixedly mounted on the relevant position of room beam respectively, the purlin hole of opposite side is connected with the suspension ring (4) of auxiliary steel pipe by latch, upper installation crane rope (7) in Heave Here (5) of each auxiliary steel pipe, and also respectively a crane rope (7) is installed in room beam (8) relevant position, two ends, crane rope is summarized in crane hook, adjust each bar rope capacity and angle, make purlin identical with roof pitch with the integral inclined degree of room beam, start crane to lift, when rising to beam relevant position, room, stablize crane hook, first room beam is installed, and then mounting purlines in order, crane hook is unclamped again after installation terminates, then the latch of suspension ring (4) and purlin (6) is opened, remove auxiliary steel pipe.
4. lift the method for room beam purlin according to claim 1 simultaneously, it is characterized in that, when use auxiliary steel pipe lifts many purlins and two room beams simultaneously, lifting step is: purlin (6) and two room beams (8) are assembled according to cowshed general arrangement by preset space length is on the ground, adopt an auxiliary steel pipe as support member, purlin side is fixedly mounted on the relevant position of room beam respectively, the purlin hole of opposite side is connected with the suspension ring (4) of auxiliary steel pipe by latch, upper installation crane rope (7) in Heave Here (5) of each auxiliary steel pipe, and also distinguish each installation crane rope (7) two room beam (8) relevant positions, two ends, crane rope is summarized in crane hook, adjust each bar rope capacity and angle, make purlin identical with roof pitch with the integral inclined degree of room beam, start crane to lift, when rising to beam relevant position, room, stablize crane hook, first room beam is installed, and then mounting purlines in order, crane hook is unclamped again after installation terminates, then the latch of suspension ring (4) and purlin (6) is opened, remove auxiliary steel pipe.
5. lift the method for room beam purlin according to claim 1 simultaneously, it is characterized in that, described steel ring (2) is made for the reinforcing bar that 6mm is thick.
6. lift the method for room beam purlin according to claim 1 simultaneously, it is characterized in that, described wire loop (3) is made for the reinforcing bar that 5mm is thick.
7. according to claim 2,3 or 4, lift the method for room beam purlin simultaneously, it is characterized in that, fix a rope made of hemp respectively at described auxiliary steel pipe or beam two ends, room.
CN201510427003.8A 2015-07-20 2015-07-20 It is a kind of at the same lift room beam purlin method Active CN104989109B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510427003.8A CN104989109B (en) 2015-07-20 2015-07-20 It is a kind of at the same lift room beam purlin method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510427003.8A CN104989109B (en) 2015-07-20 2015-07-20 It is a kind of at the same lift room beam purlin method

Publications (2)

Publication Number Publication Date
CN104989109A true CN104989109A (en) 2015-10-21
CN104989109B CN104989109B (en) 2017-05-31

Family

ID=54300990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510427003.8A Active CN104989109B (en) 2015-07-20 2015-07-20 It is a kind of at the same lift room beam purlin method

Country Status (1)

Country Link
CN (1) CN104989109B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107352386A (en) * 2017-08-31 2017-11-17 上海二十冶建设有限公司 The simple lifting tool and its application method of steel structural roof combined hanging
CN108999413A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A method of roof purline being installed using single hoist cable more gib heads
CN109292611A (en) * 2018-12-03 2019-02-01 中冶建工集团有限公司 A kind of roof purline modularization installation combined tools and installation method
CN109653424A (en) * 2018-12-30 2019-04-19 北京首钢建设集团有限公司 It is a kind of using shoulder pole girder as switching suspender roof purline installation method
CN110386546A (en) * 2019-08-05 2019-10-29 中冶天工(天津)装备制造有限公司 A kind of hanging method for the installation of more steel structure wall purlins
CN110980500A (en) * 2019-12-06 2020-04-10 中国三冶集团有限公司 Balanced stress auxiliary hanging beam and roof structure integral hoisting method
CN114033091A (en) * 2021-12-06 2022-02-11 中建八局发展建设有限公司 Construction device for large-gradient inclined roof structure and application method thereof
CN114482561A (en) * 2021-12-23 2022-05-13 中国华冶科工集团有限公司 Steel structure roof installation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29807913U1 (en) * 1998-05-02 1998-11-26 Wirtz, Raimund, 57482 Wenden Device for assembling a building
JP2002155630A (en) * 2000-11-22 2002-05-31 Taisei Corp Hanging-up method of steel frame roof purlin member
CN103061265A (en) * 2013-01-05 2013-04-24 广东省基础工程公司 Construction method for lifting combined reinforcement cages
CN203271203U (en) * 2013-04-27 2013-11-06 杨众 Totally-assembled parking shed
CN103883129A (en) * 2014-03-17 2014-06-25 中国华冶科工集团有限公司 Method for installing steel structure roof beams
CN104481148A (en) * 2014-12-11 2015-04-01 中国十七冶集团有限公司 Construction method of super-long thin-wall color steel tile roof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29807913U1 (en) * 1998-05-02 1998-11-26 Wirtz, Raimund, 57482 Wenden Device for assembling a building
JP2002155630A (en) * 2000-11-22 2002-05-31 Taisei Corp Hanging-up method of steel frame roof purlin member
CN103061265A (en) * 2013-01-05 2013-04-24 广东省基础工程公司 Construction method for lifting combined reinforcement cages
CN203271203U (en) * 2013-04-27 2013-11-06 杨众 Totally-assembled parking shed
CN103883129A (en) * 2014-03-17 2014-06-25 中国华冶科工集团有限公司 Method for installing steel structure roof beams
CN104481148A (en) * 2014-12-11 2015-04-01 中国十七冶集团有限公司 Construction method of super-long thin-wall color steel tile roof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107352386A (en) * 2017-08-31 2017-11-17 上海二十冶建设有限公司 The simple lifting tool and its application method of steel structural roof combined hanging
CN108999413A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A method of roof purline being installed using single hoist cable more gib heads
CN109292611A (en) * 2018-12-03 2019-02-01 中冶建工集团有限公司 A kind of roof purline modularization installation combined tools and installation method
CN109653424A (en) * 2018-12-30 2019-04-19 北京首钢建设集团有限公司 It is a kind of using shoulder pole girder as switching suspender roof purline installation method
CN110386546A (en) * 2019-08-05 2019-10-29 中冶天工(天津)装备制造有限公司 A kind of hanging method for the installation of more steel structure wall purlins
CN110980500A (en) * 2019-12-06 2020-04-10 中国三冶集团有限公司 Balanced stress auxiliary hanging beam and roof structure integral hoisting method
CN114033091A (en) * 2021-12-06 2022-02-11 中建八局发展建设有限公司 Construction device for large-gradient inclined roof structure and application method thereof
CN114482561A (en) * 2021-12-23 2022-05-13 中国华冶科工集团有限公司 Steel structure roof installation method

Also Published As

Publication number Publication date
CN104989109B (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN104989109A (en) Method for lifting roof girders and purlines at the same time
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN205688642U (en) A kind of large space ceiling decoration supporting construction
CN202273319U (en) Connection node device for concrete-filled steel tube column and reinforced concrete beam
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN108571071A (en) Prefabricated PC beams of concrete column connected node and construction method
CN204199686U (en) Without outrigger concrete parapet formwork system
CN206903022U (en) A kind of steel bar truss floor support plate
CN103195256A (en) Hanging column type steel structure jig frame construction method
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN204873403U (en) A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN207879008U (en) Diameter Silo structure roof support system
CN205804745U (en) A kind of precast concrete shear wall component
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN205476079U (en) Major diameter reinforcing bar net piece
CN209163484U (en) A kind of reusable vertical ladder muscle of wall steel bar binding
CN110980500A (en) Balanced stress auxiliary hanging beam and roof structure integral hoisting method
CN102864935A (en) Novel purline mounting method
CN205574216U (en) Many portable wind and rain canopies of point type
CN215107152U (en) High-altitude lateral angle control overhanging operation platform
CN211664537U (en) Balanced stress auxiliary hanging beam
CN104404923A (en) Arch dam bracket template device and construction method based on arch dam bracket template device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method for simultaneously hoisting roof beam purlin

Effective date of registration: 20211222

Granted publication date: 20170531

Pledgee: Bank of Nanjing Limited by Share Ltd. Beijing branch

Pledgor: ASIA DAIRY FAB. Ltd.

Registration number: Y2021110000105

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231222

Granted publication date: 20170531

Pledgee: Bank of Nanjing Limited by Share Ltd. Beijing branch

Pledgor: ASIA DAIRY FAB. Ltd.

Registration number: Y2021110000105